company profile - latesteniglobal.com.my/v1/images/stories/eni_profile.pdf · corporate profile eni...

16
32538 E E N N (Ele c c Lot K-6500 Jala Tel : + enquiry@e ISO 9001:2008 83-K VÉÅÑt VÉÅÑt VÉÅÑt VÉÅÑt cÜÉ cÜÉ cÜÉ cÜÉ N N I I E E n n g g i i n n e e e e r r i i n n g g S S d d n n c ctrical & Instrumentation Contractor ) ) an Bukit Mentok, Taman Haji Wan Ngah 24000 Chukai, Kemaman, Terengganu +609-858 1898 Fax : +609-858 1899 www.eniglobal.com www.eniglobal.com www.eniglobal.com www.eniglobal.com.my .my .my .my eniglobal.com.my | [email protected] tÇç tÇç tÇç tÇç Éy|Äx Éy|Äx Éy|Äx Éy|Äx B B h h d d ) ) 2,

Upload: dangnguyet

Post on 05-Feb-2018

247 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

325383

EEEEEEEENNNNNNNN

((EElleecc

Lot K-6500 Jalan Bukit Mentok, Taman Haji Wan Ngah 2,

Tel : +6

[email protected]

ISO 9001:2008

325383-K

VÉÅÑtÇçVÉÅÑtÇçVÉÅÑtÇçVÉÅÑtÇçcÜÉy|ÄxcÜÉy|ÄxcÜÉy|ÄxcÜÉy|Äx

NNNNNNNNIIIIIIII EEEEEEEEnnnnnnnnggggggggiiiiiiiinnnnnnnneeeeeeeeeeeeeeeerrrrrrrriiiiiiiinnnnnnnngggggggg SSSSSSSSddddddddnnnnnnnn

ccttrriiccaall && IInnssttrruummeennttaattiioonn CCoonnttrraaccttoorr))

6500 Jalan Bukit Mentok, Taman Haji Wan Ngah 2,

24000 Chukai, Kemaman,

Terengganu

+609-858 1898 Fax : +609-858 1899

www.eniglobal.comwww.eniglobal.comwww.eniglobal.comwww.eniglobal.com.my.my.my.my [email protected] | [email protected]

VÉÅÑtÇçVÉÅÑtÇçVÉÅÑtÇçVÉÅÑtÇç cÜÉy|ÄxcÜÉy|ÄxcÜÉy|ÄxcÜÉy|Äx

BBBBBBBBhhhhhhhhdddddddd

))

6500 Jalan Bukit Mentok, Taman Haji Wan Ngah 2,

Page 2: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

Table of ContentTable of ContentTable of ContentTable of Content

Quality Policy & Mission Statement

Introduction

Corporate Profile

ENI Organization Chart

Product & Services

Track Records

Licenses and Registrations

Page 3: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

Quality PolicyQuality PolicyQuality PolicyQuality Policy

ENIESB aim to be one of the leading E&I contractor in Oil & Gas Industry throughout Malaysia. Our mission is to maintain as a competent company that offering of high quality of service and continuously improves our services and process to satisfactory client’s requirement. “Project completion meeting specification, agreement and schedule”

Mission StatementMission StatementMission StatementMission Statement

“To Work For the Success of Entities We Serve By Providing Our Customers Reliable & Quality Service, So As To Create Lasting Customer Relationship, Provide Growth & Opportunities to Our Employees, & Generate Consistently Stable Returns to Our Shareholders”

““TToo WWoorrkk ffoorr tthhee SSuucccceessss ooff EEnnttiittiieess WWee SSeerrvvee””

Page 4: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

IIIIntroductionntroductionntroductionntroduction

ENI Engineering Sdn Bhd or ENI formerly known as Proffman Engineering Sdn Bhd and is fully owned by bumiputra. It was primarily involved in oil and gas, petrochemical industries since specialization in the field of Electrical & Instrumentation, ENI offer the following major work scope of service:

* Hook* Operation & Maintenance

Since its operation commence, ENI has continuously developed its capabilities in their scope of services. ENI’s dedicated team of personnel with hands on experience is always committed to provide reliable and competitive services to our clients. It has peadmirable in its current activities, executing work timely to a high safety and quality standard. ENI is also closely associated with a number of reputable suppliers. A number of local and oversea exclusive agents to represent them in their area of specialization are further proving of the trust they have in ENI. In order to strengthen its position and stay competence, it is ENI intention to diversifies through related integration either backward to source of supply or forward to the ultimate co

ntroductionntroductionntroductionntroduction

ENI Engineering Sdn Bhd or ENI formerly known as Proffman Engineering Sdn Bhd and is fully owned by bumiputra. It was primarily involved in oil and gas, petrochemical industries since 1995. With specialization in the field of Electrical & Instrumentation, ENI offer the following major work scope of service:

* Project Management * Hook-up & Commissioning * Operation & Maintenance * Material & Equipment * Supply of Manpower

Since its operation commence, ENI has continuously developed its capabilities in their scope of services. ENI’s dedicated team of personnel with hands on experience is always committed to provide reliable and competitive services to our clients. It has peadmirable in its current activities, executing work timely to a high safety and quality standard.

ENI is also closely associated with a number of reputable suppliers. A number of local and oversea exclusive agents to represent

a of specialization are further proving of the trust they have in ENI. In order to strengthen its position and stay competence, it is ENI intention to diversifies through related integration either backward to source of supply or forward to the ultimate consumer.

ENI Engineering Sdn Bhd or ENI formerly known as Proffman Engineering Sdn Bhd and is fully owned by bumiputra. It was primarily

1995. With specialization in the field of Electrical & Instrumentation, ENI offer the

Since its operation commence, ENI has continuously developed its capabilities in their scope of services. ENI’s dedicated team of personnel with hands on experience is always committed to provide reliable and competitive services to our clients. It has performed admirable in its current activities, executing work timely to a high

ENI is also closely associated with a number of reputable suppliers. A number of local and oversea exclusive agents to represent

a of specialization are further proving of the trust they have in ENI. In order to strengthen its position and stay competence, it is ENI intention to diversifies through related integration either

nsumer.

Page 5: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

Corporate ProfileCorporate ProfileCorporate ProfileCorporate Profile

Company NameCompany NameCompany NameCompany Name

Head OfficeHead OfficeHead OfficeHead Office

ENI ENGINEERING SDN BHD

(325383-K)

Lot K-6500, Tmn Hj Wan

Ngah 2, Jln Bukit Mentok,

Kemaman, Terengganu Date of IncorporationDate of IncorporationDate of IncorporationDate of Incorporation

30 – Nov – 1994

Type of CompanyType of CompanyType of CompanyType of Company

WorkshopWorkshopWorkshopWorkshop

Private Limited Company

Tingkat Bawah,

Lot K-6500, Tmn Hj Wan

Ngah 2, Jln Bukit Mentok,

Kemaman, Terengganu

Board of DirectorBoard of DirectorBoard of DirectorBoard of Director

Hj Ruzmilan Abdul Rahman

Rosmawaty Abd Rahman

ShareholderShareholderShareholderShareholder East Malaysia Local PartnerEast Malaysia Local PartnerEast Malaysia Local PartnerEast Malaysia Local Partner

Hj Ruzmilan Abdul Rahman

Zarina Mohamed

BCS Contract & Supply BCS Contract & Supply BCS Contract & Supply BCS Contract & Supply

Services Sdn BhdServices Sdn BhdServices Sdn BhdServices Sdn Bhd

Lot 386, S/L 4042,

Parkcity Commerce Square,

Phase 5, Jln Ahmad zaidi,

97000 Bintulu, Sarawak

Capital StructureCapital StructureCapital StructureCapital Structure

Authorized : RM1,000,000.00

Paid Up : RM 750,000.00

Page 6: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

PRODUCTPRODUCTPRODUCTPRODUCT

ELECTRICAL: TELECOMMUNICATION:

• Cables - Power, Controls, Lighting, Heat Tracing and Grounding.

• Cable Gland. • Cable Tray, Ladder and Conduit • Fabrication of support, frame and mounting stand for electrical equipment.

• Lug, termination kits & Cable Tags accessories.

• Lighting Fixtures, Lamps, Bulbs, LED Floodlight & LED Helideck.

• Street Lighting, Compound Lighting and Floodlight

• Junction Boxes and Distribution Box • Socket Outlet and Receptacle. • Multi Cable Transit. • Remote Control Units. • Cable termination kits. • Earthing accessories; earth boss, bolts & nuts, earting rod, earth pit, crimp connector and etc.

• Transformer • 6.6 KV Switchgear • LV Switchgear and MCC • AC UPS • DC UPS • Distribution Board • Soft Starter • Variable Speed Drive • Unit Control Panel • Neutral Earthing Resistor Panel • Busduct • Capacitor bank

• Cables - Fiber Optic, Data

Communication RS485, Outdoor

telephone cable Cat 6 Cable.

• Fiber Optic Telecommunication

Equipment (FOTE)

• Cable Tray, Ladder and Conduit

complete with support

• Lug, termination kits, Cable Tags.

• CCTV and Stanchion.

• Junction Boxes complete with

accessories.

• Telephone & Intercom System

• PA Systems.

Page 7: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

PRODUCTPRODUCTPRODUCTPRODUCT

INSTRUMENTATION / FIRE & GAS:

• Cables - Instrumentation, Fire & Gas and Control, Thermocouple.

• Field Equipment Sunshade & Stanchion

• Junction Boxes complete with accessories.

• Tubing, Fittings & Accessories. • Pressure & Bimetallic Temperature Gauges

• Pressure, Flow, Level and Temperature Switches.

• Level Transmitter; Displacer Type, Guide Wave Radar Type & DP Type.

• Pressure, Flow, Level and Temperature Transmitter.

• Level Instruments and Flow Indicator (E.g. Magnetic Level Gauge, Side Glass Level Indicator) Joglers Exclusive Agent in Malaysia

• Pneumatic and Electronic Controller • Ultrasonic Flare Flowmeter • Thermal Dispersion Flow Transmitter

• Positive Displacement Flow Indicator • Moisture Analyzer • Orifice Plate and Flange • Actuated Ball Valve • Motorize Valves. Control Valves; Conventional and Severe Service Valves;

• Control Valves and Piping Accessories (Norriseal Valve)

• Triple Offset Butterfly Valve, Double Block & Bleed Valve (Hobbs Valve)

• Pig Indicator and Signaller • Safety and Pressure Relief Valves. • Produce Water Skid. • Chemical Injection Skid. • Fusible Plug Loop Installation. • PAGA Systems • Hydraulic Power Pack. • Master Fire Alarm Panel • Deluge Control Panel and Skid. • Open Path Gas Detector, IR Flame Detector, Smoke & Heat Detector.

• Drilling & Wellhead Equipment - Control Flow Representative for Malaysia

• Blowout Preventers • Chokes • Drill String Products • Valves (Gate Valves, Check Valves, Surface Safety Valves, Subsea Fail Safe Valve & etc.)

• Geothermal Wellhead & Christmas Tree Equipment

• Mudline Suspension Systems • Wellhead & Christmas Tree Equipment

• Motion Compensation System • Pipe Laying / Handling Equipment

Page 8: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

ELECTRICAL SERVICESELECTRICAL SERVICESELECTRICAL SERVICESELECTRICAL SERVICES

PROJECT

# Preparation of Detailed Installation Drawings.

# Preparation of Project Jobcard and Workpack.

# Supply of materials

# Pulling of and termination of burried and above ground power, lighting, controls and grounding cable. (Including trenches work such as excavation, sand bedding, backfilling, protection tile installation and compacting)

# Fabrication and installation of Primary and Secondary cable way support.

# Installation of cable tray, ladder and conduit.

# Installation of lamp pole and lighting Fixtures

# Fabrication and installation of panel or equipment support frame.

# Installation of process area lightning and earthing system.

# Installation of building lightning and earthing system.

# Installation of Junction Boxes.

# Installation of Socket Outlet and Receptacle.

# Installation of Multi Cable Transit complete with accessories.

# Installation of Remote Control Units

# Perform all related testing works according to Vendor and client procedure.

# Punchlist killing.

# Pre-Commissioning and Commissioning.

# Prepare as-built drawing

MAINTENANCE

• Maintenance of Electrical Facilities /

Equipment (HV / LV)

o Generator, Batteries, Transformer, Cathodic Protection, Uniterrupted Power Supply System, Electrical Motor HV / LV.

o Switchboards / Ring Main Units; Intelligent Motor Control System (IMCS), Electrical Network Monitoring and Control System(ENMCS),Variable Speed Drives, 132kV, 33kV, 6.6kV, 3.3Kv & 415V Switchgear.

o Protection Relay Servicing and Setting.

o Electrical Heater.

o Aircraft Warning Light & Winch System.

o Navigation Aid.

• Rectification and Modification Works.

• HV / LV Cable Fault Locator.

• HV / LV Cable Jointing.

• Preventative and Corrective Maintenance.

Page 9: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

INSTRUMENT INSTRUMENT INSTRUMENT INSTRUMENT

SERVICESSERVICESSERVICESSERVICES

PROJECT

# Preparation of Detailed Installation Drawings.

# Preparation of Project Jobcard and Workpack.

# Supply and Installation of Instrument Items

# Pulling of and termination of burried and above ground power, lighting, controls and grounding cable.

# Including trenches work such as excavation, sand bedding, backfilling, protection tile installation and compacting.

# Fabrication and installation of Primary and Secondary cable way support.

# Installation of Cable tray and conduit.

# Installation of Instrument Stanchion.

# Installation of Field Instrument Items; PT, TT, FT, LT, Analyzer, Controller, Switches and etc.

# Fabrication and installation of panel or equipment support frame.

# Installation of field Instrument earthing system.

# Installation of Junction Boxes.

# Installation of Multi Cable Transit complete with accessories.

# Perform all related testing works according to Vendor and client procedure.

# Punchlist killing.

# Pre-commissioning and Commissioning Works.

# Prepare as-built drawing

MAINTENANCE

* Field Instrument calibration and

revalidation.

* Refurbish and Modified All Type of Valves

* Mechanical Valve, Control Valve Servicing and Overhauling.

* In-Situ Valve Servicing and Overhauling.

* In-Situ Electronic Valve Testing

* Rectification and Modification Instrument Works.

* Preventative and Corrective Maintenance for Plant.

* Skill Manpower for Construction Technical Personnel.

* Trouble-Shooting, Fault Finding and Rectification of Fire & Gas Detection Systems.

* Wellhead greasing works

* Wellhead Repair and Overhaul

* Specialized Turnaround Packages

Page 10: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

TELECOMMUNICATION TELECOMMUNICATION TELECOMMUNICATION TELECOMMUNICATION

SERVICESERVICESERVICESERVICESSSS

PROJECT

# Preparation of Detailed Installation Drawings.

# Preparation of Project Jobcard and Workpack.

# Supply and Installation of Instrument Items

# Pulling of and termination of burried and above ground Fiber Optic, Data Communication and Telephone cables.

# Installation of Cable tray and conduit.

# Installation of Field Communication Devices.

# Fabrication and installation of panel or equipment support frame.

# Installation of Junction Boxes.

# Perform all related testing works according to Vendor and client procedure.

# Punchlist killing.

# Pre-commissioning and Commissioning Works.

# Prepare as-built drawing as per client requirement.

MAINTENANCE

* Splicing, Jointing and Testing.

* Rectification and Modification Works.

* Trouble-Shooting, Fault Finding and Rectification of Telecommunication and PA Systems.

Page 11: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

EXECUTIVE CHAIRMAN RUZMILAN ABD RAHMAN

BUSINESS DEVELOPMENT

OFFICER

ASSOCIATE PARTNER

ACCOUNT

SITI FAIRUZ

COMPANY SECRETARY FAZ CORPORATE SERVICES

CHIEF OPERATION OFFICER

M. KHAIRUDDIN

PROCUREMENT QHSE ENGINEERING

ADMIN.

CLERK

1. SUPERVISOR

2. TECHNICIAN

3. WORKERS

DIRECTOR ROSMAWATY ABD RAHMAN

CHIEF EXECUTIVE OFFICER

LUTFAN AHMAD

PROJECT

MANAGEMENT

ACCOUNT

CLERK

COST

&

CONTRACT

SALES

&

MARKETING

SERVICE

&

MAINTENANCE

ADMIN & HR

ROSMAWATY

ENI ENI ENI ENI Organization ChartOrganization ChartOrganization ChartOrganization Chart

Page 12: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

Track RecordsTrack RecordsTrack RecordsTrack Records

NO CLIENT PROJECT YEAR CONTRACT /

PROJECT VALUE (RM)

1 FPSO Ventures Install GPA Alarm Inside UPS & Install Red Flash Light In IGS Area

2010 113,190.00

2 Petronas Gas Berhad EPCC of Upgrading Pilot Igniter And Flame Scanner

2010 375,000.00

3 FPSO Ventures Services Air Circuit Breaker 2010 41,810.00

4 EPEMSB Installation Of IR Analyzer 2010 92,255.25

5 Petronas Penapisan Terengganu Sdn Bhd

MOV Installation at D-905/906 2010 196,000.00

6 Newfield Peninsula Malaysia Inc

Provision Of Electrical Inspection 2010 75,070.00

7 Petronas Carigali Sdn Bhd

(PCSB) To Install Wellhead Control Panel -Regultor(Pulai-B Platform)

2010 349,992.63

8 Petronas Carigali Sdn Bhd

(PCSB) Provision of Portal Cabin Electrical Tie-In at Malong Platform

2010 42,660.00

9 Vinyl Chloride (Malaysia)

Sdn Bhd To Repair Skin Temperature-Shutdown 2010 85,295.00

10 Petronas Carigali Sdn Bhd

(PCSB)

Provision of instrumentation modification and installation of cyclonic separator and inline static mixer at ABU-A

2010 73,527.00

11 Petronas Penapisan Terengganu Sdn Bhd

Maintenance and Service Switchgears and Transformers

2010 125,000.00

12 Petronas Gas Berhad (PGB) Cable fault rectification for 415V motors KM5-1701B &KM6-1702B at GPP B

2010 46,260.00

13 PETRONAS AMMONIA

SDN BHD

Supply, Installation and testing of new fluorescent light fitting for replacement of stahl exlux 6000 fluorescent light fitting

2008-2009

TERM CONTRACT

14 MURPHY SARAWAK OIL

CO. LTD

Provision Electrical Instrument & Telecommunication Works of MGP-1 for Phase 1 SK309/311 Gas Development Project

2008-2009

40,405,728.87

15 Petronas Penapisan Terengganu Sdn Bhd

PP(T)SB

Call-off Contract for Cabling Works, Lighting and Power Socket Installation & Maintenance at Petronas Penapisan (Terengganu) Sdn Bhd. Term Contract 3 years + optional 1 year

2006-2009

TERM CONTRACT

16 Petronas Carigali Sdn Bhd

(PCSB) Installation of Caisson Pumps 2008 257,900.00

17 Petronas Penapisan Terengganu Sdn Bhd

PP(T)SB

Provision of Contraction Contractor for Electrical and Instrument Installation of Proposed KR-1 CDU Debottlenecking 2007 Project

2008 715,000.00

Page 13: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

NO CLIENT PROJECT YEAR CONTRACT /

PROJECT VALUE (RM)

18 Petronas Penapisan Terengganu Sdn Bhd

PP(T)SB

Lighting pole 8 mtr hdg octagonalmidhinge, mid-hinge column flange mounted type

2007 9,792.00

19 Petronas Penapisan Terengganu Sdn Bhd

PP(T)SB Cabling work for local indicator at WWTP 2007 22,767.50

20 Petronas Penapisan Terengganu Sdn Bhd

PP(T)SB Cabling work for AFC Project 2007 15,200.00

21 Petronas Penapisan Terengganu Sdn Bhd

PP(T)SB Installation lighting system at gate 27 2006 10,382.10

22 Tenaga Nasional Bhd

(TNB) Kerja rentis sekitar Air putih dan Cheneh 2006 9,947.50

23 Petronas Penapisan Terengganu Sdn Bhd

PP(T)SB Manpower for troubleshoot and repair 2006 9,630.14

24 Hoerbiger KT Asia Services

Pte Ltd.

Installation of Lubricator/Compressor System for 1102A/B Modification Project - E & I Works (PPTSB)

2006 215,180.70

25 Mecip Global Engineers

Sdn Bhd

Provision of Engineering Services to Installation at Commissioning of the New P1801 a/b/c at VCM Plant

2006 190,000.00

26 Formis Automation Sub-contract for Perimeter Lighting and CCTV at GPPA and CUF Gebeng.

2006 477,343.70

27 Petronas Dagangan Berhad

(PDB) Supply material, manpower, and tools for upgrading the self verification grounding system

2005 18,876.00

28 Petronas Carigali Sdn Bhd

(PCSB)

Supply of Manpower, Materials,Equipment & Consumables for Helideck Lighting System at Pulai B Platform

2005 158,789.24

29 Petronas Penapisan Terengganu Sdn Bhd

PP(T)SB

Supply and Install Instrument Cable Tray at Petronas Penapisan (Trg) Sdn Bhd

2005

53,570.00

30 Petronas Penapisan Terengganu Sdn Bhd

PP(T)SB

To Supply and Install Permanent Distribution Panel for KR2 TA Cabin

2005

32,224.50

31 Petronas Dagangan Berhad

(PDB)

Price Agreement For Electrical Maintenance Work at PDB Bulk & Aviation Depot & LPG Bottling Plant ( Eastern )

2003-2005

TERM CONTRACT

32 Petronas Gas Berhad (PGB) Safety Incentive Scheme (For GPP-6 TA April-May 2004 at GPP Complex B)

2004 10,659.00

Page 14: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

NO CLIENT PROJECT YEAR CONTRACT /

PROJECT VALUE (RM)

33 Petronas Carigali Sdn Bhd

(PCSB) To Replace Power Cable for MOL Pump at Bekok C

2004 72,225.90

34 Petronas Gas Berhad (PGB) General Electrical Servicing for GPP6 Turnaround at Petronas Gas Bhd. Complex B

2004 245,419.00

35 Sime Sembcorp Sub-contract for Electrical & Instrumentation Work for Electrical Control Building (ECB) & Maintenance Workshop Building (MWB).

2003-2004

1,005,043.00

36 Sime Sembcorp Sub-contract for Electrical & Instrument Work for YP Topsides

2003-2004

2,860,757.00

37 BP Petronas Provision of electrical & Instrumentation Services

2002-2004

TERM CONTRACT

38 Sime Sembcorp Sub-contract for Electrical & Instrumentation Work for Angsi Topsides Project. Petronas Carigali Platform

2003 705,000.00

39 Petronas Gas Berhad (PGB) To Rectify Defective Electrical Equipment at Export Terminal, Tg. Sulong, Kemaman, Terengganu

2003 15,995.00

40 Tenaga Nasional Bhd

(TNB)

Maintenance & Cleaning work for distribution line of 132KV Bandar Penawar - Teluk Ramunia & 132KV Loop in/out Bandar Penawar/Teluk Ramunia - Desaru

2003 50,550.00

41 Petronas Gas Berhad (PGB) EPCC : Activation of Protection Relay CEFSG 2003 11,697.60

42 Ethylene Supply & Install Exd D/Board 2003 56,000.00

43 Ethylene LV Motor Overhaul for EMSB 2003 50,400.00

44 Kerteh Port Sdn Bhd Supply & Installation of new cable 2003 10,841.40

45 Tenaga Nasional Bhd

(TNB)

Laying, Testing and Commissioning of Two Circuits of 11KV Underground Cables 240mm2- 3 core XLPE Aluminium for SSU Ambulatory,Kuala Terengganu.

2002-2003

604,831.00

46 Petronas Gas Berhad (PGB) Proposed Extension of KIPC for CUF, Admin Office PGB- Telecommunication & PA System

2002-2003

115,000.00

47 Petronas Gas Berhad (PGB) Rewiring Electrical System at Inspection Building GPP A (Lighting Point, Socket Outlet and Air-Cond Point)

2002 30,499.03

48 POLY- ETHYLENE Install Additional Skin Temperature 2002 45,390.00

49 Petronas Gas Berhad (PGB) To Replace Cabel Tray at Export Terminal, Tg. Sulong, Kemaman, Terengganu

2002 62,907.80

50 Petronas Gas Berhad (PGB) Elect. & Gen. Ins. Package for DPCU3 T/A for GPP Complex B

2002 170,327.00

Page 15: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

NO CLIENT PROJECT YEAR CONTRACT /

PROJECT VALUE (RM)

51 Petronas Penapisan Terengganu Sdn Bhd

PP(T)SB To Provide Service to Replace New GM477 2002 44,174.00

52 Petronas Dagangan Bhd

(PDB)

The Price Agreement for preventive maintenance work at PDB Bulk Depots, Aviation Depots and LPG Bottling Plant (electrial maintenance) for the period of one year with an option to extend for another one year

1999-2001

430,820.00

53 VCMSB Provision of manpower for instrumentation services for VCMSB, Kertih, Terengganu.

2000-2001

324,000.00

54 Petronas Carigali Sdn Bhd

(PCSB) Supply manpower and material for replacement of intrument air tubing for Duyong C shutdown.

2000 362,544.16

55 ES/PCSB Supply manpower for Resak RCPP & RDP-A Hook-up and commissioning.

1999-2000

240,000.00

56 Petronas Carigali Sdn Bhd

(PCSB)

Supply and install skid, pump, tbing, valves and fitting to complete the installation & comm of Chemical Injection Pump Skid Dulang.

1999-2000

386,515.43

57 Ethylene Supply equipment and consumable for E & I works

1999 226,659.95

58 Petronas Gas Bhd (PGB)

Procure,Fabricate,Supply,Delivery,Construction & Commissioning for the work of Additional Cooling Water Pump in Petronas Gas Plant at Export Terminal,Kemaman.

1998-1999

432,502.00

59 Shapadu/ Petronas Carigali Supply Manpower for Design, Engineering & Execution of Electrical & Instrument Work for 3 years + 1 year under PMO term contract

1996-1999

509,256.99

60 Shapadu/ Petronas Carigali Supply Material,Equipment & Consumables for 3 years + 1 year to execute E & I work under PMO contract

1996-1999

2,693,039.30

61 Petronas Gas Berhad (PGB) Supply E& I Equipment and Consumables 1998-1999

108,662.76

62 Shapadu Supply Instrument and Power Cable for KELOIL 1997 196,496.00

63 System Protection & Maintenance (SPM)

Electrical Installation at KLCC Fit Out Work 1997 1,123,580.40

64 System Protection & Maintenance (SPM)

Paka Conversion Plant TNB Instrument Equipment Installation,calibration,testing and commissioning

1996 261,585.00

65 System Protection & Maintenance (SPM)

Paka Conversion Plant TNB Cable Laying & Termination

1996 354,902.00

66 Shapadu Design,supply,install and testing for Shapadu Open Yard and Workshop electrical wiring and cabling works

1995-1996

101,518.50

Page 16: COMPANY PROFILE - LATESTeniglobal.com.my/V1/images/stories/ENI_PROFILE.pdf · Corporate Profile ENI Organization Chart ... • Drilling & Wellhead Equipment - ... Vendor and client

Supporting Document (Company License)