concrete cube testing template blank)
DESCRIPTION
Concrete cube test proceduresTRANSCRIPT
![Page 1: Concrete Cube Testing Template Blank)](https://reader035.vdocument.in/reader035/viewer/2022071708/55cf9e08550346d033b063c3/html5/thumbnails/1.jpg)
1 04/17/2023
SUMMARY OF CONCRETE CUBE TEST RESULTSContract Name:
Contract Ref:
Concrete Grade: C 35 Specified Strength
Client:
Pile No. Site Location Date Cast Comments
N/mm2
Request Sheet No.
Cube Set No.
Date Collected
Compressive Strength (N/mm2) after Characteristic Strength @
28 Days (N/mm2)7-13Days
14-27Days
28-42Days
28-42Days
43-55Days
56+Days
![Page 2: Concrete Cube Testing Template Blank)](https://reader035.vdocument.in/reader035/viewer/2022071708/55cf9e08550346d033b063c3/html5/thumbnails/2.jpg)
2 04/17/2023
Contract Name:
Contract Ref:
Concrete Grade: C 35 Specified Strength
Client:
Pile No. Site Location Date Cast Comments
N/mm2
Request Sheet No.
Cube Set No.
Date Collected
Compressive Strength (N/mm2) after Characteristic Strength @
28 Days (N/mm2)7-13Days
14-27Days
28-42Days
28-42Days
43-55Days
56+Days