DELHI DEVELOPMENT AUTHORITY TENDER DOCUMENT FOR E-AUCTION OF BUILT UP SHOPSjOFFICESjKIOSKSjSTALL August-September, 2018.(19 Complete e-auction documents are available on e-auction website Www.tenderwizard.comjDDAAUCTION) .and DDA Website www.dda.org.in. CQrrigendum, if any, shall only be available on above websites). , ,

Upload: others

Post on 26-Apr-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

DELHI DEVELOPMENT AUTHORITY

TENDER DOCUMENT FOR E-AUCTION

OF

BUILT UP SHOPSjOFFICESjKIOSKSjSTALL

August-September, 2018.(19

Complete e-auction documents are available on e-auctionwebsite Www.tenderwizard.comjDDAAUCTION) .and DDAWebsite www.dda.org.in. CQrrigendum, if any, shall only

be available on above websites).

,,

Scheduled of Bidding ProcessE-Auction ,of Shops / Offices / Stalls /Tharas

1 Reserve Price As per Annexure- I

2 Start date of online registration for. Date: 13.08.2019participating in e-auction onwww.tenderwizard.com/DDAAU(TION

3 Earnest Money Deposit. 25% of the Reserve Price for each Unitas Earnest Money. •.

4 Last date for online submission of Date: 06.09.2019 up to 6.00 P.M.mandatory documents with EMD

5 List of mandatory documents to be The bidder is required to attach theuploaded on the portal at the time of identity proof and address proof withrequest along with EMD. E-auction Form online

6 Cost of offer documents Free of cost

7 Help desk operation for training and . Date: 13.08.2019 onwards frominformation on e-auction 11.00A.M.to 5.00 P.M.

(on all working days)

8

13.09.2019(Sl NO.1 to 85 as per annexure - I)

(10:00 AMTo 01:00 PM)

Date of online bidding under this e-auction

(Any change in above schedule will be notified only on DDA Websitewww.dda.org.inand e-auction website www.tenderwizard.com DDA UCTION).

TERMS AND CONDITIONS OF E-AUCTIONFORALLOTMENT OF BUILT-UPSHOP/OFFICE/KIOSK, ON FREE HOLD BASIS UNDER THE DELHI '

DEVELOPMENT AUTHORITY (MANAGEMENT DISPOSAL OF HOUSINGESTATE) REGULATIONS, 1968.

1. Allotment

1. Any person/company/partnership firm etc. except a minor may bid forthe allotment of built-up shop/kiosk/office/Thadas.

2. No change in name of the bidder will be allowed under any circumstances.

3. The bidder shall be required to submit 25% of the Reserve Price asEarnest Money per Unit in the form of online payment on the e-auctioning portal at the time of requesL Separate Bid has to be quotedfor each site and separate Earnest Money has to be submitted for eachsite. .

4. Please note that the difference amount of quoted price (HI Bid) andReserve Price as EMD i.e. (25% of the Quoted Price-25% of the ReservePrice) will have to be deposited by the successful Bidder within 7 days'from the Date of issue of LOT through online payment on the e-auctioningportal, failing which the EMD will be forfeited and the work awarded willbe cancelled.

2. E-auctioning & Submission of Documents.

1. (i) The officer conducting the e-auctionsjDirector(CE) may withoutassigning any reasons may withdraw all or any of the shop/kiosk/office/Thadas from the bid at any stage i.e., before handing over possession of theunit. The bid shall be for the office/built-up units, being sold on 'as is whereis basis'. It is presumed that the bidder has inspected the property beforegiving his bid. However, ifthere is any increase/ decrease of the actual plintharea of the unit following procedure should be followed:

Actual plinth area is within :t5% ofthe plinth area notified

Actual plinth area is within :tl0%of the' plinth area notified (butdifference is more than :t5%)

Actual plinth area is more than10% of the plinth area notified.

Actual plinth area is less than 1!?%of the plinth area notified

Bid submitted by the bidder shall beconsidered as such and noexcess/refund shall be due onaccount of difference in area.Bidder will be liable to pay pro rataadditional prerpium in case ofincrease in area' and in case ofdecrease in area, refund will bemade b DDA on ro-rata basis.Successful bidder shall have optionto

(a) Pay pro-rata addi~ionalpremium for the excess area,or

- (b) Surrender the plot (Nopenalties will be levied &EMD will be refunded.

Successful bidder shall have optionto

on the rate

\bid for (with no refund forshortfall in area), or

(b) Surrender the plot. (N0penalties shall be levied &EMD will"be refunded.

(ii) If any refund/ excess charge becomes due on account of this clause,the claim should be made within 6 months of takeover of possession. Thisshall be without prejudice to other rights or remedies that may be availableto DDA.

2. The person after submission of bid shall not be' permitted to withdraw,surrender or modify his bid on any ground whatsoever. If he withdraws orsurrenders the bid, the entire amount of earnest money shall be forfeitedabsolutely. This shall be without prejudice to other rights or remedies thatmay be available to DDA.

3. In case of married person the bid can be accepted in the joint name ofhusband and wife also.

4. The Officer conducting the e-auctions/Director (CE) shall normally acceptthe highest bid subject to confirmation by the competent authority providedthe highest bid is above the reserve price and is accompanied by thepayment of 25% of Reserve Price as Earnest Money in favor of DDA.

5. The officer conducting the e-auctions/Director (eE) may for reasons to berecorded in writing recommend to the competent authority for the rejectionorany bid including the highest bid. '

J6. The confirmation of the highest bid shall be the sole discretion of the

Competent Authority who does not birid himself to confirm the highest bid

and reserves to himself the right to reject all or any of the bids withoutassigning any reason even if the highest bid is above the reserve price.

7. If the bid is not accepted the Earnest Money will be refunded to the bidderwithout any interest. .

8. The demand-cum-allotment letter would be sent to the successful bidderimmediately after the bid is accepted by the competent authority. Thehighest bidder shall make payment of balance 75% of the amount demandedvide demand cum allotment letter referred to above within 90 days from thedate of issue of demand letter by Bank Draft/PayOrder/NEFT /RTGSpayable at Vikas Sadan, INA, New Delhi branches of Central Bank ofIndia/State Bank of India shill.l submit a copy of the bank challan toDy.Director(CE). The Competent Authority may, in his absolute discretion,extend the last date of payment up to a maximum period of 180 daysbeyond the. last date for payment with reference to the date of issue ofdemand letter subject to payment of interest on the balance amount at rateof 18% per annum where the delay does not exceed by 90 days and at therate of 25% per annum where. the delay exceeds 90 days provided thatbidder / auctioneer has applied to the Competent Authority for grant ofextension of payment within 20 days from the date of issue of the demandletter. '~

'. ~~~-. .

9. Facilitation charges will be paid per ShopjOfficejKioskjThada by thesuccessful bidder to the e-auctioning agency engaged by DDA at thefollowing rates:-

SINo. Particulars Chargj;1s (Per.

Shoo/Office/Kiosk/Thada)1 e-auction value from Zero to lO Crore 0.95% of awarded value as per

the final bid of auction2 e-auction value from More than 10 0.90% of awarded value as per

Crore to 25 Crore the final bid of auction.Min. Cap-Rs. 10,00,000/-Max. Cap - Rs. 20,00,000/-

3 e-auction value for more than 25 Crore Participation fee Rs., 22,50,000/- payable by

successful bidder.

NOTE: Above mentioned payment + GST (As applicable) is to be made throughonline mode within 3 days of issue of LOI (Letter of Intimation), failing which noDemand Letter of the shops will be issued to the successful bidder

10.Four copies of proposed conveyance deed will be supplied to the succ~ssfulbidder along with the demand letter as described above. The Earnest Moneyshall stand forfeited and the bidder shall not be liable to any compensationwhatsoever if the allottee fails to submit conveyance deed within a period of3 months from the date of issue of the conveyance deed from the office ofDeputy Director (CE). It shall be the sole responsibility of the bidder tosubmit stamped C.D. papers duly stamped before issue of the possessionletter to him. The possession letter will be issued only after submission ofthe same to the Deputy Director(CE). After taking possess~on, the successfulbidder is required to intimate the date of taking over the physical possessionto execute the conveyance deed before the Asstt. Director(CE). In case theexecution of conveyance deed is not completed within a period of 3 monthsfrom the date of issue of the possessiQn letter from the office of Dy.Director(CE), on account of any lapse on the part of the bidder it wiliamount to violation of terms and conditions and action includingcancellation of unit will be taken.

11. In .case the highest bidder fails to pay balance 75% of amount of the bidamount within 90 days from the date of issue of demand letter or withinsuch extended period if any granted by Competent Authority on his writtenapplication, the bids shall stand cancelled and the earnest money forfeited.In that eventuality the Competent Authority shall be competent to re-bid theshop.

12.Within 10 days from the date of making the payment indicated in clause 2(8)above the highest bidder shall appear before the Dy. Pirector(CE) in hisoffice in person or through .authorized representative along with terms andconditions. of.bid duly typed on a non-judicial stamp paper worth Rs.10j- \signed by bidder and duly attested by the notary public. Specimen signatureof individual or combined as case may be duly. attested by notarypublicjgazatted officer and 4 passport size joint photo one of which shouldbe attested by gazetted officer and conveyance deed paper duly stamped bycollector of stamps and any other documents indicated in the demand letter.On submission of the above documents, the possession letter will be issuedsame day and the sarne can also be collected in person by Bidder~

same day. The possession letter so issued shall carry the date by which thephysical possession of the unit will be handed over to the bidder at site. Fornon-production of proof of the payment of balance 75% of premium in timeas stipulated above clause 2(vii)the bid is liable to be cancelled and theearnest money shall be forfeited.

13.The successful bidder/allottee who does not appear before theDeputy/Director (CE) as per clause (xi) above and does not take thepossession of the shop' as per the date and time indicated in.the possessionletter shall be charged the followingpenalties:- ~.

For shops / OfficesFor stall/kiosk/Thadas

Rs. 1,000/- p.m.Rs. 500/- p.m.

14.In case shop already stand allotted to someone earlier, the bidder will beaccommodated. by offering another shop in the same locality/ area, ifavailable failing which the amount deposited by the bidder will be refundedand no request to make another' allotment of shop will be considered on anyground whatsoever.

MAINTENANCECHARGE

1. In addition to the price of the unit the highest bidder/allottee shall paymaintenance charge for the price allotted/purchased by him at suchfinal rate as may be determined and communicated with effect from thedate of taking over possession. Till the services of shopping center arehanded over to MCD.The amount of maintenance charges is payable inadvance for each year and the bidder is required 'to submit proof ofpayment ofmaintenance charges at the beginning of the year.

2. An interest of 18% per annum of such rate as the DDA may in its.absolute discretion decide from time to time is recoverable on any delayin payment of maintenance charges subject to the condition that fullfortnight ofmonth as the case may; be and not any; fraction thereof shallbe taken for delayed payment ofmaintenance charges.

CONVEYANCEDEED ANDOTHERCONDITIONTHEREOF

1. The terms and conditions of the conveyance deed are contained in theenclosed conveyance deed formats. The successful bidder/purchaser shalldeemed to have agreed to all the terms and conditions cont9ined therein.The bidder shall execute the conveyance deed in the said form within 3months of the issue of the possession letter, or as and when called upon todo so by the DDA.

2. All expenditure in respect of electricity and water connection etc. andpayment of all property tax, electricity and water bills shall be incurred bythe lessee:

3. That the allottee shall not cause or permit to be cause any damage to theshop including joint .wallsunder any circumstances and the allotte shall notmake any addition or .alterations to the existing structure nor shall anystructure be allowed to be constructed on the roof the shop or any adjoiningarea, shutters etc. as provided by DDAshall not be disturbed.

4. The shop will not be used for any repair or manufacturing work or any non-confirming use as defined in the master plan for Delhi. Un ess otherwise

specified, units, are for general commercial use.

5. That the allo;tees shallnot keep any animal or conveyance in or outside theshop. . ..

6. That allottee shall keep the shop neat and clean and shall not employ orpermit to employ or to allow to enter into the said shop any person sufferingfrom any contagious and loathsome disease which may effect the neighborsor the passerby.' .

7. That allottee shall faithfully follow and. abide by all the prOViSIOnsof theDelhi Municipal Corporation Act, bye laws and rules and regulations madethere under and the provisions of the Delhi Shop and Estt. Act and anyother law for the time being enforce.

8. That the allottee shall be liable to pay dues, taxes, charges and allassessments as arrears ofland revenue.

9. All dues payable to the lessor/DDA in respect of the shop shall berecoverable as arrears of land revenue.

lO.If the allotment of the unit'is obtained by any misstatement or fraud, thepossession of the shop will be taken over by the DDA and allottee will not beentitled to claim any compensation or refund thereof.

11.The verandah in front of the shop is meant for public circulation and theallottee shall not encroach upon the verandah or any other area. Only thearea of shop specifically indicated at the time of bid shall be used by theallottee. '

12.The successful bidder/allottee shall return ,the conveyance deed papers dulystamped from the collector of stamps before possession letter is. handedover.

13.The terms and conditions of the bid shall be strictly followed by thesuccessful bidder/purchaser and in case there is any breach of the termsand conditions of the' bid or the conveyance the allotment shall standcancelled. The orders of V.C./DDA in this respect of the interpretation of anyconditions of the bid and of the conveyance shall be final and binding andshall not be called in action in any proceedings.

/ .14. The successful bidder allottee shall abide by the terms and conditions of the

free hold property,as imposed from time to time. The orders of VC/DDA inthis respect of the interpretation of any of terms and conditions of the bid orconveyance shall be' final and binding and shall not be cal~ed in action inany proceedings. .

Cost and Transfer Duties.

1. The cost and expenses of preparation stamping and registration of. conveyance deed and its copies and other incidental expenses will bepaid by the purchaser/allottee. He/She shall also pay the duty ontransfer of immovable property levied by the MCD or any other duty orcharges as may be levied by any other authority.

1. I/We have read and understood the terms and conditions of the bid forallotment of the built-up units/shops as detailed above as individualand/ or on behalf of firm/company undertake to abide by the sameuncondi tionally.

Signature of the Bidder /Authorized personon behalf of the applicant/firm/company and etc ..

Date :-Plaee:-

Technical Terms and Conditions of Online e-auction

1. Prospective bidders- 'shall ensu~e this process before participating m e-auction.

a) Participants have to get themselves registered on the e-Auctionportal i.e. www.tenderwizard.com/DDAAUCTION by making apayment for Rs: 20001- + eST. Help is provided to theprospective bidders of registration at DDA Help Desk, VikasSadan, INA, New Delhi and the Tender Wizard Helpdesk, C-62, ..2nd Floor, Preet Vihar, Opp. to Metro Pillar No.79, New Delhi-110092, Contact No.8800991846, 8800378610, Participantsshall have a valid Class III Digital Signatures Certificate (DSC)issued by any of the certifying authority. Help is provided toprospective bidders for procuring digital signatures at the help, desk mentioned as above, if they so desire.

b) Participants shall safely keep their User ID and Password,which will be issued by the online serVice provided uponregistration, and which is necessary fore-biding.

c) Bidders are advice to change. the password immediately onreceipt from the e-auctioning portal.

d) Bidders ~shall not disclose their User ID a well as password and. other material information relating to the bidding to anyoneand safeguard it secrecy.

e) Vendors should not use the same generated NEFT challan formultiple payments. .

f) Vendors should make only one single payment for the respectiveauctions and. do not use multiple payments for the same'

. ,

auction.g) Vendors should update the correct Account Number details in

their profile for Refund process. If any discrepancy in theaccount number, Refund .transactions will get reject and ittakes around 10-15 days to get refund

Time Extension: .If any market leading bid (bid higher than the highest at the poiilt in time) is received withinthe last Ten (lO) minutes of closing time, the lime of auction sale will get automaticallyextended by another Ten (lO) minutes and subsequently, if no further bid. higher than the lastquoted highest bid is received within the said extended Ten minutes, the auction sale will beautomatically closed at the expiry of the extended Ten (lO) minutes.

2. Training and Assistance Booth for the prospective Bidders: Forfacility of the prospective bidders, a Help-Desk has been set up atNagrik Suvidha Kendra, DDA Office, D-Block, Vikas Sadan, INA,New Delhi-23. Prospective bidders can get the required trainingand information on e-auctioning process on working days duringworking hours.

3. Bids: Once the bid is placed, the bidder cannot reduce or withdraw thebid for whatever reason. If done so, the EMDamount shall be forfeited.

4. E-auction will start and end as per schedule in mentioned in offerdocument. The bid for e-auction shall stat with minimum one incrementabove the reserve price. Increment of rate in e-auction shall be RS.l 000 /-(minimum increment value) or multiple thereof. The bidders shall besolely responsible for all consequences arising out of the bid submittedby him (including any wrongful biding) and no complaint/representationwill be entertained in this regard by the DDA/Service provider. Hence,bidders are cautioned to be careful to check the bid amoun t andalter /rectify their bid if required before confirming the bid submitted.

Note of caution for the Bidders: Bidders may encounter certainunforeseen problems such as time lag, heavy traffic, and system / powerfailure at the Bidders end. To avoid losing out on bidding because ofabove-mentioned reasons, it is advised not to wait for the last momentfor submitting their bids.

ANNEXURE: IDETAILS OF CE PROPERTIES TO BE DISPOSED BY AUCTION

SL.No. Zone Wise Loc Cat Se P B Plinth Me Co Cou Total Use Floor Total ~ostalty egor c. k I Area zzn ver rt Area (Land costI y t k of the ed Yar of as perSho ShC?P Flo Bal d/o the GNCTD+P (in r co pen shop Cost ofNo. sq.mt (in ny Bal Constructio

r.) sq. ata con n by addingmtr ch y 10% P.A..) ed (in till date(@ Ve sq. (Reserve75 rn mtr Price)% dh .)of a (@this (@ 5Qare 10 0/0 •

a) 0% ofof thisthi ares a)areal

ZONE:NORTHCSC at PitampuraPocket-YIP} .

7.2 SHO Ground Rs.1 19 D 12.17 5 15.8 P Floor 57,23,813/-

Ground Rs.31,43,36.2 27 D. 10.11 10.11 Stall Floor 6/-

CSC at Pitampura,Pocket-BIUI

{ Ground Rs.26,29,093 13 D 8.82 8.82 Shop Floor 5/ -

h

esc at PitampuraPocket-KID)

.30(3 2.3 Ground Rs.26,48,234 l D 6.11 7 7.3 OPF Floor 9/-

31(4 2.3 Ground Rs.26,48,235 ) D 6.11 7 7.3 OPF Floor 9/-

esc at SandeshVihar, Pitampura

Ground Rs.88,15,196 11 D 30.24 30.24 Shop Floor 7/-

esc at RajdhaniEnclave, Pitampura

Ground RS.28,73,767 5 D 9.62 9.62 Shop Floor 2/ -

Ground Rs.28,73,768 6 D 9.62 9.62 Shop Floor 2/ -

Ground RS.30,41,049 22 D 10.18 10.18 Shop Floor 9/ -',

esc at Sainik ViharH-4/H-5 at

,

PitampuraGround RS.33,85,77

10 8 D 9.99 9.99. Shop Floor 2/ -Ground Rs.65,24,13

11 15 D 19.25 19.25 Shop Floor 2/ -\

Rs.51,95,5812 9 D 15.33 15.33 Office First Floor 1/-

Ground Rs.65,24,1313 18 D 19.25 19.25 Shop Floor 2/-

esc at ShalimarBa~h, Block-Ble..

Platfo Ground RS.14,31,9014 10. D 5.07 5.07 rm floor 1/-

Platfo Ground Rs,13,66,9415 15 D 4.84 4.84 rm Floor 7/-

esc at Shalimar \

Bagh, Block BIT) ..

Ground Rs.91,28,1216 20 D 28.87 28.87 Shop Floor. 9/-

Ground RS.2,74,82,317 21 D" 86.92 86.92 Shop Floor 78/-

Ground RS.l,82,05,618 17 D 57.58 57.58 Shop Floor 60/-

esc at ShalimarBagh, Block-AIG)

Ground Rs.38,49,7219 7 . D 12.44 12.44 Shop Floor 4/ -

Ground Rs.41,06,5620 11 D 13.27 13.27 Shop Floor 2/ -

esc at RampuraGround Rs.6,89,348

21 15 F 5 5 OPF Floor /-Zone:Northesc at Pitampura,Pocket-L(U) )

Ground Rs.22 33 0 89.06 89.06 Shop Floor 2,59,14,375/-

ZONE: ROHINI ..

esc No.2, Sector-IS,\

Rohini, 15.6 Ground RS.57,59,559

23 30 E 18.14 9 . 29,91 Shop Floor l-ese No.1, Sector-8,Rohini

Ground RS.33,07,1124 22 E 10.26 9 17.01 Shop Floor 3/-

9.3 Ground Rs.43,49,9925 24 E 15.52 5 22.53 Shop Floor 0/-

, ,~-

esc No.12, Sector-16, Block-D

Ground Rs.1O,86,4726 14 E 5.32 5.32 Shop Floor 2/ -

Ground Rs.40,40,2727 5 E 23.46 23.46 Shop Floor 4/- /esc No.12, Sector-

3, Rohini9.3 Ground RS.32,55,52

28 21 E 10.74 5 17.75. Shop Floor 0/-18. Ground RS.55,81,60

29 29 E 16.55 35 30.31 Shop Floor 11-esc No.5, Sector-3,Rohini

11. .Ground RS.33,88,7630 7 E 9.45 22 17.87 Shop Floor 11-

Ground RS.25,12,9331 20 E 7.59 7.6 13.29 Shop Floor 9/-

Ground Rs.22,95,2232 21 E 6.4 7.6 ,12.1 Shop Floor 9/ -

Ground Rs.25,12,9333 23 E 7.59 7.6 13.29 Shop Floor 9/ -

11. Ground RS.33,88,7634 27 E 9.45 22 17.87 Shop Floor 1/-

Ground Rs.22,95,2235 38 E 6.4 7.6 12.1 Shop Floor 9/-

esc No.H, Sector-3, Rohini

8.2 Ground Rs.28,71,9536 8 E 8.49 9 14.71 Shop Floor 0/-

12. Ground Rs.43,47,6237 18 E 13.28 03 22.3 Shop Floor 8/ -

esc No.8, Sector-8,Rohini ..

24. Ground Rs.63,27,9438 16 E 18.38 5 36.76 Shop Floor 4/ -

12. Ground Rs.38,65,5139 35 E , 13.06 65 22.55 Shoo Floor 2/ -

ZONE: EASTesc at East of LoniRoad, Block-B .-

Ground Rs.1O,10,0640 32 G 6.55 6.55 Stall Fioor' 11-

esc No.1, PreetVihar, Block-G

.Ground RS.37,48,03

41 12 D 11.99 11.99 Shop Floor 5/ -Distt. Centre atLaxmi Nae:ar

Ground Rs.42 6 34.96 34.96 Kiosk Floor 4,816,706

Ground Rs.43 7 22.9 22.9 Kiosk Floor 3,155,108

Ground Rs.44 10 21.67, 21.67 Kiosk Floor 2,985,641

Ground Rs.45 11 23.37 23.37 Kiosk Floor 3,219,863- Ground Rs.46 12 36.58 36.58 Kiosk Floor 5,039,906

Ground Rs.47 13 40~04 40.04 Kiosk Floor 5,516,616

,Ground Rs.

48 19 21.83 21.83 Kiosk Floor 3,007,686Ground Rs.

49 26 20.06 20.06 Kiosk Floor 2,763,819Ground Rs.

50 31 14.08 14.08 Kiosk Floor 1,939,909

Ground Rs.51 35 21.0.8 21.08 Kiosk Floor 2,904,352

ese No.2, KondliGharoli, Sector-A

Ground RS.18,43,92052 13 G 12.71 12.71 Shop Floor /-

Zone :West ZoneLocality: PaschimViharese Hindustan eHBS,Paschim Vihar Site-II ..

21.7 Ground RS.2,51,32,7753 2 D 60.52 8 71.41 Shop .Floor 1/- .

, Ground RS.31,82,90454 33 D 10.1 Shop Floor /-

ese at Berochi Dus,Paschim Viliar

Ground RS.59,48,31355 10 D 19.58 Shop Floor /-

Ground Rs.42,56,18056 11 D 14.01 . Shop Floor /-

ese at Paschim Vihar,Block-A4 Near sa MillseGHS

Ground RS.57,56,94957 19 D 13.12 7.11 ,shop Floor /-

Loca1itv:Janaklluriese at JanakpuriBlock-A-2

RS.53,56,54758, 3 D 16.75 Shop /-

RS.63,09,53259 8 D 19.73 Shop /-

Locality:Rohiniese No.5 at Sector-14Rohini

Ground RS.1,86,75,3160 10 E 94.62 16.9 Shop Floor 5/-

Ground Rs,39,11,04561 23 E 22,8 Shop Floor l-

ese NO.2, Sector-II,-Rohini

Ground RS.2,19,034062 19 E 7.89 4.8 Shop Floor /-

Localitv:Madane:ir . .

LSe at Madane:irRS.37.39.825

63 37 F 24.22 Shop First Floor /-

Localitv:Jahae:irilluri,

ese at 656 MIGHouses at Jahae:irilluri

RS.13,89,22964 3 G 11.19 Shop /-

Localitv:Ashok Viharese at Ashok Vihar,Phase-IV, Block-B&e

Ground Rs.1,12,89,4265 6 D 37.76 Shop Floor 3/-

Ground RS.59,91,52366 14 D 20.04 Shop Floor /-

Localitv:Tikri KalanTikri Kalan in Group-I,Zone-A

RS.12,14,34667 6 H 19.45 Shop /-

Locality:JagritiEnclaveesc at Jagriti EnclaveeHBS Zone 10-11

Ground RS.31,22,14368 7 D . 9.9 ) . Shop Floor / -

I

~

Ground RS.36,04,65369 12 D 11.43 Shop Floor /-

RS.2,24,54,1670 1 D 71.2 Office First Floor 6/-

esc atTrilokpuri/Himmatpuriesc atTrilokpuril Himmatpuri, B1ock-36(IndiraMarketl

Ground Rs.71 .1 G 6 Stall Floor 6,30304/-

Ground. Rs.72 2 G .6 Stall Floor .. 6,30,304/-.

Ground Rs.73 5 G 6 Stail Floor 6,30,304/-

Ground Rs.74 . 7 G - 6 Stall Floor 6,30,304/-

Ground Rs.75 8 G 6 Stall Floor 6,30.304/-

Ground' Rs.76 9 G 6 Stall Floor 6,30,304/-

Ground Rs.77 13 G 6 Stall Floor 6,30,304/-

Ground Rs.78 14 G 6 Stall Floor 6,30,304/-

Ground Rs.79 50 G 6 Stall fi'loor 6,30,304/-

Ground Rs.80 78 G 6 Stall Floor 6,30,304/-

Ground Rs..81 92 G 6 Stall Floor 6,30,304/-

Ground Rs.82 143 G 6 Stall Floor 6,30,304/-

Ground Rs.83 147 G 6 , Stall Floor 6,30,304/-

Ground Rs.84 .155 G 6 Stall Floor 6,30,304/-

Ground Rs.85 162 G 6 Stall Floor 6,30,304/-

\

~