compulsory pre-bid meeting. agenda welcome & introduction presentation induction session ...
TRANSCRIPT
COMPULSORY PRE-BID MEETING
AGENDA
WELCOME & INTRODUCTION
PRESENTATION
INDUCTION SESSION
SITE VISIT
QUESTION & ANSWER SESSION
SIGNING OF SITE INSPECTION CERTIFICATE (FORM 7.8)
CLOSURE
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
1. SCOPE OF WORK
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
1.1 Electrical Installation
NEW INTERNAL LIGHTING (HEIGHT – 10m, 250 LUX) REPARATION OF EXISTING TASK LIGTHING
- INSTALL EMERGENCY LIGTHING / SIGNAGE ON ESCAPE ROUTES/STAIRCASES (0.3 LUX)- INSTALL EXTERNAL LIGHTS (NORTHERN / WESTERN / SOUTHERN AREAS – 36 UNITS)- INSTALL NEW DISTRIBUTION BOARD FOR ROOF SERVICES- RE-ROUTE ALL EXISTING CABLING ON THE EXISTING WESTERN WALL- REPLACE COOLING TOWER SUPPLY AND CONTROL CABLING - EXTEND EXISTING COMPRESSOR POWER SUPPLY - NEW SUPPLY TO NEW FRESH AIR SUPPLY UNIT- CABLE SUPPORT EXTENSION / RELOCATION FOR EXISTING PROCESS EQUIPMENT- CABLE RACKS (EXISTING TO NEW ROOF STRUCTURE)- REPLACE FIBER OPTIC CABLE TO WORKSHOP- THREE PHASE POWER SUPPLY TO NEW MACHINE SHOP
SECURITY AND CONTROL SYSTEMS- DOOR AUTOMATION- FENCE ELECTRIFICATION (SOUTH WALL RELOCATION)- SECURITY CAMERA RELOCATION (SOUTH WALL)
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
1.1 Electrical Installation (continue)
- CONFIRM THAT EXISTING PROCESS CABLING DOES NOT REQUIRE ANY CHANGES / RE-LOCATION / FUNCTIONAL - CONFIRM THAT EXPANSION IS AVAILABLE IN EXISTING SUBSTATION TO ADD SUPPLY NEW FRESH AIR SUPPLY UNIT, MACHINE SHOP AND NEW ROOF SERVICES - REPAIR / TIDYING OF EXISTING ELECTRICAL SERVICES ON CABLE RACKS (THOUGHOUT
NEW BUILDING FACILITY) SECURITY AND CONTROL SYSTEMS
- DOOR AUTOMATION- FENCE ELECTRIFICATION (SOUTH WALL RELOCATION)- SECURITY CAMERA RELOCATION (SOUTH WALL)- CONFIRM THAT EXISTING PROCESS CABLING DOES NOT REQUIRE ANY CHANGES / RE-
LOCATION / FUNCTIONAL - CONFIRM THAT EXPANSION IS AVAILABLE IN EXISTING SUBSTATION TO ADD SUPPLY
NEW FRESH AIR SUPPLY UNIT, MACHINE SHOP AND NEW ROOF SERVICES - REPAIR / TIDYING OF EXISTING ELECTRICAL SERVICES ON CABLE RACKS (THOUGHOUT
NEW BUILDING FACILITY)
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
1.2 Mechanical & HVAC Installation
AIR CONDITIONING UNIT (SERVER ROOM) - ONE COOLING TOWER TO BE RE-POSITIONED. RE-ROUTE CHILLED WATER PIPELINE - COMPRESSED AIR – EXISTING COMPRESSOR AND RADIATOR TO BE RE-POSITIONED NEXT TO THE EXISTING FILTER AND DRYER PLANT. PIPING TO BE ADJUSTED - COLD ROOM (HOT AIR TO BE EXTRACTED FROM UNITS) - EXTRACTION SYSTEM IN CERTAIN AREAS OF PACKAGING AREAS TO BE RECONNECTED - FIRE PROTECTION – NEW SPRINKLER PIPE SYSTEM EXISTING PIPE ON WESTERN WALL WILL BE RE-ROUTED / FIRE HYDRANTS RE- POSITIONED - PROCESS : AIR CONVEYER FAN / FILTER UNITS WILL BE RE-POSITIONED. EXTRACTION DUCTING BE EXTENDED / RE-ROUTED TO MONITOR - STEAM : TWO BOILER STACKS TO BE RE-POSITIONED. STEAM PIPE (WESTERN WALL) TO BE RE-POSITIONED
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
1.2 Mechanical & HVAC Installation (continue)
VENTILATION : EXISTING FRESH AIR SUPPLY UNITS WEATHER LOUVER - EXISTING AIR DISTRIBUTION DUCT TO BE ADJUSTED – COOKER AREA - ADDITIONAL FRESH AIR SUPPLY UNIT TO BE INSTALLED – CRUMBS PLANT - EXISTING MECHANICAL ROOF VENTILATORS WILL BE REPLACED BY PRESSURE RELIEF DAMPERS (HOT PROCESS AREAS) - REPAIR / TIDYING OF EXISTING MECHANICAL SERVICES ON CABLE RACKS / WALLS (THOUGHOUT NEW BUILDING FACILITY)
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
1.3 Fire Sprinkler Installation
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
1.3 Fire Sprinkler Installation (continue)
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
2. COMPLETION DATES OF THE WORKS
TENDER CLOSING DATE : 15 MARCH 2010TENDER EVALUATION : 16 – 18 MARCH 2010REVISED PROJECT COST ESTIMATE : 26 MARCH 2010 PRESENTATION TO KELLOGG’S : ??ANTICIPATED COMMENCEMENT DATE (Site Handover) : ?? 1 JUNE 2010TIME OF COMPLETION OF THE WORKS : ??COMPLETION DATES FOR SECTIONS OF WORKS- Electrical Installation :- Mechanical & HVAC Installation :- Fire Sprinkler Installation :
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
3. BID DOCUMENT
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
3.1 Instruction to Bidders
Employer : Kellogg’s
Fix price contract :
Bid validity period : 60 days
Bid security amount : Nil
Employer’s address for bid submission : Greene Consulting Engineers (Pty) LtdBondev Office Park, Block Dcorner Willem Botha Str & Wierda RoadEldoraigne
Bid closing date : 15 March 2010 at ???
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
3.2 General Conditions of Contract
FIDIC – General Conditions of Contract for Construction for Building and Engineering Works
(First Edition 1999 as published by the International Federation of Consulting Engineers)
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
3.3 Particular Conditions of Contract
Sub-Clause 2.2 : Permits, Licences or Approvals
Sub-Clause 4.20 : No equipment of the Employer will be available on Site
Sub-Clause 6.1 : “The Contractor shall not recruit labour from any other Contractor, Subcontractor, the Employer (AdX) or any other company operating on the site, without the approval of Engineer
Information on the recruitment of local labour will be made available by Mr ??
Sub-Clause 6.2 : The Contractor shall pay the same rates of wages and observe
the same conditions of labour as ADX ( List of wage rates will be attached to pre-bid meeting’s minutes)
Sub-Clause 6.7.1 : Health and Safety – Government and Local Laws and Regulations pertaining to Health and Safety to the Work, including without limitation, the requirements of the South African Occupational Health and Safety Act No.85, 1993
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
3.4 Project Specifications (Portion 1)
PS 2 : Site Description & Access :
PS 5 : Site Facilities Available : Water - 3 to 5 bar Electricity - 400V AC
(Available free of charge, approximately 150m of Works)
: Sewage - Chemical toilets: Telephone & Fax – Contractor to arrange own facilities
PS 7 : Features requiring special attention : Safety Health and Environmental Aspects
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
3.4 Project Specifications (Portion 1) continue
PS 3.3 : Testing & Quality Control : Contractor shall engage the services of an approved independent laboratory to undertake all
testing of materials
PS 7.4 : Subcontractors : All matters pertaining to subcontractors shall be dealt with directly between Engineer and
Contractor
PS 20 : Applicable Standardized Specifications : SABS / SANS
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
3.5 Form of Tender
Section 7 : Forms 7.1 to 7.17 - All forms MUST be completed and submitted with bid documentation
FORM 7.2 – APPENDIX TO TENDER
Employer : Kellogg’s
Engineer : Greene Consulting Engineers (Pty) Ltd
Time of Completion : ??(Completion dates for each section of the Works)
Performance Security : 10% of Accepted Contract Amount (South African Rand)
Delay damages : 0.14% of Accepted Contract Amount for each sectionMaximum amount for delays – 10% of Contract Price
Total Advance payment : 10% of Accepted Contract Amount excluding Prov Sums
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
3.5 Form of Tender (continue)
Retention : 10% to a limit of 5% of the Accepted Contract Amount
Maximum amount of deductibles of Employers’ risk (Sub-Clause 18.2d)
The Employer will provide Professional Indemnity insurance of R50m with a first deductible of a R1m in aggregate. The Employer will provide Contract Insurance cover in joint names of the Employer and Contractor. The Contractor shall be responsible for the first deductibles for claims which initiates as follows:- Fire, explosion, testing and commissioning : R500 000- Storm and other perils : R250 000- Any other loss : R100 000- Public liability : R100 000
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
3.6 Annexure A – Safety, Health and Environmental Specification (SHE) & Huley Rules
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
4. INDUCTION SESSION
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
5. SITE VISIT
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
6. QUESTION & ANSWER SESSION
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
7. SIGNING OF SITE INSPECTION CERTIFICATE (FORM 7.8)
Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project
8. CLOSURE