company_profile.pdf

44
PT. MULTI PT. MULTI ADVERINDO ADVERINDO Servicing the World of Construction Servicing the World of Construction

Upload: dany-ho

Post on 18-Sep-2015

258 views

Category:

Documents


13 download

TRANSCRIPT

  • PT. MULTI PT. MULTI ADVERINDOADVERINDO

    Servicing the World of Construction Servicing the World of Construction

  • Contents 1. Words From The Board

    2. Company Details

    3. Professional Team

    4. List of Equipments

    5. Reference List of Major Projects

    6. Company Policy in Quality Assurance

    7. Company Policy in Health, Safety and Environmental

    8. Certificates

    9. Documentation

  • Words from the Board In servicing the world of construction, PT Multi Adverindo was established in 2003. In our very early stage, we even started with only old and used machines. We believe our solid team work determines our own and the future of the company. In the period of only five years since the establishment, PT Multi Adverindo has expanded the range of activities and performed numerous of projects in the wide scope of civil construction for and on the satisfaction of States Own and Private Clients. Such performed has been accompanied by corresponding accumulation of : Professional staffs in engineering, surveyors, mechanics, logistic and HSE staff Equipments and fleet development and innovation. Since the beginning, we maintain an extensive inventory of equipment and is constantly being increased and upgraded. Our extensive inventory of well-maintained and work ready equipment which allows us to perform to client's expectations and beyond on both small and large projects. We realizes that equipment requires continual reinvestment for maximum efficiency with minimal downtime on our projects. We focus on state-of-the-art technology, safety and productivity, and we offer a degree of professionalism and quality unmatched by our competition. Looking toward the future, we will continue our commitment to provide the best in construction, safety and environmental contracting services. In PT Multi Adverindo, we are ready in servicing the world of construction and expects continuous growth in the years to come. We invite you to experience the satisfaction of working with PT Multi Adverindo and in assisting you to realize your goals. Ir. Askaris Chioe President Director

  • Company Profile

    Servicing the World of Construction

    Company Name PT MULTI ADVERINDO Head Office Jl. Mawar No. 5 Perumahan Cemara Asri Medan 20371 Phone : +62 61 6631666, 6638666 Facsimile : +62 61 6630666, 6631590 Email : [email protected] Workshop Bengkel GM Jl. Sisingamangaraja KM.12 No. 88 Medan Deed of Establishment No. 15 dated 11 August 2003 ( Akte Pendirian ) Other Certificate No. 110 dated 20 November 2007 ( Akte Perubahan ) No. 13 dated 5 November 2008 Registration of Companys C-21394 HT.01.01.TH.2003 dated 9 September 2003 Certifcates C-07712 HT.01.04.TH.2007 dated 27 December

    2007 ( Pengesahan Akte ) AHU-90128.AH.01.02.Tahun2008 dated 26 Nov 2008 Tax Register Identification 01.516.976.6-123.000 ( NPWP ) Trading Business Permit No. 503.570/1977/02.13/PB/III/2009 ( SIUP ) dated 12 September 2008 License of Business Palace No. 470/2079/2008 ( Surat Domisili ) dated 20 October 2008 License of Construction Permit No.1.127349.1212.2.00223/2009 ( SIUJK ) dated 14 April 2009 Company Registration No. 021315101238 ( TDP ) dated 19 March 2009 Construction Firm Certificate No. 0152/GAPEKSINDO/02/03/10 ( SBU ) dated 05 March 2010 License of Mining Permit No.658.K/30/DJB/2012 ( SIUJP ) dated 12 June 2012 Classification Grade 7 ISO 9001 : 2008 16 100 0678

  • Servicing the World of Construction

    Board Management President Director : Ir. Askaris Chioe Technical Director : Ir. Rudy Bokslag

    Operational Director : Henry, SE.

    Marketing Director : Sarung, ST., MT.

    Commercial Director : Besdy, SE.

    Engineering Manager : Litto Thamsir, ST., M.Eng. Finance Manager : Drs. Koko Wijaya

  • Servicing the World of Construction

    Professional Staff

    Department Number of personnels

    Finance 5 persons Procurement 4 persons Logistic 10 persons Tax & Accounting 7 persons Engineer & Site Engineer 13 persons Human Resources 10 persons Technical Administration 10 persons QC/QA & HSE 20 persons Surveyor

    10 persons

    Electric & Mechanic 45 persons

    No

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

  • Servicing the World of Construction

    List of Equipment No Type Total 1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    Excavator

    Bulldozer

    Dump Truck

    Heavy Duty Dumper

    Motor Grader

    Compactor

    Crawler Crane

    Self Loader

    Wheel Loader

    Rough Terrain Crane

    Vibro Hammer

    Fuel Truck

    Crawler Rock Drill

    Compressor

    Rock Breaker

    Trado

    Tug Boat 450HP

    Anchor Boat 340 HP

    54 units

    38 units

    148 units

    18 units

    8 units

    14 units

    8 units

    2 units

    4 units

    4 units

    6 units

    4 units

    4 units

    2 units

    4 units

    4 units

    2 units

    2 units

    Servicing the World of Construction

    List of Equipment No Type Total Capacity 1

    2

    3

    4

    5

    Excavator

    Komatsu PC 200-7

    Komatsu PC 350LC-6

    Komatsu PC 300-8

    Hitachi ZX 330

    Bulldozer

    Komatsu D31P-18

    Komatsu D85A-21

    Komatsu D85ESS-2

    Komatsu D31P-20E

    Dump Truck

    Hino FM 260 JD

    FAW CA3256P2K15

    FAW HD 360 DT

    Mitsubishi PS 125

    Mitsubishi PS 120

    HD Truck

    Komatsu DT HD 605-5

    Motor Grader

    Komatsu GD 511 A

    Mitsubishi MG 330

    6 unit

    1 unit

    3 unit

    5 unit

    1 unit

    1 unit

    9 unit

    1 unit

    2 unit

    20 unit

    2 unit

    8 unit

    1 unit

    4 unit

    2 unit

    1 unit

    143 HP

    232 HP

    260 HP

    247 HP

    71 HP

    225 HP

    200 HP

    71 HP

    26 ton

    20 ton

    30 ton

    10 ton

    10 ton

    739 HP

    135,4 HP

    130 HP

  • Servicing the World of Construction

    List of Equipment No Type Total 1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    Excavator

    Bulldozer

    Dump Truck

    Heavy Duty Dumper

    Motor Grader

    Compactor

    Crawler Crane

    Self Loader

    Wheel Loader

    Rough Terrain Crane

    Vibro Hammer

    Fuel Truck

    Crawler Rock Drill

    Compressor

    Rock Breaker

    Trado

    Tug Boat 450HP

    Anchor Boat 340 HP

    54 units

    38 units

    148 units

    18 units

    8 units

    14 units

    8 units

    2 units

    4 units

    4 units

    6 units

    4 units

    4 units

    2 units

    4 units

    4 units

    2 units

    2 units

    Servicing the World of Construction

    List of Equipment No Type Total Capacity 6

    7

    8

    9

    10

    11

    Compactor

    Vibro Hamm 3410

    Sakai SV 515 TF-H

    Sakai SV 515 D-H

    Bomag BW 211D-40

    Crane

    XCMG QUY55

    Zoomlion QUY50-76

    Zoomlion QUY50-50

    Crawler Tractor

    John Deere 760 J

    Fuel Tank

    Hino FM 260 JD

    Water Tank

    Nissan CW 520 H

    Wheel Loader

    Furukawa 230-1

    3 unit

    2 unit

    3 unit

    3 unit

    1 unit

    1 unit

    1 unit

    3 unit

    1 unit

    1 unit

    1 unit

    134 HP

    115 HP

    121 HP

    132 HP

    55 ton

    50 ton

    50 ton

    157 HP

    26 ton

    7 ton

    2,5 m3

  • Servicing the World of Construction

    List of Equipment No Type Total 1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    Excavator

    Bulldozer

    Dump Truck

    Heavy Duty Dumper

    Motor Grader

    Compactor

    Crawler Crane

    Self Loader

    Wheel Loader

    Rough Terrain Crane

    Vibro Hammer

    Fuel Truck

    Crawler Rock Drill

    Compressor

    Rock Breaker

    Trado

    Tug Boat 450HP

    Anchor Boat 340 HP

    54 units

    38 units

    148 units

    18 units

    8 units

    14 units

    8 units

    2 units

    4 units

    4 units

    6 units

    4 units

    4 units

    2 units

    4 units

    4 units

    2 units

    2 units

    Servicing the World of Construction

    List of Equipment No Type Total Capacity

    12

    13

    Vibro Hammer

    Vibro Hammer FAV 600

    Tomen VM2-40000E

    Nisha SVS 80

    Mixer

    Mitsubishi F415 J

    FAW FW 86 R

    1 unit

    1 unit

    1 unit

    1 unit

    1 unit

    5 m3

    5 m3

  • Servicing the World of Construction

    Reference List of Major Project

    No Description of Works Location Commissioned 1 2

    3

    4 5 6 7 8 9

    10

    REINFORCEMENT WORKS ON SLOPE AT RIGHT SIDE OF DELI RIVER IN MEDAN, NORTH SU-MATERA No. : HK.02.07.06.07/01 Dated : August 23, 2002 BADERA RIVER IMPROVEMENT AND FLOOD CON-TROL WORKS No. : 02/SPBP/SACNA/FC-104/XII/03 Dated : December 22, 2003 EARTHWORKS, CUT & FILL WORKS AT PKS PT. SIAK PRIMA SAKTI IN DESA PANGKALAN PISANG, KEC. KOTO GASIT, KAB. SIAK INDRAPURA, RIAU No. : 001/KONTRAK/SPS/MA/DESEMBER 2004 Dated : December, 2004 BEACH PRESERVATION WORKS IN UJUNG KARANG LENGTH 550 METERS IN SABANG No. : 11/KPTS/BRR PBPP/2005 Dated : October 19, 2005 CONSTRUCTION OF TRESTLE, SECONDARY JETTY, TANKER BARGE JETTY AND PIPE RACK IN KUALA TANJUNG No. B.01.11/2.2/1205 (Joint Operation) EARTHWORKS OF SUMPUR MAIN CANAL AND TAM-BANGAN SECONDARY CANAL AT PANTI RAO IRRI-GATION PROJECT No. : 06/SPS/RAO/DVO-I/III/2007 Dated : March 09, 2007 SITE LEVELLING & GRADING WORK FOR 2x135 MW IPP COAL FIRED POWER PLANT IN KUALA TANJUNG NORTH SUMATERA No. : ME-C001/KLT-1007 (Joint Operation) Dated : October 26, 2007 SAIPEM KARIMUN YARD CONSTRUCTION PROJECT IN KARIMUN ISLAND INDONESIA Date : February 20, 2008 Contract Revision : Work Contract Variation014 No. : 338649 Dated : December 09, 2010 CONSTRUCTION OF LOADING HARBOUR IN SABANG No. : 01/NS-SBG/SPK/XI/2007 Dated : November 05, 2007 CONSTRUCTION OF LOADING HARBOUR IN SA-BANG No. : 02/NS-SBG/SPK/XI/2007 Dated : November 05, 2007

    North Sumatera

    North Sumatera

    Buatan, Riau

    Sabang, Nanggroe Aceh

    Darrusalam

    Kuala Tanjung, North Sumatera

    Panti Rao, West Sumatra

    Kuala Tanjung, North Sumatera

    Karimun, Kepulauan Riau

    Sabang, Nanggroe Aceh

    Darrusalam

    Sabang, Nanggroe Aceh

    Darrusalam

    Metropolitan Medan

    Urban Development Project

    PT. SAC Nusantara

    PT. Siak Prima Sakti

    NAD Resources Irrigate Public Work Dept BRR

    NAD Nias

    PT. Sarana Industama

    Perkasa

    PT. Pembangunan Perumahan Divisi Operasi I (Pesero)

    PT. Manunggal Engineering

    PT. Saipem Indonesia

    NINDYA SEJATI JO

    NINDYA SEJATI JO

    Servicing the World of Construction

    Reference List of Major Project

    No Description of Works Location Commissioned Contract Value 1 2

    3

    4 5 6 7 8 9

    10

    REINFORCEMENT WORKS ON SLOPE AT RIGHT SIDE OF DELI RIVER IN MEDAN, NORTH SU-MATERA No. : HK.02.07.06.07/01 Date : August 23, 2002 BADERA RIVER IMPROVEMENT AND FLOOD CONTROL WORKS No. : 02/SPBP/SACNA/FC-104/XII/03 Date : December 22, 2003 EARTHWORKS, CUT & FILL WORKS AT PKS PT. SIAK PRIMA SAKTI IN DESA PANGKALAN PISANG, KEC. KOTO GASIT, KAB. SIAK INDRAPURA, RIAU No. : 001/KONTRAK/SPS/MA/DESEMBER 2004 Date : December, 2004 BEACH PRESERVATION WORKS IN UJUNG KARANG LENGTH 550 METERS IN SABANG No. : 11/KPTS/BRR PBPP/2005 Date : October 19, 2005 CONSTRUCTION OF TRESTLE, SECONDARY JETTY, TANKER BARGE JETTY AND PIPE RACK IN KUALA TANJUNG No. : B.01.11/2.2/1205 (Joint Operation) EARTHWORKS OF SUMPUR MAIN CANAL AND TAMBANGAN SECONDARY CANAL AT PANTI RAO IRRIGATION PROJECT No. : 06/SPS/RAO/DVO-I/III/2007 Date : March 09, 2007 SITE LEVELLING & GRADING WORK FOR 2x135 MW IPP COAL FIRED POWER PLANT IN KUALA TANJUNG NORTH SUMATERA No. : ME-C001/KLT-1007 (Joint Operation) Date :: October 26, 2007 SAIPEM KARIMUN YARD CONSTRUCTION PROJECT IN KARIMUN ISLAND INDONESIA No. : 338649 Date : February 20, 2008 Contract Revision : Work Contract Variation014 Date : December 09, 2010 CONSTRUCTION OF LOADING HARBOUR IN SABANG No. : 01/NS-SBG/SPK/XI/2007 Date: November 05, 2007 CONSTRUCTION OF LOADING HARBOUR IN SABANG No. : 02/NS-SBG/SPK/XI/2007 Date: November 05, 2007

    North Sumatera

    North Sumatera

    Buatan, Riau

    Sabang, Nanggroe Aceh

    Darrusalam

    Kuala Tanjung, North Sumatera

    Panti Rao, West Sumatra

    Kuala Tanjung, North Sumatera

    Karimun, Kepulauan Riau

    Sabang, Nanggroe Aceh

    Darrusalam

    Sabang, Nanggroe Aceh

    Darrusalam

    Metropolitan Medan

    Urban Development Project

    PT. SAC Nusantara

    PT. Siak Prima Sakti

    NAD Resources Irrigate Public Work Dept BRR

    NAD Nias

    PT. Sarana Industama

    Perkasa

    PT. Pembangunan Perumahan Divisi Operasi I (Pesero)

    PT. Manunggal Engineering

    PT. Saipem Indonesia

    NINDYA SEJATI JO

    NINDYA SEJATI JO

    Rp 3,497,432,400 Rp 9,596,367,000 Rp 3,448,181,000 Rp 2,333,059,000 Rp 54,500,000,000 Rp 4,457,188,836 Rp 54,300,000,000 USD 24,984,303.74 Rp 423,500,000 Rp 3,540,400,000

  • Servicing the World of Construction

    Reference List of Major Project

    No Description of Works Location Commissioned

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    CONSTRUCTION OF LOADING HARBOUR IN SA-BANG No. : 01/NS-SBG/SPK/IV/2008 Dated : April 28, 2008 CONSTRUCTION OF LOADING HARBOUR IN SABANG No. : 02/NS-SBG/SPK/IV/2008 Dated : April 28, 2008 CONSTRUCTION OF COAL HAULING ROAD No.4 Part 3A No. : 059-2009-TCM Dated : December 01. 2009 CONSTRUCTION OF STOCKPILE AND ROM STOCK No. : 001_BRT/LGL/10 Dated : January 29, 2010 CONSTRUCTION OF PERAK BRIDGE No. : 045-2010-TCM Dated : February 01, 2010 LAND RECOVERY AT PT. SUKAJADI SAWIT MEKAR PROJECT No : 006/SSM-SMPT/PEK.PNMBNAN/VII/2010 Dated : July 13, 2010 SHORE PROTECTION AT PT. SUKAJADI SAWIT MEKAR PROJECT No. : 007/SSM-SMPT/PEK.JLN.CONBLOCK/XII/2010 Dated : September 15, 2010 CONBLOCK WORKS AT PT. SUKAJADI SAWIT MEKAR PROJECT No : 008/SSM-SMPT/PEK.JLN.CONBLOCK/IX/2010 Dated : December 1, 2010 TRENCH WORKS & FENCE FOUNDATION AT PT. SUKAJADI SAWIT MEKAR PROJECT No. : 009/SSM-SMPT/PEK.PRT&POND.PGR/XII/2010 Dated : December 1, 2010 FABRICATION OF CONCRETE PROTECTION PRE-MIER OIL GAJAH BARU PROJECT No. : 572050 Dated : February 2, 2011 LAND MATURATION AND SOIL INVESTIGATION AT PT. MUSIM MAS FUJI PROJECT No. : 004/III/MMF-MA/GA/11 Dated : March 10, 2011 OMATI LANDFALL OPERATION FOR PNG LNG EPC2 OFFSHORE PIPELINE PROJECT No. : 602357 Dated : June 24, 2011

    Sabang,

    Nanggroe Aceh Darrusalam

    Sabang,

    Nanggroe Aceh Darrusalam

    Melak, East Kalimantan

    Melak, East Kalimantan

    Melak, East Kalimantan

    Sampit, Central

    Kalimantan

    Sampit, Central

    Kalimantan

    Sampit, Central

    Kalimantan

    Sampit, Central

    Kalimantan

    Batam, Pekanbaru

    Bekasi, West Java

    Omati, Papua New

    Guinea

    NINDYA SEJATI JO

    NINDYA SEJATI JO

    PT. TRUBAINDO COAL MINING

    A subsidiary of ITM

    PT. BHARINTO EKATAMA A subsidiary of ITM

    PT. TRUBAINDO COAL MINING

    A subsidiary of ITM

    PT. SUKAJADI SAWIT MEKAR

    PT. SUKAJADI SAWIT MEKAR

    PT. SUKAJADI SAWIT MEKAR

    PT. SUKAJADI SAWIT MEKAR

    PT. Saipem Indonesia

    PT. MUSIM MAS FUJI

    Saipem Asia PNG Branch

    Servicing the World of Construction

    Reference List of Major Project

    No Description of Works Location Commissioned Contract Value

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    CONSTRUCTION OF LOADING HARBOUR IN SABANG No. : 01/NS-SBG/SPK/IV/2008 Date: April 28, 2008 CONSTRUCTION OF LOADING HARBOUR IN SABANG No. : 02/NS-SBG/SPK/IV/2008 Date: April 28, 2008 CONSTRUCTION OF COAL HAULING ROAD No.4 Part 3A No. : 059-2009-TCM Date: December 01. 2009 CONSTRUCTION OF STOCKPILE AND ROM STOCK No. : 001_BRT/LGL/10 Date : January 29, 2010 CONSTRUCTION OF PERAK BRIDGE No. : 045-2010-TCM Date : February 01, 2010 LAND RECOVERY AT PT. SUKAJADI SAWIT MEKAR PROJECT No. : 006/SSM-SMPT/PEK.PNMBNAN/VII/2010 Date : July 13, 2010 SHORE PROTECTION AT PT. SUKAJADI SAWIT MEKAR PROJECT No. : 007/SSM-SMPT/PEK.SHRE.PRTCTN/IX/2010 Date : September 15, 2010 CONBLOCK WORKS AT PT. SUKAJADI SAWIT MEKAR PROJECT No. : 008/SSM-SMPT/PEK.JLN.CONBLOCK/XII/2010 Date : December 1, 2010 TRENCH WORKS & FENCE FOUNDATION AT PT. SUKAJADI SAWIT MEKAR PROJECT No. : 009/SSM-SMPT/PEK.PRT&POND.PGR/XII/2010 Date : December 1, 2010 FABRICATION OF CONCRETE PROTECTION PRE-MIER OIL GAJAH BARU PROJECT No. : 572050 Date : February 2, 2011 LAND MATURATION AND SOIL INVESTIGATION AT PT. MUSIM MAS FUJI PROJECT No. : 004/III/MMF-MA/GA/11 Date : March 10, 2011 OMATI LANDFALL OPERATION FOR PNG LNG EPC2 OFFSHORE PIPELINE PROJECT No. : 602357 Date : June 24, 2011

    Sabang,

    Nanggroe Aceh Darrusalam

    Sabang, Nanggroe Aceh

    Darrusalam

    Melak, East Kalimantan

    Melak, East Kalimantan

    Melak, East Kalimantan

    Sampit, Central

    Kalimantan

    Sampit, Central

    Kalimantan

    Sampit, Central

    Kalimantan

    Sampit, Central

    Kalimantan

    Batam, Pekanbaru

    Bekasi, West Java

    Omati, Papua New

    Guinea

    NINDYA SEJATI JO

    NINDYA SEJATI JO

    PT. TRUBAINDO COAL MINING

    A subsidiary of ITM

    PT. BHARINTO EKATAMA A subsidiary of ITM

    PT. TRUBAINDO COAL MINING

    A subsidiary of ITM

    PT. SUKAJADI SAWIT MEKAR

    PT. SUKAJADI SAWIT MEKAR

    PT. SUKAJADI SAWIT MEKAR

    PT. SUKAJADI SAWIT MEKAR

    PT. Saipem Indonesia

    PT. MUSIM MAS FUJI

    Saipem Asia PNG Branch

    Rp 8,426,132,000 Rp 5,070,151,500 USD 4,735,453.66 USD 302,654.07 USD 3,118,757.57 Rp 17,000,000,000 Rp 1,500,000,000 Rp 4,842,200,000 Rp 6,674,800,000 USD 13,000 Rp. 623,900,000 USD 2,545,650

  • Servicing the World of Construction

    Reference List of Major Project

    No Description of Works Location Commissioned

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    LOAD AND HAUL OF BLASTED ROCKS IN P. KARIMUN BESAR , RIAU Dated : June 30, 2011 CUT & FILL DIGESTER POND WORKS AT PT. SUKAJADI SAWIT MEKAR PROJECT No. : 001/PKS SSM1-BIO/VII/2011 Dated : July 7, 2011 SAIPEM KARIMUN YARD CONSTRUCTION PROJECT Karimun Camp Extension No. : 626437 Dated : July 25, 2011 EARTHWORKS (CUT & FILL) MILL AREA IN PMKS PT. KEMILAU INDAH NUSANTARA No. : 051/THB-SPB/SUB/XII/11 Dated : December 19, 2011 HAULING ROAD & INFRASTRUCTURE PT. GUNUNG BARA UTAMA No. : GBU-C004/HR-0112 Dated : January 26, 2012 CUT & FILL DIGESTER POND WORKS AT PT. SUKAJADI SAWIT MEKAR PROJECT No. : 001/PKS SSM2-BIO/III/2012 Dated : March 20, 2012 EARTHWORKS (CUT & FILL) EFFLUENT POND IN PMKS PT. KALIMAN RIA SEJAHTERA No. : 010A/THB-SPB/SUB/III/12 Dated : March 05, 2012 EARTHWORKS (CUT & FILL) EFFLUENT POND IN PMKS PT. KEMILAU INDAH NUSANTARA No. : 012/THB-SPB/III/12 Dated : March 20, 2012 EARTHWORKS (POND EMBANKMENT) IN PMKS KALIMAN RIA SEJAHTERA No. : 028B/THB-SPB/SUB/V/12 Dated : May 2012 EARTHWORKS (CUT & FILL) EFFLUENT POND IN PMKS PT. KEMILAU INDAH NUSANTARA No. : 030/THB-SPB/SUB/V/12 Dated : June 01, 2012 RESERVOIR WORKS IN PMKS PT. KEMILAU INDAH NUSANTARA No. : 049/THB-SPB/SUB/VIII/12 Dated : August 08, 2012

    Karimun,

    Kepulauan Riau

    Sebabi, Central

    Kalimantan

    Karimun, Kepulauan Riau

    Bengalon, Kutim, East Kalimantan

    Melak, East Kalimantan

    Sebabi, Central

    Kalimantan

    Kuala Kurun, Central

    Kalimantan

    Bengalon, Kutim, East Kalimantan

    Kuala Kurun, Central

    Kalimantan

    Bengalon, Kutim, East Kalimantan

    Bengalon, Kutim, East Kalimantan

    PT. Pacific Granitama

    PT. SUKAJADI SAWIT MEKAR

    PT. Saipem Indonesia

    PT. Tunas Harapan Baru

    PT. Gunung Bara Utama

    PT. SUKAJADI SAWIT MEKAR

    PT. Tunas Harapan Baru

    PT. Tunas Harapan Baru

    PT. Tunas Harapan Baru

    PT. Tunas Harapan Baru

    PT. Tunas Harapan Baru

    Servicing the World of Construction

    Reference List of Major Project

    No Description of Works Location Commissioned Contract Value

    23

    24

    25

    26

    27

    28

    39

    30

    31

    32

    33

    LOAD AND HAUL OF BLASTED ROCKS IN P. KARIMUN BESAR , RIAU Date : June 30, 2011 CUT & FILL DIGESTER POND WORKS AT PT. SUKAJADI SAWIT MEKAR PROJECT No. : 001/PKS SSM1-BIO/VII/2011 Date : July 7, 2011 SAIPEM KARIMUN YARD CONSTRUCTION PROJECT Karimun Camp Extension No. : 626437 Date : July 25, 2011 EARTHWORKS (CUT & FILL) MILL AREA IN PMKS PT. KEMILAU INDAH NUSANTARA No : 051/THB-SPB/SUB/XII/11 Date : December 19, 2011 HAULING ROAD & INFRASTRUCTURE PT. GUNUNG BARA UTAMA No. : GBU-C004/HR-0112 Date : January 26, 2012 CUT & FILL DIGESTER POND WORKS AT PT. SUKAJADI SAWIT MEKAR PROJECT No. : 001/PKS SSM2-BIO/III/2012 Date : March 20, 2012 EARTHWORKS (CUT & FILL) EFFLUENT POND IN PMKS PT. KALIMAN RIA SEJAHTERA No : 010A/THB-SPB/SUB/III/12 Date : March 05, 2012 EARTHWORKS (CUT & FILL) EFFLUENT POND IN PMKS PT. KEMILAU INDAH NUSANTARA No : 012/THB-SPB/SUB/III/12 Date : March 20, 2012 EARTHWORKS (POND EMBANKMENT) IN PMKS KALIMAN RIA SEJAHTERA No : 028B/THB-SPB/SUB/V/12 Date : May 2012 EARTHWORKS (CUT & FILL) EFFLUENT POND IN PMKS PT. KEMILAU INDAH NUSANTARA No : 030/THB-SPB/SUB/V/12 Date : June 01, 2012 RESERVOIR WORKS IN PMKS PT. KEMILAU INDAH NUSANTARA No : 049/THB-SPB/SUB/VIII/12 Date : August 08, 2012

    Karimun,

    Kepulauan Riau

    Sebabi, Central

    Kalimantan

    Karimun, Kepulauan Riau

    Bengalon, Kutim, East Kalimantan

    Melak, East Kalimantan

    Sebabi, Central

    Kalimantan

    Kuala Kurun, Central

    Kalimantan

    Bengalon, Kutim, East Kalimantan

    Kuala Kurun, Central

    Kalimantan

    Bengalon, Kutim, East Kalimantan

    Bengalon, Kutim, East Kalimantan

    PT. Pacific Granitama

    PT. SUKAJADI SAWIT MEKAR

    PT. Saipem Indonesia

    PT. Tunas Harapan Baru

    PT. Gunung Bara Utama

    PT. SUKAJADI SAWIT MEKAR

    PT. Tunas Harapan Baru

    PT. Tunas Harapan Baru

    PT. Tunas Harapan Baru

    PT. Tunas Harapan Baru

    PT. Tunas Harapan Baru

    USD 934,742.57 Rp. 2,879,231,360 USD 1,850,000 Rp. 2.039.000.000 Rp. 164.345.274.951 Rp. 2.201.697.750 Rp. 1.421.152.000 Rp. 3.565.685.000 Rp. 33.959.000 Rp. 720.900.000 Rp. 3.406.913.000

  • Servicing the World of Construction

    Reference List of Major Project

    No Description of Works Location Commissioned

    34

    35

    36

    37

    38

    39

    40

    41

    EARTHWORKS ACCESS ROAD & WOODEN PILE IN PKMS PT KEMILAU INDAH NUSANTARA No. : 060D/THB-SPB/THB/IX/2012 Dated : September 15,2012 LAND CLEARING AND FILLING WORKS AT SIDE B AREA AT PT SUKAJADI SAWIT MEKAR No. : 001/SSM-SMPT-ST.B/PRJ/2013 Dated : January 21, 2013 PAVING BLOCK AND KERB INSTALLATION PROJECT AT PT SUKAJADI SAWIT MEKAR No. : 003/SSM-SMPT/PRJ/I/2013 Dated : January 21, 2013 LAND CLEARING, FILLING, GEOTEXTILE AND BASE COURSE AT SIDE B AREA PROJECT AT PT SUKAJADI SAWIT MEKAR No. : 003/SSM-SMPT-ST.B/PRJ/I/2013 Dated : January 21, 2013 SLOPING ACCESS ROAD AND AREA WATER TREATMENT PLANT WORKS AT PKMS PT TUNAS HARAPAN BARU No. : 010/THB-SPB/SUB/II/2013 Dated : February 07, 2013 DRAINAGE, FENCING, GEOTEXTILE, WOODEN PILE AND BASE COURSE AT AREA SIDE B PROJECT AT PKMS PT SUKAJADI SAWIT MEKAR No. : 005/SSM-SMPT-ST.B/PRJ/IV/2013 Dated : April 02, 2013 Cut & Fill Digester Pond Biogas Plant No. : 001/PKS GIN1-BIO/IV/2014 Dated : April 08, 2014 Earthworks No. : 048/THB-SPB/SUB/VI/2014 Dated : June 17, 2014

    Bengalon, Kutim, East Kalimantan

    Bagendang, Sampit, Central

    Kalimantan

    Bagendang, Sampit, Central

    Kalimantan

    Bagendang, Sampit, Central

    Kalimantan

    Bengalon, Kutim, East Kalimantan

    Bagendang, Sampit, Central

    Kalimantan

    Indragiri Hilir, Riau

    PKMS PT Aditya Agro

    Indo Ketapang,

    West Kalimanta

    PT. Tunas Harapan

    Baru

    PT Sukajadi Sawit Mekar

    PT Sukajadi Sawit Mekar

    PT Sukajadi Sawit Mekar

    PT. Tunas Harapan Baru

    PT Sukajadi Sawit Mekar

    PT GIN

    PT Tunas Harapan Baru

    Servicing the World of Construction

    Reference List of Major Project

    No Description of Works Location Commissioned Contract Value

    34

    35

    36

    37

    38

    39

    40

    41

    42

    43

    44

    EARTHWORKS ACCESS ROAD & WOODEN PILE IN PKMS PT KEMILAU INDAH NUSANTARA No.060D/THB-SPB/THB/IX/2012 Date : September 15,2012 LAND CLEARING AND FILLING WORKS AT SIDE B AREA AT PT SUKAJADI SAWIT MEKAR No.001/SSM-SMPT-ST.B/PRJ/2013 Date : January 21, 2013 PAVING BLOCK AND KERB INSTALLATION PROJECT AT PT SUKAJADI SAWIT MEKAR No.003/SSM-SMPT/PRJ/I/2013 Date : January 21, 2013 LAND CLEARING, FILLING, GEOTEXTILE AND BASE COURSE AT SIDE B AREA PROJECT AT PT SUKAJADI SAWIT MEKAR No.003/SSM-SMPT-ST.B/PRJ/I/2013 Date : January 21, 2013 SLOPING ACCESS ROAD AND AREA WATER TREATMENT PLANT WORKS AT PKMS PT KEMILAU INDAH NUSANTARA No.010/THB-SPB/SUB/II/2013 Date : February 07, 2013 DRAINAGE, FENCING, GEOTEXTILE, WOODEN PILE AND BASE COURSE AT AREA SIDE B PROJECT AT PKMS PT SUKAJADI SAWIT MEKAR No.005/SSM-SMPT-ST.B/PRJ/IV/2013 Date : April 02, 2013 ROAD PREPARATION WORK AT BIOGAS PLANT AREA AND PREPARATION OF HDPE PIPELINE ON DIGESTER POND AT PKMS PT SUKAJADI SAWIT MEKAR No. : 006/PKS-SSM1 BIO/V/2013/ Dated : May 01, 2013 CONCRETE BEAM DEVELOPMENT WORK AT PKMS PT SUKAJADI SAWIT MEKAR No. : 009/SSM-SMPT/PRJ/V/2013 Dated : May 20, 2013 CUT & FILL ON EMBANKMENT POND AT DIGESTER POND AREA ON PKMS PT . SUKAJADI SAWIT MEKAR No. : 008/PKS SSM2-BIO/VI.2013 Dated : June 18, 2013 CUT & FILL DIGESTER POND BIOGAS PLANT ON PKMS PT. GUNTUNG IDAMANUSA No. : 001/PKS GIN1-BIO/IV/2014 Dated : April 08, 2014 EARTHWORKS AT PKMS PT ADITYA AGRINDO No : 048/THB-SPB/VI/2014 Dated : June 17, 2014

    Bengalon, Kutim, East Kalimantan

    Bagendang, Sampit Central

    Kalimantan

    Bagendang , Sampit, Central

    Kalimantan

    Bagendang , Sampit, Central

    Kalimantan

    Bengalon, Kutim, East Kalimantan

    Bagendang , Sampit, Central

    Kalimantan

    Sampit Central

    Kalimantan

    Sampit, Central

    Kalimantan

    Sampit, Central

    Kalimantan

    Indragiri Hilir Riau

    Ketapang West Kalimantan

    PT. Tunas Harapan Baru

    PT Sukajadi Sawit Mekar

    PT Sukajadi Sawit Mekar

    PT Sukajadi Sawit Mekar

    PT. Tunas Harapan Baru

    PT Sukajadi Sawit Mekar

    PT Sukajadi Sawit Mekar

    PT Sukajadi Sawit Mekar

    PT Sukajadi Sawit Mekar

    PT Guntung Idamanusa

    PT Tunas Harapan Baru

    Rp 114.722.000 Rp 3.025.000.000 Rp. 295.900.000 Rp. 3.729.000.000 Rp. 135.034.000 Rp. 1.791.900.000 Rp. 40,000,000 Rp. 62,700,000 Rp. 21,420,000 Rp. 2,083,236,295 Rp. 9,228,728,000

  • Servicing the World of Construction

    Reference List of Major Project

    No Description of Works Location Commissioned

    34

    35

    36

    37

    38

    39

    40

    41

    EARTHWORKS ACCESS ROAD & WOODEN PILE IN PKMS PT KEMILAU INDAH NUSANTARA No. : 060D/THB-SPB/THB/IX/2012 Dated : September 15,2012 LAND CLEARING AND FILLING WORKS AT SIDE B AREA AT PT SUKAJADI SAWIT MEKAR No. : 001/SSM-SMPT-ST.B/PRJ/2013 Dated : January 21, 2013 PAVING BLOCK AND KERB INSTALLATION PROJECT AT PT SUKAJADI SAWIT MEKAR No. : 003/SSM-SMPT/PRJ/I/2013 Dated : January 21, 2013 LAND CLEARING, FILLING, GEOTEXTILE AND BASE COURSE AT SIDE B AREA PROJECT AT PT SUKAJADI SAWIT MEKAR No. : 003/SSM-SMPT-ST.B/PRJ/I/2013 Dated : January 21, 2013 SLOPING ACCESS ROAD AND AREA WATER TREATMENT PLANT WORKS AT PKMS PT TUNAS HARAPAN BARU No. : 010/THB-SPB/SUB/II/2013 Dated : February 07, 2013 DRAINAGE, FENCING, GEOTEXTILE, WOODEN PILE AND BASE COURSE AT AREA SIDE B PROJECT AT PKMS PT SUKAJADI SAWIT MEKAR No. : 005/SSM-SMPT-ST.B/PRJ/IV/2013 Dated : April 02, 2013 Cut & Fill Digester Pond Biogas Plant No. : 001/PKS GIN1-BIO/IV/2014 Dated : April 08, 2014 Earthworks No. : 048/THB-SPB/SUB/VI/2014 Dated : June 17, 2014

    Bengalon, Kutim, East Kalimantan

    Bagendang, Sampit, Central

    Kalimantan

    Bagendang, Sampit, Central

    Kalimantan

    Bagendang, Sampit, Central

    Kalimantan

    Bengalon, Kutim, East Kalimantan

    Bagendang, Sampit, Central

    Kalimantan

    Indragiri Hilir, Riau

    PKMS PT Aditya Agro

    Indo Ketapang,

    West Kalimanta

    PT. Tunas Harapan

    Baru

    PT Sukajadi Sawit Mekar

    PT Sukajadi Sawit Mekar

    PT Sukajadi Sawit Mekar

    PT. Tunas Harapan Baru

    PT Sukajadi Sawit Mekar

    PT GIN

    PT Tunas Harapan Baru

    Servicing the World of Construction

    Reference List of Major Project

    No Description of Works Location Commissioned Contract Value

    45

    46

    47

    PILING INSTALLATION WORK (DRIVEN PILES) No : 949498 Dated : July 01, 2014 CONCRETE WORKS FOR YARD DEVELOPMENT PROJECT No : 956103 Dated : July 17, 2014 CUT & FILL DIGESTER POND BIOGAS PLANT No : 001/PKS ISB-BIO/IX/2014 Dated : September 15, 2014

    Karimun,

    Kepulauan Riau

    Karimun, Kepulauan Riau

    Desa Rambah, Kec. Rambah Hilir, Kab Rokan Hulu

    PT Saipem Indonesia

    PT Saipem Indonesia

    PT Indomakmur Sawit Berjaya

    USD 140,000 USD 1,485,000 Rp 1,300,000,000

  • Quality Policy The quality policy of PT Multi Adverindo is to deliver to clients design and construction services which meet the contract and statutory requirements. EMPLOYEES All employees of PT Multi Adverindo are guided by our Quality Policy in all decisions and actions on a daily basis. To realize the Quality Policy, all employees shall set up detail execution plan in their working fields and control as the personal objectives for clients satisfaction. THE POLICY GOALS Our goals are to provide the following: A product, service, or solution which meets or exceeds our clients expectations Conscientious, responsive, and professional efforts A highly trustworthy and ethical work environment that provides long-term

    employment, development, and growth for all employees. Continuous improvement in all that we do

    THE POLICY GOALS To accomplish this policy, PT Multi Adverindo establishes the following objectives: 1. PT Multi Adverindo requires all employees to work to the clients require-

    ments, which is in terms of attendance, workmanship quality and completion timing.

    2. Prepares and uses a Project Quality Management Plan to plan, do, check, act both works and materials, for every ground engineering contract and statutory requirements which PT Multi Adverindo undertakes.

    3. Maintains core employee, selects and maintains qualified suppliers and sub-contractors, and give effective instructions and feedback so that client requirements are met effectively and efficiently.

    To ensure a complete and responsible approach to the Project Management Team, our system also includes separate policies for Health and Safety and Environmental management. PT Multi Adverindo will not compromise the integrity of our services in an attempt to satisfy short-term goals. We are committed to long-term growth, profitability and employment of our personnel and which encompasses an attitude of Quality First.

    Ir. Askaris Chioe President Director

  • HEALTH, SAFETY, AND ENVIRONMENTAL POLICY

    PT Multi Adverindo is fully committed to provide and maintain a safe and healthy working environment as the first consideration in all work and for employees. The goal is to conduct all activities in the project in order to achieve:

    1. Zero Lost Time Accident 2. Zero Occupational Illness 3. Zero effect to the Environment

    PT Multi Adverindo committed to do continuous improvements in the HSE practices and performances. All activities shall be fully compliant with all applicable laws, statutory, and standards to be insured all the time. PT Multi Adverindo Management shall take all reasonable steps in order to ensure employees understand HSE policy through instruction, training, and information. All staff is required to respect and implement the entire HSE requirement set by employer and encouraged to report and consult with management on HSE issues. PT Multi Adverindo is fully committed for implementing the project contract requirement set by Client. No alcohol and drugs must be taken into any worksites. PT Multi Adverindo recognizes this can be put at risk by those who misuse alcohol or drugs to such an extent that it may affect their health, performance, conduct, and safety, or the safety of others whilst in the worksites. The application of this policy is direct responsibility of Project Management Team (PMT), line management, all employees, and sub-contractors involved in its day-to-day application. The top management of Multi Adverindo fully supports this policy and encourages employees to take pro-active approach with respect to HSE matters in executing their duties.

    Ir. Askaris Chioe President Director

  • Servicing the World of Construction

    Certificates

    LEADERSHIP IN SAFETY ENVIROMENT FRIENDLY OPERATION

    QUALITY FIRST

  • Servicing the World of Construction

    Certificates

    ISO 9001 : 2008

  • Servicing the World of Construction

    Certificates

    ISO 14001 : 2004

  • Servicing the World of Construction

    Certificates

    OHSAS 18001 : 2007

  • Servicing the World of Construction

    Documentation

    HSE DRILL & MEETING

    Tool Box Talk everyday before

    starting to work

    Emergency and medical re-sponse drill twice a month

    Mass meeting every week

  • Servicing the World of Construction

    Documentation

    WORKSHOP & TRAINING

    Training at home office

    On site workshop

  • Servicing the World of Construction

    Documentation

    IRRIGATION AND DRAINAGE CONSTRUCTION Flood Control Project in Badera River

    Dredging by floating excavator or cutter suction

    Gabion mass and armour rock protection

  • Servicing the World of Construction

    Documentation

    OFFSHORE PILING AND MARINE CONSTRUCTION Construction of Loading Harbour

    in Sabang - Nanggroe Aceh Darrusalam

    Special handling equipment Special handling and method in marine environment

    1400 mm diameter steel spun pipe with 38 m length without joint

  • Servicing the World of Construction

    Documentation

    INDUSTRIAL BUILDING AND ITS FACILITIES Erection Works at Bleaching Earth Factory

    Steel structure fabrication and erection

  • Servicing the World of Construction

    FORESTRY AND PLANTATION SECTOR PROJECT PT Riau Andalan Pulp and Paper Project

    in Pangkalan Kerinci - Riau

    Documentation

    Harvesting of chip wood for pulp and paper industry

  • Servicing the World of Construction

    Documentation

    MINING AND HAULING OF BENTONITE Bentonite Mining and Transporting from Sipirok to Dumai Port - Riau

    Planning and Construction of mining road, mine operation and transport

  • Servicing the World of Construction

    Documentation

    EARTHWORKS FOR PALM OIL INDUSTRY Cut and Fill Works for Palm Oil Factory of PT Siak Prima

    Excavation to design elevation

    Back filling according to specification

  • Servicing the World of Construction

    Documentation

    EARTHWORKS & SOIL IMPROVEMENT FOR POWER PLANT Site Levelling and Grading Work

    for 2 x 135 MW IPP Coal Fired Power Plant in Kuala Tanjung - North Sumatera

    Vertical well to collect consolidated air and water

    Vertical drain Installation

    and preloading

    Preloading with backfilling for

    consolidation

  • Servicing the World of Construction

    Documentation

    MARINE STRUCTURE CONSTRUCTION Dumai Portland Reclamation Project for PT Adei Plantation and Industry

  • Servicing the World of Construction

    Documentation

    OFFSHORE STRUCTURE CONSTRUCTION Construction of Trestle, Secondary Jetty, Tangker Barge Jetty and Pipe Rack

    in Kuala Tanjung - North Sumatera

    2.5 KM of bridge way and jetty

    Supply of construction material at marine environment

  • Servicing the World of Construction

    Documentation

    OFFSHORE STRUCTURE CONSTRUCTION Construction of Trestle, Secondary Jetty, Tangker Barge Jetty and Pipe Rack

    in Kuala Tanjung - North Sumatera

    Managing handling of 2.5 KM harbor construction material

    Fabrication and erection of 2.5 KM steel girder

    Logistic supply and handling in offshore operation

  • Servicing the World of Construction

    Documentation

    OFFSHORE & UNDERWATER CONSTRUCTION Laying Underwater Pipes Works

    in Pangkalan Susu - North Sumatera

    Fabrication and erection of small rig for oil and gas industry

  • Servicing the World of Construction

    Documentation

    MARINE STRUCTURE CONSTRUCTION Revetment Project

    in Uleule - Nanggroe Aceh Darrusalam

    Armour rock protection for tsunami relieve

  • Servicing the World of Construction

    Documentation

    MASS HOUSING CONSTRUCTION AND FACILITIES Construction of houses in Leupung - Aceh Besar,

    Nanggroe Aceh Darrusalam

    Site preparation and mass construction of housing for tsunami victims

  • Servicing the World of Construction

    Documentation

    COAST LINE EARTHWORKS SAIPEM Karimun Yard Construction

    in Karimun, Kepulauan Riau

    Rock breaking

    Long range excavation

    Excavation of swampy area

  • Servicing the World of Construction

    Documentation

    EMBANKMENT WITH SOIL STABILIZATION SAIPEM Karimun Yard Construction

    in Karimun - Kepulauan Riau

    Backfill and compaction

    Installation of geotextile

  • Servicing the World of Construction

    Documentation

    PRELOADING AND RECLAIMED MARINE SAND SAIPEM Karimun Yard Construction

    in Karimun - Kepulauan Riau

    Large volume of earthwork operation

  • Servicing the World of Construction

    Documentation

    ROCK DRILLING AND BLASTING WORKS SAIPEM Karimun Yard Construction

    in Karimun - Kepulauan Riau

    Drilling and installation

    engineed

    ..and blasting

  • Servicing the World of Construction

    Documentation

    EARTHWORKS FOR COAL MINING INDUSTRY Melak , East Kalimantan

    Servicing the World of Construction

    Documentation

    EARTHWORKS FOR COAL MINING INDUSTRY Melak , East Kalimantan

    Over burden removal

    Cut and fill earthwork

    Land preparation for crushing plan

    Hauling of material

  • Servicing the World of Construction

    Documentation

    ENGINEERING DESIGN, PROCUREMENT AND CONSTRUCTION OF BRIDGE

    Construction of Perak Bridge West Kutai - East Kalimantan

    70 m prestressed concrete girder bridge

    Engineered and designed formwork

    Launching by special equipment

    Borepile construction and testing

  • Servicing the World of Construction

    Documentation

    REMOTE AREA OPERATION PNG LNG EPC2 OFFSHORE PIPELINE PROJECT

    Port Moresby-Papua New Guinea

    400 KM away to nearest town without road / land access

    Pipe tie in preparation at landfall area

  • Servicing the World of Construction

    Documentation

    Load and Haul of Blasted Rocks PT. Pacific Granitama

    Pulau Karimun Besar, Riau

  • Servicing the World of Construction

    Documentation

    Hauling Granite PT. Kawasan Dinamika Harmonika

    Pulau Karimun Besar, Riau