company profile - cathodic protection co ltd€¦ · subordinate regulation and codes of practice....
TRANSCRIPT
![Page 1: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/1.jpg)
1
COMPANY PROFILE
2019
![Page 2: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/2.jpg)
2
CONTENTS
Item Description Page No
1.0 Introduction 3
2.0 Company Structure 3
3.0 Company Capabilities 4-6
4.0 CP Products 7
5.0 Health, Safety and the Environment 8-9
6.0 QA Certification 10
7.0 Professional Membership 11
8.0 Key Personnel 12-15
9.0 Insurance 16
10.0 Projects List/Experience 17-22
11.0 Current Projects 23
11.1 Clients of CPCL 24
![Page 3: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/3.jpg)
3
1.0 Introduction
Cathodic Protection Co Limited, founded in 1950, was one of the first companies in the United Kingdom set
up specifically to provide equipment and engineering services for the cathodic protection of pipelines,
storage tanks, well casings, and marine structures for the oil, gas, petrochemical, water and power
industries.
In the 1970s the company also developed its Cuprion range of marine anti-fouling systems, installed in
marine pumps and seawater intakes worldwide.
o In 1989 became part of the Hostombe Group of Companies
o As part of Hostombe Group, CPCL has sufficient capital resources to undertake projects of the
largest size and complexity.
o ISO 9001 : 2015 accredited.
o ISO 14001 : 2015 accredited.
o OHSAS 18001 : 2007 accredited.
o Established Middle East office in 2000 to service GCC Market
o Acquired Cath-Tech International Ltd in 2008
o Launched REFINETM Range of Reference Electrodes in 2011
2.0 Company Structure
![Page 4: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/4.jpg)
4
3.0 Company Capabilities
EXPERIENCE: Cathodic Protection Co Limited has been providing successful cathodic protection solutions to the Oil, Gas, Petrochemical, Water and Power Industries for over 60 years. Specific applications include:
o Pipelines – oil, gas, product, water etc. o Above ground storage tanks o Underground storage tanks o Well casings o Sheet and cylindrical piling – land and marine o In plant pipe work o Compressor stations o Concrete structures –bridges, pipelines, marine
structures etc. o Ships (hull and sea chest/internal pipe work) o Marine structures – jetties, wharves etc. o Cooling water pipe work for Power Stations
For 30 years our Cuprion® Anti Fouling system has been protecting pumps, internal pipe work and process plant from the problems of marine growth and corrosion. Cuprion® systems are low maintenance, chemical free and reliable, and can be found today in service on:
o Oil rigs o Jetties o FPSOs o Water Injection Systems o Ships o Subsea Coolers and Heat Exchangers o Desalination Plants o Chemical Process Plants
SERVICES : Cathodic Protection Co Limited offers a full range of services to meet client requirements, from initial advice and support to full turnkey systems. We can provide:
o Feasibility and economic studies o Site investigations o Planning and project designs o Project management
![Page 5: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/5.jpg)
5
o Cost estimates, specifications and Bills of Materials o Materials manufacture & supply o Installation supervision, commissioning, maintenance and monitoring o Consultancy and specialist advice o General engineering and fabrication o Training courses in the UK or overseas
OUR CAPABILITIES : Cathodic Protection Design Our experienced engineers can provide a full design service for your CP application. By reference to client supplied and recognised international standards, our NACE/ICORR qualified engineers will develop cost effective solutions to ensure that your requirements are met in full. Project Management Our Cathodic Protection Department can provide a full project management service covering site investigations, design, materials supply, installation, commissioning and system handover. Procurement Either manufactured in our own works or procured from a wide range of international suppliers, Cathodic Protection Co Limited can supply the full range of cathodic protection materials. Whether you need a single anode or a have a full Bill of Materials to source, we can provide a cost effective answer.
Engineering Services Site services are provided for the supervision of installation works, commissioning and maintenance of both sacrificial and impressed current cathodic protection systems on a worldwide basis. Site surveys carried out for soil resistivity, current drain, ground bed location, CIPS, DCVG, AC corrosion monitoring, mitigation and routine monitoring.
![Page 6: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/6.jpg)
6
Anti-Fouling Systems Our Anti Fouling Department is responsible for the design, manufacture, supply, installation and commissioning of Cuprion® automatic anti-fouling systems. Using client requirements such as water flow rate, duty cycle, pump maintenance interval and intake geometry, each Cuprion® system is custom designed to provide full anti fouling protection between scheduled pump overhauls.
Consultation Our engineers are available for discussion and advice on all aspects of cathodic protection and corrosion control activities. These services are supported by design and engineering capabilities to carry proposals through to fruition.
Training Our Corrosion Engineers are also available to train client’s personnel on cathodic protection and corrosion topics in the United Kingdom or overseas.
![Page 7: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/7.jpg)
7
4.0 CP Products
Cathodic Protection Co Limited offer the following CP products :
o TRUstTM Transformer Rectifier Units (Manual or Automatic – Oil or Air Cooled - Switch Mode) o TRUstTM Remote Monitoring and Control systems o Mixed Metal Oxide Anodes, tubular, rod, wire o Elgard ribbon and expanded mesh MMO anodes for concrete CP applications (Authorised
distributor www.eltechsystems.com ) o Accessories for concrete CP installations (spacers, tie wraps, reference electrodes,
positive/negative connections) o Silicon Iron Anodes (bare & canistered) o Magnesium, Zinc & Aluminium Anodes o Carbonaceous backfill o Anode, cathode, bond boxes o Explosion proof equipment o Rustrol Solid State Surge Protection o Cable & cable accessories o Pipeline flange insulation kits o CP Data Management software, American Innovations distributor www.aimonitoring.com o Test Equipment, CIPS & DCVG Equipment o REFINETM Reference Electrodes (portable & permanent)
![Page 8: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/8.jpg)
8
5.0 Health, Safety and the Environment
HEALTH & SAFETY POLICY STATEMENT This Policy Statement is issued in accordance with Health & Safety at Work etc. Act 1974, Section 2 (3). It is the policy of Cathodic Protection Co Limited to:
o Promote the occupational health and safety of all its employees. o Comply with the requirements of the Health & Safety at Work Act 1974. The Management of Health & Safety at Work Regulations 1999 and the relevant safety
legislation.
Policy Objectives In pursuance of this policy the Company acknowledges its responsibility, so far as is reasonably practical, to minimise:-
a) The risk to health and safety of the Company employees, to hazards to which they
are exposed whilst they are at work; and b) The risks to the health and safety of persons not in the employment of the
Company arising out of or in conjunction with the conduct by those persons or their undertaking.
o Provide and maintain safe and healthy working conditions taking into account any
statutory requirements. o Ensure the design, manufacture and instructions to users of Company equipment and
products result in safe operation and handling. o Provide such information, instruction and training as is necessary to enable employees at
all levels to perform their work safely. o Maintain constant and continuing interest in health and safety matters applicable to the
Company's activities, in particular by consulting and involving employees of their representatives wherever possible.
o Make available and supervise the use of all necessary safety devices and protective equipment.
This Policy is to be reviewed annually.
![Page 9: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/9.jpg)
9
HEALTH & SAFETY PROCEDURES As part of our OHSAS18001:2007 accreditation Cathodic Protection Co Ltd operate Health & Safety Management Procedures (HSMP’s) which are a fundamental part of the Company’s Integrated Management System and are used in conjunction with:
o The requirements of relevant Health & Safety legislation o Integrated Management System Procedures o Suppliers Instructions and Data Sheets o Manufacturers Manuals etc. o Clients Health and Safety Policies, Procedures, Method Statements etc.
They are set to ensure the Company’s compliance with current Health & Safety legislation and subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The Health & Safety Management Procedures are supported by appropriate training, instruction and information, including signage, to minimise workplace risk as far as is reasonably practicable. All employees are encouraged to contribute in developing these procedures in order to improve the health and safety of themselves, fellow employees, visitors and contractors.
ENVIRONMENTAL Cathodic Protection Co Limited recognises the importance of Environmental Protection and will comply with the requirements of the Environmental Protection Act 1990 and all subordinate environmental legislation, relating to the Company’s processes and activities. It is a Company objective to ensure the co-operation with the maintenance of good relations with all regulatory authorities and bodies. The Company will endeavour to act as a responsible neighbour in all the communities in which it operates.
![Page 10: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/10.jpg)
10
It will be the policy of the Company to carry out all measures reasonably practicable to meet, exceed or develop all necessary requirements to improve environmental performance. The policy will be enacted through integration into the Company’s normal management systems, giving it equal priority with all other aspects of the business management. The aims will be to, wherever possible:
o Assess the environmental effects of the Company’s activities and introduce appropriate control measures, or as appropriate, alternative materials or processes to minimise the negative impact on the environment from its operations
o Control and reduce the amount of waste produced and wherever practicable recycle waste product.
o Reduce the consumption of raw materials, water and fuels.
o To establish relationships with environmentally responsible suppliers/sub-contractors and demonstrate concern for the environment in all its purchasing activities.
o Increase the use of recyclable and renewable materials.
o Limit noise within and around the site The Company will as necessary develop the environmental awareness and understanding of its employees. Where practicable, the Company will provide information and assistance to customers on environmental issues arising from its products and services.
![Page 11: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/11.jpg)
11
QA Certification
Cathodic Protection Co Limited has been assessed and approved to ISO 9001 : 2015, Certificate No. CI/6511IQ
o The Quality Control Department has the authority to conduct quality assurance audits into raw materials and all facets of the Company's manufacturing activities.
o Reporting functions for this Department are directly to the Managing Director.
o Lines of communication within the Department are set out in the Company procedures. o A copy of the Company Quality Manual is available on request.
![Page 12: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/12.jpg)
12
7.0 Professional Membership
Cathodic Protection Co Limited is a member of the following professional organisations: NACE National Association of Corrosion Engineers I.Corr Institute of Corrosion CPA Corrosion Prevention Association BSI British Standards Institution
![Page 13: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/13.jpg)
13
8.0 Key Personnel & Personnel Resource DIRECTORS Rob Holden, Managing Director, (BSc (Hons) Degree in Engineering and Master’s Degree in Business Administration). Rob has over 30 years’ business management experience including 10 years at senior manager/director level in a FTSE 100 engineering company. He has extensive international experience and has spent most of his career working in the fields of Operations Management, Quality Management and Business Improvement. He is responsible for the strategic leadership of CPCL and ensuring that company resources are established, maintained, and directed to ensure that our corporate goal of complete customer satisfaction is consistently achieved. Chris Martin, Operations Director, has worked in the CP industry for over 11 years and is responsible for a team of Engineers and Technicians involved in the Installation, Operation and Maintenance of CP systems worldwide. He is well informed in modern CP design techniques, the application of computer aided fault finding and survey techniques, (CIPS, DCVG, ACVG) and electronic management of monitoring and maintenance data. He has also a broad knowledge of most CP applications including, Pipelines, Jetties, Offshore Structures, Tank Farms, Refineries, and Process Plants with working experience in the UK, Middle East, North Africa, Europe and South America. MANAGEMENT TEAM Dr Dan Marshall, Senior Cathodic Protection Engineer, (BSc, PhD, M.I.Corr) has over 17 years’ experience in the corrosion industry. Dan obtained a PhD in Corrosion Science from The Corrosion and Protection Centre, UMIST UK, in 2000, is a Member of The Institute of Corrosion and is certified as a Senior Corrosion technologist by NACE (certificate number 10078). He is the Senior Cathodic Protection Engineer in the Project Department covering the design of CP systems, submission of technical and commercial quotations, project management and overseeing the project department. Dan has worked on numerous CP projects in Africa (North and Sub-Saharan), Middle East, Far East and Europe and joined CPCL in October 2006. Ed Sparks, Project Sales Manager, obtained a BSc (Hons) in Mathematics from Loughborough University in 2005 and has gained wide experience in the CP industry in technical sales over 11 years. Ed is responsible for major project sales and marketing, focusing on securing major contracts and managing key accounts. Over the years he has developed an extensive knowledge of CP applications and the wider industry. Marcus Hardy, Technical Manager, has been with CPCL for 6 years, initially in the role of Production Manager, moving to Technical Manager in 2011. Marcus is responsible for engineering the company’s products to maintain the quality and performance standards our customers require, he is also responsible for the CAD team, and is management representative for the company’s ISO9001/ISO14001/ISO18001 management systems. Stuart Martin, Sales Manager, has worked in the CP industry in excess of 14 years. He is the key contact with American Innovations, responsible for sales in the region. Stuart also technically supports PCS Software and Allegro applications in the European and the Middle East, and supports our Dubai office operations with the Project Management of projects in the UAE and Saudi Arabia key skills include preparation and submittal of materials sales quotations / bid packages, development of new markets and servicing of existing client base. CP ENGINEERING
![Page 14: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/14.jpg)
14
Simon Filmore, Senior Project Engineer, has an electrical background with over 22 years’ experience in the cathodic protection industry. Simon has experience in sacrificial and impressed current cathodic protection systems including design, site surveys, installation, commissioning, monitoring and maintenance. He is trained to Level 2 Cathodic Protection Technician, I.Corr approved and is also a trained First Aider. He has field experience in the UK, Jordan, Kuwait, Qatar, Saudi Arabia, Nigeria and Gibraltar. Alessandro Bonetti, Cathodic Protection Engineer, (BSc, MSc) has over 5 years’ experience in the corrosion industry. He has an MSc in Materials Engineering from Politecnico di Milano and is certified Level 2 in CP for metallic structures in sea water and buried metallic structures. He works in the Project Department covering the design of CP systems, technical and commercial quotations and site activities. He has worked extensively around the world, both on and offshore, including Italy, Saudi Arabia, UAE, Bahrain, Turkey, Egypt, Iran, Azerbaijan and Kazakhstan. Dr Eric Liu, Cathodic Protection Engineer, with a BSc in Chemistry and a Doctorate in Nano Chemistry, has worked for CPCL for over 8 years. Based in our Middle East office, he specialises in ICCP design and sacrificial anode systems in concrete structures and has been heavily involved in such major projects as Ras Laffan in Qatar and Zirku Island, UAE. ANTI FOULING Matthew Lamb, Anti-Fouling Product Manager, (BEng (Hons) Degree in Manufacturing Engineering) has over 28 years’ experience in industry. Previously working in the pump industry, Matthew has over 11 years’ experience in the design and manufacture of marine anti-fouling systems. Matthew ensures that all of our anti-fouling systems are designed, engineered and manufactured according to client specifications. TRANSFORMER RECTIFIERS Rob Mason, TR Applications Engineer, has an ONC in Electrical and Electronic Engineering, and has been with CPCL for over 5 years. He started work building and testing the TR units and has now moved on to designing the range. As with most engineers in the company, Rob has travelled extensively to sites around the world. Jordan Hemming, Software Engineer, obtained a BSc (Hons) in Computer Science from Manchester University. He has over 5 years’ experience in the development of Remote Control and Monitoring Systems for the Cathodic Protection industry, and joined CPCL in March, 2014. FIELD SERVICES Paul Williams, Project Engineer, has 30 years’ experience in cathodic protection systems both in the UK and abroad. Paul is familiar with most aspects of cathodic protection including survey, design and supply, installation and maintenance of onshore and offshore applications. He has extensive experience in the supervision of drilling companies and crews for deep well ground bed application, resistivity surveys and Close Interval Potential Surveys. Also has a working knowledge of marine anti-fouling systems and internal corrosion monitoring and inhibitors. Ivan Preston, Senior CP Technician, has a vast amount of experience in the CP industry, and has been with the company for over 20 years. During this time he has developed an unrivalled knowledge of CP techniques in the field, and has worked throughout the world in a supervisory capacity on a variety of high profile projects.
![Page 15: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/15.jpg)
15
Roberto Galindo, Senior CP Technician, is a highly experienced engineer and CP surveyor with over 18 years’ experience, MSc in civil engineering and is ICorr Level 2, working on a wide range of major projects in Europe, Middle East, Asia, North Africa, South America and Turkey. In 2009 he was appointed CPCL's Libya Branch Technical Manager, involving the completion of tenders and quotations as well as the day to day liaison with clients. Chris Pimm, Survey Supervisor, has worked for CPCL for 8 years, specialising in the supervision of CIPS and DCVG combined surveys. During which time he has been involved with large clients such as Southern Gas Networks, Scotia Gas Networks, National Grid and Wales & West Utilities, and has worked around the globe from Madagascar to the Falkland Islands. Chris has undertaken considerable specialist training, and is qualified at ICorr CP Level 1. Motaz Abbas, CP Technician, is based in Jordan and gives more depth to CPCL's Middle East operations. With a BSc in Chemical Engineering and NACE CP Level 2, Motaz brings a high level of technical and practical knowledge to the company, and has worked on major global projects, including Saudi Arabia, Libya and Azerbaijan. Tom Pain, Technical Services Co-ordinator, has been with CPCL for 4 years since leaving Manchester Metropolitan University with a BSc in Geography. His role is to plan, execute, and track the technical requirements for the service technicians, working closely with the Field Services Manager.
PERSONNEL RESOURCE
Discipline Quantity
CP Engineers 3
Project/Field Engineers 19
Draughtspersons 3
Production 13
Sales & Administration 14
Accounts 2
![Page 16: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/16.jpg)
16
9.0 Insurance This is to certify that we Cathodic Protection Co Limited hold the following insurance:- Employers Liability Renewal Date: 27th November annually Limit of Indemnity £10,000,000 any one occurrence Public / Products Liability Renewal Date: 27th November annually Limit of Indemnity: £15,000,000 any one occurrence and in the
aggregate in respect of Products Liability. Contract Works Renewal Date: 27th November annually Limit of Indemnity £2,000,000 any one contract Contractors All Risks/Hired In Plant Renewal Date: 27th November annually Limit of Indemnity £1,000,000 any one contract for contract works £100,000 any one occurrence for hired in plant Professional Indemnity Renewal Date: 27th November annually Limit of Indemnity £5,000,000 in the aggregate
![Page 17: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/17.jpg)
17
10.0 Recent Projects List
PIPELINES & PLANTS
Project Name Country Scope Value Date Client
IGD UAE ICCP design, supply and commissioning of piping and pipelines
£430K Ongoing Initec/Gasco
Z-Cina Gas Reinjection Algeria ICCP design, supply and commissioning of piping and pipelines
£370K Ongoing Dodsal/ Sonatrach
RAPID4 Malaysia ICCP design, supply and commissioning of tanks and piping £160K Ongoing Petrofac/Petronas
KPONE Ghana ICCP design, supply and commissioning of tanks, piping and pipelines
£130K Ongoing Electrowave
HAIL UAE GACP for in-plant piping £100K Ongoing Initec/ADCO
TAPCO Colling Water Piping
UAE In plant ICCP system £250K 2016 TAPCO
Shah Deniz Phase II Azerbaijan Design & supply of materials for ICCP in plant piping tanks using a canistered anode system
£650K 2014 KBR & BP
Vasiliko Terminal Cyprus Design and material supply of CP for jetty and multi-purpose pipeline
£155k Ongoing VTTV
Etilino Project Mexico Design & supply of materials for ICCP in plant piping using a linear anode system
£350K 2013 Technip & Technimont
Gran Chaco Project Bolivia Design & supply of materials for ICCP in plant piping using a combined linear/canistered anode system tank base and internals, pipelines & GACP to tank internals
£238K 2013 Technicas Reunidas
EGTL Nigeria Survey, design, manufacture and supply of Cathodic Protection system for gas to liquids plant
£2,000k 2006-2013 Chevron/NNPC
Bir Seba Project Algeria Design & supply of materials for ICCP in plant piping using a linear anode system, tank base and internals, pipelines & GACP to tank internals
£310K 2012 JGC & Sonatrach
Dunkerque LNG Project France Design & supply of materials for ICCP in plant piping, pumps & earthing system
£198K 2012-2014 TSLNG
Skikda LNG Algeria Survey, design, manufacture and supply of Cathodic Protection system
£450K 2009-2012 KBR/Sonatrach
Assiut To Aswan Gas Pipeline
Egypt Survey, design manufacture & Supply Of Permanent & Temporary CP Systems For A 525km 30” Gas Pipeline
£250K 2008-2010 Enppi/Egas
Medgaz 48” Gas Pipeline Algeria Design, manufacture & supply of Temporary & Permanent CP Systems for 250kms Gas Pipeline
£400K 2007-2008 Sonatrach
Common Cooling Water Phase 2
Qatar Cathodic protection design, supply and commissioning for all new reinforced concrete seawater cooling systems
£1,875K 2007-2008 Qatar Petroleum
Emethanex Project Egypt Survey, design, manufacture and supply of ICCP systems for pipelines, tanks and jetty
£130K 2008 Techint/Emethanex
BTC Turkey Design verification, supply of materials, installation & commissioning of 280km Lot-“A” of the BTC P/L.
£250K 2005-2007 BOTAS/BTC BP
BTC Turkey Design verification, supply of materials, installation & commissioning for 4No pumping stations & 1No pigging station
£300K 2005 BOTAS/BTC BP
CONCRETE
Project Name Country Scope Value Date Client
SAFCO Repair Project KSA Supply of Materials for Concrete CP £355K 2019-Ongoing AFIC
SABIC HQ KSA Supply of Materials for Concrete CP £2,000K 2018-Ongoing AFIC
![Page 18: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/18.jpg)
18
Tay Road Bridge UK Supply of TRs and remote monitoring equipment £120K 2019-Ongoing Tay Road Bridge Company
M6 Smart Motorways UK Supply of Materials for Concrete CP £55K 2019 Freyssinet
Harrow Road UK Supply of Materials for Concrete CP £85K 2019 Freyssinet
La Reunion La Reunion Supply of TRs and remote monitoring equipment £190K 2018-2019 Freyssinet
Kurnell Refinery Australia Supply of TRs and remote monitoring equipment £180K 2017-Ongoing Freyssinet
POM Project Saudi Arabia Design & Supply of Materials for Concrete CP £1,770K 2016-2019 Intecsa/SABIC
KEMYA Project Saudi Arabia Design & Supply of Materials for Concrete CP £632K 2015-2018 HAMON/SABIC
4 Islands United Arab Emirates Design & Supply of Embedded Materials for Concrete CP £1,871K 2015-2019 AFIC/Petrofac/ZADCO
London Waste UK 26 channel TR system with steel in concrete materials £80K 2016 Volker Laser
Wolverhampton Civic Centre
UK 21 channel Switch Mode TR system, along with steel in concrete materials
£40K 2016 Volker Laser
Haslar Bridge CP System UK 20 Channel TR system to Highways Agency specifications, with CP materials
£45K 2015 CRL/Atkins
BSS Tech Saudi Arabia 3 TRs to SABIC specifications with RMCS £35K 2015 SABIC
Brighton Marina UK Supply of Embedded Materials for Concrete CP £60K 2013-2014 Various
Tangiers Med Port II Morocco Supply of Transformers & Remote Monitoring of reinforced concrete caissons
£1,800K 2013-2014 MECAP
Tangiers Med II Morocco Embedded Materials £945K 2012 MECAP
Princess Promenade UK Supply of Transformer Rectifiers with Remote Monitoring System
£86K 2012 Dawnus
Southern Seawater Desalination Plant
Australia 50 Channel Transformer Rectifier Unit £135K 2011 SSJV
Tangiers Med II Morocco Embedded Materials £1,350K 2011 MECAP
Ras Laffan Port Expansion
Qatar Cathodic protection design, supply and commissioning for new reinforced concrete substation buildings and various metallic water tanks, Liquid Petroleum Berths, Container berths, Tug Berths and naval Base structures. This includes piles, decks, capping beams, walkways, etc.
£3,125K 2007-2014 Qatar Petroleum
Southern Seawater Desalination Plant
Australia Supply of Elgard MMO Ribbon, Reference Electrodes 7 Accessories
£250K 2009 SSJV
Tangier Port Development
Morocco Supply of Elgard MMO Ribbon Anodes & Accessories £500K 2007-2009 MECAP/PPTM
Common Cooling Water Phase 2
Qatar Cathodic protection design, supply and commissioning for all new reinforced concrete seawater cooling systems
£1,875K 2007-2008 Qatar Petroleum
MARINE
Project Name Country Scope Value Date Client
Canakkale Bridge Turkey ICCP design and supply for bridge support caissons. £200K 2018-Ongoing Cimtas / Canakkale Bridge
Greenport, Hull UK ICCP design, supply and installation on sheet pile wall £310K 2015-2018 Graham Lagan/ABP
Izmit Bay Bridge Turkey ICCP design and supply for bridge support caissons. £250K 2014 Tuzla/IHI
Dunkerque LNG Project France Design & supply of materials for GACP for jetty & pumps £317K 2012-2014 TSLNG
GATE Project Netherlands Design, supply and commissioning of Sacrificial and Impressed Current CP systems for LNG jetty
£250K 2010 GATE/TS LNG
![Page 19: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/19.jpg)
19
Upgrade Of Fuel Loading Jetty
Kuwait Survey, design, supply & Installation Of ICCP system retrofit and upgrade
£650K 2008-2009 KNPC
Tianjin Port Development
China Design For ICCP System and supply of Specialist Materials £75K 2006-2007 Orient Resource Holdings
DOW-PIC Olefins 2 Project (OL2K) Jetty No 34 Expansion CP System FEED
Kuwait Front End Engineering Design (FEED) for the Impressed Current Cathodic Protection (ICCP) System for the expansion of Jetty No 34
£6K 2005 Mouchelparkman for DOW Chemicals
Amwaj Islands Bahrain Design, supply, install & commission ICCP system for sheet piles & reinforced concrete capping beam
£300K 2005-2006 Ossis Developments
PetroPlus Jetty UK Supply, Install and commission ICCP system £85K 2001 PetroPlus
Aughinish Alumina Ireland Survey, design & installation of impressed current on tubular jetty piles
£30K 1999 Alcan
Yanbu Seawater Pumphouse
Saudi Arabia Survey, design & installation of ICCP systems for seawater pumping stations
£50K 1999 YANPET
Humber Oil Terminals UK Survey, design & installation of impressed current systems on oil loading jetties
£68K 1999 Associated Petroleum Terminals
Texaco Berths 7 & 8 UK Design, supply and install CP system to jetty piles £130K 1997 Texaco Ltd
STORAGE TANKS
Project Name Country Scope Value Date Client
PS1 – North Rumaila Iraq Tank ICCP rehabilitation £70K Ongoing Nardis/Basra
Zubair Iraq Tanks ICCP design, supply and commissioning £110K Ongoing Ergil/ENI
SADAF EOP KSA Tanks and piping ICCP design, supply and commissioning £130K Ongoing TCC / SABIC
Buncefield UK Rehabilitation of tanks and piping – ICCP systems £240K 2015 AMEC/BPA
Tucuman Airport Panama Design of tank CP system £7K 2014 Foster & Partners
Storage tanks at Samawa Iraq Design and supply of CP systems to 19 oil and product storage tanks for internal and external protection
£400K 2011 SCOP (State Company For Oil Projects)
Crude Oil Storage Tanks Libya Supply of CP Systems for 10 No Crude Oil Storage Tanks £275K 2009 SOC (Sirte Oil Company)
SOC Fuel Storage Iraq Design and supply of CP Systems for 8 No Crude Oil Storage Tanks
£150K 2009 South Oil Company
Al Amal Development Project
Egypt Survey, design, manufacture and supply of ICCP systems for Tank Storage facility
£40K 2009 Amapetco
Tenghizchevroil Tank Bottom Project
Kazakhstan Design verification, supply of materials, installation & commissioning
£110K 2006-2007 Worley Parsons/TCO
SCECO Saudi Arabia Design and installation of mixed metal oxide anode system for protection of storage tank bases
£65K 2004 Saudi Bemco
SCECO Saudi Arabia Design and installation of mixed metal oxide anode system for protection of storage tank bases
£50K 2002 Saudi Bemco
Mina Al Ahmadi Kuwait Design & installation of silicon iron anode ground beds for protection of storage tank bases & pipework
£90K 1999 Sinopec/Kuwait National Petroleum Co.
Shuaiba Tank Restoration
Kuwait Design, supply and supervision of installation of cathodic protection system
£40K 1998 KNPC
Umm Said Tank Farm Qatar Design and installation of mixed metal oxide deep well anode ground beds for protection of storage tank bases
£200K 1997 Qatar General Petroleum Co.
Teeside Refinery UK Survey, design & Installation of Borehole Ground beds & polymeric anodes, rectifiers
£400K 1997 Phillips Petroleum
![Page 20: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/20.jpg)
20
MATERIAL SUPPLY
Project Name Country Scope Value Date Client
Solar Controllers KSA Supply of solar controllers £120K 2019-Ongoing Riyadh Geotechnique
Allegro Upgrade UK Supply of upgraded Allegro equipment
£220K 2019 SGN
Killingholme UK Supply of TR’s, Junction Boxes MMO Anodes & Accessories
£140K 2019-Ongoing CLH
Transformer Rectifier stock supply Iraq Supply of Transformer Rectifiers for stock £170K 2018 Al Saqr
GMMRA Libya Survey equipment, junction boxes and training £190K 2018 GMMRA
BS-171 Booster Station Kuwait Supply of TRs, Junction Boxes, MMO Anodes & Accessories £550K 2012-2018 Saipem India
ADCO TRs UAE 45TRs to ADCO specifications £350K 2017 LIWA/ADCO
TR Refurbishment Morocco Refurbishment of existing Electrotech equipment £171K 2015 MECAP
AGOCO Libya Supply of TR’s, Junction Boxes MMO Anodes & Accessories £750K 2014 CPSI
Chevron Bangladesh Bangladesh Supply of TR’s, Junction Boxes MMO Anodes & Accessories £300K 2014 JST
Kazakhstan-China Gas Pipeline Project
Kazakhstan Supply of Transformer Rectifiers £70K 2013 KSS
Suriname Project Suriname Supply of MMO Anodes, Bulk Materials & Accessories £340K 2012 Saipem SpA
Pointhouse Quay UK Supply of Transformer Rectifiers with Remote Monitoring System
£110K 2012 R&R Corrosion
IKRA Vinyl Plant Russia Supply of 26 TR Units , 1000 MMO Anodes, Junction Boxes, Ref Cells and Accessories
£900K 2011-2014 Technip/Rusvinyl
BS-171 Booster Station Kuwait Supply of TR’s, Junction Boxes MMO Anodes & Accessories £550K 2011-2012 Saipem India
PMP Project Qatar Supply of TR’s, Junction Boxes MMO Anodes & Accessories £250K 2011 Technip
Arzew Project Algeria Supply of TR’s, Junction Boxes MMO Anodes & Accessories £180K 2011 Saipem SpA
GATE Project Netherlands Design, supply and commissioning of Sacrificial and Impressed Current CP systems for LNG jetty
£250K 2010 GATE/TS LNG
Koniambo Nickel New Caledonia Design, supply and commissioning of Sacrificial and Impressed Current CP systems pipe works, tanks and jetty facility
£650K 2010 Koniambo Nickel/Technip
QGX Ras Laffan Qatar Supply Of Junction Boxes / Remote Monitoring £83K 2010 Qatar Liquefied Gas Company/CTJV
QGX Ras Laffan Qatar Supply Of Transformer Rectifiers £59K 2010 Qatar Liquefied Gas Company/CTJV
Stublach Gas Wells UK Design & supply of CP systems including 13 No Transformer Rectifiers
£100K 2009 Storengy
QAFCO 5 Qatar Supply Of TR’s, Junction Boxes, MMO Anodes and Accessories
£250K 2008-2009 Snamprogetti/QAFCO
El Feel Water Injection Project
Libya Supply Of TR’s, Junction Boxes, MMO Anodes and Accessories
£250K 2008-2009 CPP/ENI
Kashagan Kazakhstan Supply Of CP Equipment For Protection Of 10 Storage Tanks £150K 2007 MSS/AGIP
Zueitina 103A Pipeline Libya Supply Of Temporary & Permanent CP Equipment £100K 2006-2007 CPPMEC/Zueitina Oil Company
Great Man Made River Project
Libya Supply Of CP Accessories £120K 2006 Al Nahr Co. Ltd
CP Data Management UK Supply Of Allegro Field Computers £220K 2006 Scottish & Southern
![Page 21: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/21.jpg)
21
Nafoora Field Upgrade Libya Supply Of Cathodic Protection Materials & Services £220K 2005-2006 Bosna S Oil Service Company/AGOCO
ANTI FOULING
Project Name Country Scope Value Date Client
Tyra Redevelopment Project
Denmark Supply of deck mounted Copper/Chlorine Anti Fouling System
£300K 2019-Ongoing McDermott
Karratha Gas Plant Australia Deck System for 4 Fire Water Pump Caissons, c/w Feed Pump
£105K 2018-Ongoing Woodside
NASR UAE CUPRION® Screen Mounted system for Seawater Lift, Fire Water and Jockey Pumps
£200K 2016-2018 ADMA-OPCO
Umm Lulu UAE CUPRION® Screen Mounted system for Fire Water and Jockey Pumps
£295K 2017 ADMA-OPCO
DolWin III HVDC Convertor
Germany 4No. Deck Systems for Cooling Water Pumps £176K 2016 Alstom / TenneT
GUPCO AF Egypt Supply of Anti-Fouling Unit £130K 2015 GUPCO
Ravenspurn UK Hazardous Area Deck System £160K 2015 Perenco
Vasiliko Terminal Cyprus Lloyd’s Registered CUPRION® high pressure system. £45K 2014 J&P Energy
Umm Lulu UAE CUPRION® Screen Mounted system for 6 Seawater Lift Pumps
£311K Ongoing ADMA-OPCO
Safaniyah Saudi Arabia CUPRION® Pump Mounted system for1 No. Seawater Wash-down Pump
£17K 2014 Saudi Aramco
SARB-3 North & South Island
UAE CAnDU™ Deck Mounted system for 4 No. Main & 4 No. Make up Seawater Pumps
£550K 2014 ADMA-OPCO
Zakum West & Umm Shaif
UAE CAnDU™ Deck Mounted system for 4 No. Seawater Lift Pumps
£54K 2013 ADMA-OPCO
Izmit Refinery Turkey CUPRION® Screen Mounted system for 11 N0. Firewater Pumps
£178K 2013 Tupras
South Satellite Platform UAE CUPRION® Screen Mounted system for 2 N0. Firewater & 2 No. Jockey Pumps
£41K 2013 ZADCO
Morecombe Bay UK CAnDU™ Deck Mounted System £63K 2013 Centrica
Biodiesel Plant Hong Kong CUPRION® Screen Mounted system, 6 No. firewater Pumps £58K 2012 TKO
Upper Zakum Field, South Satellite Platform
UAE Firewater and Jockey Pump Systems £42K 2011 ZADCO
Champion 7 Brunei Firewater Pump system £45K 2011 Frank Mohn Flatøy AS/ Brunei Shell Petroleum
MPI Adventure UK Systems for Cooling Water Pumps £49K 2011 MPI Offshore
Puerto Montt & Mejillones Fuel Terminals
Chile Firewater and Jockey Pump Systems £82K 2010 Sihi Chile/COPEC
PLTU 2 Sulawesi Utara Indonesia Power Plant Cooling Water Intake £147K 2009 PT Wijaya Karya Tbk/ PT PLN (Persero)
Trinidad Project Trinidad Tank Based system £150k 2009 BHP
Fire Water Pump Project UK Fire Water Pump system £75k 2008-2009 Sulzer Wood
Rough Platform Upgrade UK Cooling, Fire and Service Water Pump System £120K 2006 Amec
SURVEY & MONITORING
![Page 22: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/22.jpg)
22
Project Name Country Scope Value Date Client
Thames Barrier UK Inspection, repair and maintenance of CP system in gate arms and leaves
£- 2017 - Ongoing
Balfour Beatty/Thames Barrier
Routine Monitoring Ireland Supply of routine monitoring services and resident engineer £- 2017 - Ongoing
GNI
Field Surveys Libya Field Surveys £320K 2018 - Ongoing
Akakus Oil Operations
Various UK Conducting feasibility surveys and installation of the CP system associated with the Total pipeline on behalf of Fisher German
£150K Ongoing Fisher German
CIPS AND DCVG UK Various pipelines in West of UK £10K Ongoing W&W Utilities
Island CIPS & DCVG UK Since 1998 CPCL has carried out extensive work as the preferred provider of CP Services
£500K Ongoing Island Gas Ltd`
Southern Gas UK CPCL has been working with Southern Gas since 2006 providing complete CP services
£400K Ongoing Southern Gas Ltd
GPSS Contract UK Conducting a wide range of CP surveys and installations on the GPSS Network over 5 years replacement of 80+ transformer rectifiers including AC boxes, 30+ groundbeds, and 52+ test point monitoring stations
£500K 2008-2013 Costain Oil & pipeline Agency
Wigmore Viaduct UK Installation of high level remote control Transformer Rectifiers, including AC cabling. Implement remote control software and train client. Proof test equipment and handover to client
£400K 2013 Amey Links
GNL Norte Phase 2 Chile Installation of temporary CP system during the hydro pneumatic test for the LNG tank. Including associated installation works, and full commissioning,
£90K 2013 Technicas Reunidas
CIPS AND DCVG UK Various pipelines in West of UK £10K 2012 W&W Utilities
The SCPX Expansion Project
Georgia/ Azerbaijan CP feasibility and soil & resistivity surveys of proposed SCPX expansion pipeline loop corridors between Sangachal in Azerbaijan and the end of loop 2 in Georgia.
£110K 2012 RSK/CB7I
CIPS & DCVG Libya 1,500Kms of CIPS and DCVG Survey £500k 2010-2011 Waha Oil Company
CIPS AND DCVG Libya 1,000kms of CIPS and DCVG Survey £500k 2008-2009 SOC
Various Pipeline Surveys Georgia & Azerbaijan SCPX and WREP Pipeline Route Surveys on South Caucuses Pipeline Network
£120k 2011 RSK/BP
Various Pipeline Surveys Georgia Pipeline Surveys on South Caucuses Pipeline Network £400k 2011 RSK/BP
Operation and Maintenance of Cathodic Protection Facilities
UK Operation and Maintenance of Cathodic Protection facilities to 2000 KM of OIL Pipelines in the UK, to include remedial works and upgrading of systems.
£400K 2008 - 2012 OPA
![Page 23: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/23.jpg)
23
12.0 Recent Projects
Tangier – Tangier Mediterranean Port Project
In the largest RMCS project undertaken by CPCL to date, 28 large multi-channel TRs have been supplied for the Tangier Port Project which by the mid 2015 had clocked up 7 million channel running hours. CPCL has worked closely with the main contractor in the project since 2007 to create a world-class port facility and major trading hub on the northern shores of Morocco. The commissioning team sent to Tangiers energised the last TR in December 2014 and so far 964 TR channels are clocking up over 160,000 channel operating hours a week.
Intecsa Polyoxymethylene (POM) Project, Saudi Arabia
In a deal worth over $1 million, CPCL has been awarded
the contract to provide Steel in Concrete CP for the
cooling tower and conventional CP for storage tanks as
part of the Polyoxymethylene (POM) Project at Al-
Jubail in Saudi Arabia. The contract was awarded by
Intecsa on behalf of clients SABIC and Celanese, with all
design and materials to SABIC specification. CPCL’s
TRUst Transformer Rectifiers are being used to provide
99 DC outputs.
ADMA-OPCO – Umm Lulu Full Field Development Project Package 2
Cathodic Protection Co Ltd. has been contracted to supply its Cuprion® marine anti-fouling system for 6 seawater
lift pumps on the Umm Lulu Super Complex, in the United Arab Emirates. The project, worth over £300,000, will
see the Cuprion® anti-fouling electrodes, supplied with Super Duplex Stainless Steel intake strainers, fitted inside
the pump caisson, and are designed to be removable whilst the pump is in-situ.
![Page 24: COMPANY PROFILE - Cathodic Protection Co Ltd€¦ · subordinate regulation and codes of practice. They provide safe systems of work for Cathodic Protection Co Ltd employees. The](https://reader034.vdocument.in/reader034/viewer/2022042212/5eb46ea901be9b57341c776f/html5/thumbnails/24.jpg)
24
12.1 Clients of CPCL