Outline
• Business Process (BP) Modeling
• ID-Net: Motivations
• ID-Net: Semantics
• Model Composition with ID-Net
• Example
2
A.Chen PNSE 2007 Workshop, Siedlce, Poland
BP Modeling: Elements
Process
Activity
receiveorder
collectpayment
shippingschedule
productionschedule
sendinvoice
Participant
Flow
Each color represents an organization
3
A.Chen PNSE 2007 Workshop, Siedlce, Poland
BP Modeling: Control-Flow
4
A PossibleControl-Flow receive
order
schedule
shippingschedule
productionschedule
collectpayment
order
payment
invoice
sendinvoice
createinvoice
Receive order and collect payment can be parallel or sequential, depending on the interpretation of the informal model. parallel might be more flexible in this case
receive oder
collectpayment
shippingschedule
productionschedule
sendinvoice
Informal description
A.Chen PNSE 2007 Workshop, Siedlce, Poland
BP Modeling: Data Model
receive oder
collectpayment
shippingschedule
productionschedule
sendinvoice
Data Model
Item Order Shipping10..* 1 0..1
Payment
1
Production
10..1
0..*
5
A.Chen PNSE 2007 Workshop, Siedlce, Poland
BP Modeling: Dimensions
Executable Workflow?
Data Model
Item Order Shipping10..* 1 0..1
Payment
1
Production
10..1
0..*
Control-Flow Model
receiveorder
schedule
shippingschedule
productionschedule
collectpayment
order
payment
invoice
sendinvoice
createinvoice
??
6
A.Chen PNSE 2007 Workshop, Siedlce, Poland
BP Modeling: Approaches
• (Explicit) State-Based Model: Petri Net and its variances, e.g. Workflow Nets, CPN
• Service-Oriented: service composition, e.g. BPEL
• Metamodel-Based with
• Implicit state
• Explicit state (combined with State-Based semantics)
7
A.Chen PNSE 2007 Workshop, Siedlce, Poland
The CPN Solutionschedule
shippingschedule
productionschedule
order
payment
a
b
c
d
(c, d)=schedule(a,b)
The relations between a,b,c,d should be defined in the PN
The transition schedule uses a and b to produce c and d
SE: strong coupling between PN structure and data!
Forced to use the built-in data modeling mechanism (CPN ML)
8
A.Chen PNSE 2007 Workshop, Siedlce, Poland
BP Modeling and Development
From SE’s point of view:
• The data modeling power is enough (e.g. with tuples), but impractical in real BP development
• Structure and data of BP are too constrained each other
• Built-in, inflexible operational semantics
• CPN is designed to analyze and verify models, not for BP development
• Same problem for other PN variances
9
A.Chen PNSE 2007 Workshop, Siedlce, Poland
ID-Net: Hook Points
Semantics is operationally
different with CPN
T.around : Customized semantics for T
Hook points (as in AOP)
Tshippingschedule
productionschedule
order
payment
a
b
c
d
T.before : Select tokens from pre-set places (access the contents of places)
T.before
T.with : Working with selected resources (access selected tokens)
T.with
T.after : Working with produced resources (access post-places)
T.after :
10
A.Chen PNSE 2007 Workshop, Siedlce, Poland
ID-Net: IDs
Order
Payment
shipping schedule
productionschedule
P1:P3:
P2: P4:
T order
payment
shipping schedule
production schedule
Places are typed by the kind of ID
11
A.Chen PNSE 2007 Workshop, Siedlce, Poland
ID-Net: IDs (cont.)
Tokens are IDs referring to (concrete or not) resources
Order
Payment
shipping schedule
productionschedule
P1:P3:
P2: P4:
T order
payment
shipping schedule
production schedule
12
A.Chen PNSE 2007 Workshop, Siedlce, Poland
IDtifier
• ID is independent of modeling formalism
• Presented in many kinds of applications, e.g. security (keys), Web (e.g. URLs, cookies)
• For BP Modeling, ID is the key to:
• symbolically represent the resource (modeling phase)
• identify a concrete resource (implementation phase)
• support data model (e.g. candidate key)
13
A.Chen PNSE 2007 Workshop, Siedlce, Poland
ID-Net
1. Tokens are typed IDs to identify the resources
2. Places are typed “IDs Holder”
3. The ID-Net model controls the visibility of resources using the classical Petri Net semantics
4. Semantics of transitions can be extended by composing other models with ID-Net model
5. External models produce and use the IDs to do specific work
14
A.Chen PNSE 2007 Workshop, Siedlce, Poland
ID-Net + Data Model: Type Mapping
receiveorder
schedule
shippingschedule
productionschedule
collectpayment
order
payment
invoice
sendinvoice
createinvoice
Item Order Shipping10..* 1 0..1
Payment
1
Production
10..1
0..*
15
A.Chen PNSE 2007 Workshop, Siedlce, Poland
Data Manipulation Operations (DMOs)
• DMO’s are derived from the metamodel (implied by the data semantics of metamodel)
• In term of DB: CRUD (Create, Read, Update, Delete) operations
OrderID order_id= Order.Create();setRelation(order_id, item_id, “has”)setAttribute(order_id, aDate, ”date”,);
Relationship Creation
Pseudo code:
ItemID item_id= Item.Create(name, price);Entity Creation
DMOs
Entity Removal Item.Delete(item_id);
Relationship Removal RemoveRelation(order_id, item_id, “has”);
16
A.Chen PNSE 2007 Workshop, Siedlce, Poland
DMOs: Motivation
• Real-world BPs are constructed on and supported by DB systems
• Activities of BPs are composed of data manipulation(in memory)and data persistence(with DBMS)
• Data manipulation are relied principally the domain data model
• DMOs are services provided by DBMS
• ID is the key to access the data
17
A.Chen PNSE 2007 Workshop, Siedlce, Poland
Model Composition
• Specify the composition: synchronize the PN transition with the DMOs (similar to service composition)
• Using the temporal operators of AOP to compose DMOs with the control-flow: before, after, around
• Using synchronization operator // (with) to create atomic actions (from CO-OPN)
18
A.Chen PNSE 2007 Workshop, Siedlce, Poland
Example: ID -> Data Instances
payment
order shippingschedule
productionschedule
P1: P3:
P2: P4:
T payment
order
shipping
production
Order Shipping1 0..1
Payment
1
0..* Production
10..1
IDs refer to instances of data
19
A.Chen PNSE 2007 Workshop, Siedlce, Poland
Example:Synchronized function
payment
order
shipping
production
P1:P3:
P2: P4:
T payment
order
shipping
production
P1.take( ); P2.take( );
payment=getPaymentFromID( );order=getOrdersFromID( );
if (payment.clientID != order.clientID) { P1.release( ); P2.release( ); throws NotFirableException()}
reserve tokens
check firability
access resources
synchronized function: M with T
M with T uses selected tokens as inputs
Executable, composed model
20
A.Chen PNSE 2007 Workshop, Siedlce, Poland
Example:Synchronized function
payment
order
shipping
production
P1:P3:
P2: P4:
T payment
order
shipping
production
synchronized function: M with T
M uses the IDs to do anything it wants, and produces post-tokens
Executable, composed model ...date = estimateDeliveryDate(order);
=Shipping.Create(date, dest); =Production.Create(date, orderSet);
P1.remove( ); P2.remove( );
P3.put( ); P4.put( );
external stuff
produce post-conditions
DMOs
21
A.Chen PNSE 2007 Workshop, Siedlce, Poland
Composed Semanticspayment
order
shipping
production
P1:P3:
P2: P4:
T payment
order
shipping
production
synchronized function: M with T
Executable, composed model
P1.take( ); P2.take( );payment=getPaymentFromID( );order=getOrdersFromID( );if (payment.clientID != order.clientID) throws NotFirableException(){P1.release( ); P2.release( ); }...date = estimateDeliveryDate(order); =Shipping.Create(date, dest); =Production.Create(date, orderSet);P1.remove( ); P2.remove( );P3.put( ); P4.put( );
reserve tokens
check firability
external stuff
produce post-conditions22
A.Chen PNSE 2007 Workshop, Siedlce, Poland
ID-Net in BP Development
V1 V1
V2
Model-BasedIterative
DevelopmentProcess
V2
V3 V3
ID-NetModel
DataModel
ModelComposition
Executable Workflow
ModelReconciliation
23
A.Chen PNSE 2007 Workshop, Siedlce, Poland
Framework
Executable Workflow
Data Model
Item Order Shipping10..* 1 0..1
Payment
1
Production
1
0..1
0..*
Control-Flow Model
receiveorder
schedule
shippingschedule
productionschedule
collectpayment
order
payment
invoice
sendinvoice
createinvoice
ModelCompositionComposition
specification
24
A.Chen PNSE 2007 Workshop, Siedlce, Poland
Conclusion
• ID-Net has flexible and extensible semantics:
• it handles the tokens as the classical PN
• the external models will produce and interpret the values tokens
• the composition specifies the interplay between ID-Net and other models
• BPs can be developed in an iterative and flexible way with the framework using ID-Net
25
A.Chen PNSE 2007 Workshop, Siedlce, Poland
Research Perspectives
• Relations between the functional dependency of data and dependency of activities in workflow
• How the composed external model interprets the properties of an ID-Net
• Hiding information during the design of BP service (issues in cross-organizational BPs)
26
A.Chen PNSE 2007 Workshop, Siedlce, Poland
ID-Net SemanticsPreliminary operational
semantics
A Place is a multi-set which supports the following operations: •take(token): reserve token •release(token): release token (inverse of take)•put(token): put token into the place•remove(token): remove token from the place
P1 P2T
Firing a transition consists of:1. select tokens in pre-set places2. reserve pre-condition tokens temporally 3. evaluate T (if failed, release reserved tokens)4. remove reserved tokens5. put post-conditions into post-set places
before: [0..1]
with: [2..4]
after: >5
around: [0..6]
The steps can be hooked
T will be evaluated successfully if each pre-set place provides at least one token
27