Ganson Building & Civil Engineering is one of Ireland’s most progressive building and civil engineering companies. We undertake projects throughout Ireland and the UK with offices in Dublin and Castlewellan and are a leading contractor in all sectors of Public and Private works.

With over 15 years experience, Ganson Building & Civil Engineering have built up significant resources and expertise with a current workload in excess of €80 million. Our primary activity is undertaking large, complex projects in commercial, retail, tourism, high-tech and institutional buildings, refurbishment and civil engineering works.

In addition to technical and plant resources, Ganson Building & Civil Engineering has a strong financial base, allowing execution of multiple large projects simultaneously. The company’s success over the years is based on sound financial and management principles. The company prides itself on having a 100% credit ratings which is unprecedented in the construction industry.

Ganson Building & Civil Engineering offers a full range of construction services including management contracting, design & build & partnerships in addition to traditional building arrangements. The range of work undertaken varies in type and size from multimillion Euro contracts up to €30 million to small and medium sized projects.

Ganson Building & Civil Engineering is fully committed to providing a quality service – completing projects to the highest standards, on time and within budget. The Company is certified to ISO 9001:2008 and to ISO 14001: 2004 standards.

The Company is also dedicated to maintaining a safe working environment for all employees and significant resources are deployed to ensure best practice in the areas of Health & Safety. In 2012 the Company was awarded Safe-T-Cert accreditation, recognised by the International Register of Certificated Auditors (IRCA).

COMPANY OVERVIEW

Regional Office:Ganson UK Ltd,Claremont Avenue,Castlewellan,BT31 9BX,

Tel: 048 437 71022E-Mail: [email protected]

Bankers:Bank of Ireland,Drogheda,Co Louth.

Tel: 041 983 7653Contact: Eoghan Farrelly

Accountants:Francis J Woods & Company Limited,Balbriggan Business Campus, Balbriggan, Co. Dublin

Tel: 01 691 3500Contact: Eugene O’Callaghan

Solicitors:Keaveny Walsh & Co.Headfort Place,Kells, Co. Meath.

Tel: 046 924 0004Contact: Michael Keaveny

Solicitors:A & L Goodbody,North Wall Quay, Dublin 1, Ireland

Tel: 01 649 2000 Contact: Kevin Feeney

Insurance:Martin Insurance Brokers;Railway RoadCavan

Tel: 049 433 2944Contact: James Martin

COMPANY INFORMATIONHead Office:Unit 19 + 20,

Balbriggan Business Park,Balbriggan,Co Dublin.

Tel: 01 690 5716E-Mail: [email protected] Reg: 371334

VAT No: 6391334 S

WHO WE WORK WITH

Scoi l Mhuire, Lucan, Co. Dubl in

Client: Department of Education and Science

Architect: Henry J Lyons

Contract Sum: €3.4 Million

Contract Period: Jun 12’ – Nov 13’

Description:Construction of 16 classroom extension and sports hall and refurbishment of 8 classroom existing school. The existing school was live for the duration of the works and to facilitate this, the project was carried out in three phases.

Education

Education

Dundalk Grammer School

Client: Department of Education and Science

Architect: TODD Architects

Contract Sum: €6.8 million

Contract Period: November 2011 – May 2013

Description:Demolition of existing single and two storey buildings within the school site and the construction of a new two storey 25 classroom school building, multi purpose hall with associated car parking and landscaping.

Education

Holy Rosary National School, Tal laght, Co.Dubl in

Client: Holy Rosary National School, Tallaght, Co. Dublin

Architect: Mallon Architects

Contract Sum: €3.7 Million

Contract Period: April 2012 – July 2013

Description:Construction of a new two storey school building comprising 24 classroom school plus General Purpose Hall , special needs units, staff rooms and ancillary accommodation of 7562 sq m. External works included adjustments to and enlargement of the existing car park adjacent to the existing Church at Old Court Avenue to provide an additional 21 car parking spaces

Blanchardstown West Educate Together National School

Client: Department of Education & Science

Architect: TODD Architects

Contract Sum: €6.1 Million

Contract Period: April 2013 - August 2014

Description:Construction of a new 24 Primary School on a greenfield site in Hansfield, Dublin 15. The school is 4500m2 in size and caters for approximately 600 pupils.

The school building encompassed a 24 Classrooms school. Administrative Offices, Library, General Purpose Room, Special Needs Unit, Plant Rooms, Lift, Sanitary Facilities and all ancillary areas. The external works include 3 play areas; ball courts traffic circulation areas and associated developments such as car parking areas, sensory garden, primary SNU play area, soft landscaping, fencing and boundary treatments.

Education

Education

Dundalk Inst i tute of Technology

Client: Dundalk Institue of Technology

Architect: McGahon Architects

Contract Sum: €1.2 Million

Contract Period: July 2007 – September 2007

Description:Construction of 5 new science rooms and offices at Dundlak IT. This work included all mechanical and electrical works, demoltion and refurbishment of existing kitchen area and building and provision of new. All of the work was carried out in a live environment. Installation of 2. all weather playing pitches and associated builders work.

Education

Loreto Dalkey

Client: Loreto Abbey Dalkey

Architect: Quinn Barnwell Buggy Architects

Contract Sum: €2.3 Million

Contract Period: Dec 2013 - Feb 2015

Description:Construction of New Sports Hall Building at Loreto Abbey Secondary.

Commercial

Casement Aerodrome, Baldonnel l , Co. Dubl in

Client: Department of Defence

Architect: RPS Ltd

Contract Sum: €1.2 million

Contract Period: September 12’ – May 13’

Description:Construction of 1550m2 aircraft hangar, at Casement Aerodrome. The building is a steel portal framed building to accommodate aircraft, offices, storage, administration, and associated areas.

Commercial

Expert Retai l , Tul lamore, Co. Offaly

Client: Expert Retail

Architect: Doherty Finnegan Kelly

Contract Sum: €2.1 million

Contract Period: Oct 2008 - July 2009

Description:This project consists of the demolition of an existing Warehouse and the construction of a new 2,528m² retail store including a mezzanine level. The works consisted of a shell and core building and then the complete fit out package as a turn key operation.

Commercial

McCloskeys Bakery

Client: McCloskey’s Bakery

Architect: Emmet Finnegan

Contract Sum: €350,000

Contract Period: Sept 2012 – Dec 2012

Description:Fit out of unit 3 at McCloskeys bakery and alteration work to existing unit 2. Works included all Mechanical and Electrical Works. External works included the installation of new drainage system, site lighting and yard slab.

Commercial

AIBP Gui ldford, Surrey

Client: AIBP Meats

Architect: Mitchell Evans LLP, Anchor House,Station Row, Shalford, Guildford,Surrey, GU4 8BY

Contract Sum: £200,000.00

Contract Period: June 2010 – Sept 2010

Description:Construction of a new waste water building on existing treatment facility. Works included the installation of a 5 metre sump chamber and associated drainage, raft slab foundation, steel frame and cladding. Installation of water treatment equipment to newly constructed building.

Commercial

Maxol Fi l l ing Stat ion

Client: Seamus Kane

Contract Sum: €1.9 Million

Contract Period: September 2009 - November 2009

Description:This project involved the construction of Maxol’s. The works included demolition, excavation works, external site works and new surface finishes. The project also included the installation of three new 40,000 litre underground fuel tanks, underground fuel lines, 8 fuelling dispensers and a new forecourt canopy structure. The works were completed within an extremely stringent 13 week construction programme, the works were also completed within the client’s budget.

Talbot Lodge Nursing Home, Malahide, Co. Dubl in

Client: Kinsealy Property Limited Extention

Architect: Kevin Brady Architects

Contract Sum: €2.6m

Contract Period: Aug 13’ – Aug 14’

Description:Construction of eight single storey extensions at the existing Talbot Lodge Nursing Home. This included a new main entrance area, small cafe for residents and visitors, additional day/dining rooms, activity area, 32 bedroom extensions, bathrooms and additional staff facilities. The new bedrooms are all single rooms with en-suite bathrooms. The existing dining room was divided up internally to provide a link corridor to improve the fire escape route from the existing kitchen area.

Healthcare

Healthcare

Stamul len, Neuro Rehab

Client: Redwood Neurobehavioural Services Limited

Architect: Kevin Brady Architects

Contract Sum: €2.6m

Contract Period: Aug 13’ – Aug 14’

Description:New build construction of a Neuro-Rehabilitation centre comprising of a 19 bedroom acquired brain injury residential care unit, 4 no 7 bedroom residential care units, resource centre, training complex, auditorium with shop & café.

Church of Immaculate Conception,Termonfeckin

Client: Father Aiden Murphy and the Parish Committee, Church of Immaculate Conception, Termonfeckin, Drogheda

Architect: Doherty Finnegan Kelly Consulting Engineers

Contract Sum: €400,000

Contract Period: June 11’ – August 11’

Description:Renovations and upgrade of Mechanical and Electrical services of The Church of immaculate Conception which was built in 1883 to the Designs of William Hague, a prolific designer of churches, who designed or altered up to 50 Roman Catholic churches. The church at Termonfeckin was built at a time that Hauge was architect to Armagh Cathedral. The Church is a protected structure.

Restorat ion& Conservat ion

Poor Clares Monastery, Simmonscourt, Co. Dubl in

Client: Mother Abbess the Poor Clare Monastery

Architect: Paul O’Daly & Associates

Contract Sum: €300,000

Contract Period: Oct 2013 – Nov 2013

Description:Refurbishment of Monastery

Restorat ion& Conservat ion

37 Grafton Street, Co.Dubl in

Client: Aviva Insurance

Architect: Fitzgerald Kavanagh & Partners

Contract Sum: €595,000.00

Contract Period: April ’11 – Aug ‘12

Description:Refurbishment of a 4 storey office building at 37 Grafton Street. The project involved demolition and strip out works internally to allow for a full upgrade internally including new M&E upgrade, joinery, repointing and roof works.

Restorat ion& Conservat ion

110 Grafton Street, Co.Dubl in

Client: Aviva Investors

Architect: Fitzgerald Kavanagh Partners

Contract Sum: €220,000

Contract Period: Oct 2011 – Jan 2012

Description:The project consists of the refurbishment of the existing 110 Grafton Street. This existing building was a 4 storey office building requiring extensive renovation throughout.

Restorat ion& Conservat ion

Corpus Christ i Church, Griff i th Avenue

Client: Church of Corpas Christi

Architect: Downes Meehan Robson

Contract Sum: €300,000

Contract Period: June 2011 – July 2012

Description:Refurbishment of Church

Restorat ion& Conservat ion

Restorat ion& Conservat ion

Dundalk Grammer School

Client: Department of Education and Science

Architect: TODD Architects

Contract Sum: €6.8 million

Contract Period: November 2011 – May 2013

Description:Demolition of existing single and two storey buildings within the school site and the construction of a new two storey 25 classroom school building, multi purpose hall with associated car parking and landscaping.

Phi l ipstown CommunityCentre

Client: Philipstown Community Centre

Architect: Denis Williams

Contract Sum: €1 Million

Contract Period: Feb 13’ – Aug 13’

Description:Construction of a New Community Centre, Inc 2 dressing rooms, Sports Hall, Meeting rooms

Leisure& Social

Seapoint Golf Club Termonfeckin Co Louth

Client: Termonfeckin Ltd

Architect: Brendan G Cashell

Contract Sum: €3.0 million

Contract Period: Mar 11’ – Mar 12’

Description:Demolition and refurbishment of existing club house and construction of new clubhouse bar and restaurant. New changing rooms, offices, toilet blocks and pro shop.

Leisure& Social

Louth GAA Centre of Excel lence

Client: Louth GAA

Architect: Denis Williams

Contract Sum: €4 million Contract Period: February 2008 – September 2010

Description:Development of new Centre of Excellence at Darver, Co.Louth comprising of 5 floodlit grass playing pitches, 1 floodlit artificial surface pitch and 2 storey clubroom building incorporating 18000 sq. ft of changing rooms, conference facilities and administration offices on a 35 acre site.

Leisure& Social

Skerr ies Harps GAA Clubhouse

Client: Skerries Harps

Architect: Mark Kelly Architects

Contract Sum: €1.1 Million Contract Period: March 2014 – January 2015

Description:Demolition of the existing clubhouse at Skerries Harps GAC and construction of a new 2 storey clubhouse with a gross floor area of 800m2. The new facility includes 4no changing rooms with showers, toilets, entrance foyer, club shop, bar, external balcony area with glass balustrades and 3no meeting rooms. The works included new Mechanical, Electrical and Lift installation works. External works included the installation of new utility services to the building, bitmac surfacing to car parking area and entrance, fencing, new floodlighting system to the main pitch and training pitch and all associated drainage and landscaping works.

Leisure& Social

Rathbourne Apartments, Ashtown, Dubl in 15

Client: Mazars Ireland

Architect: O’Mahony Pike

Contract Sum: €4.3 million

Contract Period: Sept 13’ – Oct 14’

Description:Completion of 60 apartments consisting of fit-out and remedial works to existing structure, completion of basement Carpark, external landscaping , roads and footpaths.

Resident ial

Valhal la Sheltered Housing Development, Clondalkin Dubl in

Client: South Dublin County Council/ Clanmill Housing Association

Architect: South Dublin County Council

Contract Sum: €1.8m

Contract Period: September 2011 – October 2012

Description:Construction of a Sheltered Housing Development for Clanmill Housing Association to provide fully accessible living accommodation for up to 24 persons with varying levels physical disability. The building embraces environmental responsibility and sustainable technology with the aim of achieving a carbon neutral building.

Resident ial

Mil l Lane, Mountrath,Co. Laois

Client: Customeade Developments Ltd

Architect: John Madden and Associates

Contract Sum: €3.5 Million

Contract Period: January ’06 – May ‘07

Description:16 Number house residential project in Mountrath, Co. Laois.Detached three bedroom semi-detached and four bedroomdetached houses in a private development with highspecification finishes throughout.

Resident ial

Cherry Orchard Day Care Faci l i ty

Client: Andy Burton

Architect: Burdon Craig Dunne Henry Architects

Contract Sum: €1.9 Million

Contract Period: Sept 2008 – November 2009

Description:Construction of new single storey 1500m2 creche facility in Croftwood Crescent in Dublin 12. The building and grounds engage with the large public open space left at the heart of Cherry Orchard, which has been masterplanned by Dublin City Council.

Chi ldcare

Whitehal l Creche, Swords Road, Drumcondra, Dubl in 9

Client: City of Dublin VEC

Architect: Ann Blackwell Associates

Contract Sum: €600,000

Contract Period: June 2010 – February 2011

Description:Construction of a single storey New Creche facility in the grounds of Whitehall college.

Chi ldcare

Accenture Off ice Fit-Out

Client: Accenture Grand Canal Plaza 6th Floor Level

Architect: Colman Stack - Rogerson and Reddan

Contract Sum: €120,000

Contract Period: Feb 2010 – Apr 2010

Description:Complete fit-out of office

Fit-out

McCloskeys Bakery

Food

Client: McCloskey’s Bakery

Architect: Emmet Finnegan

Contract Sum: €350,000

Contract Period: Sept 2012 – Dec 2012

Description:Fit out of unit 3 at McCloskeys bakery and alteration work to existing unit 2. Works included all Mechanical and Electrical Works. External works included the installation of new drainage system, site lighting and yard slab.

Food

AIBP Gui ldford, Surrey

Client: AIBP Meats

Architect: Mitchell Evans LLP, Anchor House,Station Row, Shalford, Guildford,Surrey, GU4 8BY

Contract Sum: £200,000.00

Contract Period: June 2010 – Sept 2010

Description:Construction of a new waste water building on existing treatment facility. Works included the installation of a 5 metre sump chamber and associated drainage, raft slab foundation, steel frame and cladding. Installation of water treatment equipment to newly constructed building.

Industr ial Units, Tul lamore, Co Offaly

Client: Seamus Kane

Architect: Kenny Lyons Architects

Contract Sum: €3 Million

Contract Period: August 2010 – June 2011

Description:Construction of 4 commercial units and the fit out of the Flat bread factory, which included all plant and equipment.

Industr ial