  • 316 D, OPF Housing Colony Raiwind Road, Lahore-53700 Phone: +92 302 5000678, +92 344 4650646E-mail: [email protected] Web http://www.berkeley.com

    Company Profile

  • Berkeley Associates (Pvt.) Ltd.

    CONTENTS INTRODUCTION

    OUR DOMAIN

    ORGANIZATION

    TURNOVER

    SPECTRUM OF SERVICES

    COMPLETED PROJECTS

    CLIENTS

    TOPOGRAPHIC SURVEY EQUIPMENT

    DRILLING EQUIPMENT

    LABORATORY TESTING EQUIPMENT

    KEY PERSONNEL

    FIELD STAFF

    REGISTRATION

    QUALITY & SAFETY POLICY

  • Introduction f 

    Berkeley Associates (Pvt) Ltd 

    Berkeley Associates (Pvt.) Ltd. Consulting Engineers

    Berkeley Associates (Pvt.) Ltd. is an engineering firm providing highly professional services in various disciplines of Civil Engineering. We provide project management, design, supervision, planning and drafting services in the fields of Construction, Geotechnical, Groundwater and Structural Engineering for various infrastructure and development Projects including Buildings, Highways, Motorways, Hydropower, Dams, Power Transmission Lines, and Airfields. Main areas of our Engineering Services include Topographic and Bathymetric Surveys, Project Management, Value Engineering, Geotechnical Investigations and Design, Foundation Engineering, Site Evaluation, Site Improvement, Pavement Design and Evaluation, Material Engineering, Construction Supervision of Earthworks and Foundations and Ground Water Studies. The project planning services are provided for all project stages including inception, feasibility, design, construction, and operation. Computer aided drafting facilities are provided for all kinds of engineering drawings.

    INTRODUCTION 

  • Our Domain

    For Civil Engineering Projects we provide services in the following engineering disciplines;

    1. Project/ Construction Management

    2. Hydropower Engineering

    3. Value Engineering

    4. Geotechnical Engineering

    5. Pile Foundation and Construction of Fills

    6. Groundwater Engineering

    7. Structural Engineering

    8. Transmission Line / Grid Station & Power Plants

    9. Highways & Bridges

    10. Detailed Engineering & Drafting

    11. Dewatering Design / Supervision

    12. Topographic and Bathymetric Surveys

    OUR DOMAIN

  • BERKELEY ASSOCIATES (PVT) LTD

    ORGANIZATIONCHART

    CHEIF EXECUTIVE OFFICERDr. Tahir Masood

    BOARD OF DIRECTORSDr. Tahir MasoodJahangir AkhtarKhalid Ayyub

    Structural EngineeringIjaz Shafi

    Senior Structural Engineers

    Junior Structural Engineers

    CAD Operators

    Geotechnical EngineeringKhalid Ayyub

    Site Staff i/c Drillers & Helpers

    Senior Geotechnical Engineers

    Junior Engineers/ Geologists

    Draftsmen

    Geotechnical Engg. Laboratory Technicians

    Hydropower & Dams Engineering

    Jahangir Akhtar

    E&M Design Engineers

    Civil Design Engineers

    Project Managment & Business DevelopmentSheikh Ilyas Ahmad

    Schedulers

    Planning Engineers

    Environmental & Public Health Engineering

    Sayed Azhar Maqsood

    Environmental Engineers

    Environmentalists

    Public Health Engineers

    Contract ManagementSyed Hamid Hassan

    Groundwater EngineeringAhmed Nawaz

    Site Staff

    Geophysicists

    Survey SectionRaja Naeem

    Surveyors

    Helpers

    Office AdministrationAslam Hayat

    Accounts and Record Keeping

    Asif Chughtai

  • Organization Chart

  • Spectrum of Services

     Berkeley Associates (Pvt.) Ltd.

    For Civil Engineering Projects we provide services in the following engineering fields

    The Geotechnical Engineering services include planning and execution of field investigations,

    preparation of geotechnical investigation reports, evaluation of geotechnical design parameters,

    analyses and design of foundations, slopes, embankments. Evaluation of existing foundations,

    and earth retaining structures are also carried out.

    Carrying out field investigations including drilling of boreholes, sampling, field tests,

    installation of piezometers, monitoring of ground water table, etc., using our in-

    house facilities.

    Planning of comprehensive Geotechnical investigation program tailored to specific

    needs of the Project with particular aim of obtaining safety and economy in the design

    of foundations and earth structures. Planning includes establishing drilling

    requirements, extent of drilling, method of drilling, method of soil sampling etc.

    Prepare cost estimates and specifications for the geotechnical investigations.

    Supervision and monitoring the progress of field investigations ensuring

    that investigations are being carried out in accordance with the internationally

    recognized standard practice.

    Carrying out initial analyses of the field data and modifying (if required) the field

    investigation program.

    Inspection of soil samples and preparation of most efficient laboratory testing

    Program.

    Carryout the laboratory testing under technical supervision.

    Carryout geophysical surveys.

    Evaluation of physical and engineering characteristics of soils/ rocks on the basis of

    field and laboratory test results.

    Determination of foundation design parameters.

    Design of shallow and deep foundations i.e. spread foundations, rafts, piles etc.

    Preparation of geotechnical investigation reports.

    Design of earthen embankments for roads and water retaining structures.

    SPECTRUM OF SERVICES

    Soil Investigations

    Analyses & Design of Foundations & Embankments

    Geotechnical Engineering

  • Spectrum of Services

     Berkeley Associates (Pvt.) Ltd.

    Slope stability analyses

    Design of cut slopes and slope stabilization systems.

    Design of excavation support systems.

    Design of dikes and coffer dams. Design of under-ground water cut-off systems.

    Seepage analyses of water retaining structures.

    Liquefaction analyses.

    Evaluation of dynamic design parameters for design of foundations.

    Evaluation and remediation of problematic soil conditions.

    Design of site improvement systems.

    Design, performance and analyses of pile load tests.

    Design and construction supervision of cast in-situ piles.

    Design and construction of contiguous pile system. Preparation of technical specifications for earthworks.

    Quality control of large earthworks.

    Assessment of engineering characteristics of earthworks.

    Supervision of construction of foundations, earthwork and soil improvement works.

    Pile load tests and evaluation.

    In order to assess the groundwater potential for various projects, we plan and execute field

    investigations, computer modelling, assessment of aquifer parameters, prediction of availability

    of groundwater, ground water quality analyses. Design of tube wells and influence of exiting

    water facilities on pumping of new wells is also carried out. Groundwater Engineering services

    include;

    Design of dewatering systems.

    Design and installation of piezometers.

    Performance of electrical resistivity surveys for initial assessment of ground water quality.

    Groundwater monitoring.

    Groundwater quality assessment.

    Planning and execution of pump out tests.

    Interpretation of pump out test data and evaluation of aquifer parameters.

    Installation and development of tube wells.

    Piling and Construction of Fills

    Groundwater Engineering

  • Spectrum of Services

     Berkeley Associates (Pvt.) Ltd.

    Topographic surveys are carried out for all types of projects for developing the surface

    contours, area assessments, project planning and layout studies. Underwater surveys

    (Bathymetric Survey) are carried out to develop underwater bed profiles required for

    placement of intake and outfall structures. The services include;

    Performance of Topographic Surveys of land for infrastructures projects.

    Preparation of topographic maps at desired contour intervals.

    Establishment of Benchmarks.

    Performance of underwater (Bathymetric) survey of canals and offshore sites.

    Feasibility stage structural designs are carried out for development of cost estimates.

    Detailed analyses and design of structures are carried out using computer aided tools for all

    type of projects. Construction drawings are prepared for material take-offs and

    implementation. Design review services are also provided. Other service include;

    Planning stage design of various structures.

    Analyses of structural elements of all types of projects.

    Detailed design of structures.

    Preparation of tender drawings and construction drawings.

    Preparation of bar bending schedules.

    Preparation of as-built drawings.

    Review of Civil works Design prepared by EPC contractors.

    Optimization of design and Value Engineering.

    Design for strengthening and rehabilitation of structures

    Project Management services are provided for optimizing the available resource. Resident

    construction supervision services are provided for ensuring quality construction and

    adherence to agreed time line. The services include;

    Preparation and monitoring of project implementation schedules.

    Preparation and implementation of quality control/ quality assurance plans.

    Providing resident supervision and monitoring progress of works.

    Maintaining construction and QA/QC records.

    Preparation of as built drawing.

    Verify construction quantities and progress payment invoices.

    Topographic and Bathymetric Surveys

    Structural Engineering

    Project Management & Construction Supervision

  • Spectrum of Services

     Berkeley Associates (Pvt.) Ltd.

    Contract management, issuance of variation orders.

    Preparation of detailed Bill of Quantities (BOQ) for construction projects.

  • Completed Projects

     Berkeley Associates (Pvt.) Ltd.

    COMPLETED PROJECTS

  • Completed Projects

     Berkeley Associates (Pvt.) Ltd.

    150 MW Patrint Hydropower Project, AJK

    22 MW Jabban Hydropower Project, KPK

    90 MW Batakundi Hydropower Project, KPK

    180 MW Naran Hydropower Project, KPK

    300 MW Balakot Hydropower Project, KPK

    100 MW Solar Power Project, Bahawalpur

    Cooling Tower for AES Lal Pir Power Project, Muzaffargarh

    120 MW Shushghai Zhendoli Hydropower Project, Chitral

    100 MW Kotli Hydropower Project, AJK

    100 MW Shogo Sin Hydropower Project, Chitral

    762 MW AES Power Project, Muzaffarabad

    232 MW Karkey Rental Power Project, Karachi

    120 MW Rajdhani Hydropower Project, AJK

    Engro Rice Plant Extensions, Bhikki

    Engro Food Plant Floor Rehabilitation

    New Ammonia / Urea Plants Project of Engro Dharki

    Machai Hydropower Project, AJK

    Fire Water Tanks in UAE

    Khari Hydropower Project, AJK

    Sind Engro Coal Mining Project, Thar

    Foundation Piling for Mabarak Center, Lahore

    Hub Water Treatment Plant, Hub, Karachi

    Effluent Treatment Plant for Tanneries, Kasur

    Additional Cooling Towers for AES Power Project , Mahmood Kot, Muzaffargarh

    Water Supply & Sewerage System and Sewage Treatment Plant for New Mir Pur City

    FEASIBILITY STUDIES DESIGN & PROJECT MANAGEMENT SERVICES

    CONTRACT MANAGEMENT, CONSTRUCTION SUPERVISION & QUALITY CONTROL SERVICES

  • Completed Projects

     Berkeley Associates (Pvt.) Ltd.

    Project, AJK

    Water Supply & Sewerage System for Defense Housing Scheme, Islamabad New

    Ammonia/ Urea Plants Project at Engro Chemicals Pakistan, Daharki Commercial

    Complex at G-4, Clifton Road Karachi

    Commercial Complex at F-99, Clifton Road Karachi

  • Dewatering Design / Supervision Projects

     Berkeley Associates (Pvt.) Ltd.

    DEWATERING DESIGN / SUPERVISION PROJECTS

  • Dewatering Design / Supervision Projects

     Berkeley Associates (Pvt.) Ltd.

    Estimation of drainage requirements and design of dewatering system for Lusai Underground Railway Construction Project, Qatar Estimation of drainable surplus using available data on aquifer parameters.

    Doha Conventional Centre and Tower Project, Doha, Qatar Aquifer testing and data analysis, estimation of dewatering requirements, design of dewatering system and dewatering wells for construction below water table.

    Site B-201 Nawabshah, Sindh, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation (50 ft. below NSL) of the buildings.

    Site B-109, Sargodha, Punjab, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation (50 ft. below NSL) of the buildings.

    Study causes of rise of water table and proposed remedial measures - Industrial and ResidentialAreas in Dammam, Saudi Arabia.

    Chashma Hydropower Project Member of panel of experts for dewatering. Analysis of aquifer test data, estimation of dewatering requirements to lower water table about 15 m to facilitate construction of power plant.

    CHASNUPP - Evaluation of pumping requirements and design of dewatering system to facilitate construction of intake structure.

    Supervision of 26 numbers dewatering tubewells installation at CHASNUPP Assuring installation in accordance with the design specifications

    Dewatering Design / Supervision Projects

  • Geotechnical Investigations

     Berkeley Associates (Pvt.) Ltd.

    GEOTECHNICAL INVESTIGATIONS

  • Geotechnical Investigations

     Berkeley Associates (Pvt.) Ltd.

    Army Officers Housing Scheme ASKARI-II, Gujranwala Cant.

    Army Officers Housing Scheme ASKARI-III, Sargodha Cant.

    Army Officers Housing Scheme ASKARI-VII, Rawalpindi.

    Prime Minister Housing Scheme Peshawar.

    Prime Minister Housing Scheme Faisalabad.

    Prime Minister Housing Scheme Gujranwala.

    Commercial Plaza at Army Welfare Housing Society Morgah Rawalpindi.

    Park View Housing Society, Lahore Cant.

    Punjab Housing Scheme Satiana Road Faisalabad.

    Eden Canal Villas, Lahore.

    High rising building at DHA Morgah-II Islamabad.

    Sport Complex DHA Morgah-II Islamabad.

    Sukh Chayn Gardens Housing Society Multan road Lahore.

    WAPDA Finance Housing Scheme Raiwind Road Lahore.

    WAPDA Finance Subsistence Farm Homes Lahore.

    Mosque at Defense Housing Islamabad.

    Crescent Bay Project, Karachi

    Mabarak Center, A Mixed Use Project, Lahore

    Crescent Bay Project, Karachi

    Faletti's Hotel Development Project, Lahore

    Kalu Khan Girls High School Building at Swabi

    District Headquarter Complex at Swabi

    Regency Plaza at Mini Market Gulberg Lahore

    Aslam Arcade Mcleod Road Lahore

    Pakistan Air Force Complex at Abbott Road Lahore

    Police Club Complex at Race Course Road Lahore

    Mosque at Rinala Kurd

    Rahber Center at Jail Road Lahore

    Tax Free Plaza on Lawrance Road Lahore

    Extension Unit for Pakistan Air Force Complex at Abbott Road Lahore

    Shopping Complex at Main Market Gulberg Lahore

    Extension Units for Tax Free Plaza on Lawrance Road Lahore

    Pakistan Bait-ul-Maal Complex on Dev Smaj Road Lahore

    Leeds Center Main Boulevard Gulberg Lahore

    Ibrahim Mosque at Ferozepur Road Lahore

    Housing Schemes

    High-Rise Buildings

  • Geotechnical Investigations

     Berkeley Associates (Pvt.) Ltd.

    Big City Plaza Building at Liberty Chowk Lahore

    Multi storey building at Narang Mandi

    Multi-storey building at Bhatta Chowk Lahore

    Benevolent Fund Building at Peshawar

    Residential Villas Saudi Embassy Islamabad

    NHA Building at Thokar Niaz Baig, Lahore

    MCB Building, Jail Road Lahore

    Aitchison College, Lahore

    McDonald's Allama Iqbal Town , Lahore

    Jamia Mosque, Kala Shah Kaku, Lahore

    Descon ES Building, Lahore

    Zohra Heights, Gulberg Lahore

    Garrison Academy for Girls, Lahore Cantt.

    Garrison Degree College, Lahore Cantt.

    McDonalds, Faisalabad

    Fauji Foudation Medical College, Rawalpindi

    Honda Building Ferozpur Road, Lahore

    IT Building, Raiwind Road, Lahore

    A.D. Palace Rahim Yar Khan

    Aitchison College, Junior Wing, Lahore

    Babul Islam, Sargodha

    Bank Alhabib, Gulberg Lahore

    PSO Retail Stations at Lahore, D.G. Khan and Sargodha

    Law Chambers at Fan Road Lahore

    Neighbourhood G-11/4 Islamabad

    Detatched Houses at I-8 Islamabad

    New Auriga Shopping Plaza, Gulberg Lahore

    International Islamic Center, Johar Town Lahore

    PIA Facilities at New Terminal Lahore Airport

    Aligarh college, Gulberg Lahore

    Aitchison College Staff Housing Lahore

    River Side Hotel Jhelum

    FFC Tower The Mall Rawalpindi

    PC Hotel Muzzaffarabad

    PIA Engineering Transportation Site

    PIA Cargo Complex Site

    Shaheen Airport Services SAPS Cargo Complex site

    Sheikh Zayyed Complex at Ferozpur road Lahore

    Expo Center Johar Town Lahore

  • Geotechnical Investigations  

       Berkeley Associates (Pvt.) Ltd.

    Kohat University of Science and Technology Kohat

    Schlumberger offices and workshop at Sukkur

    Plaza at Liberty Market

    Bahria Town Lahore

    PSO Zoom Logo Sign Tower Pattoki Bypass

    Plaza at Abbott Road Lahore

    Plaza at 37-P, Gulberg Lahore

    Plaza at Davis Road Lahore

    Plaza at Mcleod Road Lahore

    Commercial plaza at Bedian Road Lahore

    Eden Palace Villas

    Mediacom Faisalaba

    Comsat Complex Islamabad

    PACE complex Gujrat

    Decent Plaza Gujranwala

    Government College Lahore

    Al-Nafah Tower Gujranwala

    Commercial Plaza Faisalabad

    Historical Structural at Shalimar Garden Lahore

    Enplan Plaza Garden Town Lahore

    IT Park Ferozepur Lahore

    Suzuki Motors Showroom Sargodha

    Mian Tyre Office at Jail Road Lahore

    Sterling Plaza at M M Alam Road Lahore

    North East Hospital Complex, Peshawar

    Ammar Medical Complex at Jail Road, near bypass, Lahore

    Rahmat-ul-Alameen Trust Hospital Pak Patten

    Muhammad Nawaz Sharif Kidney Institute at Shaikh Zayed Hospital Lahore

    Alkhidmat Hospital, Sialkot

    Hospital at Ferozpur road Lahore

    Federal Hospital Rawalpindi

    Hospitals

  • Geotechnical Investigations  

       Berkeley Associates (Pvt.) Ltd.

    Cherished Pharmaceutical Industry at Raiwind

    MSB Industries on Ferozepur Road Lahore

    Cholistan Sugar Mill Liaquatpur

    ICI go down near Kala Shah Kaku

    Rawat Switchyard

    FJFC Complex Bin Qasim Karachi

    Merino Textile Mill on Faisalabad Shahkot Road Shahkot

    International Juice Factory Azad Jammu & Kashmir

    Sapphire Textile at Bhai Pharu

    Pharmagen Beximco on Ferozpur Road Lahore

    CCL extension unit at Kot Lakhpat Industrial Area Lahore

    ProDiesal Services on Firozpur Road Lahore

    Genesis Pharmaceutical Complex on Sheikhupura Faisalabad Road

    Tower Crane Foundation at Fauji Cement, Jhang Bhatar

    Ammar Textiles on Defence Road near Multan Road Lahore

    Gas Treatment Plant at Liberty Power Project Ghotki Sind

    CCL Godowns at Industrial Area Kot Lahkpat Lahore

    Maria Balal Garment Factory and its Extension Units at Raiwind Road Lahore

    Zuchini Industries Raiwind Road Lahore

    Expansion of Caustic Soda Plant at Sitara Chemicals Limited on Faisalabad Sheikhupura Road

    Carpet Processing Unit at Defence - Raiwind Road Lahore for Abbas Corporation (Pvt) Ltd

    Expansion Unit for Dynamic Sportswear (Pvt) Ltd Canal Road Lahore

    New Processing Unit for Vision Technologies (Pvt) Ltd Sialkot

    Burhan Flour Mill at Gujrat Bypass

    Kohat Cement Factory at Kohat

    Coca Cola Plant, Gugranawala

    Millac Foods, Manga Raiwind Road, Lahore

    Merit Pharmaceutical, 34 km Ferozpur Road Lahore

    Pepsi Cola International, Hattar

    Pakistan Gloves Manufacturers & Export, Building, Sialkot

    Shangai Chemicals, Sheikhupura Road

    Nishat Dying and Finishing, Lahore

    Ramey Textile Mills, Lahore

    Forest Sweaters Pvt Limited

    SKB Milk Plant, Raiwind Road, Lahore

    Sitara Chemicals, Faisalabad

    Rizwan Textile, Lahore

    Industrial Buildings

  • Geotechnical Investigations  

       Berkeley Associates (Pvt.) Ltd.

    SKB Factory at Raiwind Road, Lahore

    Tandlianwala Suger Mill

    CSK Distilleries Palia

    Kohat Cement Plant Kohat

    ICI extension for polyester plant Sheikhupura

    Infra-structural for DHA Phase-VI Lahore

    Packages Pulp and Paper Factory Kasur

    Shed for Pepsi Cola Hattar

    Export Processing Zone Gujranwala

    Waste water treatment plant Rawalpindi

    Madina Cold Storage Sillanwali Road Faisalabad

    Food Processing Plant at Export Promotion Zone Gujranwala

    Pepsi cola Manga Road Lahore

    Rest House Building at Packages Kasur

    Hitech Feeds Rawalpindi, Sheikhupura, Sharakpur and Fatehjang

    Snack Green Field Factory at Sunder Industrial Estate for Pepsi.

    Faisal Asad Textile Mill Muzaffargarh

    Sitara Agriculture Research Centre Gutwala Faisalabad

    Sitara Hydrogen peroxide Plant Faisalabad

    Sitara Chemicals Faisalabad

    Underpasses at Committee Chowk and Rawalpindi General Hospital Chowk on

    Murree Road Rawalpindi

    Sub-soil Investigation for Internal Roads for Rupafab at Raiwind

    Sub-soil Investigation for Internal Roads for District Headquarter at Swabi

    Sub-soil Investigation for Lahore Bypass (sub-contract)

    Sub-soil Investigation for Rawalpindi Ring Road Project Rawalpindi

    Road Side Soil Investigation & Borrow Material Exploration/Testing For ADB

    Assisted Rural Access Roads Project Phase - I in District Mandi Bahauddin,

    Jhelum, Khushab, Kasur and Okara.

    Road Side Soil Investigation & Borrow Material Exploration & Existing Road

    Condition Survey for Dualization of Sheikhupura Faisalabad Road Soil Investigation for Seven Nos. Of Bridges For Sheikhupura Faisalabad Dual Carriage

    Way

    Flyover bridge at Sherpao bridge Lahore

    Flyover bridge at Katchary Chowk Multan

    Underpass bridge at Jail Road Lahore

    Roads and Bridges

  • Geotechnical Investigations  

       Berkeley Associates (Pvt.) Ltd.

    Additional Carriage Way (N-5) Section: TMP-Bahawalpur.

    Road Side Soil Investigation & Borrow Material Exploration/Testing & Existing Condition

    Survey for Khwaza Khela Besham Road Malakand Division.

    Road Side Soil Investigation & Borrow Material Exploration/Testing & Existing Condition

    Survey for Three Roads in Malakand Division.

    Bridge Over Sutlej River

    Soil Investigation and Testing at Ferozpur Road Lahore

    Quetta Chamman Road

    200 km Roads in Wanna

    200 km Roads in MRDP

    Sibbi Much Road

    Internal and Main Boulevard for Bahria Town Lahore M3

    Confirmatory Investigations

    Lahore Ring Road Project Package VIII, IX, XI, VII and VIII

    Chukiatian Barawal Road

    Feasibility study for 1.2 Mw Marchai Hydropower Project.

    Feasibility Study for 1.5 MW Khari II Hydropower Project.

    Feasibility Study for 120 MW Shushghai Zhendoli Hydropower Project.

    EPC Bid Preparation for 100 MW Kotli Hydropower Project.

    Feasibility Study for 100 MW Shogo Sin Hydropower Project.

    Detail Civil Design for 22 MW Jabban Hydropower Project.

    EPC Bid Preparation for 120 Mw Rajdhani Hydropower Project.

    Periodic Inspection of 1450 Mw Ghazi Brotha Hydropower Project.

    Feasibility Study for 300 MW Naran Hydropower Project.

    Feasibility Study for 98 MW Batakundi Hydropower Project.

    Feasibility Study for 180 MW Balakot Hydropower Project.

    Bid Preparation for Small Hydropower Project on Canal in Punjab.

    Engineering Services for Lucky Hydropower Project, Marala

    Engineering Services for LBDC Hydropower Project, Chichawatni.

    Engineering Services for JBC Hydropower Project.

    Engineering Services for 130 MW Sehra Hydropower Project.

    Hydropower Projects

  • Geotechnical Investigations

     Berkeley Associates (Pvt.) Ltd.

    1180 MW RLNG Bhikki Power Project

    230 MW LNG Based Engro Power Project Port Qasim

    350 MW Coal Based Power Project of Siddique Sons, Port Qasim

    2 x 330 MW coal Fired Power Project in Thar, Engro Energy.

    100 MW Charbon Coal Power Project.

    2 x 60 MW Coal Fired Power Project, Fatima Energy.

    50 MW Coal Power Project near Johar Abad, Orient Power.

    11 MW Biomass Based Project in Faisalabad.

    1 x 46 MW Coal Based captive power plant of Nishat Chunian Ltd., Pakistan

    425 MW Combined Cycle Nandipur Power Plant

    152 MW Combined Cycle Diesel Engine Power Project Pasrur Sialkot

    225 MW Shahpur Power Plant, Sargodha

    135 MW Bhiki Power Project

    225 MW Combined Cycle Balloki Power Plant

    225 MW Combined Cycle Saif Power Plant, Sahiwal

    AES Power Plant; Design of Cooling Towers and Construction Supervision

    Preliminary sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura

    Faisalabad Road

    Preliminary sub-soil Investigation for proposed Thermal Power Plant near Kot Addu

    Detail Design stage sub-soil Investigation for 481 MW Thermal Power Plant on

    Sheikhupura Faisalabad Road

    Confirmatory sub-soil investigation for Olympia Power Project on Sheikhupura

    Faisalabad Road

    1 x 46 MW Coal Based captive power plant of Nishat Chunian Ltd., Pakistan

    425 MW Combined Cycle Nandipur Power Plant

    152 MW Combined Cycle Diesel Engine Power Project Pasrur Sialkot

    225 MW Shahpur Power Plant, Sargodha

    225 MW Combined Cycle Balloki Power Plant

    225 MW Combined Cycle Saif Power Plant, Sahiwal

    Engro Chemicals Pakistan; Design of Pile Foundations and Supervision of Piling Works

    AES Power Plant; Design of Cooling Towers and Construction Supervision

    Preliminary sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura

    Faisalabad Road (Main contract with M/s Mirza Associates (pvt) Ltd

    Preliminary sub-soil Investigation for proposed Thermal Power Plant near Kot Addu

    Power Plant and Fertilizer Plants

    Thermal Power Plants

  • Geotechnical Investigations  

       Berkeley Associates (Pvt.) Ltd.

    (Main contract with M/s Habib Rafiq (pvt) Ltd)

    Detail Design stage sub-soil Investigation for 481 MW Thermal Power Plant on

    Sheikhupura Faisalabad Road (Main contract with M/s Progressive Consultants (pvt) Ltd

    PAK and M/s Black & Veatch USA)

    Confirmatory sub-soil investigation for Olympia Power Project on Sheikhupura

    Faisalabad Road (Main contract with M/s Olympia Group)

    135 MW Bhiki Power Project (Main contract M/s Pakistan Power Resources LLC)

    Engro Chemicals Pakistan; Design of Pile Foundations and Supervision of Piling Works

    Preliminary Geotechnical Investigation for New Processing Units at Attock Refinery

    Morgah Rawalpindi (Main contract with M/s ARL Rawalpindi Pakistan)

    Detail design Geotechnical Investigation for New Processing Units at Attock Refinery

    Morgah Rawalpindi (sub-contract with M/s Mitsui Japan)

    Geotechnical Investigation for New tank area sites at Attock Refinery Morgah

    Rawalpindi (Main contract with M/s ARL Rawalpindi Pakistan)

    Preliminary Geotechnical Investigation for Pak Arab Refinery (PARCO) Mahmood Kot

    (sub-contract with M/s Habib Rafiq (pvt) Ltd).

    Geotechnical Investigation for Flare Stack Structure at Attock Refinery Rawalpindi (sub-

    contract with M/s Descon Engineering (pvt) Ltd)

    Detail design Geotechnical Investigation for Central Processing Plant for REHMAT-1

    Gas Field at Sardar Garh near Gotki (Main contract with M/s Presson International of

    Canada)

    Detail design Geotechnical Investigation for Central Processing Plant for MOL Gas Plant

    at GURGURI (Main contract with M/s Presson International of Canada)

    Soil Survey Along 6” Dia. Oil Pipeline From Turkwal to ARL Via Pindori (for K.F.

    Corporation (Pvt.) Ltd

    New Grey 6700 TPD Cement Plant for M/s Kohat Cement Company Ltd at Kohat

    New Grey 7600 TPD Cement Plant for M/s Fauji Cement Company Ltd at Fatehjang

    Oil & Gas Sector

    Cement Industry

    Oil Refinery & Fertilizer Plants

  • Geotechnical Investigations  

       Berkeley Associates (Pvt.) Ltd.

    28 Nos. of 30 m to 60 m High GF Towers in Lahore for Nortel Networks

    18 Nos. of 30 m to 60 m High GF Towers in Sialkot for Nortel Networks

    18 Nos. of 30 m to 60 m High GF Towers in Gujrat for Nortel Networks

    18 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Nortel Networks

    18 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Nortel Networks

    14 No. of 30 m to 60 m High GF Towers in Sheikhupura for Nortel Networks

    18 Nos. of 30 m to 60 m High GF Towers in Multan for Nortel Networks

    3 Nos. of 30 m to 60 m High GF Towers in Attock for Nortel Networks

    8 Nos. of 30 m to 60 m High GF Towers in Islamabad and Rawalpindi

    45 Nos. of 30 m to 60 m High GF Towers in Lahore for Ericsson Pakistan

    8 Nos. of 30 m to 60 m High GF Towers in wazirabad for Ericsson Pakistan

    7 Nos. of 30 m to 60 m High GF Towers in Gujrat for Ericsson Pakistan

    9 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Ericsson Pakistan

    21 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Ericsson Pakistan

    14 No. of 30 m to 60 m High GF Towers in sialkot for Ericsson Pakistan

    12 Nos. of 30 m to 60 m High GF Towers in Multan for Ericsson Pakistan

    8 Nos. of 30 m to 60 m High GF Towers in sargodha for Ericsson Pakistan 5 Nos. of 30 m to 60 m High GF Towers in sheikhupura for Ericsson Pakistan

    8 Nos. of 30 m to 60 m High GF Towers in phalia for Ericsson Pakistan

    5 Nos. of 30 m to 60 m High GF Towers in tandianlwala for Ericsson Pakistan

    3 Nos. of 30 m to 60 m High GF Towers in Okara for Ericsson Pakistan

    8 Nos. of 30 m to 60 m High GF Towers in Gujrat for Alandick Pakistan

    4 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Alandick Pakistan

    8 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Alandick Pakistan

    11 No. of 30 m to 60 m High GF Towers in sialkot for Alandick Pakistan

    17 Nos. of 30 m to 60 m High GF Towers in Multan for Alandick Pakistan

    18 Nos. of 30 m to 60 m High GF Towers in sargodha for Alandick Pakistan

    15 Nos. of 30 m to 60 m High GF Towers in sheikhupura for Alandick Pakistan

    5 Nos. of 30 m to 60 m High GF Towers in phalia for Alandick Pakistan

    8 Nos. of 30 m to 60 m High GF Towers in tandianlwala for Alandick Pakistan

    Tele Communication Towers

  • Geotechnical Investigations  

       Berkeley Associates (Pvt.) Ltd.

    Tarbela Lahore 500 kv in-out arrangement for M/s ICC (Pvt) Ltd

    Rewat Islamabad 220 kv transmission line towers for M/s ICC (Pvt) Ltd

    Shahibagh - Peshawar 220 kv transmission line towers for M/s ICC (Pvt) Ltd

    Barotha Nowshera Shahibagh 220 kv transmission line towers for M/s ICC (Pvt) Ltd

    Rahim Yar Khan - Jamshoro 500 Kv Transmission Line, 3rd Circuit

    Zahir Pir - Guddu 500 Kv Transmission Line

    Jamshoro - Dadu 500 Kv Transmission Line (partial)

    Ghazi Barotha 500 kV Transmission Line

    132/11.5 kV GIS Station at Lahore Airport

    500 kV Grid station at Sahiwal for Siemens

    Ghatti-Muzzaffargarh 500 kv Transmission Line Project

    Thal Canal Project

    PSO Petrol Pump

    Sewerage Treatment Plant Rahim Yar Khan

    Mazar at Chalay Sharif Gujrat

    Weather Radar Station Islamabad

    Swimming Pool at Aitchison College Lahore

    Beacon House Complex Raiwing Road Lahore

    Bridge at Abdullahpur Faisalabad

    Office building for DESCON Ferozepur Road Lahore

    Sethi Motor Showroom Ferozpur Road Lahore

    Beacon House School Walton Road Lahore

    Magic park Motorway

    State Bank of Pakistan

    Suzuki Motors Sargodha Road Lahore

    Schlumberger S.A. offices and workshop at Sukkur

    Lahore Rapid Mass Transit Project, Lahore

    Orange Line Metro Train Project, Lahore

    Miscellaneous

    Power Transmission Lines

    Mass Transit Projects

  • Piling Projects  

       Berkeley Associates (Pvt.) Ltd.

    PILING PROJECTS

  • Piling Projects  

       Berkeley Associates (Pvt.) Ltd.

    Construction and Load Testing of 14 test piles for Orange Line Metro Train Project, Lahore

    Construction of 40 pile foundations for Barotha Nowshera Industrial Shahi Bagh D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003  

    Construction of 32 pile foundations for Peshawer Shahi Bagh D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003

    Construction of 28 pile foundations for Rewat Islamabad D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003

    Construction of 1500 nos of 760 mm each of 40 m deep diameter piles for New Grey Cement Plant for Kohat Cement (Pvt) Ltd at Kohat.

    Construction of pile foundation for Highway Bridge near Muridkay. (Diameter of pile = 760 mm, Nos. of piles = 36, Using reverse rotary method)

    Construction of pile foundation for Highway Bridge over B.S. Link Canal near Chunian. (Diameter of pile = 760 mm, Nos. of piles = 26, Using percussion method)

    Construction of pile foundation for railway overhead bridge Ghari Shahu. (Diameter of pile = 840 mm, Nos. of piles = 126, Using reverse rotary method)

    Construction of pile foundation for nullah at kharian Cantt. (Diameter of pile = 610 mm, Nos. of piles = 6, Using reverse rotary method)

    Construction of pile foundations for 25 m high Mobilink Tower at Chung. (Diameter of pile = 760 mm, Nos. of piles = 4, Using reverse rotary method)

    Construction of pile foundations for 25 m high Mobilink Tower at Muridkay.(Diameter of pile = 760 mm, Nos. of piles = 4, Using reverse rotary method)

    Construction of 1220 mm dia piles for towers for 220 KV Transmission Lines (76 nos. of towers)

    Construction of 1000 mm diameter piles for bridge at Bahria Town Rawalpindi

    Piling Projects

  • Well Drilling Projects  

       Berkeley Associates (Pvt.) Ltd.

    WELL DRILLING PROJECTS

  • Well Drilling Projects  

       Berkeley Associates (Pvt.) Ltd.

    Design and Construction of Four (4) tubewells having 3.2 cusec discharge capacity at 425 MW CCPP Nandipur for M/s DEC China

    Design and Construction of six (6) tubewells having 3 cusec discharge capacity at PARCO Mid-Country Refinery Project Mahmood Kot for M/s Marubeni Corporation (MC / JJC) Japan.

    Construction of one (1) tubewell at Rehmat Oil and Gas Processing Plant for Presson / Petronas Canada.

    Construction of one (1) tubewell for Wapda at Gujrat Construction of one (1) tubewell at Liberty Power Project Ghotki Sind. Construction of one (1) tube well having 2 cusec discharge capacity at Sunny View Housing Scheme Lahore for M/s Habib Rafiq (pvt) Ltd.

    Construction of seven (7) tube wells having 3 cusec discharge capacity for construction of Lahore Islamabad Motorway on Section - I.

    Construction of five (5) tube wells for water supply in Islamabad. Construction of two (2) tube wells for water supply at Bhimber and Mirpur. Construction of two (2) tube wells for L.D.A. in under construction Gujarpura Scheme as sub-contract.

    Construction of seven (7) tube wells for WASA Faisalabad as sub-contract. Construction of three (3) tube wells for agriculture purpose in Kasur. Construction of one no. of tubewell at Labour Colony Gujrat for M/s Ghulam Habib Construction.

    Construction of one no. of tubewell at Gujrat for WAPDA Colony. Construction of one tubewell at Rehmat Gas Treatment Plant Gothki.

  • Completed Projects

    Berkeley Associates (Pvt.) Ltd.

    Topographic Surveys

  • Completed Projects

    Berkeley Associates (Pvt.) Ltd.

    75 KTPA LIGHT ASH EXPANSION (PHASE-I) ICI Khewera

    425 MW Combined Cycle Nandipur Power Plant

    1180 MW CCPP at Bhikki

    1223 MW CCPP at Balloki

    Calci Packages Limited

    100 MW Fatima Energy Cogen Power Project

    New Ammonia / Urea Plants Project of Engro Dharki

    PARCO Mid-Country Refinery Project Mahmood Kot

    Pepsi Cola International, Multan

    660 Lucky Hydropower Project

    Gulf Rental Power

    230 MW LNG Based Engro Power Project Port Qasim

    Green Power CNEC

    Rehabilitation of Building Defects of Malala Yousaf Zai Daanish School (Boys and Girls) Jand

    District Attock

    100 MW Solar Power Project

    300 MW Coal Based Power Project of Siddique Sons, Port Qasim

    1 x 46 MW Coal Based Captive Power Plant of Nishat Chunian Ltd, Pakistan

    90 MW Batakundi Hydropower Project, KPK

    180 MW Naran Hydropower Project, KPK

    300 MW Balakot Hydropower Project, KPK

    120 MW Shushghai Zhendoli Hydropower Project, Chitral

    200 Bed North East Hospital Complex, Peshawar

    Moro & Dadu 500Kv substations

    22 MW Jabban Hydropower Project, KPK

    Residential Villas Saudi Embassy Islamabad

    JBC Hydropower Project, Sukheke

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    PROJECT SHEETS

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: 1180 MW CCPP at Bhikki

    Location: Bhikki, District Shekhupura, Pakistan

    Client: Quaid-e-Azam Thermal Power (Pvt.) Ltd., Govt. of Punjab

    Scope of Services:

    Geotechnical  Investigations  for  Power  Plant  and  Access  Road  comprising 3,500  m  drilling  of  investigation  boreholes,  down‐hole  seismic  survey, electrical resistivity survey, and laboratory testing     

    Topographic Survey and Bathymetric Survey of canal 

    Groundwater Studies comprising site survey, groundwater modeling, design of pumping wells 

    Construction of test piles, pile load testing, evaluation of pile load tests 

    Construction of 1300 cast in‐situ concrete piles        

    Start date: October 2015

    End date: Dec. 2015

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: 350 MW Coal Fired Power Plant

    Location: Port Qasim

    Client: Siddique Sons Energy

    Scope of Services:

    Geotechnical Investigations 

    Topographic Survey & Bathymetric Survey 

    Groundwater Studies    

    Resistivity Survey  

    Start date: Jan, 2015

    End date: Mar, 2015 

    B k l A i tB k l A i tB k l A i tB k l A i t

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Orange Line Metro Train, Project

    Location: Lahore, Pakistan

    Client: Punjab Metro bus Authority

    Scope of Services:

    Geotechnical Investigations along the alignment of the Orange Line 

    Execution of 14 Test Piles and Pile Load Tests up to 12000 tons, interpretation of pile load tests, and design recommendations for working piles    

    Start date: July 2015

    End date: September 2015

     

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: 150 MW Patrind Hydropower Project

    Location: Muzaffarabad, AJK

    Client:  Daewoo Engineering & Construction 

     

     

     

     

     

    Scope of Services:

    Preparation of Construction Drawings for Power House, Weir, Excavation, Retaining System.

    Detailed Design and preparation of Construction Drawings for Access Roads

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Feasibility Study of 12 MW Biomass Based IPP Project

    Location: Faisalabad, Punjab

    Client: Masood Textile Mills

    Scope of Services:

    Sitting Studies

    Topographic survey

    Geotechnical investigations

    Initial Environmental Examination

    Grid interconnection studies

    Completion Time: 9 Months

    Completion Date: March 2013

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Feasibility Study for 180 MW Naran Hydropower Project

    Location: Naran, Khyber Pakhtunkhwa

    Client: Sarhad Hydel Development Organization (SHYDO)

    Scope of Services: Preparation of Geotechnical investigations program and tender documents

    Top supervision of Geotechnical investigations

    Preparation of laboratory testing program

    Geotechnical analysis and design for feasibility study

    Preparation of geotechnical investigations report

    Feasibility level design of all hydraulic structures

    Preparation of drawings for feasibility level design

    Financial and economic analyses of the project

    Seismological studies and geological mapping

    Environmental studies

    Completion Time: 18 Months

    Completion Date: December, 2013

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Feasibility Study for 300 MW Balakot Hydropower Project

    Location: Balakot, Khyber Pakhtunkhwa

    Client: Sarhad Hydel Development Organization (SHYDO)

    Scope of Services: Preparation of Geotechnical investigations program and tender documents

    Top supervision of Geotechnical investigations

    Preparation of laboratory testing program

    Geotechnical analysis and design for feasibility study

    Preparation of geotechnical investigations report

    Feasibility level design of all hydraulic structures

    Preparation of drawings for feasibility level design

    Financial and economic analyses of the project

    Seismological studies and geological mapping

    Environmental studies

    Completion Time: 18 Months

    Completion Date: December, 2013

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Feasibility Study for 98 MW Batakundi Hydropower Project

    Location: Batakundi, Khyber Pakhtunkhwa

    Client: Sarhad Hydel Development Organization (SHYDO)

    Scope of Services: Preparation of Geotechnical investigations program and tender documents

    Top supervision of Geotechnical investigations

    Preparation of laboratory testing program

    Geotechnical analysis and design for feasibility study

    Preparation of geotechnical investigations report

    Feasibility level design of all hydraulic structures

    Preparation of drawings for feasibility level design

    Financial and economic analyses of the project

    Seismological studies and geological mapping

    Environmental studies

    Completion Time: 18 Months

    Completion Date: December, 2013

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Shogo – Sin Hydropower Project

    Location: Chitral

    Client: Private Power Infrastructure Board (PPIB)

    Scope of Services: Preparation of Geotechnical investigations program

    Preparation of Tender documents for Geotechnical investigations

    Top supervision of Geotechnical investigations

    Preparation of Laboratory testing program

    Geotechnical analysis and design for feasibility study

    Preparation of geotechnical investigations report

    Feasibility level design of all structures

    Preparation of drawings for feasibility level design

    Completion Time: 15 Months

    Completion Date: April, 2010

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Shushghai - Zhendoli Hydropower Project

    Location: Chitral

    Client: Private Power Infrastructure Board (PPIB)

    Scope of Services: Preparation of Geotechnical investigations program

    Preparation of Tender documents for Geotechnical investigations

    Top supervision of Geotechnical investigations

    Preparation of Laboratory testing program

    Geotechnical analysis and design for feasibility study

    Preparation of geotechnical investigations report

    Feasibility level design of all structures

    Preparation of drawings for feasibility level design

    Completion Time: 15 Months

    Completion Date: April, 2010

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: 548 MW Kaigah Hydropower Project

    Location: Kandian River

    Client: Kaigah Power Pvt Ltd

    Scope of Services: Preparation of Geotechnical investigations program

    Preparation of Tender documents for Geotechnical investigations

    Top supervision of Geotechnical investigations

    Preparation of Laboratory testing program

    Geotechnical analysis and design for feasibility study

    Preparation of geotechnical investigations report

    Feasibility level design of all structures

    Preparation of drawings for feasibility level design

    Completion Time: 15 Months

    Completion Date: February, 2011

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: 22 MW Jabban Hydroelectric Power Station Rehabilitation Project

    Location: Jabban – District Malakand

    Client: WAPDA

    EPC Contractor: HRL – CCPG JV

    Scope of Services: Preparation of Geotechnical investigations program

    Carrying out geotechnical investigation at site

    Preparation of geotechnical investigations report

    Geotechnical analysis and design for various components of

    Project (i.e. power house, substation, and penstock)

    Structural design of powerhouse, penstocks and 132 kV substation

    Rehabilitation design for Forebay structure

    Preparation of civil work construction drawings

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: JBC Hydropower Project, Sukheke

    Location: Sukheke, (50km from Lahore)

    Client: JBC Powr Ltd.

    Consultants: Pakistan Consulting Services

    Scope of Services: Drilling of 4 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling

    Total exploratory drilling – 130m

    Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

    Factual and Interpretative Reports

    Completion Time: Eight (04) weeks

    No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and accessories

    Completion Date: August 30th 2008

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: LBDC Hydropower Project, Chichawatni

    Location: Chichawatni, (180km from Lahore)

    Client: LBOD Power Ltd.

    Consultants: Pakistan Consulting Services

    Scope of Services: Drilling of 4 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling

    Total exploratory drilling – 130m

    Field permeability tests in boreholes

    Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

    Factual and Interpretative Reports

    Completion Time: Eight (04) weeks

    No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and accessories

    Completion Date: September 10th 2008

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Lucky Hydropower Project

    Location: Sialkot

    Client: Olympus Energy (Pvt.) Ltd.

    Consultants: Barqab

    Scope of Services: Drilling of 5 boreholes ranging in depth from 20m to 30m along with SPT and undisturbed soil sampling

    Total exploratory drilling – 155m

    Field permeability tests in boreholes

    Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

    Factual and Interpretative Reports

    Completion Time: Eight (04) weeks

    No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and accessories

    Completion Date: August 30th 2008

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: 100 MW Fatima Energy Cogen Power Project

    Location: Sanawan - Pakistan

    Client: Fatima Energy Limited (FEL)

    Scope of Services:

    Sitting Studies

    Topographic survey

    Groundwater studies

    Material studies

    Coal Transportation studies

    Geotechnical investigations

    Initial Environmental Examination

    Preliminary design of civil structures

    Completion Time: 10 Months

    Completion Date: May 2011

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    COOLING TOWERS FOR AES THERMAL POWER PLANT

     

     

     

     

    Scope of Work:  

    o Preparation of detailed design of all civil and mechanical works, and preparation of technical specifications, drawings, and Bill of Quantities

    o Preparation of tender documents o Prequalification of Contractors and Invitation of Bids o Evaluation of Bids o Award of construction contract o Construction Supervision for all site works o Quality Control and Quality Assurance audits o Verification of contractors running bills o Preparation of completion reports o Preparation of progress reports o Preparation of as-built drawings

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Fatima Energy Cogen Power Project

    Location: Sanawan, Pakistan

    Client: Fatima Energy Limited  

     

     

     

     

     

     

     

     

     

     

    Scope of Services:

     

    Geotechnical Investigation (Drilling of 5 boreholes ranging from 15m to 30 m depth along with SPT and undisturbed soil sampling, 4 testpits, laboratory testing including PSD, consolidation, direct shear, unconfined compression and Factual and Interpretative Reports)

    Electrical Resistivity Survey Geologic al Hazard Assessment

     

    Completion Date: May 2011 (4 Weeks)  

     

     

     

     

     

     

     

     

     

     

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: 234 MW Combined Cycle Power Plant

    Location: Muridke, Lahore

    Client: Albario Engineering (Pvt) Ltd.

    Project Consultants: Skoda Export  

     

     

     

     

     

     

     

     

     

     

     

     

     

    Scope of Services: Geotechnical Investigation (Drilling of 3 boreholes each down to 15m

    depth along with SPT and undisturbed soil sampling, laboratory testing including PSD, consolidation, direct shear, unconfined compression and Factual and Interpretative Reports)

    Pile Integrity Test (Total Tested Piles = 23 Piles)  

    Completion Time: April 2008 (02 Weeks)

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Feasibility Studies for 11 MW Biomass Based Power Plant

    Location: Jhang, Punjab

    Client: Lumen Energia (Private) Limited

    Scope of Services:

    Sitting Studies

    Topographic survey

    Geotechnical investigations

    Initial Environmental Examination

    Grid interconnection studies

    Completion Time: 9 Months

    Completion Date: July 2011

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Feasibility Study of 100 MW Charbon Coal Power Project

    Location: Chakwal, Punjab

    Client: Habib Rafiq (Pvt.) Limited

    Scope of Services:

    Sitting Studies

    Topographic survey

    Groundwater studies

    Material studies

    Coal Transportation studies

    Geotechnical investigations

    Initial Environmental Examination

    Preliminary design of civil structures

    Completion Time: 12 Months

    Completion Date: June 2013

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: 100 MW Solar Power Project

    Location: Quaid-e-Azam Solar Park, Bahawalpur, Pakistan

    Client: TBEA, China

    Scope of Services:

    Review of Geotechnical Data 

    Review Design of foundations for the Solar Panels and Buildings 

    Evaluation of the load test results of the screw piles used for panels   

    Start date: June 2014

    End date: Nov. 2014

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: 50 MW Coal Fired Khushab Power Plant

    Location: Khushab - Pakistan

    Client: Shahpur Energy (Pvt.) Limited

    Scope of Services:

    Sitting Studies

    Topographic survey

    Groundwater studies

    Material studies

    Coal Transportation studies

    Geotechnical investigations

    Initial Environmental Examination

    Preliminary design of civil structures

    Completion Time: 12 Months

    Completion Date: April 2011

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Lahore Rapid Mass Transit System Project

    Location: Lahore

    Client: Metro Associates, Lahore

    Consultants: Systra Group, France

    Scope of Services: Drilling of 78 boreholes ranging in depth from 28m to 50m along with SPT and undisturbed soil sampling along the 27km long alignment

    Total exploratory drilling – 2,622m

    Field permeability tests in boreholes

    Installation of fourteen piezometer

    Thirty shallow test pits along with field density tests

    Five Plate Load tests

    Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

    Factual and Interpretative Reports

    Completion Time: Eight (08) weeks

    No. of Drill Rigs: Six straight rotary drilling rigs along with necessary crew and accessories; and seven crews of hand auger cum light percussion

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: 425 MW CCPP Nandipur, Pakistan

    Location: Nandipur (160 km from Lahore)

    Client: Dongfang Electric Corporation Limited (DEC), China

    EPC Contractor: DEC, China

    Scope of Survey: Topographic Survey on Land and under water for Canal Preparation of Survey Maps and Report

    Scope of Services: Drilling of 137 boreholes ranging in depth from 15m to 50m along with SPT and undisturbed soil sampling

    Total exploratory drilling = 4,200 m

    Down hole shear wave velocity tests in six boreholes 50 m deep

    Cone Penetration Tests (CPT) at 23 locations

    Field permeability test

    Six Plate load tests

    Electrical resistivity tests at 83 locations

    Laboratory testing including PSD, consolidation, direct shear, unconfined compression

    Factual and Interpretative Reports on the basis of Chinese Code

    - Construction of a 120 m deep well, and five piezometers Performance of pump out test, analyses of data and design of pumping wells.

    - Tubewell

    - Ground water studies

    - Surface water studies

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: 225 MW CCPP Saif Power Project Sahiwal

    Location: Sahiwal (150 km from Lahore)

    Client: Saif Power Limited, Islamabad

    EPC Contractor: CMEC, China

    Scope of Services: Drilling of 112 boreholes ranging in depth from 30m to 40m along with SPT and undisturbed soil sampling

    Total exploratory drilling – 2,800m

    Down hole shear wave velocity tests in three boreholes 80m deep

    Six Plate load tests

    Electrical resistivity tests at 20 locations

    Laboratory testing including PSD, consolidation, direct shear, unconfined compression

    Factual and Interpretative Reports

    Completion Time: Ten (10) weeks

    No. of Drill Rigs: Nine straight rotary drilling rigs along with necessary crew and accessories

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: 152 Combined Cycle Diesel Engine Power Plant, Pasrur

    Location: Eastern Power Company (EPCO), Islamabad

    Client: Eastern Power Company (EPCO), Islamabad

    EPC Contractor: Gama Power, Turkey

    Scope of Services: Drilling of 20 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling

    Total exploratory drilling – 920m

    Five shallow test pits along with field density test

    Installation of piezimeters

    Aquifer Pump out test

    Electrical resistivity tests at 12 locations

    Laboratory testing including PSD, consolidation, direct shear, unconfined compression

    Factual and Interpretative Reports

    Completion Time: Eight (08) weeks

    No. of Drill Rigs: Three straight rotary drilling rigs along with necessary crew and accessories

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: New Urea / Amonia Plants Project, Engro Dharki

    Location: Dharki, Dist. Ghotki, Sindh

    Client: Engro Chemicals Pakistan Ltd

    EPC Contractor: Snamprogatti, Italy

    Descon, Pakistan

    Scope of Services:

    - Geotechnical Investigation and foundation design - Design coordination with EPC contractor - Supervision of piling constructions - Design of dewatering system - Design of parameters for PMS buildings - Design review of ammonia storage tanks - Quality control and quality assurance of all civil works through

    resident team of engineers - Trouble shooting and assistance in design and construction

    bottle necks

    Completion Time: Three (03) Years

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Design of Cofferdam for Construction of Intake Structure

    Location: Guddu, Sindh

    Client: Habib Rafiq (Pvt.) Ltd.

     

    Scope of Services:

    - Development of design of cofferdam including stability analysis, seepage analysis

    - Preparation of construction drawings - Preparation of detailed method statement - Analysis to find out impact of construction of cofferdam on the

    following canal and development of remedial measures

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: PARCO Refinery

    Location: Mahmood Kot, Near Multan

    Client: Marubeni Corporation of Japan

    Consultants: NA

    Scope of Services: Design, Construction, and Commissioning of 6 deep wells of 2 cusec (ft3/sec) capacity each. The scope included drilling of wells, procurement of all materials and machinery required for the works.

    Completion Time: Eight (08) weeks

    No. of Drill Rigs: Two (reverse rotary type)

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Flattie’s Hotel Development Project

    Location: Lahore

    Client: Gulf Commercial Bank, Abu Dhabi

    Consultants: Meinhardt, Singapore

    Scope of Services: Drilling of 25 boreholes ranging in depth from 65m to 80m along with SPT and undisturbed soil sampling

    Total exploratory drilling – 1925m

    12 CPT probes to 30m depth each

    Field permeability tests in boreholes

    Installation of piezometers

    Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

    Factual and Interpretative Reports

    Completion Time: Eight (08) weeks

    No. of Drill Rigs: Nine straight rotary drilling rigs along with necessary crew and accessories

     

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Mobilink Office Building at Quaid-e-Azam Industrial Estate

    Location: Lahore, Punjab

    Client: Progressive Consultants (Pvt.) Ltd.

    Scope of Services:

    Comparison of different layout of shoring systems

    Finalizing the layout of shoring system

    Evaluation of lateral loading at different support levels

    Design of different structural components of shoring system

    Design of in-situ tangent concrete piles

    Preparation of detailed construction drawings

    Preparation of Tender Documents for the construction of shoring system

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Safety Assessment of Existing Shoring System and Design of Rehabilitation/ Strengthening Measures at Mubarak Center, Ferozepur Road, Lahore

    Location: Lahore, Punjab

    Client: M/s Taavun (Pvt.) Ltd.

    Scope of Services:

    Stage – I Assessment of existing retaining system and establish the need for remedial/ strengthening measures, which included;

    a) Condition survey/ physical inspection of entire shoring system

    b) In-situ Testing; Anchor lift-off tests; Integrity of concrete piles and bracing beams using Schmidt hammer and PUNDIT

    c) Evaluation of existing shoring system by incorporating results of in-situ testing

     

    Stage – II Suggesting the most appropriate and economical strengthening measures to ensure safety of the shoring system and adjacent buildings

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Pindi Bhattian Faisalabad Motorway (M-3) Location: Pindi Bhattian -Faisalabad

    Client: National Highway Authorities (NHA)  

     

     

     

     

     

     

     

     

     

     

     

     Scope of Work:

    Drilling of 40 boreholes ranging in depth from 05m to 10m along with SPT and undisturbed soil sampling along the 60km long alignment Forty (40) test pits along with field density tests Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests Factual and Interpretative Reports

    Preparation of comprehensive evaluation rep 

     

     

     

     

     

     

     

     

     

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Bridge on Sutlej River, Bahawalpur. Location: Bahawalpur

    Client: SKB Pvt. Ltd.  

     

     

     

     

     

     

     

     

     

     

     

     Scope of Work: Drilling of 2 boreholes to maximum depth of 50.0m along with

    SPT and undisturbed soil sampling Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

     

    Preparation of geotechnical

    investigation report Design of bridge

    foundations

     

    Start Date: July 01, 2003

     

    End Date: July 20, 2003

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Naran Jalkhan Road Location: Naran to Jakkhad

    Consultants: Republic Engineering Corporation (REC), Lahore  

     

     

     

     

     

     

     

     

     

     

     Scope of Work: Eighty (80) test pits along with field density tests along the

    60km long alignment  

    Laboratory testing including PSD, Liquid Limit, Plastic Limit, consolidation, direct shear, CBR tests

     

    Preparation of geotechnical investigation reports for the road and all the structures along the road including bridges, culverts, and cross drainage structures

     

    Design of pavement  

    Design of foundations for all the structures along the road

     

    Date of Work Started: July 5, 2000

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Lai Nullah Road Project, Rawalpindi Package-1) Location: Rawalpindi Client: National Engineering Services Pakistan (Pvt.) Limited

     

     

     

     

     

     

     

     

     

     

     

     Scope of Work: Drilling of 20 boreholes ranging in depth from 20m to 40m along

    with SPT and undisturbed soil sampling.  

    Thirty Two shallow test pits along with field density tests  

    Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

     

    Preparation of factual reports for geotechnical investigations  

    Start Date: March 21, 2007

     

    End Date: April 21, 2007  

     

    Completion Time: Eight (04) weeks

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Lukpass Tunnel Quetta Location: Quetta, Baluchistan

    Client: Associated Consulting Engineers (ACE) Pvt. Ltd.  

     

     

     

     

     

       

     

       

     

       

     

     

    Scope of Work: Drilling of 2 boreholes to maximum depth of 120m along with SPT and undisturbed soil sampling

     

    Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

     

    Preparation of geotechnical

    investigation reports Initial design of

    tunnels support system

    Design of slope stabilization near portals  

    Start Date: February 15, 2006

     

    End Date: March 30, 2006

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Improvement/Renovation of Existing Multan Road from Thokar Niaz Baig to Chauburji, Lahore Location: Lahore

    Client: National Engineering Services Pakistan (Pvt.) Limited  

     

     

     

     

     

     

     

     

     

     

     

     Scope of Work: Drilling of 4 boreholes to maximum depth of 06m along with

    SPT and undisturbed soil sampling  

    Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

     

    Fourteen (14) test pits along with field density tests  

    Start Date: October 01, 2009

     

    End Date: November 01, 2009

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    EFFLUENT TREATMENT PLANT FOR TANNERIES, KASUR  

     

    Scope of Work:  

    Detailed design of Treatment Ponds, Screen House, Equalization Tanks, Settling tanks, Pump House, Embankments, Sludge Disposal Lagoons

     

    Construction supervision for all site works  

    Quality Control and Quality Assurance audits  

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    HUBB WATER TREATMENT PLANT  

     

    Scope of Work:

    Detailed design of civil works of entire treatment plant including building, roads, and tanks

     

    Construction Supervision for all site works  

    Quality Control and Quality Assurance audits  

    Preparation of progress report  

  • Project Sheets  

       Berkeley Associates (Pvt.) Ltd.

    Project: Design, Construction and commissioning of six (6) tubewells having 1.0 cusec discharge capacity  

    Location: PARCO Mid-Country Refinery Project Mahmood Kot, Pakistan

     

    Client: M/s Marubeni Corporation (MC) JGC Japan  

     

     

     

     

     

     

     

     

     

     

     

     

    Scope of Work:

    Design of wells, procurement of well material and pump / motor units, construction of wells, development and testing of wells

    Completion Time: Two Months  

    Completion Date: November 1997

  • Clients  

       Berkeley Associates (Pvt.) Ltd.

    CLIENTS

  • Clients

     Berkeley Associates (Pvt.) Ltd.

    Harbin Electric International, China Dong Fong Electric Corporation, China CMEC, China CHINT, China TBEA, China Deawoo Corporation, Koria Karkey International, Turkey Sinogy, China Vestas, Australia M/s Mitsui Engineering & Shipbuilding Co Ltd Japan M/s Marubeni Corporation (JGC) Japan M/s Petrosin Pakistan Ltd M/s Presson Pakistan Ltd M/s Habib Rafiq (Pvt) Ltd M/s General Construction Company (Pvt) Ltd M/s Al-Wasay Construction Company (Pvt) Ltd M/s Walee Builders (Pvt) Ltd M/s Nowshera Engineering Services NENSER (Pvt) Ltd M/s Hisar Corporation (Pvt) Ltd M/s Ghulam Habib Construction (Pvt) Ltd M/s Nazir & Company (Pvt) Ltd

    Engro Pakistan Pepsicola, Pakistan Siddique Sons Energy, (Pvt.) Ltd. Tetra Pack, Pakistan Packages Pakistan Nishat Group Shareef Group M/s Align Technologies (pvt) Ltd USA M/s Fauji Fertilizer Rawalpindi M/s Pakistan Services Limited PSL Karachi M/s Regency Developer Group (Pvt) Ltd M/s Rupali Group (Pvt) Ltd M/s Crescent Services (Pvt) Ltd M/s Attock Refinery Ltd M/s Four Brothers (Pvt) Ltd M/s Global Marketing (Pvt) Ltd M/s Zafar Sons (Pvt) Ltd M/s Rahmat-ul-Alameen Trust M/s Cherished Pharmaceuticals (Pvt) Ltd M/s MSB Industries (Pvt) Ltd M/s Cholistan Sugar Mills (Pvt) Ltd M/s ICI Group Ltd M/s Merino Textile (Pvt) Ltd M/s International Juices (Pvt) Ltd M/s Sapphire Textile Group (Pvt) Ltd M/s Pharmagen Beximco (Pvt) Ltd M/s ProDiesal Services (Pvt) Ltd M/s Genesis Pharmaceuticals (Pvt) Ltd M/s Olympia Power Ltd M/s Hoechst Ravi Chemical Ltd M/s Sitara Chemicals Limited M/s Zuchini Industries Limited M/s Kohat Cement Limited

    Private Agencies

    Contractors

  • Clients  

       Berkeley Associates (Pvt.) Ltd.

    National Highway Authority Building Division Swabi Pakistan Air Force Police Club Pakistan Bait-ul-Maal Rawalpindi Metropolitan Corporation Pakistan Television Corporation (Headquarter) Islamabad Assistant Director Housing Gujranwala Cantt General Headquarter AG's Branch Rawalpindi National Engineering Services Pakistan (NESPAK) Lahore Development Authority Engineering Consultancy Services Punjab (ECSP) Public Health Engineering Department, Punjab

    Government Agencies

  • Topographic Survey Equipment  

       Berkeley Associates (Pvt.) Ltd.

    TOPOGRAPHIC

    SURVEY EQUIPMENT

  • Completed Projects

    Berkeley Associates (Pvt.) Ltd.

    RTK DGPS (Dual Frequency)

    2 NO, SET Trimble R10 GNSS System,440 Channel Dual Frequency GPS and

    WAAS/EGNOS receiver system with L2C capability and integrated UHF

    radio modem

    4 NO, SET Trimble R8 GNSS System, 440 Channel Dual Frequency GPS and

    WAAS/EGNOS receiver system with L2C capability and integrated UHF

    radio modem

    2 NO, SET Trimble 5700 DGPS Receiver Advanced Dual Frequency GPS and

    WAAS/EGNOS receiver system with L2C capability and integrated UHF

    radio modem.

    2 N0'S Sokkia Stratus L1 12 channel single frequency Receivers.

    3 NO’S Magellan Triton series 400

    3 NO’S Garmin Hand Held GPS E Series.

    TOTAL STATION

    5 No’s (I) Sokkia CX‐105 (10,000 point) Built in Memory with Reflector less)

    2 No’s (II) Sokkia 530 RK, (10,000 point) Built in Memory with Reflector less

    1 No’s (III) Nikon NPl‐632, 2” accuracy (Built in Memory with SD card)

    2 No’s (IV) Nikon Nivo 5‐M (Built in Memory)

    ECHO SOUNDERS

    2 No’s GPSMAP 527xs ‐ Garmin

    LEVELS

    10 No’s (I) Digital Level, Sokkia, NIKON, PENTAX (Level accuracy 0.10 mm)

    (ii) Wild B2

    * Above all items are available with their accessories.

  • Drilling Equipment  

       Berkeley Associates (Pvt.) Ltd.

    DRILLING EQUIPMENT

  • Drilling Equipment  

       Berkeley Associates (Pvt.) Ltd.

    DESCRIPTION QTY MAKE Rotary Boring Rig for Soil Investigations 12 No. Pakistan

    Wash Boring Rig for Soil Investigation 2 No. Pakistan

    CPT Rig (Manual) 1 No. Pakistan

    Percussion Rig for Soil Investigation 4 No. Pakistan

    Percussion Rig for Piling 15 No. Pakistan

    Reverse Rotary for Tube well & Piling 6 No. Pakistan

    Auger Bucket Dry Drilling Rigs for Piling 3 No. Pakistan

    Auger boring for Soil Investigation 8 No. Pakistan

    Tremie, Funnel, Bucket and Pipes 5 No. Pakistan

    Core Extraction Machine 1 No. Pakistan

    Hydraulic Jack 2 No. Pakistan

    Casing 100mm Diameter Sufficient Pakistan

    Shelby Tubes Sufficient Pakistan

    Speedy Moisture Tester 2 No. USA

    Pitcher Sampler 5 No. Pakistan

    Denison Sampler 5 No. Pakistan

    SPT Rods (AW) 800 m USA

    SPT Apparatus 3 No. USA

    Sand Cone Apparatus 3 No. Pakistan

    Drive Cylinder 10 No. Pakistan

  • Laboratory Testing Equipment  

       Berkeley Associates (Pvt.) Ltd.

    LABORATORY TESTING EQUIPMENT

  • Laboratory Testing Equipment  

       Berkeley Associates (Pvt.) Ltd.

    DESCRIPTION QTY MAKE Electric Oven 2 Nos. Germany

    Triple Beam Balance 2 Nos. USA

    Digital Balance 4 Nos. USA

    Analytical Balance 1 Nos. China

    Field Balance 2 Nos. China

    US Standard Sieve 4 Sets Imported Mesh

    US Standard Sieve (Coarse) 2 Sets Pakistan

    Liquid Limit Device 3 Sets China

    Unconfined Compression Machine 2 Nos. Imported Ring

    Direct Shear Machine 1 Nos. Imported Ring

    Consolidation Machine 4 Nos. Pakistan

    Standard Proctor Apparatus 2 Nos. Pakistan

    Modified Proctor Apparatus 2 Nos. Pakistan

    CBR Molds 12 Nos. Pakistan

    CBR Machine 1 Nos. Pakistan

    Sample Extruder 1 Nos. Pakistan

    AASHTO Compaction Test 2 Sets Pakistan

    Cylinder 1000 ml 12 Nos. China

    Cylinder 500 ml 2 Nos. China

    Beaker 250 ml 12 Nos. China

    Pycnometers 50 ml 6 Nos. China

    Moisture Can Sufficient

    Allied Accessories Sufficient

  • Key Personnel  

       Berkeley Associates (Pvt.) Ltd.

    KEY PERSONNEL

  • Key Personnel  

       Berkeley Associates (Pvt) Ltd 

    NAME AND DESIGNATION QUALIFICATION EXPERIENCE Dr. Tahir Masood Ph.D. in Geotechnical 34 years experience Chief Executive Officer Engineering in design of various

    Geotechnical Projects and Construction Management

    Jahangir Akhtar B.Sc. Civil 48 years experience in Executive Director Engineering Geotechnical and

    Geoenvironmental Engineering, design of dams and overall engineering

    management of large projects

    Khalid Ayyub M.Sc. in 24 years in Director/ Geotechnical Geotechnical Head Geotechnical Engineering Engineering, field work, Engineering Laboratory work, Analyses and design. Ahmad Nawaz M.Sc. Geology 46 years experience in Groundwater Expert ground water Hydrology Sheikh Ilyas Ahmed B.Sc. Civil 48 years experience of Chief Structural Engineer Engineering Structural Design of Head Project Manager Building, hydropower Project. Ijaz Shafi B.Sc. Civil 40 years experience Head Structural Engineering Saqib Mir B.Sc. Civil Engineering 15 years experience Principal Structural Engineer Umar Maqsood B.E Civil Engineering 2.5 years experience Senior Structural Engineer Hafiz Muhammad Hassan B.Sc. Civil Engineering 1 year experience Ajmal Junior Structural Engineer

  • Key Personnel  

       Berkeley Associates (Pvt) Ltd 

    NAME AND DESIGNATION QUALIFICATION EXPERIENCE Farooq Naveed M. Sc. Civil 8 years in Geotechnical Senior Geotechnical Engineering Engineering Engineer Imran Farooq M.Sc. Civil 5 years in Geotechnical Senior Geotechnical Engineering Engineering Engineer Abdullah Masood B.Sc. Civil 1 years experience Junior Engineer Engineering Mannan Ali B.Sc. Geological 2 years experience Geological Engineer Engineering Hafiz Abdur Razzaque M.Sc. Geology 5 years experience Senior Geologist Asad Ali BS Applied Geology 2.5 years experience Geologist Maheen Malik M.Sc. Environmental 2.5 years experience Public Health and Engineering Environmental Engineer Raja Naeem Diploma in Civil 35 Year Experience in Chief Surveyor Technology Surveying, BOQs, Bar Bending Schedule and rate analyses

  • Field Staff  

       Berkeley Associates (Pvt.) Ltd.

    FIELD STAFF

  • Field Staff  

       Berkeley Associates (Pvt.) Ltd.

    NAME AND DESIGNATION QUALIFICATION EXPERIENCE Abdur Razzaque M. Sc. Applied 5 years experience Site Geologist Geology

    Asif Ali M. Phil Applied 2 years experience Site Supervisor Geology

    Muhammad Ali Chughtai B. Sc. Geology 30 years experience Site Supervisor

    Usman Majeed B. Sc. Geology 1 year experience Site Supervisor Engineering

    Muhammad Ishaq F. Sc. 5 years in field and Site Supervisor Laboratory Testing

    Muhammad Tariq Matric 15 years in piling and Site Supervisor well drilling works

    Muhammad Naeem Matric 15 years in piling and Site Supervisor well drilling works

    Muhammad Saeed F.A 30 years in laboratory Laboratory Technician testing at UET Lahore Ajmal Hahat B. A 25 years experience in Laboratory Technician material testing lab. Sikandar Hayat F.A 5 years experience in Laboratory Assistant laboratory testing Abdul Hameed Middle 15 years experience in Driller drilling

    Abdur Razzaque Middle 13 year experience in Driller drilling

    Muhammad Imtiaz Middle 13 year experience in Driller drilling

  • Curriculum Vitae of Key Personnel

    Berkeley Associates (Pvt.) Ltd.

    JAHANGIR AKHTAR : Partner/ Project Management Specialist

    Nationality : Pakistani Date & Place of Birth : November 05, 1947 Lahore Pakistan

    Profession : Civil Engineer

    Position in Firm : Executive Director

    Registration Number with : CIV-00873 Pakistan Engineering Council Affiliation with : Member Pakistan Engineering Council Professional Insti tutions Member Institution of Engineers Pakistan

    Member Pakistan Geotechnical Engineering Society Member International Society for Soil Mechanics & Geotechnical Engineering

    Key Qualifications

    Practicing Professional Engineer since 1968.

    Presently working as Executive Director in Berkeley Associates (Pvt.) Ltd., Responsible for

    technical coordination, business development, budget monitoring, overseeing the coordination

    of mega projects. Responsible for technical management, corporate technical monitoring and

    control, and value addition to the technical outputs of existing projects and review of proposals,

    bids and TORs for new mega projects.

    Worked as Chief Operating Officer and Senior General Manager/Head Geotechnical and

    Geoenvironmental Division in Engineering Consultancy Services Punjab (Pvt.) Limited,

    Lahore (ECSP) from February, 2012 to April, 2016.

    Worked as Chief Executive in Jahangir Akhtar and Associates (J&A) from 2009 to January

    2012. In this capacity, handled geotechnical problems of Al-Ilam Bridge along Ring Road and

    two bridge projects along Batinah Coastal Road Sultanate of Oman for M/s Turkpak

    International. Besides worked as project manager for hydropower, management consultancy

    and off shore engineering works in Pakistan.

    Worked with NESPAK from 1973 to 2009 as Geotechnical Engineer in various positions

    starting from Senior Engineer to Vice President (Technical Coordination) and Vice President

    / Head of Geotechnical and Geoenvironmental Engineering Division Worked on a wide

    range of Projects as designer, head of design teams, review expert and coordinator including

    large dams and water supply projects, hydropower projects, small and medium dams,

    Highways, Motorways, Airports and bridge projects, Industrial and Energy Projects and

    Buildings.

    During the career with NESPAK, worked on the following major engineering projects, as a

    Geotechnical Engineer in different capacities ranging from team leader to a team member.

    Dams, Water Supply and Drainage Projects Ghazi-Barotha Hydropower Project, Raising of Mangla Dam, Basha Diamer Dam, Mirani

    Dam, 12 small dams in FATA, 3 small dams in NWFP, Khanpur Dam Project, Simly Dam

  • Curriculum Vitae of Key Personnel

    Berkeley Associates (Pvt.) Ltd.

    Islamabad; Anchor Sihala Dam; 706 Army Base Workshop Water Supply Project; Gadani

    Water Supply Project Lasbela; Goronyo Dam, Nigeria; Euphrates East Drain Project Iraq;

    Eastern Province Water Transmission Project,K.S.A; Remodelling of Kinjhar-Gujjo Canal;

    Quetta Water Supply

    Project; Qusayba Drainage Project, K.S.A; Fordwah-Sadqia Surface Drainage Project; South

    Jazira Tunnel Project, Iraq; Hofuf Water Transmission System, K.S.A; Buraidah Feeder Line

    Project, K.S.A; Sabya Water Network Project (Phase-I), K.S.A.

    Participated in inspection of Chashma Barrage, Simly Dam and Khanpur Dam as a

    member of Panel of Experts.

    Energy and Power Projects

    Chashma Nuclear Power Plant; 500 KV Transmission Network Towers Pakistan; Kot Addu Gas Turbine Power Station Pakistan; Efficiency Improvement of WAPDA Thermal Power Plants; 450 MW Combined Cycle Thermal Power Plant Guddu; Tarbela and Mangla Hydropower Extension projects Pakistan; KCP Workshop Jauharabad.

    Bridges and Highway Projects

    Third IBRD financed highway projects in Pakistan; Pategi-Eggan Road Project Nigeria; Bridges in Northern Areas; Sohar Roads-Sultanate of Oman; Khasab Coastal Road, Oman; Additional Carriageway Mianchannu-Sahiwal Highway; various portions of Indus Highway Pakistan; Djouju-Porga Road Benin; Overhead Bridge at Quetta; Chitral Booni Road; upgrading of Old Bridges on Kohat Thal Road; Farm to Market Roads in NWFP and Punjab; Rahim Yar Khan - Tarinda M. Pannah Highway; Strengthening and extension of N-70 Highway; Balochistan Development Authority (BDA) Roads, Islamabad-Muzaffarabad Dual Carriageway, N-70 Road Project.

    Motorway Projects

    Pakistan Motorway Lahore-lslamabad Section (M-2 Section) and Pakistan Motorway Sheikhupura - Multan -D.G. Khan Section (Old M-3 Section), Pakistan Motorway Pindi Bhattian- Faisalabad Section (current M-3 Section).

    Buildings

    UBL Multistoreyed Buildings at Karachi, Lahore and Islamabad; Armed Forces Medical City Rawalpindi; Overseas Pakistanis Foundation Head Office Islamabad, Aiwan-e-lqbal Complex Lahore; Air and Naval Headquarters Islamabad; Pakistan Engineering Council Head Office Islamabad; Gomal University D.I. Khan; EFU Head Office Lahore; SLIC Head Office Islamabad; State Bank Building Sialkot; Army Welfare trust Plaza Rawalpindi; PISIC House Lahore; MCB Head Office Building Karachi; OGDC Energy House Islamabad; Prime Minister's House and Secretariat Islamabad; Airport Terminal Buildings at Karachi; Lahore and Islamabad, Pakistan Housing Project spread all over Pakistan; Kidney Centers in Pakistan.

    Industrial Facilities

    Pak-Saudi Fertilizer Complex; Iron Ore and Coal Berths Port Qasim; Sea Water Intake and Disposal System Karachi Steel Mills; Galadari Cement Works Karachi; Mustehkam Cement Factory Hattar; Maple Leaf Cement Factory Iskandarabad; Storage Facilities for 40,000 tons of rice in Punjab Pakistan, Bhit Gas Field Development Project.

  • Curriculum Vitae of Key Personnel

    Berkeley Associates (Pvt.) Ltd.

    Education

    Name of Institution Year Degree/Diploma

    University of Engineering & Technology, Lahore-Pakistan

    1968 B.Sc. Civil Engineering

    Other Courses University of Engineering &

    1977

    Certificate in Computer

    Technology, Lahore-Pakistan Programming

    L' Alliance Francaise Lahore 1990

    Three Units Course in French Language

    EXPERIENCE

    I Name of Employing Agency Berkeley Associates (Pvt.) Ltd. Title of Position Executive Director

    Location of Assignment Lahore-Pakistan

    Period of Assignment May, 2016 to date

    Activities

    Working as Director in Berkeley Associates (Pvt.) Ltd., Responsible for technical coordination,

    business development, budget monitoring, overseeing the coordination of mega projects.

    Responsible for technical management, corporate technical monitoring and control, and value

    addition to the technical outputs of existing projects and review of proposals, bids and TORs for

    new mega projects.

    II Name of Employing Agency Engineering Consultancy Services Punjab (Pvt.) Title of Position Chief Operating Officer

    Location of Assignment Lahore-Pakistan

    Period of Assignment February, 2012 to April, 2016.

    Activities

    Wo