company profile - intecsa-inarsa · company profile. general presentation // intecsa-inarsa slide 2...

27
www.intecsa-inarsa.es Engineering and technical consulting since 1965 Company Profile

Upload: others

Post on 18-Jun-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

www.intecsa-inarsa.es

Engineering and

technical consulting since 1965

Company Profile

Page 2: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 2GENERAL PRESENTATION // INTECSA-INARSA

CONTENT

10. INFRASTRUCTURES11. Tunnels and structures13. Railways and roads

15. PORTS AND LOGISTICS16. Ports and Coasts18. Building and Urban Planning

20. WATER AND ENVIRONMENT

04. Intecsa-Inarsa in the world05. Organization chart 06. Quality and environmental

management07. Quality certificates08. Recent awards

PRESENTATION

Pag

e 03.INTECSA-INARSA

Pag

e 04.ACTIVITYAREAS

Pag

e 09.MAINCLIENTS

Pag

e 26.CONTACT

Pag

e 27.

Page 3: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 3GENERAL PRESENTATION // INTECSA-INARSA

Presentation

Intecsa-Inarsa is a Spanish company specialising in consultancy and engineering with private capital, whichwas founded in 1965 on the basis of a limited number of technicians with wide experience in design andexecution of building work. Progressive growth has allowed the company to become one of the leading andmost diverse Spanish consultancy and engineering companies with powerful and prestigious internationalprojection.

The constant updating and ongoing innovation make it possible to offer made-to-measure solutions based onlatest-generation technology. Our company has been operating for fifty years in the sectors of Engineeringfor Linear Transport Works, Land Engineering, Underground Works and Structures; Port Engineering, MarineEnvironment and Coasts; Consultancy and Engineering of Water; Building Engineering and Urban Planningand Project Management.

Intecsa-Inarsa's technical team, trained and certified in a range of disciplines, is in permanent contact withUniversities and Research Centres which puts it on the front line of Technological Development, and offersanything from Feasibility Studies to Detailed Engineering.

Engineering and technical consulting since 1965

1965Establishmentof INTECSA

1998Acquisition & Merger of INTECSA by INARSA

2007Acquisitionby SNC Lavalin Group

2014INTECSA-INARSA returns to be a spanish companyHeadquarters : C/ Julián Camarillo, 53, 28037 Madrid, Spain.

Page 4: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 4GENERAL PRESENTATION // INTECSA-INARSA

Intecsa-Inarsa in the world

HEADQUARTERS: MADRID

Julián Camarillo 53 Street, Madrid 28037Tlf: +34 915.67.38.00

Fax: +34 915.67.38.01/2/3/4/[email protected]

Branch Office: SAUDI ARABIA

Granada Business Park. Tower A4, 12th Floor, Office # 1230 East Ring Road, RiyadhTlf: +966 115 118 118, Ext. 8012

+966 115 118 111, +966 115 118 [email protected]

[email protected]

Branch Office: PANAMÁ

Manuel Maria Icaza St.PH PROCONSA 1 Building, 10B Floor.

Tlf: 507 693 66 [email protected]@intecsa-inarsa.es

Branch Office: COLOMBIA

93 Street # 18-28Office 404, Bogotá (Colombia)

Tlf: 571 645 12 [email protected]

[email protected]

Branch Office: ECUADOR

C.C. Comercial Laguna Plaza,Office 408, Vía a la Costa Km. 12,5

Guayaquil (Ecuador)Tlf: 593 97 908 55 50

[email protected]

Branch Office: PERU Branch Office: CHILE

La Concepción Street, 191. Planta 6, Office 25, Santiago de Chile (Chile)

Tlf: +56 2 2903 3394Tlf: +56 9 7742 4492

[email protected]

Permanentoffices

Countries where there have been projects

Branch Office: MURCIA

Street: Madre Paula Gil Cano s/nEdif. Torre Jemeca 3º-4ªpta, 30009 - Murcia Tlf: +34 968 22 50 06, Fax: +34 679 956 495

[email protected]

Branch Office: MEXICO

Homero St. 906, 6th Floor,Polanco, Delegation Miguel HidalgoCiudad de México, Distrito Federal.

México. Tlf: +525 552 575 [email protected]

[email protected]

Narciso de la Colina St. Nº421Office 1002.

Miraflores District, Lima (Peru)Tlf: 51-1 24 29 005 / (01) 284 – 2508

[email protected]

Page 5: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 5GENERAL PRESENTATION // INTECSA-INARSA

Organization chartIntecsa-InarsaCEO

Deputy General Manager

C.F.O.

Human Resources Manager

Proposals and Contracting Dept.

Tunnelsand Structures Department

Executive Vice PresidentInternational Expansion

Legal Department

Quality Management

IT Support Dept.

Subcontracting Dept.

International

C.M. Peru

B.D.M. Chile

C.M. Colombia

Director C. America/MexicoOperations Director

Railwaysand RoadsDepartment

Ports / Coastsand LogisticsDepartment

Water andEnvironmentDepartment

Safety and Health Dept.

B.D.M. Ecuador

B.D.M. Panama

Director MEA

B.D.M. Mea

Page 6: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 6GENERAL PRESENTATION // INTECSA-INARSA

Quality and environmental management

INTECSA-INARSA'S environmental experience in all kinds of building has beenrecognised for decades and its designs include systems which respect theenvironment and with high energy efficiency.

INTECSA-INARSA'S experts accompany their customers in such global matters as:

• LEED (Leadership in Energy and Environmental Design)• High Environmental Quality (HQE, from the French abbreviation)• BREEAM (BRE Environmental Assessment Method)• MINERGIE• PAASIVHAUS.

INTECSA-INARSA contributes unbeatable knowledge to the design and operationof facilities including environmental parameters. Furthermore, it has dealt withnumerous projects of considerable energy efficiency and exemplary landscapeintegration.

The powerful commitment related with sustainable development is put intoeffect for all kinds of project.

Page 7: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 7GENERAL PRESENTATION // INTECSA-INARSA

Quality certificates

From the point of view of Quality, in November 1994, INTECSA-INARSA obtainedthe Certificate of Company Registration No. ER-0244/1/94 from AENOR, the SpanishAssociation for Standardisation and Certification, accrediting the recognition of theQuality Assurance System applied in the company with the UNE-EN ISO 9001Regulation.

It likewise obtained the corresponding European Certification, the Quality SystemCertificate from EQNET (European Network for Quality Assessment andCertification), with the identical accreditation number.

From the environmental point of view, in August 1998, the Certificate of CompanyRegistration No. CGM-98/051 was obtained from AENOR, which accredits that theEnvironmental Management System applied to Intecsa-Inarsa is adapted toregulation UNE-EN ISO 14001. It likewise obtained the corresponding EuropeanCertificate from EQNET with the same accreditation number.

In 2006, INTECSA-INARSA integrated its Quality Management and EnvironmentalManagement Systems. Likewise, in 2011, the System for Prevention of OccupationalRisks was implemented according to the standards of rule OHSAS 18001-2007..

Page 8: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 8GENERAL PRESENTATION // INTECSA-INARSA

Recent awards

Finalist at The Fleming Awards 2014 by British Geotechnical Association:-”Barcelona High Speed Railway Tunnel Project – Protecting World Heritage Buildings”.(Barcelona, Spain). Highest budget consultancy contract awarded by ADIF.

Best Civil Public Work 2013 by Madrid College of Civil Engineers:- “Railway Access to Barajas airport” Project (Madrid, Spain).

Aqueduct of Segovia Award 2011:- “General System Regeneration and Reuse of Urban Wastewater”

(Murcia, Spain)

Prize of the Madrid Civil Engineers Association to the technical office of the “Best PublicWork in Madrid. 2012”:- “Refurbishment of the Serrano street and construction of 3 underground parking lots”

(Madrid, Spain)

SNC Lavalin 2013 Awards of excellence:- “SR99 Alaskan Way Tunnel en Seattle”

(Seattle, USA). Øexcavation = 17.50 m (World Record)

Fidic Awards 2014:- “Burying of M-30 Highway and Madrid-Río”, (Madrid, Spain)

Page 9: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 9GENERAL PRESENTATION // INTECSA-INARSA

InfrastructuresPorts – Coastsand Logistics

Water and Environment

Activity areas

Page 10: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 10GENERAL PRESENTATION // INTECSA-INARSA

Arroyofresno collector, Madrid, Spain.

1. Infrastructures

1.1. Tunnels and structures1.2. Railways and roads

Page 11: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 11GENERAL PRESENTATION // INTECSA-INARSA

Our Story

References

Main clientsExperience

This area works mainly large infrastructures (tunnels, underground works and large structures).They have developed highly complex works for public and private clients (national andinternational). Their main works are viaducts for high-speed trains, subway tunnels (Barcelona,Madrid) and special structures with high seismic activity.

Public

Private

Ministry of Public WorksLocal Spanish Administrations

TUNNELS AND UNDERGROUND WORKS• Studies: 228 studies.• Projects: 173 projects - 200 km of underground works.

- Metro: 64 stations and 88 km.- Tunnels: 85 km for roads and 150 km for urban roads.

• Supervision: 68 supervision.• Support: 22 assists.

STRUCTURES• High pass bridges: 32 for TGV and 65 for roads.• 68 overpasses, 250 underpasses and 19 footbridges.• Building: 200.000 m2.• Underground structures: 8 metro stations.• Other special structures: high seismic activity, settlements, temporary.

1.1. Tunnels and Structures

Page 12: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 12GENERAL PRESENTATION // INTECSA-INARSA

CENTENARIO BRIDGE.

(Sevilla, Spain)

MAIN

REFERENCES IN

TUNNELS AND

STRUCTURES

▪ Year: 2012 – ongoing (2018)▪ Client: UTE Dragados-Sisk▪ Location: London, U.K.▪ Description: Will conect 37 stations, including Heathrow airport and Maidenhead. Auxiliary Building: foundations for

cranes, TBM thrust structures, metal platforms to support tunneling, etc.

CROSSRAIL C305

▪ Year: 2010 - 2012▪ Client: HNTB Corporation▪ Location: Seattle, U.S.A.▪ Description: The SR 99 Tunnel is a double board road tunnel built with prefabricated sections of 0.60 m thick, with an

outer diameter of 17,56 m, dug under the center of the city of Seattle and parallel to the coastline .

CONSTRUCTION PROJECT SR 99 TUNNEL

▪ Year: 2009▪ Client: ERGOSE (Greek railway administration)▪ Location: Greece▪ Description: High speed line between Thessalonica and Athens. The bridge has three bow-string arches in an area of high

seismic activity and active faults with vertical and horizontal differential movements (30 cm)

ARCH BRIDGE IN THE STRETCH LIANOKLADI-DOMOKOS, SG 26 STRUCTURE

▪ Year: 2008 - 2009▪ Client: Urbaser environment▪ Location: Marseille, France▪ Description: Construction project. Structural design of seven industrial buildings in high seismic activity area with sand

liquefaction in foundation. French regulations.

WASTE TREATMENT CENTER WITH ENERGY PRODUCTION

Page 13: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 13GENERAL PRESENTATION // INTECSA-INARSA

Our Story

Main clients

Railways and roads area develops its work for public and private clients both nationally andabroad. Its principal activity centers on projects for high-speed trains, subway and its integrationinto the urban centers. It is also dedicated to road design projects, construction and tender.Recently expanded its activities to countries in the Middle East and South America where thedevelopment in this type of infrastructure increases the complexity and contracts.

References

Public

Private

RAILWAYS• High speed: > 500 km.• Subway, light rail, tram and suburban: 210 km. • Urban integration: 7 projects.

ROADS• Studies: > 1,500 km.• Layout projects: > 500 km.• Detail Design: > 2,000 km. • Tender projects: > 1,000 km.

1.2. Railways and Roads

Experience

Page 14: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 14GENERAL PRESENTATION // INTECSA-INARSA

MAIN

REFERENCES IN

RAILWAYS AND

ROADS

▪ Year: 2013▪ Client: FCC / Riyadh Subway / Saudi ARAMCO▪ Location: Dharan, SAUDI ARABIA▪ Description: Assess the feasibility of transit system in an exclusive right-of-way linking primary SAUDI ARAMCO campus

activity centers in the Dhahran Area and to define the best system in terms of system capacity, quality of service,environmental, cost and risk level.

MONORAIL / LRT DHAHRAN AREA TRANSIT FESIBILITY STUDY

▪ Year: 2014▪ Client: KFCA (King Fahd Causeway Authority)▪ Location: SAUDI ARABIA / BAHRAIN▪ Description: Technical, economic and financial feasibility studies of a new causeway linking Saudi Arabia and Bahrain.

Special attention is paid to the environmental impact. Will have 25 km long and connect to the GCC network.

FEASIBILITY STUDY AND ENGINEERING. CONNECTION BETWEEN SAUDI ARABIA AND BAHRAIN. VIA RAIL GCC A. CAUSEWAY.

▪ Year: 2002 – Work in progress▪ Client: ADIF▪ Location: Barcelona, SPAIN▪ Description: Preliminary Study. Detailed Design. Site Supervision. Technical Inspection on behalf of the Administration.

Extensive geotechnical survey Hydrogeological study with ACA. Noise and vibration study to provide solutions close tothe Sagrada Familia; settlement study and settlement monitoring during work.

UNDERGROUND URBAN SECTION CONNECTING SANTS STATION AND SAGRERASTATION IN BARCELONA.

▪ Year: 2010 Client: Ministry of Public Works▪ Location: Madrid, SPAIN▪ Description: The project consists of burying underground the A-42 highway between the junctions with M-45 and M-50

highways. The total length is 5.8 Km. Interchanges 4 Unit. Overpasses: 5 Unit. Transversal crossing over structure: 10Ramp for Public Transport: 6 Unit. Drainage Works: 2 pumping wells. Emergency exits: 74 Unit.

DETAILED DESIGN OF RESERVED CARRIAGEWAYS FOR PUBLIC TRANSPORTATION. A-42 HIGHWAY. STRETCH M-45 AND M-50. (MADRID, SPAIN)

Page 15: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 15GENERAL PRESENTATION // INTECSA-INARSA

2. Ports – Coasts and Logistics

2.1. Ports and Coasts2.2. Logistics (Buildings and Urban Planning)

Page 16: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 16GENERAL PRESENTATION // INTECSA-INARSA

Main Clients

2.1. Ports and Coasts

Experience

References

Our Story

The Ports & Marine Area develops its activity in three main sectors, namely ports, marine and coasts, working in diverseengineering and consultancy projects such as port planning and management, marine studies, and detailed design & workssupervision. Regarding marine environment, this Area works on physical and operational oceanography and marine environment,its natural resources, marine environmental studies and environmental supervision of works, as well as in Integrated CoastalZones Management (ICZM) projects.

Intecsa-Inarsa offers a wide range of services comprising pre-feasibility and feasibility studies, basic and detailed engineering,works direction and supervision, integrated project management, as well as other specific consultancy and engineering works.

Public

Private

PORTS• Consultancy: Port planning & management and terminals• Engineering: Marine studies and design & supervision

MARINE STUDIES• Oceanography: physical and operational.• Marine Environment: Natural resources, environmental studies and

environmental works supervision.

COASTAL STUDIES• Integrated Coastal Zones Management (ICZM)• Coastal Engineering: Processes and Design & Supervision

▪ National port authorities (Spain)▪ Coastal managers▪ Ministry of Environment▪ International port authorities

▪ Chile ▪ Peru

▪ Spain▪ Gabon

T T I

Page 17: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 17GENERAL PRESENTATION // INTECSA-INARSA

MAIN

REFERENCES IN

PORTS AND

COASTS

DEVELOPMENT OF LARGE SCALE PUERTO SAN ANTONIO (CHILE)

SYSTEM FOR A REAL-TIME CONTROL DATA FOR METEO-OCEANOGRAPHIC VARIABLES IN SAN ANTONIO (CHILE)

COMMERCIAL AND INDUSTRIAL PORT. FREE ZONE MANDJI ISLAND (GABON)

MASTER PLAN FOR THE SUSTAINABLE USE OF THE COAST. PROVINCES OF SANTA CRUZ DE TENERIFE AND LAS PALMAS (SPAIN)

▪ Year: 2013▪ Client: San Antonio Port Company (EPSA)▪ Location: San Antonio, Chile▪ Description: Feasibility study of a new commercial port with a capacity of 6 million TEU, consisting of two partly-

authomated terminals. It included the preliminary design of major works: dredging, docks, piers, fillings, urbanization and buildings).

▪ Year: 2012▪ Client: San Antonio Port Company (EPSA)▪ Location: San Antonio, Chile▪ Description: Design, supply, installation, commissioning, operation and maintenance for one year of a real-time control

system for meteo-oceanographic data at San Antonio Port: wind, waves, currents, temperature, visibility, UV index ....

▪ Year: 2011▪ Client: Ministry of Economy, Trade, Industry and Tourism of the Republic of Gabon▪ Location: Mandji Island, Gabon▪ Description: Basic Design of a new commercial port for container terminals, solid bulk and liquid bulk jetty. It included

the preliminary design of major works: dredging, docks and berths, filling and urbanization.

▪ Year: 2010▪ Client: Coasts General Directorate; Ministry of Environment▪ Location: Canary Islands, Spain▪ Description: Analysis of physical, environmental, socio-economic and urban features of the seacoast, SWOT Analysis

and Proposal of actions according to the Policy of Integrated Coastal Zone Management (ICZM)

Page 18: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 18GENERAL PRESENTATION // INTECSA-INARSA

Our Story

Main Clients

INTECSA-INARSA´s building and urban planning specialists provide services related with the mainstudies developed by other departments (infrastructures, industrial, water and environment) andalso for specific clients in urban planning, architecture and Integrated Project Management. Theyalso work in technical engineering fields, from geotechnical to structural design, mechanical,electrical, security, etc. and organization, management and control of projects. The teamcapacities comprise technical and management support and ensure the achievement of allquality goals, cost and time of completion.

References

Activities / Services:Design, construction projects, control and supervision of work:

• Residential and office buildings • Hotels and residences• Research and teaching centers• Shopping malls • Hospitals • Intelligent Buildings• Airport terminals, railway stations and maritime terminals• Rehabilitation• Energy optimization

Services• Architectural and engineering construction design for different types of

buildings. • Consulting and research work Feasibility studies, Layout plans,

Technical/ Economics Audits, Land acquisition, Regulations, Negotiation of building permits

• Control and supervision of construction work.• Project and construction management

2.2. Building and Urban planning

Experience

Publics

Privates

• Ministry of Public Works• Local Spanish Administrations• CSIC (Spain)• INSS (Spain)

• Zone Franche Île Mandji (Gabon)• CyLOG (Spain)• PLAZA (Spain)

• National and International Construction Companies• Real State Developers

Page 19: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 19GENERAL PRESENTATION // INTECSA-INARSA

MAIN

REFERENCES IN

BUILDING AND

URBAN

PLANNING

▪ Year: 2012▪ Client: Spanish National Social Security Institute (INSS)▪ Location: Málaga, SPAIN▪ Description: Construction Design and works supervision for the headquarters of the Social Security in the city of Málaga

(Spain). Top quality standards design with high energy efficiency consumtion. Total 23,000 sqm

INSS MALAGA

▪ Year: 2007

▪ Client: Complutense University in Madrid

▪ Location: Madrid, SPAIN

▪ Description: Preliminary studies of the current building condition and its facilities and complet rehabilitation project of the

Faculty of Medicine at the UCM, more than 100.000 sqm. Historic monument building, high level of protection.

FACULTY OF MEDICINE COMPLUTENSE UNIVERSITY IN MADRID (UCM)

▪ Year: 2007

▪ Client: CSIC

▪ Location: Madrid, SPAIN

▪ Description: New headquarters for the National center for Phisics and Mathmatics Research. Provided with the most

updated facilities for the research, study and teaching activities.

CONSTRUCTION PROJECT FOR THE INSTITUTE OF PHYSICS AND MATHEMATICS AT THE UAM

▪ Year: 2009 - 2010

▪ Client: Presidency of the Republic of Gabon

▪ Location: Port Gentil, GABON

▪ Description: An organization and urban planning project is proposed. It´s a swampy area near the sea. The project

provides the Parcel "F" of new accesses and infrastructures.

ORGANIZATION AND URBAN PLANNING PROJECT OF PARCEL “F” IN ILE MANDJI –PORT GENTIL, GABON

▪ Year: 2006 - 2007

▪ Client: Consorcio Urbanístico Los Molinos Buenavista

▪ Location: Getafe, Madrid, SPAIN

▪ Description: Masterplan, infrastructures construction project and supervision of the works for the new urban area of

Buenavista.

URBAN PLANNING PROJECT OF PP-03 “BUENAVISTA“ SECTOR

Page 20: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 20GENERAL PRESENTATION // INTECSA-INARSA

3. Water and Environment

Page 21: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 21GENERAL PRESENTATION // INTECSA-INARSA

Main Clients

Our Story

With a long tradition in Hydraulic Works and Hydrological Planning,Intecsa-Inarsa’s Directorate of Water and Environmental Planning isstaffed by professionals who cover, in the different phases of planning,project and operations, the entire water cycle within a framework ofsustainability and environmental care. The constant challenge is tooptimize the resource and define viable projects from the economic,social and environmental point of view.

References

Water engineering: consultancy, projects and site management or supervision. • Transport and distribution networks: pipes and channels for water supply, drainage

and irrigation.• Storage infrastructures such as reservoirs, ponds and tanks.• Collection works and pumping stations.• Drainage and storm tanks.• Emergency plans and operating regulations.• Auscultation of dams.• Treatment plants: Drinking water, Wastewater.• Desalination.• Outlets.• Irrigation.

River Hydraulics: consultancy, projects and site management or supervision• Adaptation and restoration of watercourses: projects and on-site supervision.• Channeling and water defenses: projects and on-site supervision.

Hydrological Planning and water resources: studies and plans• Watercourse management plans.• Evaluation and study of surface and underground resources.• Drought.

Environment: studies, plans and on-site supervision• Evaluation of the Environmental Impact of Projects.• Landscape and Environmental Integration Projects .• Environmental Vigilance on Site.

3.1. Water and The Environment

Publics

Privates

• European Commission• MAGRAMA• Local authorities • Hydrographic confederations • Water treatment institutions• Regional organizations• State-owned companies: AcuaMED, AcuaES, SEIASA, …• BEI

• Water distribution companies• Building firms • Water concessions • Energy firms • Ariab Mining Company Ltd.

Page 22: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 22GENERAL PRESENTATION // INTECSA-INARSA

MAIN

REFERENCES IN

WATER

ENGINEERING

▪ Year: 2004 – 2016 Client: Confederación Hidrográfica del Duero (Hydrographic Confederation of the Duero).▪ Location: SPAIN▪ Description: Quantitative and qualitative monitoring of the dam designed for flood control, urban water supply, irrigation

of 6,010 hectares and maintenance of the ecological flow downstream from the dam. The typology is a straight gravitydam and vibrated concrete, the height is 75 m above the flow and the capacity of the reservoir is 44.12 hm3.

DA

MS

CONTROL AND MONITORING OF THE WORK ON THE CASTROVIDO RESERVOIR ON THE RIVER ARLANZA.

▪ Year: 2010- 2013 Client: AcuaEs. Location: Lérida, SPAIN.▪ Description: The total length of the section is 22,230 m, with maximum design flow of 15 m³/s. The channel is made in a

trapezoidal section of 2.45 m in height and widths of 3.00 m at the base and 12.60 m at the top, with covering of massconcrete of 15 cm thickness. Most significant pieces of work: aqueduct, of 171 m, two tunnels of 289 m and 4,927 m, twotraps of 2,302 m and 1,417 m. The work is completed with the different elements and auxiliary installations (regulationwork, irrigation outlets, beacons and safety overflow channels).

IRR

IGA

TIO

NMANAGEMENT OF THE BUILDING WORK FROM THE PROJECT AND ADDENDA NO.1 OF THE SEGARRA-GARRIGUES CHANNEL. SECTION V.

▪ Year: 2012 – 2013 Client: Aguas de la Cuenca del Sur.▪ Location: Seville, SPAIN.▪ Description: The main artery of 51,500 m of ductile cast iron of 800 mm, and branches of 52,000 m of 250-500 mm and

8,000 m of 110-250 mm diameter. It includes the construction of five new tanks (capacities of between 15,000 m3 and1,000 m3) and the Ecija 3 pumping station, of 2,268 m3/h; Hm= 98 m; P=810 KW.

WA

TE

R S

UP

PLY

IMPROVEMENT OF THE WATER SUPPLY SYSTEM FOR THE “PLAN ECIJA” CONSORTIUM OF WATER SUPPLY AND DRAINAGE.

▪ Year: 2004 Client: Confederación Hidrográfica del Duero (Hydrographic Confederation of the Duero).▪ Location: Salamanca, SPAIN. Description: Technical assistance for the building work on the Waste Water

Treatment Plan designed to treat a maximum daily flow of approximately 120,000 m3 of waste water, amounting to anannual flow of 30 hm3. This volume of water is equivalent to that generated by a population of 550,000. Apart from thewater and sludge treatment lines, it includes a safety overflow for cases of flooding, an outlet with a 718 m tunnel and theconstruction of the Southern General Collector, of 2,380 m in length, the water and sludge lines of the plant.

WA

TE

R

TR

EA

TM

EN

T

CONTROL AND MONITORING OF THE WORK ON THE SALAMANCA WASTE WATER TREATMENT PLANT.

Page 23: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 23GENERAL PRESENTATION // INTECSA-INARSA

MAIN

REFERENCES IN

RIVER

HYDRAULICS

▪ Year: 2004 Client: Conferación Hidrográfica del Guadalquivir (Hydrographic Confederation of the Guadalquivir)▪ Location: Granada, SPAIN▪ Description: The villages of Monachil, Cájar, La Zubia, Ogíjares and Gójar, located on the southern edge of the fertile

plain, with approximately 37,000 inhabitants and solid growth, are threatened by the existence of ten ravines. With thesituation prior to the project, the heavy rains caused serious floods which caused grave damage. The project is for thedesign of diversions, channeling and protection work to prevent future floods in the affected villages.C

HA

NN

ELI

NG

PROJECT OF THE DIVERSION AND CHANNELING OF THE RAVINES ON THE SOUTHERN EDGE OF THE GRANADA FERTILE PLAIN

▪ Year: 2008 Client: Confederación hidrográfica del Júcar (Hydrographic Confederation of the Júcar)▪ Location: Valencia, SPAIN Description: The work took place on 24 Km of the bank of the River Turia, from the Parque

de Cabecera de Valencia, to Villamarxant. It included: restoration and environmental improvement, replanting of theedges and banks, reforestation, creation and adaptation of footpaths, execution of 19 wooden structures for crossing theriver, planning of anthropic uses (pouring areas, vantage-points, bird-watching observatories, signaling, fishing points).Creation of two interpretation centers.R

EST

OR

ATIO

NCONTROL AND MONITORING OF THE WORK ON THE PROJECT: RIVER PARK OFTHE TURIA BETWEEN VILLAMARXANT AND QUART DE POBLET

▪ Year: 2008 Client: Confederación hidrográfica del Segura (Hydrographic Confederation of the Segura)▪ Location: Alicante, SPAIN▪ Description: Environmental recovery so as to revitalize the area, improve the aesthetic and scenic condition of the

Amorós y San Cayetano Ravine (section of action from 9,186 m).The work consisted basically of improvement to thecrossing infrastructure, actions of replanting with autochthonous species and adaptation of the sides of the ravine so as toreduce the powerful erosion by water arising.

AD

AP

TIO

N

DRAWING UP THE PROJECT FOR FIGHTING DESERTIFICATION IN THE AMORÓSAND SAN CAYETANO RAVINE IN THE MUNICIPAL DISTRICT OF CREVILLENTE(ALICANTE)

▪ Year: 2012 Client: Ministry of the Environment, Rural and Marine Areas, Hydrographic Confederation of the Guadiana▪ Location: SPAIN Description: Determination and selection of the Areas of Significant Potential Risk of Flooding as set

down in the European Flood Risk Directive (Directive 2007/60/CE) through the collection and analysis of the availableinformation of interest, the conduct of a historical study of flooding and a geo-morphological study of uses of the land andthe conduct of the hydrological and hydraulic models on 209 km of watercourse, which resulted in the selection of 850 kmof watercourses as such areas.

FLO

OD

ING

PRELIMINARY EVALUATION OF THE RISK OF FLOODING IN THE HYDROGRAPHIC DEMARCATION OF THE GUADIANA (SPAIN)

Page 24: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 24GENERAL PRESENTATION // INTECSA-INARSA

MAIN

REFERENCES IN

HYDROLOGICAL

PLANNING AND

WATER

RESOURCES

▪ Year: 2011 – 2012 Client: Agencia Vasca del Agua (Basque Water Agency)▪ Location: SPAIN Description: Review and extension of the daily series of water resources in the entire river network of

the Basque Country by means of the construction and comparison of the TETIS distributed model of the UP Valencia andthe SACRAMENTO (Soil Moisture Accounting model) of the US NMS. Once the models are constructed, they arecompleted with the analysis of the effect of climate change and the calculation of modular ecological volumes for therivers of the Basque Region.

RE

SOU

RC

ES

UPDATING THE EVALUATION OF WATER RESOURCESOF THE BASQUE REGION 2010

▪ Year: 2008 – 2013 Client: Dirección General del Agua (General Water Management)▪ Location: SPAIN Description: The scope covers 150,000 km2 of the Mediterranean catchment area, which represents

30% of the Spanish mainland territory. The determination of the regime of ecological volumes in rivers and estuaries hasbeen carried out in such a manner as to guarantee the functionality and structure of the associated aquatic and terrestrialecosystems, contributing to achieving a good condition or ecological potential in the continental and transitional waters.E

CO

LOG

ICA

LCONSULTANCY AND ASSISTANCE OF ECOLOGICAL VOLUMES IN THE HYDROGRAPHIC DEMARCATION OF THE EBRO, THE SEGURA AND THE JÚCAR

▪ Year: 2008 – 2010 Client: Agencia Andaluza del Agua (Andalusian Water Agency)▪ Location: Andalusia, SPAIN▪ Description: The scope of the work covers 7,952 Km2 in an area of some 50 km width and 350 km in length. It is

characterised by its great contrasts both in the physical features of the territory and in the climatic and socio-economicconditions. The programme includes 340 measures designed to achieve a substantial improvement in the state of themasses without compromising current and future uses .

PLA

NN

ING

HYDROLOGICAL PLANNING AND PROGRAMME OF MEASURES IN INTRA-COMMUNITY BASINS OF ANDALUSIA

▪ Year: 2011 – 2013 Client: Confederación Hidrográfica del Segura (Hydrographic Confederation of the Segura)▪ Location: Baños de Fortuna, Quibas, Sierra de Argallet, Sierra de Crevillente and Cuaternario de Fortuna. SPAIN▪ Description: Quantification of the volume of overuse of the aquifers for the establishment of improvement measures of

the state of underground waters, in fulfillment of the Water Framework Directive (WFD). Actions carried out: inventoryand updating of underground water points for the hydrogeological units in the study, establishment of the water balanceand analysis of the annual volume of overuse of the aquifers and preparation of a GIS in support for the cartographicrepresentation of the analysis and the results obtained.G

RO

UN

DW

ATE

R

STUDY FOR QUANTIFICATION OF THE ANNUAL VOLUME OF OVERUSE OF THE AQUIFERS OF THE MASSES OF UNDERGROUND WATERS

Page 25: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Slide 25GENERAL PRESENTATION // INTECSA-INARSA

MAIN

REFERENCES IN

THE

ENVIRONMENT

▪ Year: 2003 - 2012▪ Client: Confederación Hidrográfica del Segura (Hydrographic Confederation of the Segura)▪ Location: SPAIN▪ Description: Management of waste authorization files: Exploitation of the control networks for water quality, annual

preparation of the waste control fee, processing of official complaints due to quality problems in continental waters,preparation of the proposals for punishments deriving from the waste dumping campaigns, adaptation to the Water.W

ATE

R Q

UA

LITY

TASKS OF PROTECTION AND MONITORING OF THE WATER QUALITY OF THE CONTINENTAL WATERS IN THE HYDROGRAPHIC CONFEDERATION OF THE SEGURA

▪ Year: 2014▪ Client: Confederación Hidrográfica del Segura (Hydrographical Confederation of the Segura)▪ Location: Murcia, SPAIN▪ Description: Environmental proceedings of the project for a flood abatement dam on the Rambla de la Torrecilla (initial

document and environmental impact study) according to the ordinary procedure of evaluation of environmental impactset down by Act 21/2013, of 9th December, on Environmental Evaluation.C

ON

SULT

AN

CY

STUDY OF SOLUTIONS AND ENVIRONMENTAL PROCEDURES OF THE BUILDING PROJECT FOR DEFENSE WORKS AGAINST FLOODS IN THE RAMBLA DE LA TORRECILLA. TORRECILLA DAM

▪ Year: 2012 – 2014 Client: European Commission, Directorate General of the Environment▪ Location: Europe▪ Description: Conduct of the tasks of technical secretariat, easing the information flow between the member states, the

European Commission and the private sector taking as the main objective ensuring the achievement of the environmentalgoals by means of the improvement of the transfer of innovation for which an online platform has been developed whichpromotes connection between those offering and those requiring innovation.C

ON

SULT

AN

CY

EUROPEAN INNOVATION PARTNERSHIP ON WATER

▪ Year: 2012 – 2017 Client: AcuaEs Location: Pontevedra, SPAIN▪ Description: Integration and coordination of the environmental activities with those of the Project Management and with

the technical assistance of engineering which give support to it in the following phases: Phase I: Supervision of theBuilding Project, Phase II: Review of the Environmental Assurance Plan, Phase III: Preparation of the Plan for Supervisionand Environmental Monitoring, Phase IV: Environmental Management of the Work and Phase V: EnvironmentalManagement of Start up.

SERVICES OF TECHNICAL ASSISTANCE TO THE PROJECT MANAGEMENT IN THE ENVIRONMENTAL SUPERVISION OF PROJECTS, WORK AND START UP OF THE “DRAINAGE OF VIGO” AND “NEW WATER SUPPLY TO PONTEVEDRA AND ITS ESTUARY”

MO

NIT

ORIN

G

Page 27: Company Profile - Intecsa-Inarsa · Company Profile. GENERAL PRESENTATION // INTECSA-INARSA Slide 2 CONTENT 10. INFRASTRUCTURES 11. Tunnels and structures ... SNC Lavalin 2013 Awards

Julián Camarillo, 53

28037 | Madrid | Spain

T +34 915 673 800

F +34 915 673 805

www.intecsa-inarsa.es

©©

20

17

In

te

csa-In

arsa. A

ll rig

hts rese

rve

d.