COMPANY PROFILE ELECTRICAL DIVISION GRAND ENTERPRISES L.L.C P.O..Box :1638,PC,P.C. :133, Sultanate of Oman TEL: 00968-24504021,Fax :24504034 Email: [email protected]

Upload: shaikh-afroj

Post on 24-Jan-2018

724 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: Company profile -Electrical  12

COMPANY PROFILE

ELECTRICAL DIVISION

GRAND ENTERPRISES L.L.C

P.O..Box :1638,PC,P.C. :133, Sultanate of Oman

TEL: 00968-24504021,Fax :24504034 Email: [email protected]

Page 2: Company profile -Electrical  12

TABLE OF CONTENTS

SECTION 1: INTRODUCTION

SECTION 2: ORGANIZATION

SECTION 3: RESOURCES

SECTION 4: LICENSES

SECTION 5: PROJECT REFERENCES

SECTION 6: PHOTOS FROM PROJECTS

Page 3: Company profile -Electrical  12

SECTION 1: INTRODUCTION

Page 4: Company profile -Electrical  12

Profile of the company

Established in the year 1977, as M/S , Abdulqawi & Partners Co ,and later changed

the Name to M/S Grand Enterprises LLC ,in 1993, we are one of the pioneers and

leading Electrical and Electro-Mechanical Contractors in the Sultanate of Oman .with

a term of qualified and experienced professional we continue executing numerous

prestigious project in the Sultanate for various ministries and private organizations.

Our vision

1. To emerge as the No.1 Electrical and Electro-Mechanical Contractors in the Sultanate of Oman

2. To upkeep Quality of work without compromising on Safety and Environmental Protection.

3. Complete Customer Satisfaction.

Our Mission

1. To diversify our activates in more Engineering Fields. 2. Update with the new processes and technologies in the field , and induct them

in the company.

3. Constant training of staff in new work practice and awareness in safety and environment.

Registrations with Ministries

1. Distribution Code Review Panel- Grade 'A' (33KV ,11KV,and LT .Works)

2. D.G of Water Supply & Transport

3. Royal Court Affaires(Diwan)

4. Raysut Industrial Estate

5. Ministry of Defence Engineering Services

6. Tender Board

7. Oman Chamber of Commerce and industry

.

Page 5: Company profile -Electrical  12

Client Satisfaction

Client Satisfaction is One of Our foremost priority . We cater to our clients as per

their requirements and are successful in attaining customer satisfaction .witch the

aim to Create long –lasting bonds with our esteemed client , we offer prompt and

effective engineering solution and maintenance support by encouraging customer

feedback.

Activities (Electrical Division )

Electrical construction work such as 33kV & 11kV overhead lines , L.T. Overhead lines

,HT & L.T Under Ground Cables ,33kV &11kV Substation , H.V& LV .Switch Gears

,Street Lighting ,Feeder Pillars Distribution Panels , Control system , Building

Electrification Works ,fire Alarm Systems .Maintenance & services for electrical and

electromechanical installations in various facilities.

Activities ( Mechanical & Electro- Mechanical Division

Design , Supply, Erection and Commissioning of Reverse Osmosis water Treatment

Plants ,Operation & Maintenance of Water Treatment Plants, Design , Supply

Erection and Commissioning of Sewage treatment Plants, Operation & Maintenance

of Sewage Treatment Plants, Supply & Erection of Pumps ,Pump Controls. Telemetry

Systems Supply & Erection of Diesel Generators , Operation & Maintenance of diesel

Power Stations , Repair & Service of Hydraulic Equipments and diesel Generators.

Page 6: Company profile -Electrical  12

Team

Along with an upgraded infrastructure, we also possess a team o highly qualified and

experienced professionals . we own our success to our team ,which constantly strives

to offer jobs of unmatched quality. Our company nurtures a talented workforce

which comprises of professionals from diverse backgrounds. Besides, we also conduct

regular training session to keep our team updated with the latest advancements in

the field.

We are in Possession of a full Supply of tools & Plants ,regularly replacing old and

damaged ones, updating , and upgrading to the current standards. We procure

specific testing equipment and special tools from renowned companies around the

world on regular basis.

Tools and Plants

Our strengths

Apart from ethical and transparent business practices ,our client –centric approach

and cost effective services have mode us obtain a good position in the region .We

have achieved a credible name in the field with great diligence and effort.

Contracting Services Provided by us have outdone premium standards set up by the

market.

Quality Assurance

We are highly conscious about our quality .our first priority is to offer excellent

quality job at a competitive price no compromise is ever done to the quality of

materials used in projects Utmost care is taken to see that all relevant standards and

specifications are met in each part of the works. Staff is made aware with the latest

standards and regulations issued by the authorities from time to time .

Page 7: Company profile -Electrical  12

Health , Safety and Environment

Our Company has an excellent track record on safety . No untoward incident is

reported for a very long time we professionally train our staff in health ,safety and

environment consciousness. First aid training , Electrical safety requirements

environment protection etc. are mode aware to all the category of staff through

accredited training institutes. Regular safety meetings are organized for evaluation

of safety procedures at site , and updating the staff with work specific safety

measures Adequate personnel protective equipment is issued to all.

Page 8: Company profile -Electrical  12

SECTION 2: ORGANIZATION CHART

Page 9: Company profile -Electrical  12

Organization Chart

Page 10: Company profile -Electrical  12

SECTION 3: RESOURCES

Page 11: Company profile -Electrical  12

Team

Along with an upgraded infrastructure, we also possess a team o highly qualified and

experienced professionals . we own our success to our team ,which constantly strives

to offer jobs of unmatched quality. Our company nurtures a talented workforce which

comprises of professionals from diverse backgrounds. Besides, we also conduct regular

training session to keep our team updated with the latest advancements in the field.

We are in Possession of a full Supply of tools & Plants ,regularly replacing old and

damaged ones, updating , and upgrading to the current standards. We procure specific

testing equipment and special tools from renowned companies around the world on

regular basis.

Tools and Plants

Our strengths

Apart from ethical and transparent business practices ,our client –centric approach and

cost effective services have mode us obtain a good position in the region .We have

achieved a credible name in the field with great diligence and effort. Contracting

Services Provided by us have outdone premium standards set up by the market.

Quality Assurance

We are highly conscious about our quality .our first priority is to offer excellent quality

job at a competitive price no compromise is ever done to the quality of materials used

in projects Utmost care is taken to see that all relevant standards and specifications are

met in each part of the works. Staff is made aware with the latest standards and

regulations issued by the authorities from time to time .

Health , Safety and Environment

Our Company has an excellent track record on safety . No untoward incident is reported

for a very long time we professionally train our staff in health ,safety and environment

consciousness. First aid training , Electrical safety requirements environment protection

Page 12: Company profile -Electrical  12

etc. are mode aware to all the category of staff through accredited training institutes.

Regular safety meetings are organized for evaluation of safety procedures at site , and

updating the staff with work specific safety measures Adequate personnel protective

equipment is issued to all.

Page 13: Company profile -Electrical  12

LIST OF TOOLS & PLANTS IN THE COMPANY

AS ON 30.07.2013

S.No. Description Qty

1 3 Ton Double Cabin Pickup 2 No

2 1 Ton Double Cabin Pickup 4 No

3 8 Ton Hiab Crane 2 No

4 6 Ton Hiab Crane 1 No

5 J.C.B. 3CX 3 No

6 Excavator cum Rock Breaker 1 No

7 10Ton Tipper Trucks 2 No

8 Saloon Cars/SUVs 9 No

9 Mini Bus 1 No

10 Concrete Mixer Machine 2 No

11 Air Compressor with jack hammer 1 No

12 Megger , 500V/1000V 6 No

13 Megger , 5kV / 10kV 2 No

14 High Potential Test Equipment, 100kV 1 No

15 Cable Locator 3 No

16 Multi Tester 10 No

17 Earth Tester 4 No

18 Hydraulic Crimping Tool 2 set

19 Hand Operated Crimping Tools Lot

Page 14: Company profile -Electrical  12

20 Cable Rollers 200 No

21 Concrete Vibrator 2 No

22 Compactor 3 No

23 Portable Generator 2 No

24 Cable Puller 5Ton 1 No

25 40' Aluminium Ladders 6 No

26 40' Fibre Glass Ladders 15 No

27 Cable Jacks 6 Sets

28 Portable Drill Machines 6No

29 Portable Grinders 4 No

30 Hand Tools Lot

31 Hilti 2 No

32 Line Winches 16 Sets

33 Scaffoldings 1 Lot

34 High Voltage Line Tester 2 set

35 H.T. Line Earthing Kit 6 kit

36 Phase Rotation Indicator 2 No

36 Asphalt Cutter 2 No

Page 15: Company profile -Electrical  12

SECTION 4: LICENSES

Page 16: Company profile -Electrical  12
Page 17: Company profile -Electrical  12
Page 18: Company profile -Electrical  12
Page 19: Company profile -Electrical  12
Page 20: Company profile -Electrical  12
Page 21: Company profile -Electrical  12
Page 22: Company profile -Electrical  12
Page 23: Company profile -Electrical  12
Page 24: Company profile -Electrical  12
Page 25: Company profile -Electrical  12
Page 26: Company profile -Electrical  12
Page 27: Company profile -Electrical  12
Page 28: Company profile -Electrical  12
Page 29: Company profile -Electrical  12

SECTION 5: PROJECT REFERENCES

Page 30: Company profile -Electrical  12

Sl. Value Completion Year/Date ofNo. (RO) Period Completion

1 Emergency Services Relating to Power Supply in Taqa District Self MEW Taqa 52,747.000 3 Years 2001

2 Electrical Power Supply to Said Bin Tabit Mosque Self DGPMS Ittin 1,537.000 3 Weeks 2001

3 Electrical Works for Residential Building Self Min. of Housing Dhariz 1,016.000 3 Weeks 2001

4 100kVA P/M S/Stn. for street lighting Self Dhofar Muncipality Sanaiya 1,820.000 2 Weeks 2001

5 315kVA P/M S/Stn. at South Al Saadah Self MEW ALSaadah 3,026.000 2 Weeks 2001

6 315kVA P/M S/Stn. at North Awakad Self MEW N. Awkad 4,178.000 2 Weeks 2001

7 315kVA P/M S/Stn. at New Salalah Self MEW NewSalalah 3,001.000 3 Weeks 2001

8 Reinforcement of HT/LT Network at North Awkad and Raysut Self MEW Salalah 3,971.000 3 Weeks 2001

9 500kVA S/Stn. & Internal Electrical Installation for Aysha Bint Aboobacker School Al Shaheer Trdg. Min. of Edu. Salalah 24,500.000 4 Months 2001

10 500kVA S/Stn. For Al Nahdah School Self Min. of Edu. Salalah 14,000.000 2 Months 2001

LIST OF WORKS EXECUTED DURING THE LAST TEN YEARS

GRAND ENTERPRISES LLC.

Name of Project Main Cont. Client Location

Page 31: Company profile -Electrical  12

11 500kVA S/Stn. & allied works for Sharqia School Self Min. of Edu. Salalah 16,500.000 2 Months 2001

12 Refurbishment of OR's Barracks at Thumrait Al Haddad Trdg. MODES Thumrait 6,250.000 3 Months 2001

13 Maintenance & Modification of Electrical Installations at Technical College at Saadah Self Min. of Social

Affairs & Labour Al Saadah 12,928.000 3 Months 2001

14 Extension of 33kV Line to RAO Camp at Jasmine Self MODES Jasmine 17,970.000 2 Months 2001

15 Extension of 33kV Line to RAO Camp at Gadow Self MODES Gadow 11,831.000 2Months 2001

16 Service Connection & Minor Works Self Various Salalah 60,000.000 1Year 2001

17 Operation & Maintenance of R.O.Plant at Mazyouna Self MHEW Mazyouna 239,426.000 5 Years 2002

18 Op. & Maintenance of Power Plant at Mazyouna Self MHEW Mazyouna 74,079.000 3 Years 2002

19 Installation of 8nos 100kVA Pole Mounted Substation for Street Lighting Self Dhofar

Municipality Salalah 14,141.000 6 Months 2002

20 Maintenance of Civil, M&E and Fire Fighting Installations at Civil Guard Accommodation, Salalah Self DGPMS Salalah 39,009.000 3 Years 2002

21 Provision of MOEW Power supply to RAO Camp Arfit Self MODES Arfit 3,497.000 1 Month 2002

22 Modification of Electrical Installation to provide Air-Conditioners at Al-Farabi & Al Saan Boys preparatory School. Self MOE Salalah 19,638.000 2 Months 2002

23 Modification of Electrical Installation to provide Air-Conditioners at Al-Noor Girls Preparatory School Self MOE Salalah 23,528.000 2 Months 2002

Page 32: Company profile -Electrical  12

24 Modification of Electrical Installation to provide Air-Conditioners at Al-Hafa Girls Preparatory School Self MOE Salalah 17,707.000 2 Months 2002

25 500 kVA Transformer Substation and Allied Works for Saadah School Self MOE Salalah 16,520.000 1 Month 2002

26 500 kVA Transformer Substation and Allied Works for Dhariz School Self MOE Salalah 14,680.000 1 Month 2002

27 Provision of MOEW Power supply to RAO Camp Mudhai Self MODES Salalah 20,672.000 3 Months 2002

28 Maintenance and Improvement of L.T. Distribution Network at A Mazyouna (Zeena Area) Self MOE Mazyouna 7,543.000 5 Weeks 2003

29 750 M3/Day brackish water R.O.Plant at Thumrait Air Base for MODES

Self MODES Thumrait 80,000.000 12 Weeks 2003

30 1500 M3/Day brackish water R.O.Plant at Thumrait Air Base for MODES

Self MODES Thumrait 202,000.000 16 Weeks 2003

31 2 Nos. 500KVA 11KV Substaion and allied works at Khareef Festival Camp Self Dhofar

Municipality Salalah 16,717.000 2 Weeks 2003

32 315 KVA PMTx. And extension of 11 KV line for mixed Secondary School at Shuwaimiya Self MOE Shomya 20,519.000 8 Weeks 2003

33 2 Nos 1000KVA 11Kv substation and allied works for North Awqad & new Salalah Schools Self MOE Salalah 21,122.000 7 Weeks 2003

34 315 KVA PMTx. At Taqa Self MHEW Taqa 1,460.000 2 Weeks 2003

35 Design, Supply & Install 200 m3/day R.O. Water Treatment Plant at Shirbitat

Self D.G. of Water Supply Shirbitat 81,500.000 4 Months 2003

36 Two Nos. 100kVA PMTx. For street lighting at Qarun Hairiti Self Dhofar Municipality

Qarun Hairiti 3,100.000 2 Weeks 2003

37 Yearly Contract for maintenance of Service of Service Connections for Dhofar Power Company Self DPC Salalah 40,000.000 1 year 2003

Page 33: Company profile -Electrical  12

38 Op. & Maintenance of Power Plant at Mudhai Self MHEW Mudhai 23,029.000 1Year 2004

39 Op. & Maintenance of Power Plant at Shisur Self MHEW Shisur 29,045.000 1Year 2004

40 15 M3/Day brackish water R.O.Plant at Abutabul for Ministry of Defence

Self MOD Abutabul 51,065.000 6 Months 2004

41 Operation & Maintenance of Power Plant at Fitkait & Mahwise Self MHEW Fatkait & Mahwise 53,555.000 12 Months 2004

42 15 M3/Day brackish water R.O.Plant at Al Wajan for Ministry of Defence

Self MOD Al Wajan 51,010.000 6 Months 2004

43 1000 kVA 11kV/433 V Substation for Dhofar Municipality Self Dhofar Municipality Salalah 16,730.000 3 Weeks 2004

44 Power Supply to Quarantine building at Mazyuna Self Ministry of Agriculture Mazyuna 4,290.000 2 Weeks 2004

45 Improvement & maintenance of 11KV & L.T. Network at Mudhai Self MHEW Mudhai 14,410.000 5 Weeks 2004

46 BPA # BT-0011-04 For Supply of Technical Consumables Self DynCorp Thumrait On going Continues 2004

47 BPA # BT-0008-04 For Supply of Transportation workshop consumables Self DynCorp Thumrait " " 2004

48 SMA ST-0046-04 For Maintenance of Club Cars Carryall Self DynCorp Thumrait " " 2004

49 Installation to Provide Air -Conditioners in Classrooms at Meetan for General Education Mixed School Self MOE Meetan 11,831.000 10 Weeks 2004

50 Installation to Provide Air -Conditioners in Classrooms at Harweeb for General Education Mixed School Self MOE Harweeb 11,768.000 10 Weeks 2004

51 Installation to Provide Air -Conditioners in Classrooms at Baithana for general Education Mixed school Self MOE Baithanah 10,513.000 10 Weeks 2004

Page 34: Company profile -Electrical  12

52 15 M3/Day brackish water R.O.Plant at Ramlat Shuayt for Ministry of Defence

Self MOD Ramlat Shuwait 48,950.000 6 Months 2005

53 Operation & Maintenance of R.O.Plant at Dhalqut Self MHEW Dhalqut 574,000.000 5 Years 2005

54 Maintenance of Civil, M&E and Fire Fighting Installations at Civil Guard Accommodation, Salalah Self DGPMS Salalah 42,924.000 45 Months 2005

55 1 Nos. 1000KVA 11kV Substaion and allied works at Khareef Festival Camp Self Dhofar

Municipality Salalah 27,500.000 4 Weeks 2005

56 Installation of 5 Nos. 100 kVA pole mounted transformers for street lighting Trade Links Dhofar

Munuciplaity Salalah 10,000.000 2 Months 2005

57 Mechanical, Electrical & Electromechanical Maintenance of college of Education , Salalah Self Ministry of

Higher Education Salalah 11,880.000 12 Months 2005

58 Electric Power Supply to School Bulding at Fatkait Self M.O.E Fatkait 3,500.000 3 Weeks 2005

59 L.V.Upgrade in P-48 Camp bungalow area Self M.O.D Thumrait 60,201.000 3 Months 2005

60 Minor Works & Service Connection Jobs Self Various Dhofar 70,000.000 1year 2006

61 Modification to the Electrical Installation to provide Air Coditioners in Classrooms at Barbazom Self M.O.E Barbazom 12,122.250 3 Months 2006

62 Modification to the Electrical Installation to provide Air Coditioners in Classrooms at Tosinat Self M.O.E Tosinat 12,075.000 3 Months 2006

63 Modification to the Electrical Installation to provide Air Coditioners in Classrooms at Zakar Self M.O.E Tosinat 15,943.200 3 Months 2006

64 Modification to the Electrical Installation to provide Air Coditioners in Classrooms at WADI ARAH Self M.O.E Wadi arah 14,109.900 3 Months 2006

Page 35: Company profile -Electrical  12

65 Residential Street lighting in Zeek and Astah Self Dhofar Municiplaity

Zeek and Astah 12,551.660 45 Days 2006

66 Street lighting in Car park and service road around municipal festival ground in Ittin Self Dhofar

Municiplaity Ittin 133,125.900 90 Days 2007

67 Operation & Maintenance of R.O.Plant at Mazyouna Self MHEW Mazyouna 295,201.000 5 Years 2012

68 Installation of Decorative Display Units in Salalah Self Dhofar Municiplaity Salalah 23,000.000 90 Days 2007

69 Maintenance and Improvement of L/T Distribution Net Work in Khareef Festival Ground in Ittin Self Dhofar

Municiplaity Ittin 33,778.500 90 Days 2007

70 Electric Power Supply to Women's Masjid at Ittin Self Dhofar Municiplaity Ittin 8,699.000 21 Days 2007

71 Street lighting in Salalah for North A'saada and South Al Saadah Self Dhofar

Municiplaity Salalah 148,964.550 60 Days 2008

72 Street Lighting for East Service Road from Taumoor Street to Ean Sahamoot Self Dhofar

Municiplaity Salalah 128,222.850 150 Days 2008

73 Street Lighting of Internal Roads in North Awqad, South Awqad & Industrial Area Self Dhofar

Municiplaity Salalah 450,455.000 180 Days 2008

74 Residential lighting in Taqa, Mirbat Self Dhofar Municiplaity Salalah 24,045.000 90 Days 2008

75 Residential lighting in Dhalqut, Rahyut Self Dhofar Municiplaity Salalah 19,470.000 90 Days 2008

76 Street Lighting work at Demeet , Wadi Arah, Fitkait, Kuboot, Mahwice and Rahab Self Oman Building

& Cont. Co. LLC Dhofar 200,000.000 120 Days 2008

77 Electrification Job for Masjid at Qairun Hairithi Self Ministry of Al Aqawf

Qairun Hairithi 5,542.000 4 Weeks 2008

78 Power Connection to Pump Room at Sultan Qaboos Hospital round about Self Dhofar

Municiplaity Salalah 7,600.000 4 Weeks 2008

Page 36: Company profile -Electrical  12

79 Supply and Installation of 150 M3/DayReverse Osmosis Water Treatment Plant at Dhaboon

Self D.G. of Water Supply Dhaboon 70,000.000 6 Months 2009

80 Supply and Installation of 50 M3/DayReverse Osmosis Water Treatment Plant at Barbazom

Self D.G. of Water Supply Barbazom 45000.000 6 Months 2009

81 Electrical & Civil Works at Fisheries Harbour , Dhalqut Self Ministry of Fisheries Wealth Dhalqut 41501.000 60 Days 2008

82 Operation & Maintenance of 200 m3R.O.Plant at Sharbitat Self D.G. of Water Supply Sharbitat 422,804.375 29 Months 2008

83 Street Lighting along with Ittin street from Ittin round about to Nabi Ayub and Awqad area Self Dhofar

Munuciplaity Dhofar 737,655.800 240days 2008

84 Relocating of existing 11 kV Power Net Work at Salalah Large Dam site Strabag

Ministry of Regional

Municipalities

Salalah 92,238.100 105 days 2008

85 New 11kV Power Line to 2 Nos Borewells at Salalah Large Dam Site Strabag

Ministry of Regional

Municipalities d W t

Salalah 36,394.250 105 days 2008

86 Maintenance of Civil, M&E and Fire Fighting Installations 2009-2010 at Accommodation for Security Unit of RCA : Dhariz Self Royal Court

Affairs Dhariz 72,550.000 3 Years 2012

87 Installation of Decorative Street Light Poles on the Major Roads in Salalah, with new Interlock tiles in the median area. Stars Light LLC Dhofar

Munuciplaity Salalah 130,000.000 240 days 2009

88

Power Supply to Asphalt Plant and Site Camp for OBCC Company at Rawia, Extension of 11kV O/H Line, Installation of 1000kVA 11kV/433V Substation, Construction of New L.T. O/H Line and allied works

Self Oman Building & Cont. Co. LLC

Rawia, Qarun Hariti

55,000.000 45 days 2009

89 Design, Supply, Installation & Commissioning of 500m3/Day Sea Water Reverse Osmosis Water Treatment Pant at Dalqut Self D.G. of Water

Supply Dalqut 224,121.600 180days 2009

Page 37: Company profile -Electrical  12

90 Maintenance and Improvement of L/T Distribution Net Work at Salalah Tourism Festival in Ittin Self Dhofar

Municiplaity Salalah 39,225.000 60 days 2009

91 Upgrading of Substation to 1000kVA and Installation of New Feeder Pillar with Cables Self Dhofar

Municiplaity Salalah 42,964.000 30 days 2009

92 Street Lighting along with Nabi Ayub to Teetam Road Self Dhofar Municiplaity Salalah 142,170.000 60 days 2009

93Supply & Installation of Decorative Lighting on the crest of Salalah Large Dam including 2Nos 500kVA + 1No 100kVA Transformer Substations and extension of 11kV Lines

Self Strabag Oman Salalah 412,995.500 6 Months 2009

94 Operation and Maintenance of R.O. Desalination Plants and Diesel Generators at Mandar Al Zubian & Mashash. Self D.G. of Water

Supply

Mandar Al Zubian & Mashash.

738,685.650 5 Years 2009 - 2014

95 Design, Supply, Erect,& Commission New Containerised R.O. Plant 25m3/Day at Mander Al Zubian Self D.G. of Water

SupplyMandar Al

Zubian 34,603.000 4Months 2010

96 Supply, Install & Commission 2 Nos 250kVA and 2 Nos 160kVA Diesel Generators at Mandar Al Zubian & Mashash Self D.G. of Water

Supply

Mandar Al Zubian & Mashash.

75,624.000 6Months 2010

97 Operation & Maintenance of 500m3/day Sea Water Reverse Osmosis Water Desalination Plant at Rakhyut Self D.G of Water

Supply Rakhyut 346,755.750 5 Years 2009 - 2014

98 Operation & Maintenance of 500m3/day Sea Water Reverse Osmosis Water Desalination Plant at Shawmiya Self D.G of Water

Supply Shawmiya 357,596.250 5 Years 2009 - 2014

99 Street Lighting and associated Electrical Power Distribution Works for By-Pass Road at Salalah. OBCC

Supreme Committee for Town Planning

Salalah 2,940,650.000 36 Months 2010-2012

100 Utility Net-Work Extension - Lot-6/2010 Self DPC Salalah 130,516.000 3 Months 2010

101 Summer Mitigation Part C-11 Self DPC Salalah 11,670.500 1 Month 2010

Page 38: Company profile -Electrical  12

102 Supply, Installation & Commissioning of 1000kVA, 11kV/433V Substation, and allied works for Asphalt Plant for OBCC Self OBCC Raysut 56,913.000 1Month 2010

103 Operation & Maintenance of 200 m3/Day Sea Water R.O.Plant at Sharbitat Self D.G. of Water

Supply Shirbithat 360,564.000 5 years 2010-2015

104 Operation & Maintenance of 1000m3/Day Sea Water Reverse Osmosis Water Treatment Plant at Dalqut Self D.G. of Water

Supply Dalqut 1,478,135.100 5 Years 2010-2015

105 Supply, Installation & Commissioning of 100m3/day Reverse Osmosis Water Treatment Plant at Marzoudid Camp Self MODES Marzoudid 128,612.600 9 Months 2010

106 Design, Supply, Installation & Commissioning of 500m3/Day Sea Water Reverse Osmosis Water Treatment Pant at Dalqut Self D.G. of Water

Supply Dalqut 240,000.000 6 Months 2010

107 Design, Supply, Installation & Commissioning of 1000m3/Day Reverse Osmosis Water Treatment Pant at Thumrait Self D.G. of Water

Supply Thumrait 153,599.000 4 Months 2010

108 Relocation of Pole Mounted Transformer & Shifting of 33kV & 11kV Cables at Ittin Round-about OBCC

Supreme Committee for Town Planning

Ittin 25,016.400 1 Month 2010

109

Supply, Installation & Commissioning of 1000kVA, 11kV/433V Substation, and allied cabling works for Modification/Expansion of existing Stage at Municipality Khareef Festival Ground

Self Dhofar Municiplaity Ittin 83,263.400 6 Weeks 2010

110Converting existing 11kV & 33kV Overhead Line to Underground Cables at New Hajeef Round-about for By-pass Road project.

OBCCSupreme

Committee for Town Planning

North Salalah 118,070.490 1 Month 2010

111Converting existing 11kV & 33kV Overhead Line to Underground Cables for New Round-about at Industrial Area for By-pass Road project.

OBCCSupreme

Committee for Town Planning

Industrial Area,

Salalah85,478.400 1 Month 2010

Page 39: Company profile -Electrical  12

112Converting existing 11kV & 33kV Overhead Line to Underground Cables for New Round-about at North Awqad for By-pass Road project.

OBCCSupreme

Committee for Town Planning

North Awqad 80,000.000 1 Month 2010

113 Supply & Installation of Decorative Street Lighting for Khor Rouri Link Road at Taqa Nasr Arabian Co Royal Cout

Affairs Taqa 151,300.000 3 Months 2010

114 Supply & Installation of Street Lighting for Internal Roads at North Awqad Nasr Arabian Co

Supreme Committee for Town Planning

North Awqad 222,735.300 3 Months 2010

115 Supply & Installation of Street Lighting for Internal Roads at Taqa Nasr Arabian Co

Supreme Committee for Town Planning

Taqa 41,177.000 3 Months 2010

116 Street Lighting jobs at various parts of Dhofar Governotate Self Dhofar Municiplaity Dhofar 311,776.600 1year 2010-2011

117Converting existing 2 Nos 33kV Overhead Line to Underground Cables for New Round-about at Raysut for By-pass Road project.

OBCCSupreme

Committee for Town Planning

Raysut 85,000.000 1 Month 2011

118 Electrical Distribution Works at Thumrait Airbase Strabag MODES Thumrait 176,934.840 4 Months 2011

119 Power Supply Distribution Net-Work to Site Camp with 3x500kW Diesel Generators Self Nasr Arabian Co Mughshin 29,828.750 1 Month 2011

120 Installation of Street Lighting in Salalah Area, from Mughsail to Taqa & adjoining Jablal areas Self Dhofar

Municipality Salalah 100,000.000 1 year 2011-2012

121 Residential Street Lighting in Salalah Area Self Dhofar Municipality Salalah 100,000.000 1 year 2011-2012

122 Dualization of Ibri-Dhariz-Miskin Road, Street Lighting Works, Shifting/Undergorunding of 33kV,11kV & L.T. Overhead Lines.

Strabag Oman LLC.

Ministry of Transport &

CommunicationsIbri 3,464,622.800 18 Months 2011-2012

Page 40: Company profile -Electrical  12

123 Modification of Power Supply & Lighting of Al Saadah Park Self Dhofar Municipality Al Saadah 16,166.800 3 Months 2011

124 Design, Supply, Installation & Commissioning of 500m3/Day Sea Water Reverse Osmosis Water Treatment Pant at Dalqut Self D.G. of Water

Supply Dalqut 224,121.600 6 Months 2011

125 Supply of Electrical Materials to Dhofar Municipality Self Dhofar Municipality Salalah On going 1 Year 2011-2012

126 Utility Net-Work Extension - Lot-12A/2011 Self DPC Salalah 2,063.000 30 days 2012

127 Utility Net-Work Extension - Lot-1A/2012 Self DPC Salalah 9,184.020 30 days 2012

128Design, Supply, Installation & Commissioning of 500m3/Day Sea Water Reverse Osmosis Water Treatment Pant at Rakhyut

Self D.G. of Water Supply Rakhyut 231,000.000 6 Months 2012

129Electro-mechanical works including supply and installation of 3Nos borewell pumps, storage water tanks, piping, electrical supply, control system etc for Rakhyut water treatment plant

Self D.G. of Water Supply Rakhyut 152,641.500 6 Months 2012

130 Extension of new 11kV Feeder from Rumais S/S to Barka Water Station at Barka in South Batinah Self MEDC Barka,

Muscat 562,524.380 4 Months 2012

131 Upgrading of Power Supply to Dhofar Municipality Building, installation of 1600A Energy Meter Panel etc. Self Dhofar

Municipality Salalah 15,930.000 30days 2012

132 Upgrading of Power Distribution at the Ammunition Depot at Adonib including 1x1000kVA 11kV/433V Substation Self MODES Salalah 95,000.000 90 Days 2012

133

Devolopment of Power Distribution in Municipality Entertainment Center, with 2Nos 1000kVA 11kV/433V Substation, 31Nos Himast Light Poles with 4x2000W Metal Halide Flood Lights etc.

Self Dhofar Municipality Salalah 221,473.100 45days 2012

Page 41: Company profile -Electrical  12

134 Dismantling services for balance of plant materials and site infrastructure of the TM units at Salalah Self DPC Raysut 41,000.000 30days 2012

135 Cleaning of existing Decorative Street Lights and Feeder Pillars in Salalah for year 2012-2013 Self Dhofar

Municipality Salalah 27,615.000 1 year 2012

136 Street Lighting Works in the Dhofar Governorate for Year 2012-13 Self Dhofar

Municipality Dhofar 100,000.000 1 year 2012-13

137 Residential Street Lighting in Dalqut & Rakhyut Area Self Dhofar Municipality

Dalqut & Rakhyut 100,000.000 1 year 2012-13

138 Electro-mechanical works - Supply and installation of 6Nos Borewell Pumps, Control systems, 4.8km water pipe line etc. Self D.G. of Water

Supply Shweimiya 197,969.500 180 days 2013

139Converting 33kV Overhead Line to underground cables & Relocation of 11kV Cable for Interchange at Salalah New Airport

OBCC Dhofar Municipality Salalah 300,000.000 90 Days 2013

140 Management, Operation and Maintenance of Waste Water Treatment Plant (STP) at Dalkhut Self

Salalah Sanitary Drainage Services

Dalkhut 89,988.000 2 years 2012-2014

141 Converting 33kV & 11kV Overhead Line sto Underground Cables along Salalah By-pass Road at 7 locations OBCC Dhofar

Municipality Salalah 189,989.685 90 Days 2013

142Operation & Maintenance of Sewage Treatment Plants (11nos) and Sewarage System at Al-Dhakhliya Governorate

Self

Min. of Reg. Municipalities &

Water Resources

Al-Dakhliya 304,920.000 1 year 2013-2014

143 Maintenance of Civil, M&E and Fire Fighting Installations 2009-2010 at Accommodation for Security Unit of RCA : Dhariz Self Royal Court

Affairs Dhariz 162019.000 4 Years 2013-2016

144Management, Operation and Maintenance of Conveyence, Distribution and Usage of Treated Effluent Supply Net-work in Salalah

SelfSalalah Sanitary

Drainage Services

Salalah 865,400.000 3 Years 2013-2016

Page 42: Company profile -Electrical  12

145 Relocate 11KVLine located in Wadi at Qurum ,Baushaer area in Zone-2 Self MEDC QURUM 133,508.500 120 Dyas 2013

146 Ghala -18 (Residential Commercial Project Of Sh.Mohd. Kassim Al Zadiali) KASSIM MEDC Ghala 67,000.000 30days 2013

147

Construction of new 11kv feeder (under ground cable ) from al nahdah 33/11kv primary Substation and connection of the same cable to the existing 11kv cable feeding masirah new Hospital wilayat masirah alsharqiyah governorate.

Self RAECO Masira 154,045.500 194Days 2013-2014

Page 43: Company profile -Electrical  12

SECTION 6: PHOTOS FROM PROJECTS

Page 44: Company profile -Electrical  12
Page 45: Company profile -Electrical  12
Page 46: Company profile -Electrical  12
Page 47: Company profile -Electrical  12
Page 48: Company profile -Electrical  12
Page 49: Company profile -Electrical  12
Page 50: Company profile -Electrical  12
Page 51: Company profile -Electrical  12
Page 52: Company profile -Electrical  12
Page 53: Company profile -Electrical  12
Page 54: Company profile -Electrical  12
Page 55: Company profile -Electrical  12
Page 56: Company profile -Electrical  12
Page 57: Company profile -Electrical  12