compositeworks - recent major projects.pdf
TRANSCRIPT
-
3SPECIFICATIONS
Length 62.3m
Beam 10.8m
Draft 3.3m
Builder Feadship
Year 2000
REFIT
Naval Architect Azure
Designer Steve Howard / Chahan Interior Design
Duration 6 months / 6 months
Exterior: Complete remodelling of sun deck including installation of new carbon fi bre swimming pool and sunbeds forward, lowering of aft deck level, complete with new bar and furniture and a custom liferaft launching system
Interior: Complete replacement of major guest areas including salon, dining and owners areas as well as upgrade of major interior systems
-
4 5
-
9
-
10 11
-
12 13
after
before
-
14 15
SPECIFICATIONS
Length before / after 65.6m / 68.7m
Beam 9.7m
Draft 3.7m
Builder Feadship
Year 1983
REFIT
Naval Architect Olesinski Design
Designer Olesinski Design
Duration 7 months
Exterior: Total remodelling of superstructure forward and aft on every deck. 3m+ transom extension, 1m high modification to forward sheerline up to bow, modifications to fashion plates, wing stations, bulwarks and other superstructure details to totally modernise the vessels profile leaving it complete unrecognisable from its previous guises.
Interior: Replacement of VIP flooring, installation of beach club in lazarette.
-
16 17
-
19
-
24 25
SPECIFICATIONS
Length 138.4m
Beam 18.5m
Draft 5m
Builder Lurssen
Year 2004
REFIT
Naval Architect Azure
Designer Beiderbeck
Duration 3 months
Exterior: Design, manufacture and installation of a self supporting carbon fibre swimming pool to grace one of the worlds best know mega yachts. With strict heating, water storage and pumping requirements and a very short project duration it was a challenge described by Lurssen themselves as impossible.....
-
26 27
-
30 31
-
32 33
SPECIFICATIONS
Length before / after 30m / 35.8m
Beam 7.3m
Draft 2.5m
Builder Inace
Year 2009
REFIT
Naval Architect Azure
Designer Stefano Pastrovich
Duration 5 months / 5 months
Exterior: Hull extension at stern area of yacht over 6m in length to create a large aft deck dining/bar area, spacious swim platform and new interior engineering and toy storage area complete with additional ensuite crew cabin
Interior: Removal and replacement of all major guest areas with modern African themed Pastrovich masterpiece. All exterior areas modernised and co-ordinate with new interior
-
34 35
afterbefore
-
36 37
-
40 41
-
45
-