SECTION 18
CONCEPT AND PROPOSAL SKETCHES
RTA Structural Drafting Proposal Sketches and Detailing Manual
18 CONCEPT AND PROPOSAL SKETCHES 18.1 GENERAL
A Bridge Design Proposal is comprised of RTA Form No 62 “Bridge Design Proposal” and a Proposal Sketch.
A Proposal Sketch is a plan or set of plans prepared to depict what is considered to be the most appropriate type of structure for the site under consideration and shows the location, details of the site, the type of construction and the major dimensions of the proposed bridge.
18.2 CONCEPT SKETCHES
A Concept Sketch is a design development sketch used to assist both design staff and the client with the choice of the most appropriate type of structure for the site under consideration. Concept Sketch development is often used to trial multiple options or alternatives for the proposed bridge site in order that client input and feedback may be obtained prior to the selection of the preferred option. Options may include various horizontal and vertical alignments as well as superstructure types, bridge lengths, bridge widths and locations. The information to be shown on Concept Sketches is similar to that shown for Proposal Sketches as outlined below, however, in most instances, the information shown is less refined than that for a Proposal Sketch.
A typical Concept Sketch is shown in Figures 18.2.1A and 18.2.1B.
Concept sketches submitted by the tenderer on design and construct and similar contracts should be of a similar standard.
18.3 REGISTRATION AND NUMBERING
When prepared by the Authority’s Bridge Engineering Section, all Concept Sketches and Proposal Sketches, shall be registered as sketches and numbered in accordance with Section 3 of this Manual.
18.4 INFORMATION TO BE SHOWN ON PROPOSAL SKETCHES The following information shall be shown on Proposal Sketches. Plan View Elevation Typical Cross Section Locality Plan Site Plan Vertical Alignment Diagram (if applicable) Horizontal Alignment Diagram (if applicable) General Notes Title Block
The information to be shown (where relevant) is as stated below. Where the information to be shown is not available at the time that the Proposal Sketch is prepared, it shall be requested from the relevant Client’s office.
OTB005 Issue 1 – Revision 1 (16 May 2008) Page 1 of 6
RTA Structural Drafting Proposal Sketches and Detailing Manual
A typical Proposal Sketch is shown in Figures 18.4.1(a) and 18.4.1(b).
18.4.1 Plan View
- An outline of the structure - The watercourse, railway line or road under the structure - Any existing structure (if applicable) including the RL of the existing deck - The location of any public utilities - The Base centreline or Control Line and Carriageway centreline as appropriate - Chainages on the Base centreline or Control Line at the ends of deck and at each
pier centreline together with the RL at each location - The bearing or radius of the Base centreline or Control Line as appropriate - The outline of concrete safety barriers, footways and railings as appropriate - Joints in the deck surface represented by a single heavy line - The position of name plates - The outlines of the structural elements ie abutments, piers, piles, footings and
columns etc where the scale of the sketch permits - Horizontal clearances as appropriate - The location of any minimum vertical clearance referenced from the Elevation - Contours of the existing surface - Shapes and slopes of any embankments - Extent of any embankment protection required - Extent of any channel excavation required - The direction of flow of the watercourse or conventional tidal representation - The compass direction of True North indicated by a suitable north point - The outline of parapet extensions, approach slabs and steel safety barrier in the approaches - For bridges over other roads, the Easting and Northing of the intersection point of
the centrelines (or Control Lines) or chainages on centrelines (or Control Lines) as appropriate
18.4.2 Elevation
- The outline of the elevation face of the structure projected from the Plan view showing foundation type, abutments, piers, superstructure and railings.
- The overall length of deck The number and length of spans - The grade on the deck (represented by an arrow and % sign) or the reduced level of the deck as appropriate - The normal water level or stream condition ie normally dry etc - Mean High Water Springs and Mean Low Water Springs for tidal waters - Navigational clearances above Mean High Water Springs for navigable waterways - High flood level both calculated (ie the 1 in 100 year ARI and the 1in 2000 year
ARI) and reported with a date for the reported high flood level - Minimum vertical and horizontal clearances for structures over roads and/or railways
including the approximate design surface level of any road or railway line under the structure at the Base centreline
- Vertical and horizontal clearances for opening span bridges both open and closed - The existing surface on the Base centreline projected from contour levels - Proposed cross section for channel excavation
Form and extent of any embankments and any required embankment protection whether above or below the existing Natural Surface
- Concrete Safety Barrier extensions, approach slabs and approach steel safety barrier - Contract levels of foundation elements - Bearing types represented by the letters 'F' for fixed, R for restrained and 'E' for
expansion
OTB005 Issue 1 – Revision 1 (16 May 2008) Page 2 of 6
RTA Structural Drafting Proposal Sketches and Detailing Manual
- Joints in the superstructure represented by a single heavy line. Expansion (moveable) joints should be labelled “EJ”
- Chainages, existing surface levels and design surface levels at the ends of deck and at each pier on the Base centreline or Control Line, given in a Datum block below the Elevation
- Datum Level-usually to Australian Height Datum however an assumed local datum may be used
- Structure location with respect to nearest major towns ie FROM / TO 18.4.3 Typical Cross Section
- General form of the piers or abutments including foundation elements - Outline of the superstructure elements - Overall width of the superstructure - Width between concrete safety barriers - Widths of concrete safety barriers and/or footways - Clear width of footways - Railing type or types, as appropriate - Safety Screens and noise walls, as appropriate - Railway safety screens as appropriate - Base centreline, Control Line and/or Carriageway centreline - Crossfall or superelevation represented by an arrow and % sign - Type and thickness of wearing surface - Indication of orientation with respect to stream flow or compass point
ie UPSTREAM or DOWNSTREAM, NORTH or SOUTH - Roadway lighting, as appropriate
18.4.4 Skew Diagram The Skew Diagram shall be in the following format:
- A right angle triangle with the base parallel to the setting out line or base centreline, the hypotenuse parallel to the abutment and pier centrelines and with the skew angle designated at the apex of the triangle.
The Skew Diagram shall contain the following information:
- A dimension for the vertical side of the triangle (normally 10 000). A dimension for the base and hypotenuse of the triangle calculated from the vertical dimension and the skew angle.
See Figure 21.5 for an example of the correct representation of a Skew Diagram. 18.4.5 Vertical Alignment Diagram
- The length of the vertical curve - The grade on the road at each end of the vertical curve - The chainage and reduced level at each end of the vertical curve - The chainage and reduced level of the intersection point of the approach grades on
the Control Line or Base centreline - The chainage and reduced level at each end of the bridge together with a heavy line
to represent the bridge location
OTB005 Issue 1 – Revision 1 (16 May 2008) Page 3 of 6
RTA Structural Drafting Proposal Sketches and Detailing Manual
18.4.6 Site Plan
- Control Line or Base centreline, including the position of any Tangent Points etc - The position and chainage of each end of the bridge - The existing bridge (if applicable) including the RL of the existing deck - Survey Marks and Bench Marks (including RL) obtained from Road Design plans or
the RTA’s Survey Services Section - Road boundaries - The location of any existing public utilities - The location and description of any nearby features which are likely to affect the
construction of the new bridge - A suitable Northpoint
18.4.7 Locality Plan - Bridge Site
- Major nearby towns referenced in the Elevation (if appropriate) - State Highways and Main Roads (as applicable) - State Borders (as applicable) - Railway lines (as applicable) - Rivers and creeks (as applicable)
18.4.8 General Notes
The General Notes on the Proposal Sketch shall be in the format shown for General Arrangement Drawings on the current issue of RTA Standard Bridge Drawing No RTAB029 with the blank spaces being filled in with the appropriate information.
18.4.9 Title Block
- Road type and number eg Main Road No 246, Highway No 10, Freeway No F3, Motorway No M5
- Local Government Area name eg Shire of Byron, City of Greater Taree See Clause 4.5 of this Manual - Council names shall not be used
- Sketch number - Title and location of the bridge - Sheet number and Issue
18.5 DRAWING CONVENTIONS
The preferred scales for use on Proposal Sketches are 1:1, 1:2, 1:2.5 and 1:5 or their decimal multiples represented in the format shown in Section 7 of this Manual. Views shall be drawn to a definable scale and shall be labelled appropriately. The Plan and Elevation shall be drawn to the same scale with the Elevation being projected from and directly above the Plan. Chainages shall increase from left to right in most applications, the only exception being where the Proposal is for a bridge widening. In the case of a bridge widening, the Proposal shall be prepared in accordance with Section 30 of this Manual. Abutments shall be labelled “Abutment A” (for the left hand end of the bridge – the end with the lowest chainage), and “Abutment B” (for the right hand end of the bridge – the end with the highest chainage ), the only exception being where the Proposal is for a bridge widening. In the case of a bridge widening, abutments shall be labelled in accordance with Section 30 of this Manual.
OTB005 Issue 1 – Revision 1 (16 May 2008) Page 4 of 6
RTA Structural Drafting Proposal Sketches and Detailing Manual
Spans and Piers shall be numbered ie “Span 1”, “Pier 1” as appropriate. Chainages and Reduced Levels shall be given to the nearest 0.001m. Contract levels shall be given to the nearest 0.1m. Existing surface levels shall be given to the nearest 0.1m
Arrows that denote the grade of the deck, crossfall or superelevation shall always point in a downward direction (from the higher end/side to the lower end/side)
18.6 ORIENTATION 18.6.1 LOCALITY PLAN
The Locality Plan shall be orientated with the cardinal directions of the compass square to the borders of the sheet, with North being at the top.
18.6.2 PLAN AND SITE PLAN
The Plan and Site Plan shall be orientated in the same direction for convenient reference. 18.7 ISSUE OF PRELIMINARY SKETCHES
Where prepared by the RTA’s Bridge Engineering Section, any Concept or Proposal Sketch that has not been formally approved and is issued to any party for the purpose of checking, comment or review, shall be marked to clearly show the stage of development of the sketch. This shall be shown as percentage complete and it shall be placed beside the words Issue Status in the title block, a typical description being 75% COMPLETE. Sketches that are in the development stage shall have a numerical character shown in the Issue box in the bottom right hand corner of the title block. The first issue of the sketch for the purpose of checking shall be denoted Issue 0. When Issue 0 is amended it shall become Issue 1 and this number shall be updated with each successive issue of the sketch.
18.8 SUBMISSION OF PROPOSAL SKETCHES FOR APPROVAL BY CLIENT
Proposal Sketches that are to be submitted to the client for approval shall have Issue A recorded in the appropriate position in the title block and the words “FOR APPROVAL” entered into the space provided beside the words Issue Status in the title block.
18.9 AMENDMENTS TO APPROVED PROPOSALS
Approved Proposal Sketches may only be amended in accordance with Clause 15.4 of this Manual. Where significant changes to an approved Proposal Sketch are required, eg span lengths, structure width, superstructure type etc, a new Proposal Sketch shall be prepared with the new Proposal Sketch containing a reference to the superseded Proposal Sketch.
18.10 PREPARATION OF SKETCHES FOR HERITAGE ISSUE CONSIDERATION Where sketches are prepared for rehabilitation work on existing bridges that are to be submitted to the client and the Heritage Office for consideration, the structure shall be shown in its existing condition and the convention of showing existing work in “existing” line style (double dashed chain line) is not required.
OTB005 Issue 1 – Revision 1 (16 May 2008) Page 5 of 6
RTA Structural Drafting Proposal Sketches and Detailing Manual
In the case of plans, part plans, elevations, part elevations, sections and part sections, a view of the structure in its existing condition shall be shown directly above (or beside as appropriate) the structure in its proposed condition following the required rehabilitation works so that direct comparison can be readily made. In order to satisfactorily illustrate the proposed changes to the existing structure, only those elements to be replaced need be shown in normal line intensity. Existing elements that will remain shall be shown in lines with reduced intensity or in grey scale. As the sketches do not show strict engineering details, an architectural presentation style may be adopted. Figures 18.10.1 – 18.10.5 show a typical example of a suite of sketches prepared for heritage issue consideration in rehabilitation works.
OTB005 Issue 1 – Revision 1 (16 May 2008) Page 6 of 6
UB
D D
irecto
ry u
nd
er
Lic
en
ce t
o R
TA
by
Sen
sis
Pty
Ltd
LOCALITY PLAN
THE BRIDGE SITE IS APPROXIMATELY
km BY ROAD FROM SYDNEY174
BRIDGE SITE
GENERAL NOTES0 10 20 30m
510
1 0
CONCEPT SKETCH OPTION 1 - SHEET A
FIGURE 18.2.1(a)
SCALES
DIMENSIONS ARE IN MILLIMETRES.
CHAINAGES AND REDUCED LEVELS ARE IN METRES.
REDUCED LEVELS ARE RELATED TO AUSTRALIAN HEIGHT DATUM
TP DENOTES TANGENT POINT.
CL DENOTES CONTRACT LEVEL.
E DENOTES EXPANSION BEARING.
F DENOTES FIXED BEARING.
R DENOTES RESTRAINED BEARING.
EJ DENOTES EXPANSION JOINT.
CONCRETE BRIDGE DECK WATERPROOFING MEMBRANE SHALL
CONFORM TO RTA SPECIFICATION B344 OR BPC2005/02.
WATERPROOFING MEMBRANE SHALL BE OVERLAYED WITH 75mm
THICK ASPHALT. PRELIMINARY
PREPARED CHECKED
DESIGN
DRAWING
MANAGER, BRIDGE DESIGN PROJECTS
ISSUE DATE REVISION PREP AUTH
ROADS AND TRAFFIC AUTHORITY OF NSW
CHECK
TH
IS D
RA
WIN
G I
S C
ON
FID
EN
TIA
L A
ND
SH
AL
L O
NL
Y B
E U
SE
D F
OR
TH
E P
UR
PO
SE
OF
TH
E N
OM
INA
TE
D P
RO
JEC
T.
BRIDGE OVER HUNTER RIVER
SKETCH No
SHEET No
ISSUE STATUS:
RTA BRIDGE NUMBER
ISSUE
CAD No KP2F1821A.dgn
MAIN ROAD No 101 CITY OF MAITLAND
AT 2.1km NORTH OF EAST MAITLAND
PREPARED BY
BRIDGE ENGINEERING
110 GEORGE STREET
PARRAMATTA NSW 2150
PHONE (02) 8837-0802
FACSIMILE (02) 8837-0055
CLIENT
HUNTER REGION MAJOR PROJECTS
47 DARBY STREET NEWCASTLE
PO BOX 489 NEWCASTLE NSW 2300
PHONE (02) 4924-0289
FACSIMILE (02) 4929-5271
KD803CS1
HU
NT
ER
RIV
ER
585.000
APPROACH SLAB
1.5 TO 1
2 T
O 1
2 T
O 1
APPROACH SLAB
STEEL SAFETY
BARRIER THRIE BEAM
2 T
O 1
2 T
O 1
1.5 TO
1
1.5
TO
1
35 000 35 000 35 000 35 000 35 000 35 000 35 000 35 000 35 000 35 000
TO DUNGOG
SPAN 1 SPAN 2 SPAN 3 SPAN 4 SPAN 5 SPAN 6 SPAN 7 SPAN 8 SPAN 9 SPAN 10
6 000
APPROACH SLAB
6 000
APPROACH SLAB
12
.60
0
13.1
50
13
.58
0
13
.88
6
14.0
70
14
.13
1
14.0
70
13
.88
6
13
.58
0
13.1
51
12
.60
0
37
5.0
00
1km
41
0.0
00
445.0
00
480.0
00
51
5.0
00
58
5.0
00
62
0.0
00
65
5.0
00
55
0.0
00
72
5.0
00
RL 12.600
RL 13.150
RL 13.580RL 13.886 RL 14.070
RL 14.131
RL 14.070
RL 13.886
RL 13.580
RL 13.151
RL 12.600
FROM PITNACREE
R1 3
00 0
00
CONTROL LINE MC
END OF DECK
ABUTMENT B
1.5
TO
17.6
7.4
6.0
4.6
2.4
0.6
7.8
7.6
7.0
DATUM RL -20.000
69
0.0
00
END OF DECK
ABUTMENT A
E E E E E F E E E E E
MHWS RL 0.52
MLWS RL -0.13
CALCULATED 1:100
YEAR HFL RL 9.630
ELEVATION
PLAN
1
2
1
2
2
2
2
2
NAME PLATE
ON WING WALL
NAME PLATE
ON WING WALL
CH 375.000
CH 410.000
CH 445.000CH 480.000 CH 515.000
CH 550.000
CH 620.000
CH 655.000
CH 690.000
CH 725.000
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.0
6.5
6.0
5.5
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
0.0
-0.0
-1.0
-1.5
-1.5
-1.0
-0.5
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
7.5
7.0
6.5
6.5
7.0
7.5
8.0
8.5
9.0
8.0
7.5
7.0
6.5
6.0
5.5
5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
0.0
-0.5
-1.0
-1.0
-0.5
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
6.5
6.5
5.5
6.0
6.5
7.0
7.5
8.0
8.0
7.5
7.5
8.0
8.0
8.0
5.0
9.0
9.0
9.0
8.5
8.0
7.5
7.0
6.5
TB
TB
TB
TB
TB
TB
TB
TB
TB
TITLE BOUNDARY
¶ O
F P
IER
1
¶ O
F P
IER
2
¶ O
F P
IER
3
¶ O
F P
IER
4
¶ O
F P
IER
5
¶ O
F P
IER
6
¶ O
F P
IER
7
¶ O
F P
IER
8
¶ O
F P
IER
9
-0.3
-1.2
DESIGN SURFACE
LEVELS ON
CONTROL LINE MC
EXISTING SURFACE
LEVELS ON
CONTROL LINE MC
CHAINAGE ON
CONTROL LINE MC
OVERALL LENGTH OF DECK ALONG CONTROL LINE MC = 350 000
EJ EJ
2 0
GENERAL NOTES
SCALE
FOR OTHER GENERAL NOTES RELATING TO THIS DRAWING, SEE SHEET No 1
0
5001 000
1 000 2 000 3 000mm
CONCEPT SKETCH OPTION 1 - SHEET B
FIGURE 18.2.1(b)
PRELIMINARY
PREPARED CHECKED
DESIGN
DRAWING
MANAGER, BRIDGE DESIGN PROJECTS
ISSUE DATE REVISION PREP AUTH
ROADS AND TRAFFIC AUTHORITY OF NSW
CHECK
TH
IS D
RA
WIN
G I
S C
ON
FID
EN
TIA
L A
ND
SH
AL
L O
NL
Y B
E U
SE
D F
OR
TH
E P
UR
PO
SE
OF
TH
E N
OM
INA
TE
D P
RO
JEC
T.
MAIN ROAD No 101 CITY OF MAITLAND
BRIDGE OVER HUNTER RIVER
AT 2.1km NORTH OF EAST MAITLAND
SKETCH No
SHEET No
ISSUE STATUS:
RTA BRIDGE NUMBER
ISSUE
CAD No KP2F1821B.dgn
KD803CS1
PREPARED BY
BRIDGE ENGINEERING
110 GEORGE STREET
PARRAMATTA NSW 2150
PHONE (02) 8837-0802
FACSIMILE (02) 8837-0055
CLIENT
HUNTER REGION MAJOR PROJECTS
47 DARBY STREET NEWCASTLE
PO BOX 489 NEWCASTLE NSW 2300
PHONE (02) 4924-0289
FACSIMILE (02) 4929-5271
610610
200 000 200 000
CH
1 3
50
.00
0
RL
12.1
31
CH
1 7
50
.00
0
RL
12.1
31
AB
UT
ME
NT
A
CH
1 3
75
.00
0
RL
12
.60
0
AB
UT
ME
NT
B
CH
1 7
25
.00
0
RL
12
.60
0
CH 1 550.000
RL 16.131
2.00% -2.00%
VERTICAL ALIGNMENT
NOT TO SCALE
LENGTH OF VC = 400 000
SECTION 1
1
UPSTREAM DOWNSTREAM
3%3%
DESIGN SURFACE
LEVEL
1800 DEEP
SUPER T GIRDERS
12 220
NOT TO SCALE
FROM PITNACREE TO DUNGOG
TP CH 1751.321
ABUTMENT B
CH 1725.000
CONTROL LINE MC
ABUTMENT A
CH 1375.000
TP CH 1364.682
SITE PLANH
UN
TE
R R
IVE
R
1780.0
00
1760.0
00
1740.0
00
1720.0
00
1700.0
00
1680.0
00
1660.0
00
1640.0
00
1620.0
00
1600.0
00
1580.0
00
1560.0
00
1540.0
00
1520.0
00
1500.0
00
1480.0
00
14
60
.00
0
1440.0
00
1420.0
00
1400.0
00
1380.0
00
1360.0
00
1320.0
00
1340.0
00
CONTROL LINE MC
2 000
SHOULDER
3 500
TRAVEL LANE
3 500
TRAVEL LANE
2 000
SHOULDER
610
MHWS RL 0.52
MLWS RL -0.13
3%3%
REGULAR PERFORMANCE
LEVEL TRAFFIC BARRIER
610610
SECTION 2
1
UPSTREAM DOWNSTREAM
3%3%
DESIGN SURFACE
LEVEL
1800 DEEP
SUPER T GIRDERS
12 220
CONTROL LINE MC
2 000
SHOULDER
3 500
TRAVEL LANE
3 500
TRAVEL LANE
2 000
SHOULDER
610
3%3%
REGULAR PERFORMANCE
LEVEL TRAFFIC BARRIER
1 0
00
TY
P
RL -0.25
1 0
00
TY
P
EXISTING SURFACE LEVEL
75 THICK
ASPHALT
75 THICK
ASPHALT
NEW SURFACE LEVEL AFTER POSSIBLE PERMANENT SCOUR
CAST-IN-PLACE CONCRETE
CLADDING TO EXTEND DOWN
IN THE EVENT OF PERMANENT
SCOUR
RADIALRADIAL
·1 500 PERMANENTLY
CASED CAST-IN-PLACE
PILE FOUNDED ON ROCK - TYP
·1 500 PERMANENTLY
CASED CAST-IN-PLACE
PILE FOUNDED ON ROCK - TYP
-0.5
00
5.0
00
SCALE OR AS SHOWN.
GENERAL NOTES
PLAN������
0 10m8642
12
1
2
1
2
BRIDGE SITE
LOCALITY PLAN
NOT TO SCALE
THE BRIDGE SITE IS APPROXIMATELY
70km BY ROAD FROM SYDNEY
MAJOR TRANSMISSION LINES
AND POWER POLES
TELEPHONE SINGLE
CONCRETE PIT
INVERT OR OBVERT OF PIPE
FENCE LINE
EXISTING ROADS
TREES
SEWER MAIN
MAJOR TRANSMISSION LINES
TELEPHONE LINE
WATER MAIN
FIBRE OPTIC CABLE
GAS MAIN
FIGURE 18.4.1(a)
PREPARED BY
BRIDGE ENGINEERING
110 GEORGE STREET
PARRAMATTA NSW 2150
PHONE (02) 8837-0802
FACSIMILE (02) 8837-0055
HIGHWAY No 1 CITY OF WOLLONGONG
BRIDGE No 2 OVER WOODLANDS CREEK
AND MAIN ROAD No 185 ACCESS RAMPS
AT BULLI PASS INTERCHANGE
PROPOSAL SKETCH - SHEET A
1 0
PRELIMINARY
CAD No KP2F1841(a).dgn
KD554PS
CLIENT
SOUTHERN REGIONAL OFFICE
90 CROWN STREET WOLLONGONG
PO BOX 477 WOLLONGONG NSW 2500
PHONE (02) 4221-2460
FACSIMILE (02) 4221-2777
DENOTES LOCATION OF
MINIMUM VERTICAL CLEARANCE
DIMENSIONS ARE IN MILLIMETRES.
CHAINAGES AND REDUCED LEVELS ARE IN METRES.
REDUCED LEVELS ARE RELATED TO AUSTRALIAN HEIGHT DATUM.
LEGEND
CH 214.590
RL 26.003
CH 259.620
RL 27.027
FENCES
FENCE
FENCE
CH 302.100
RL 27.387
CO NT ROL LIN E M C00
UNDERGROUND
STORMWATER PIPES
50
6 050
DESIGN SURFACE LEVEL ON
APPROX EXISTING SURFACE
LEVEL ON
CHAINAGE ON
45 020 42 480
MR 185 ACCESS RAMP
WOODLANDS CREEK
MIN CLEARANCE REQUIRED = 5 300
MIN CLEARANCE PROVIDED = 5 600
REINFORCED SOIL WALL
REINFORCED SOIL WALL
DATUM RL 5.000
ELEVATION
50
6 050
SPAN 1 SPAN 2
CONTROL LINE MC00
CONTROL LINE MC00
CONTROL LINE MC00
APPROXIMATE EXISTING
SURFACE LEVEL ON
CONTROL LINE MC00
OVERALL LENGTH OF DECK = 87 510
ALONG CONTROL LINE MC00 W BEAM TO THRIE BEAM
TRANSITION IN ACCORDANCE
WITH RTA DRAWING No
WD.R132.B04.A, TYP
APPROACH
SLAB
APPROACH
SLABSTEEL SAFETY BARRIER
(THRIE BEAM), TYP
DESIGN SURFACE LEVEL
ON CONTROL LINE MC00
SITE PLAN
MAJOR TRANSMISSION LINES
AND POWER POLES
MINOR TRANSMISSION LINES
MINOR
TRANSMISSION LINES
UNDERGROUND
STORM WATERTREE
MAJOR TRANSMISSION LINES
AND POWER POLES
BRIDGE No 2 OVER
WOODLANDS CREEK
AND MAIN ROAD
No 185 ACCESS RAMPS
BRIDGE No 3 OVER
WOODLANDS CREEK
BRIDGE No 4 OVER
WOODLANDS CREEK
BRIDGE No 1 OVER
WOODLANDS CREEK
TELEPHONE SINGLE
CONCRETE PIT
TELEPHONE TWIN
CONCRETE PIT
TELEPHONE
SINGLE
CONCRETE PIT
TELEPHONE TWIN
CONCRETE PIT
SCALE OR AS SHOWN.
GENERAL NOTES
FOR OTHER GENERAL NOTES RELATING TO THIS SHEET SEE SHEET No 1
0 10 20 30m
510
INVERT OR OBVERT OF PIPE
FENCE LINE
EXISTING ROADS
TREES
SEWER MAIN
MAJOR TRANSMISSION LINES
TELEPHONE LINE
WATER MAIN
FIBRE OPTIC CABLE
GAS MAIN
PREPARED BY
BRIDGE ENGINEERING
110 GEORGE STREET
PARRAMATTA NSW 2150
PHONE (02) 8837-0802
FACSIMILE (02) 8837-0055
FIGURE 18.4.1(b)
HIGHWAY No 1 CITY OF WOLLONGONG
BRIDGE No 2 OVER WOODLANDS CREEK
AND MAIN ROAD No 185 ACCESS RAMPS
AT BULLI PASS INTERCHANGE
PROPOSAL SKETCH - SHEET B
KD554PS
2 0
PRELIMINARY
CAD No KP2F1841(b).dgn
CLIENT
SOUTHERN REGIONAL OFFICE
90 CROWN STREET WOLLONGONG
PO BOX 477 WOLLONGONG NSW 2500
PHONE (02) 4221-2460
FACSIMILE (02) 4221-2777
DOWNSTREAM UPSTREAM
·100 UPVC PIPE
CONTROL LINE MC00
75 THICK ASPHALT
SECTION 1
1
6 900 11 300525 525
19 250
RADIAL
APPROXIMATE EXISTING
SURFACE LEVEL
MEDIUM LEVEL
BARRIER
·1200 CAST-IN PLACE
PILES
MR 185 LAWRENCE
HARGRAVE DRIVE
50 000
LENGTH OF
VERTICAL CURVE
NOT TO SCALE
VERTICAL CURVE DIAGRAM
1
GENERAL ARRANGEMENT - EXISTING BRIDGE
GENERAL NOTES
0 10m8642
12
DIMENSIONS ARE IN MILLIMETRES.
FIGURE 18.10.1(a)
SCALE OR AS SHOWN.
14
/08
/20
07
K:\
Bri
dg
e\U
sers
\Ian
\SD
MA
NU
AL
-MA
ST
ER
\20
06
SK
ET
CH
ES
\KP
2F
18
10
A.d
gn
9:5
9:5
4 A
M
PREPARED CHECKED
DESIGN
DRAWING
ISSUE DATE REVISION PREP AUTH
ROADS AND TRAFFIC AUTHORITY OF NSW
CHECK
TH
IS D
RA
WIN
G I
S C
ON
FID
EN
TIA
L A
ND
SH
AL
L O
NL
Y B
E U
SE
D F
OR
TH
E P
UR
PO
SE
OF
TH
E N
OM
INA
TE
D P
RO
JEC
T.
PREPARED BY
BRIDGE ENGINEERING
110 GEORGE STREET
PARRAMATTA NSW 2150
PHONE (02) 8837-0855
FACSIMILE (02) 8837-0055
MAIN ROAD No 181 CITY OF HAWKESBURY
CAD No KP2F1810A.dgn
SHEET No
ISSUE STATUS:
RTA BRIDGE NUMBER
KA567
ISSUE
CLIENT
SYDNEY ASSET MANAGEMENT
85 FLUSHCOMBE ROAD BLACKTOWN
PO BOX 558 BLACKTOWN NSW 2148
PHONE (02) 8814-2939
FACSIMILE (02) 8814-2123
BRIDGE OVER MACDONALD RIVER
AT ST ALBANS
SKETCH No
PRELIMINARY
413
MANAGER, BRIDGE REHABILITATION PROJECTS
HERITAGE CONCEPT SKETCH
FROM ST ALBANS TO WISEMANS FERRY
SPAN 1 SPAN 2 SPAN 3
SPAN 4 SPAN 5
SPAN 6
1
5
1
5
2
5
2
5
3
5
3
5
4
6
4
6
5
9
5
9
6
7
6
7
7
8
7
8
8
9
8
9
9
10
9
10
10
10
10
10
pier 1
cen
trelin
e
pier 2
cen
trelin
e
pier 4
cen
trelin
e
pier 5
cen
trelin
e
ab
utm
en
t b
cen
trelin
e
abutm
ent a
cen
trelin
e
top of deck
9 144 10 668 10 668 36 023 36 023 9 848
bridge centreline
pier 3
cen
trelin
e
ELEVATION as existing
plan as existing
for details of proposed
changes to spans 1, 2 and 3
see sheet no 2
for details of proposed
changes to spans 4 and 5
see sheet no 3for details of proposed
changes to span 6
see sheet no 4
0
5001 000
1 000 2 000 3 000mm
2
GENERAL ARRANGEMENT - SPANS 1, 2 AND 3
FIGURE 18.10(b)
GENERAL NOTES
SCALE OR AS SHOWN.
FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 1.
14
/08
/20
07
K:\
Bri
dg
e\U
sers
\Ian
\SD
MA
NU
AL
-MA
ST
ER
\20
06
SK
ET
CH
ES
\KP
2F
18
10
B.d
gn
10
:11
:10
AM
PREPARED CHECKED
DESIGN
DRAWING
ISSUE DATE REVISION PREP AUTH
ROADS AND TRAFFIC AUTHORITY OF NSW
CHECK
TH
IS D
RA
WIN
G I
S C
ON
FID
EN
TIA
L A
ND
SH
AL
L O
NL
Y B
E U
SE
D F
OR
TH
E P
UR
PO
SE
OF
TH
E N
OM
INA
TE
D P
RO
JEC
T.
PREPARED BY
BRIDGE ENGINEERING
110 GEORGE STREET
PARRAMATTA NSW 2150
PHONE (02) 8837-0855
FACSIMILE (02) 8837-0055
MAIN ROAD No 181 CITY OF HAWKESBURY
CAD No KP2F1810B.dgn
SHEET No
ISSUE STATUS:
RTA BRIDGE NUMBER
KA567
ISSUE
CLIENT
SYDNEY ASSET MANAGEMENT
85 FLUSHCOMBE ROAD BLACKTOWN
PO BOX 558 BLACKTOWN NSW 2148
PHONE (02) 8814-2939
FACSIMILE (02) 8814-2123
BRIDGE OVER MACDONALD RIVER
AT ST ALBANS
SKETCH No
PRELIMINARY
413
MANAGER, BRIDGE REHABILITATION PROJECTS
HERITAGE CONCEPT SKETCH
SPAN 1 SPAN 2 SPAN 3
SPAN 1 SPAN 2 SPAN 3
remove existing
timber headstocks remove existing
timber beams
over spans 1, 2 and 3
remove existing concrete
abutment
cut back existing
timber piles below
ground level
cut back existing
timber piles below
ground level
remove existing
timber pier
remove existing
timber pier
new steel piles
and concrete
pilecap
new steel piles
and concrete
abutment
new composite concrete
and timber deck over
spans 1, 2 and 3
approx existing
surface level
approx existing
surface level
1
5
1
5
2
5
2
5
3
5
3
5
1
5
1
5
3
5
3
5
elevation showing existing
elevation showing proposed
existing stone
facing to be
maintained
existing stone
facing to be
maintained
top of deck
top of deck
10 478 10 668
10 668
10 712
2
5
2
5
new timber
TRESTLE pier
new timber
TRESTLE pier
remove existing guardRAIL
and posts
new steel guardRAILS
and posts
remove existing stress
laminated timber deck
over spans 1, 2 and 3
0
5001 000
1 000 2 000 3 000mm
3
GENERAL ARRANGEMENT - TYPICAL TRUSS
FIGURE 18.10(c)
GENERAL NOTES
SCALE OR AS SHOWN.
FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 1.
14
/08
/20
07
K:\
Bri
dg
e\U
sers
\Ian
\SD
MA
NU
AL
-MA
ST
ER
\20
06
SK
ET
CH
ES
\KP
2F
18
10
C.d
gn
10
:29
:29
AM
PREPARED CHECKED
DESIGN
DRAWING
ISSUE DATE REVISION PREP AUTH
ROADS AND TRAFFIC AUTHORITY OF NSW
CHECK
TH
IS D
RA
WIN
G I
S C
ON
FID
EN
TIA
L A
ND
SH
AL
L O
NL
Y B
E U
SE
D F
OR
TH
E P
UR
PO
SE
OF
TH
E N
OM
INA
TE
D P
RO
JEC
T.
PREPARED BY
BRIDGE ENGINEERING
110 GEORGE STREET
PARRAMATTA NSW 2150
PHONE (02) 8837-0855
FACSIMILE (02) 8837-0055
MAIN ROAD No 181 CITY OF HAWKESBURY
CAD No KP2F1810C.dgn
SHEET No
ISSUE STATUS:
RTA BRIDGE NUMBER
KA567
ISSUE
CLIENT
SYDNEY ASSET MANAGEMENT
85 FLUSHCOMBE ROAD BLACKTOWN
PO BOX 558 BLACKTOWN NSW 2148
PHONE (02) 8814-2939
FACSIMILE (02) 8814-2123
BRIDGE OVER MACDONALD RIVER
AT ST ALBANS
SKETCH No
PRELIMINARY
413
MANAGER, BRIDGE REHABILITATION PROJECTS
HERITAGE CONCEPT SKETCH
TYPICAL TRUSS DETAILS
ELEVATION AS EXISTING
ELEVATION AS PROPOSED
remove existing splice
*typical*
remove existing sway braces
*typical*
provide extension to existing
cross girder as shown on sheet no 14
and add sway brace as shown on sheet no 12
provide extension to existing
cross girder as shown on sheet no 14
and add sway brace as shown on sheet no 12
new sway braces as detailed
on sheet no 12 *typical*
4
6
4
6
5
9
5
9
4
6
4
6
5
9
5
9
modify existing
anchor blocks
*typical*
modify existing
anchor blocks
*typical*
new splice as detailed
on sheet no 13 *typical*
A
11
C
11
E
13
D
11
B
11
0
5001 000
1 000 2 000 3 000mm
4
GENERAL ARRANGEMENT - SPAN 6
FIGURE 18.10(d)
GENERAL NOTES
SCALE OR AS SHOWN.
FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 1.
14
/08
/20
07
K:\
Bri
dg
e\U
sers
\Ian
\SD
MA
NU
AL
-MA
ST
ER
\20
06
SK
ET
CH
ES
\KP
2F
18
10
D.d
gn
10
:17
:06
AM
PREPARED CHECKED
DESIGN
DRAWING
ISSUE DATE REVISION PREP AUTH
ROADS AND TRAFFIC AUTHORITY OF NSW
CHECK
TH
IS D
RA
WIN
G I
S C
ON
FID
EN
TIA
L A
ND
SH
AL
L O
NL
Y B
E U
SE
D F
OR
TH
E P
UR
PO
SE
OF
TH
E N
OM
INA
TE
D P
RO
JEC
T.
PREPARED BY
BRIDGE ENGINEERING
110 GEORGE STREET
PARRAMATTA NSW 2150
PHONE (02) 8837-0855
FACSIMILE (02) 8837-0055
MAIN ROAD No 181 CITY OF HAWKESBURY
CAD No KP2F1810D.dgn
SHEET No
ISSUE STATUS:
RTA BRIDGE NUMBER
KA567
ISSUE
CLIENT
SYDNEY ASSET MANAGEMENT
85 FLUSHCOMBE ROAD BLACKTOWN
PO BOX 558 BLACKTOWN NSW 2148
PHONE (02) 8814-2939
FACSIMILE (02) 8814-2123
BRIDGE OVER MACDONALD RIVER
AT ST ALBANS
SKETCH No
PRELIMINARY
413
MANAGER, BRIDGE REHABILITATION PROJECTS
HERITAGE CONCEPT SKETCH
SPAN 6
existing stone facing
to be maintained
top of deck
SPAN 6
existing stone facing
to be maintained
elevation showing existing elevation showing proposed
remove existing stress
laminated timber deck
over span 6
remove existing
timber beams
over span 6
approx existing
surface level
approx existing
surface level
existing
timber pier
existing concrete
pilecap and piles
existing concrete
abutment
existing steel
piles
new composite concrete
and timber deck
8
9
8
9
8
9
8
9
CURTAIN WALL TO BE
EXTENDED TO TOP
OF DECK
REMOVE TIMBER
CAPPING
PIER 5 CENTRELINE PIER 5 CENTRELINE
remove existing guardRAIL
and posts
new steel guardRAIL
and posts
0
5001 000
1 000 2 000 3 000mm
5
GENERAL ARRANGEMENT - SECTIONS - SHEET A
FIGURE 18.10(e)
GENERAL NOTES
SCALE OR AS SHOWN.
FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 1.
14
/08
/20
07
K:\
Bri
dge\U
sers
\Ian\S
DM
AN
UA
L-M
AS
TE
R\2
006S
KE
TC
HE
S\K
P2F
1810E
.dgn
10
:52
:28
AM
PREPARED CHECKED
DESIGN
DRAWING
ISSUE DATE REVISION PREP AUTH
ROADS AND TRAFFIC AUTHORITY OF NSW
CHECK
TH
IS D
RA
WIN
G I
S C
ON
FID
EN
TIA
L A
ND
SH
AL
L O
NL
Y B
E U
SE
D F
OR
TH
E P
UR
PO
SE
OF
TH
E N
OM
INA
TE
D P
RO
JEC
T.
PREPARED BY
BRIDGE ENGINEERING
110 GEORGE STREET
PARRAMATTA NSW 2150
PHONE (02) 8837-0855
FACSIMILE (02) 8837-0055
MAIN ROAD No 181 CITY OF HAWKESBURY
CAD No KP2F1810E.dgn
SHEET No
ISSUE STATUS:
RTA BRIDGE NUMBER
KA567
ISSUE
CLIENT
SYDNEY ASSET MANAGEMENT
85 FLUSHCOMBE ROAD BLACKTOWN
PO BOX 558 BLACKTOWN NSW 2148
PHONE (02) 8814-2939
FACSIMILE (02) 8814-2123
BRIDGE OVER MACDONALD RIVER
AT ST ALBANS
SKETCH No
PRELIMINARY
413
MANAGER, BRIDGE REHABILITATION PROJECTS
HERITAGE CONCEPT SKETCH
rubble fill
timber piles
timber CAPWALES
TOP OF DECK
stress laminated
timber deck with
timber girders
AS EXISTING
stress laminated
timber deck with
timber girders
4 572
AS EXISTING
timber CAPWALES
stress laminated
timber deck with
timber girders
AS EXISTING
timber piles
AND BRACING
steel guardrails
and posts
steel guardrails
and posts
steel guardrails
and posts
TOP OF DECK
ground
level
ground
level
SECTION 2
2
AS PROPOSED
4 6984 698
AS PROPOSEDSECTION 1
2
SECTION 3
2
AS PROPOSED
composite concrete
deck with timber
girders
fall fall
composite concrete
deck with timber
girders
fall fall
ground
level
new timber
TRESTLE pier
steel piles
4 698
fall fall
rubble fill
ground
level
existing timber
piles to be cut
down to clear
new structure
steel piles
concrete abutment
existing stone
facing to be
maintained
SECTION 1
1-2
SECTION 3
1-2
SECTION 2
1-2
stone facing
new steel railings
and posts
new steel railings
and posts
new steel railings
and posts
abutment a pier 2
concrete pilecap