Comprehensive Delivery Process
SDM Lite Testing Phase Training
Facilitator Name:
State of Connecticut Department of Information Technology (DOIT)
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 2
Agenda
Overview of SDM
Governance
Purpose of Testing Phase
Testing Phase Deliverables and Their Owners
Team Members
Testing Phase Activities
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 3
Business Issue
•Phase Kickoff Meeting •Project Management Plan•Project Profile •Detailed Schedule for Next-Phase •Phase-End Decision-Point Meeting
Business Requirements
•Bus. and Tech. Rqmts Document•Solution Alternatives Document•Deployment Strategy & Plan•Detailed Schedule for Next-Phase •Phase-End Decision Point Meeting
Design
•System Design Document•System Security Profile•System Design Signoff - TRB•System Design Signoff - PSC•Test Strategy & Plan•Detailed Schedule for Next-Phase
Construction
•Code & Unit Testing•Code Review•Development/Test Environments•Environment Migration Checklist•Software “Golden Build”•System Bill of Materials•System and User Documents•Test Scenarios/Cases•Test Data•Detailed Schedule for Next-Phase
Testing
•Environment Migration Checklist•Integration Testing•System Testing•User Acceptance Testing•Software “Golden Build”•System Bill of Materials•Test Summary Report•Prod. Support & Admin Document•Detailed Schedule for Next-Phase •Phase-End Decision Point Meeting
Post-Implementation
•Project Summary•Project Shutdown
Implementation
•Technology Solution Deployment•Approved Production Turnover•Phase-End Decision Point Meeting
Project Management Plan, Cost Benefit Analysis
Deliverables Updated in Multiple Phases:
SDM Lite v2.03 Deliverables/Events by Phase
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 4
Governance – The Project Steering Committee (PSC)
Who are the typical PSC members?
Agency Commissioners or Designee
Executive Director or Designee
Divisional Directors
Not members of the Project Team Wheel(With the exception of the Executive Sponsor)
What does the PSC do?
Sets business strategies within the targeted area;
Sets priorities and allocates resources (people and budgets); and
Makes Go, No-Go, or Redirect decisions for any project in the business area throughout the entire project life cycle.
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 5
Testing Phase PurposeThe Purpose of the Testing Phase is to:
Prove that the developed system satisfies the requirements defined in the Business Requirements and Technical Requirements documents. This is accomplished by executing the following test activities:
Integration Tests: Tests shall be executed and evaluated by the Testing team to prove that the various modules/functions within each application component integrate properly. Within each application, the Testing team will verify that the application features/functions, data integrity, and security satisfies the defined requirements of the system.
System Tests: Tests shall be executed and evaluated by the Testing team to prove that all of the applications and infrastructure components work together as a complete system. During system testing, the Testing team will again verify that the application features/functions, data integrity, and security satisfies the defined requirements of the system, but from an “end-to-end” system perspective.
User Acceptance Tests: Tests shall be executed and evaluated by the Business team to prove that the system meets all business requirements and supports the business scenarios of the end-user. During system testing, the Business team will verify that the system features/functions, data integrity, response times, and security satisfies the defined requirements of the system from a business process perspective.
Performance Tests: Tests shall be executed and evaluated by the Testing team to prove that the system will support end-user response time requirements, timeline processing of estimated data volume, the estimated number of end-users, estimated transaction/data growth, and sufficient performance when system resources are “stressed”.
Recovery Tests: Tests shall be executed and evaluated by the Development team to prove that the system can be backed out and restored to a previous state. This will occur in the event of undesirable implementation results requiring a solution back out or, if an unplanned disaster were to occur requiring a system recovery to maintain business continuity.
Engage the Production support team, where the Production Support & Administration Document is viewed and signed off by the Production Support Team to prepare for production turnover.
Develop a detailed plan that commits to the completion of the Testing Phase; verify targets for the completion of the Implementation and Post-Implementation Phases.
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 6
Testing Phase Work Breakdown Structure (WBS)5.0 Testing
Phase
5.01 Perform Integration
Testing
5.02 PerformSystem Testing
5.03 PerformUser Acceptance
Testing
5.07 Conduct Production Support
Process Review
Verify the
Integration TestEnvironment
Verify The
System TestEnvironment
VerifyThe UAT
Environment
5.08 Conduct Phase-End Decision Point Meeting
Create the Phase-End Decision Point Meeting
Presentation
Create the System Test
Summary
Create the UAT
Summary
Create the Integration Test
Summary
Approve & SignoffOn the Production Support & Admin
Document
Conduct the Production Support
Process ReviewMeeting
5.04 PerformPerformance
Testing
VerifyThe PerformanceTest Environment
Migrate ApplicationTo Performance
Test Environment
Execute the Communication Plan
Conduct the Phase-End Decision Point Meeting
Plan Remaining Phases
ObtainPerformance Testing
Signoff
Update the Defect Management
Tool
5.06 ConductTest Phase
Review Meeting
CreateTest Phase
SummaryReport
ObtainTesting Phase
Signoff
Conduct theTest Phase
Review Meeting
Conduct Performance
Testing
Complete the Production Support
& AdministrationDocument
5.05 Perform Recovery Testing
Update the Defect Management
Tool
Update theDefect Management
Tool
Update the Defect Management
Tool
ConductUAT
Migrate ApplicationTo
UAT Environment
ConductInter-Operability
Testing
Create the Performance Test
Summary
Conduct Integration Testing
Migrate Application to
Integration TestEnvironment
Conduct System Testing
ConductInter-Operability
Testing
Migrate Application To
System TestEnvironment
Create Recovery
Test Cases
Execute the Backout & Recovery
Test Cases
Execute Disaster Recovery
Test Cases
Establish the Recovery
Test Environment
ObtainIntegration Testing
Signoff
Obtain System Testing
Signoff
ObtainUAT Signoff
Establish the“Golden Build”
For System Testing
Establish the“Golden Build”
For UAT
Establish the“Golden Build”
For Performance Testing
Update the Defect Management
tool
ObtainRecovery Test
Signoff
Create theRecovery Test
Summary
Establish the“Golden Build”For Production
Deployment
Create/Migrate Test Data to
Integration Test Environment
Create/Migrate Test Data to
System TestEnvironment
Create/Migrate Test Data to
UAT Environment
Create/Migrate Test Data to
Performance TestEnvironment
Create/Migrate Test Data to
Recovery TestEnvironment
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 7
Key Deliverables Created in the Testing Phase
Team Lead Deliverables:
Back Out & Recovery Test Execution,
Disaster Recovery Test Execution,
Environment Migration Checklist,
Testing Phase Summary,
Integration Test Execution,
System Bill of Materials,
System Test Execution,
“Golden Build” of Software for Implementation,
Performance Test Execution,
User Acceptance Test Execution,
Production Support & Administration Document
Project Management Deliverables:
Cost-Benefit Analysis,
Detailed Phase Schedule,
Phase-End Decision Point Presentation,
Project Management Plan, and
Project Team Wheel
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 8
Testing Phase Deliverable Snapshot Phase Activity Numbers
Team Lead Deliverables Requirement Owner 01
02
03
04
05
06
07
08
Back out & Recovery Test Execution Mandatory Development Lead S I
Deployment Strategy & Plan Mandatory Deployment Lead I
Environment Migration Checklist Mandatory Infrastructure Lead S S S S
Testing Phase Summary Mandatory Test Lead S
Integration Test Execution Mandatory Test Lead S I
System Bill of Materials Mandatory Development Lead R R R R R
“Golden Build” of Software for Production
Mandatory Development Lead C
Performance Test Execution Mandatory Test Lead S I
User Acceptance Test Execution Mandatory UAT Lead S I
Production Support & Admin. Document Mandatory Prod. Support Lead S
Phase-End Decision Point Presentation Mandatory Technology Manager
S
Updated Project Management Plan Mandatory Technology Manager
R
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 9
Project Steering Committee (PSC)Name / AgencyName / Agency
TECHNOLOGY PARTNERS
BUSINESS PARTNERS
* <Name Required>Business Manager
* Name RequiredBusiness Requirements
Lead
<Name Required>Technology Manager
Name RequiredDevelopment Lead
Name RequiredSecurity Lead
* Name(s) RequiredBusiness SMEs
* Name RequiredBusiness Process
Lead
Name RequiredTest Lead
* Staffed from the Business
Name RequiredInfrastructure Lead
Name RequiredProduction Support Lead
* TBDUAT Lead
Name Required Executive Sponsor
Current Phase: Testing
Support/Consulting Roles:Financial Advisor: Enterprise Architect: Name RequiredBusiness Division Director: Name Required
* Name RequiredDeployment Lead
Name RequiredVendor Lead
Instructional Note:•Remove this note before presenting this slide•Remove roles that are not applicable to your project (even is it has “name required”)•If the role IS applicable to your project, then you must specify a name if the role has “name required”•If other standard SDM roles are needed, you may add them to the wheel.•Do not create any new role names; All role names are standardized within the SDM framework
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 10
Business Division Director (Technology Role) Assists the Executive Sponsor with establishing a Project Steering Committee, and securing resources for the team, as needed. Point of leadership escalation for technology risks and issue for the Project Team. Ensures that all technology projects being run within their assigned Agencies are aligned with SDM. Monitors the execution of all technology projects within their assigned Agencies.
Business Manager (Business Role) Responsible for coordination and delivery of all Business activities and deliverables; Provides business consultation to the technology team; Provides project plan updates for all Business activities and deliverables; Attends/Participates in all Phase-End Decision Point Meetings
Testing Phase Roles and Responsibilities
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 11
Business Process Lead (Business Role) Ensures that User Documentation and Training Materials adequately address all planned business process change; Provides general business process consultation to the project team;
Business Requirements Lead (Business Role) Maintains the Functional Requirements Workbook; Maintains the Non-Functional Requirements Workbook; Provides general business requirements consultation to the project team;
Business Subject Matter Experts (SMEs) - (Business Role) Provides business area consultation to the business team as needed to assist with business deliverable review and creation;
Deployment Lead (Business Role) Maintains the Deployment Strategy & Plan document; Responsible for coordinating all implementation activities at the deployment site(s); Verifies all User Documentation and Training Materials;
Testing Phase Roles and Responsibilities
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 12
Development Lead (Technology Role) Maintains the System Design Document; Maintains the Technical Requirements Workbook; Maintains the Requirements Traceability Matrix; Creates and maintains the System Bill of Materials; Responsible for executing Recovery Testing; Responsible for loading the migrating new software builds across environments; Responsible for coordination of all software defect remediation; Responsible for executing Performance Testing; Responsible for identifying defects, and entering them into the defect management tool; Contributes Performance test metrics to the Test Summary Report;
Enterprise Architect - (Technology Role) Responsible for ensuring that EWTA requirements are addressed with the solution; Provides on-going architecture consultation to the project team;
Testing Phase Roles and Responsibilities
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 13
Executive Sponsor (Business Role) Responsible for providing the project funding source; Attends/Participates in Phase-End Decision Point Meeting; Primary leadership escalation point for significant project risks and issues;
Infrastructure Lead (Technology Role) Single point of contact for the project team for all infrastructure needs (e.g., hardware, software, database, network); Responsible for the planning and coordination of all infrastructure activities; Relies on resources from the various infrastructure areas to deliver the actual infrastructure work; Creates and maintains the Environment Migration Checklist; Responsible for establishing the test environment; Assists the Development lead in loading test data across into the various environments; Assists the Development lead in loading software builds into the various environments;
Testing Phase Roles and Responsibilities
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 14
Production Support Lead - (Technology Role) Creates and maintains the Production Support & Administration Document; Responsible for stakeholdering the new solution with Production Support; Manages and executes the Production Turnover Checklist; Coordinates production turnover signoff with the Production Support team;
Project Steering Committee (Business & Technology Leadership Roles) Provides governance and decision making to the project team; Removes barriers for the project team; Reviews the Phase-End Decision Point presentation material prior to the Phase-End Decision Point Meeting; Renders a Phase-End decision of “Go”, “No-Go” or “Redirect” as it relates to the project team proceeding to the next phase.
Security - (Technology Role) Maintains the System Security Profile Document; Provides security consultation to the project team as needed;
Testing Phase Roles and Responsibilities
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 15
Technology Manager (Technology Role) Responsible for creation and maintenance of the overall project plan (including Business and Technology activities); Responsible for the overall coordination and delivery of all Technology deliverables; Responsible for Change Management on the project; Creates all Phase-Kickoff Meeting presentations; Facilitates all Phase Kickoff Meetings; Updates the Project Management Plan; Responsible for creating the PSC Phase-End Decision Point Meeting Presentations; Hosts and facilitates the PSC Phase-End Decision Point Meetings; Responsible for providing project status reporting at monthly project reviews; Responsible for creating the final Project Summary and formal shutdown of the project.
Test Lead (Technology Role) Maintains the overall Test Strategy & Plan for the project; Responsible for the planning and execution of Integration and System testing; Maintains all Integration and System test cases and scenarios; Responsible for identifying defects, and entering them into the defect management tool; Responsible for mapping Integration & System test cases to business requirements in the Requirements Traceability Matrix; Responsible for creating and presenting the Test Summary report and the conclusion of the Testing phase;
Testing Phase Roles and Responsibilities
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 16
UAT Lead (Business Role) Responsible for the planning and execution of User Acceptance testing; Maintains all User Acceptance test cases and scenarios; Responsible for identifying defects, and entering them into the defect management tool; Responsible for mapping UAT test cases to business requirements in the Requirements Traceability Matrix; Contributes UAT test metrics to the Test Summary Report;
Vendor Lead - (Technology Role) The single point of contact for the Vendor; Responsible for the management and coordination of all Vendor deliverables to the project team;
Testing Phase Roles and Responsibilities
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 17
Activity 5.01: Perform Integration TestingPurpose:
The purpose of this activity is to install the “Golden Build” of the application created at the end of the Construction phase into the Integration Test environment. Verify that all application modules/functions work together as designed. Thoroughly test the functionality of features that could not be tested earlier during code and unit testing. Verify that each application component has achieved the required level of quality before proceeding to system testing.
Integration testing focuses mainly on a logical group of modules/functions WITHIN an application. Integration testing verifies the interaction between such modules/functions to ensure they work properly within an application.
This Activity Produces the Following:
Verify the Integration Test Environment;
Migrate the Application to the Integration Test Environment;
Create/Migrate the Test Data to the Integration Test Environment;
Conduct Integration Testing;
Update the Defect Management Tool;
Create the Integration Test Summary;
Obtain Integration Testing Sign-Off; and
Establish the “Golden Build” for System Testing.
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 18
Activity 5.02: Perform System Testing
Purpose:
The purpose of this activity is to validate that all the solution aspects operate and meet the business and technical requirements of the business process, which include interoperability, features/functions, data integrity, security, and installation procedures.
System Testing focuses on the integration and interaction of a complete system, taking all of the individual application components that were tested separately during Integration testing and creating scenarios that string many applications together to validate that the system behaves properly from an “end-to-end” testing perspective.
System testing involves taking a group of test cases (e.g., often a subset of integration test cases) that utilize individual components and running them in sequence to simulate a required business function.
This Activity Produces the Following:
Verify the System Test Environment;
Migrate the Application to the System Test Environment;
Create/Migrate the Test Data to the System Test Environment;
Conduct Interoperability Testing;
Conduct System Testing;
Update the Defect Management Tool;
Create the System Test Summary;
Obtain System Testing Sign-Off; and
Establish the “Golden Build” for User Acceptance Testing (UAT).
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 19
Activity 5.03: Perform User Acceptance Testing (UAT)
Purpose:
The purpose of this activity is to test the solution and verify that it meets user needs. User Acceptance Testing verifies that the business process and systems work together as expected.
This Activity Produces the Following:
Verify the UAT Environment;
Migrate the Application to the UAT Environment;
Create/Migrate the Test Data to the UAT Environment;
Conduct Interoperability Testing;
Conduct User Acceptance Testing;
Update the Defect Management Tool;
Create the UAT Summary;
Obtain UAT Sign-Off; and
Establish the “Golden Build” for Performance Testing.
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 20
Activity 5.04: Perform Performance Testing
Purpose:
The purpose of this activity is to ensure that the software achieves required performance levels as defined within the Business Requirements.
This Activity Produces the Following:
Verify the Performance Testing Environment;
Migrate the Application to the Performance Test Environment;
Create/Migrate the Test Data to the Performance Test Environment;
Conduct Performance Testing;
Update the Defect Management Tool;
Create the Performance Test Summary; and
Obtain Performance Test Sign-Off.
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 21
Activity 5.05: Perform Recovery Testing
Purpose:
The purpose of this activity is to test the established plans to recover information, business processes, and systems to an operational state in the event of disaster or undesirable results.
Recovery testing does not focus on system functionality; it focuses on the following two areas:
This Activity Produces the Following:
Create Recovery Test Cases; Establish the Recovery Test Environment; Create/Migrate the Test Data to the Recovery Environment; Execute the Back Out and Recovery Test Cases; Execute Disaster Recovery Test Cases; Update the Defect Management Tool; Create the Recovery Test Summary; and Obtain Recovery Test Sign-Off.
1. Ensuring that the new system is being deployed can be backed out and restored to a previous state (i.e., a Back out & Recovery procedure) if the new system implementation yields unacceptable results.
2. Ensuring that an effective/operational recovery procedure exists in the event of an unplanned disaster (i.e., a Disaster Recovery plan), so that the effects of a disaster will be minimized and the organization will be able to either maintain, or quickly, resume mission-critical functions.
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 22
Activity 5.06: Conduct Testing Phase Review Meeting
Purpose:
The purpose of this activity is to review the final test results from all sub-phases of testing conducted on the project. The project team assesses whether or not the final testing results satisfy the Testing phase exit criteria as defined in the Project Management Plan document.
This Activity Produces the Following:
Create the Testing Phase Summary Report;
Conduct the Test Summary Review Meeting;
Obtain Testing Phase Sign-Off; and
Establish the “Golden Build” for Production Deployment.
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 23
Activity 5.07: Conduct Production Support Process Review Meeting
Purpose:
The purpose of this activity is to document the support structure required to support the new application once it is deployed to production. The support structure will describe the available support services, the responsible support organizations, and the support processes and procedures that will be utilized.
Within the State of Connecticut, it is expected that some, or all, resources from the application development team, who have now constructed the new system, will also become part of the production support organization once the solution has been implemented. The production support model should be established in “tiers”, such that problems are escalated from lower tiers to higher tiers based on the complexity of the problem or required problem solving skill set (e.g., if network-related, escalate to the network team). A common tier-based model is to establish the following tiers:
Tier 1: Call Center/Help Desk (most basic problem resolution, such as user-id setups); Tier 2: Development Team (more complicated application problem diagnosis; requires in-depth knowledge of
the application and data); Tier 3: Infrastructure Team (infrastructure problem diagnosis; requires in-depth knowledge of the hardware,
software, data structures, or networks).
Document the production turnover criteria so it is clear that when the solution is declared ready for production turnover, the project team can be dissolved.
If an existing Service Level Agreement (SLA) with a business unit(s) is expected to be impacted, additional sign offs may be required to support the deployment of the initiative. Any SLA impact must be documented in this support plan.
Once placed under change control, this document must be maintained until deployment is complete.
(Cont.)
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 24
Activity 5.07: Conduct Production Support Process Review Meeting (Cont.)
This Activity Produces the Following:
Complete the Production Support and Administration Document;
Conduct the Production Support Process Review Meeting; and
Approve and Sign-off on the Production Support and Administration Document.
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 25
Defect Severity LevelsDefect severity levels assign a numeric value representing the impact that the incident/defect has on the system/environment. Severity levels will be assigned to defects based on the severity level definitions described below.
Severity Level
1
2
3
4
• Critical Outage;
• System or key component of a system is unavailable for use;
• Emergency situation requiring immediate action overriding all planned actions.
• System is available but a key component is not functioning correctly;
• Significant defect to core functionality within the system;
• Manual workaround may or may not be available.
• System is available but a component is not functioning correctly;
• Does not necessarily result in a failure;
• Workaround is available.
• System is available but a minor or infrequently used function is not processing correctly;
• Cosmetic defects.
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 26
Activity 5.08: Conduct Phase Decision Point MeetingPurpose:
The purpose of this activity is to obtain a “Go”, “No-Go”, or “Redirect” decision from the Project Steering Committee (PSC).
Minimum Suggested Attendees for the Phase Decision Point Meeting:
Project Manager,
Executive Sponsor,
PSC,
Technology Manager, and
Business Manager
This Activity Produces the Following:
Distribute the Testing Phase-End Decision Point Presentation to the PSC;
Conduct the Phase-end Decision Point Meeting; and
Execute the communication plan.
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 27
Continuous SDM Support & Training
SDM Resources:
SDM website: www.ct.gov/doit/sdm
SDM Overview & Training
SDM Sample Deliverables
SDM Email Box:
Inbox is reviewed on a regular basis (e.g., weekly, bi-weekly, etc.)
Will add input for ‘FAQ’ section of website
PMO Team will respond to feedback
SDM Continuing Education:
SDM open communication forums
SDM Brown Bags
Specific discussion on ‘hot’ SDM topics
Scheduled assistance as requested
The purpose of the System Development Methodology (SDM) is to establish procedures, practices, and guidelines governing the initiation, concept development, planning, requirements analysis, design, development, integration and test, implementation, and operations, maintenance and disposition of information systems (IS) within the State of Connecticut.
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 28
PMO Team MembersPlease contact the PMO Team with any questions that you have. The PMO Team will be reviewing the SDM Feedback Mailbox on a regular basis.
PMOPMO
PMO Team Members:
Lois Bryant 860-622-2981 [email protected]
Tricia Johnson, PMO Director 860-622-2549 [email protected]
Dawn Keiper 860-622-2232 [email protected]
Jim Rutushni 860-622-2271 [email protected]
Lori Violette 860-622-2365 [email protected]
Larry Williford 860-622-2465 [email protected]
The PMO Team also has a group telephone # 860-622-2085. If you receive the voicemail, please leave a message as the voicemail will be
checked on a regular basis.
PMO Web site: www.ct.gov/doit/pmo
( Testing Phase Training
SDM v2.0 Confidential - Internal Use Only
State of Connecticut Department of Information Technology (DOIT)
Page 29
Thank you for attending!
Any questions, comments, or suggestions?