  • 3SPECIFICATIONS

    Length 62.3m

    Beam 10.8m

    Draft 3.3m

    Builder Feadship

    Year 2000

    REFIT

    Naval Architect Azure

    Designer Steve Howard / Chahan Interior Design

    Duration 6 months / 6 months

    Exterior: Complete remodelling of sun deck including installation of new carbon fi bre swimming pool and sunbeds forward, lowering of aft deck level, complete with new bar and furniture and a custom liferaft launching system

    Interior: Complete replacement of major guest areas including salon, dining and owners areas as well as upgrade of major interior systems

  • 4 5

  • 9

  • 10 11

  • 12 13

    after

    before

  • 14 15

    SPECIFICATIONS

    Length before / after 65.6m / 68.7m

    Beam 9.7m

    Draft 3.7m

    Builder Feadship

    Year 1983

    REFIT

    Naval Architect Olesinski Design

    Designer Olesinski Design

    Duration 7 months

    Exterior: Total remodelling of superstructure forward and aft on every deck. 3m+ transom extension, 1m high modification to forward sheerline up to bow, modifications to fashion plates, wing stations, bulwarks and other superstructure details to totally modernise the vessels profile leaving it complete unrecognisable from its previous guises.

    Interior: Replacement of VIP flooring, installation of beach club in lazarette.

  • 16 17

  • 19

  • 24 25

    SPECIFICATIONS

    Length 138.4m

    Beam 18.5m

    Draft 5m

    Builder Lurssen

    Year 2004

    REFIT

    Naval Architect Azure

    Designer Beiderbeck

    Duration 3 months

    Exterior: Design, manufacture and installation of a self supporting carbon fibre swimming pool to grace one of the worlds best know mega yachts. With strict heating, water storage and pumping requirements and a very short project duration it was a challenge described by Lurssen themselves as impossible.....

  • 26 27

  • 30 31

  • 32 33

    SPECIFICATIONS

    Length before / after 30m / 35.8m

    Beam 7.3m

    Draft 2.5m

    Builder Inace

    Year 2009

    REFIT

    Naval Architect Azure

    Designer Stefano Pastrovich

    Duration 5 months / 5 months

    Exterior: Hull extension at stern area of yacht over 6m in length to create a large aft deck dining/bar area, spacious swim platform and new interior engineering and toy storage area complete with additional ensuite crew cabin

    Interior: Removal and replacement of all major guest areas with modern African themed Pastrovich masterpiece. All exterior areas modernised and co-ordinate with new interior

  • 34 35

    afterbefore

  • 36 37

  • 40 41

  • 45