CONCRETE WORKS
Lecture 13
TSP-308 MPK Ferdinand Fassa
Concrete works
bull Concrete is a man-made (rock) construction material which is a mixture of portland cement water aggregates and in some cases admixtures
bull The cement and water form a paste that hardens and bonds the aggregates together
bull Can be placed or molded into virtually any shape and reproduce any surface texture
bull Concrete is strong durable versatile and economical
Concrete works
bull Concrete will not warp or undergo change in dimensions
bull When properly designed and placed it is nearly impermeable and extremely resistant to corrosion
bull Has good resistance to natural and processing chemicals
bull Economical but requires significant quality control
Basic concrete works process
Batching
Proportioning
Mixing
Transporting
Placing
Compacting
Finishing
Curing Stripping Out CONCRETE in
PLACE
Batching
Proportioning
Mixing
Transporting
Placing
Compacting
Finishing
Curing Stripping Out CONCRETE in
PLACE
Batching
Proportioning
Mixing
Transporting
Placing
Wood Steel
Plastics Formworking
Compacting
Finishing
Curing Stripping Out CONCRETE in
PLACE
Reinforcement
Aggregates
Cement
Water
additive
The overall Quality of Finished Product depends on
bull Quality of raw material
bull Quality of handling material andor products
bull Quality of workmanship
PROBLEMS in CONCRETE WORKS Bad materials
Improper batching mixing handling transporting
Improper formwork
Improper curing and finishing
Make sure all things are taken care of according to recommended practices and codes
INSPECTION INSPECTION INSPECTION INSPECTION hellip
Types of Portland cement
Cement type
Use
I1 General purpose cement when there are no extenuating conditions
II2 Aids in providing moderate resistance to sulfate attack
III When high-early strength is required
IV3 When a low heat of hydration is desired (in massive concrete structures)
V4 When high sulfate resistance is required
IA4 A type I cement containing an integral air-entraining agent
IIA4 A type II cement containing an integral air-entraining agent
IIIA4 A type III cement containing an integral air-entraining agent
Concreting Techniques bull Regularcommon Concreting Techniques
o Pouring concrete into ready-made formwork (in-situ)
o Beams columns slabs faccedilades foundations etc
bull Special Concreting Techniques
o Precast Concrete
bull On-site Production
bull Off-site Production
o Slipform Construction (Traveling Formwork)
bull Vertical slipforming
bull Horizontal slipforming
o Tilt-Up Construction
o Lift-Slab Construction
o Shotcrete Construction
o Balloon construction
o Prepacked Aggregate
Design and Construction Considerations
bull Regular Formwork o Vertical loads and lateral concrete pressures
o Dimensions amp tolerances
o Curing finishing and stripping
o Shoring
bull Precast concrete o Joint system (wet vs dry)
o Transportation and handling loads
bull Vertical Slipforming o Jacking system (hydraulics)
o Slipforming operation
bull Horizontal Slipforming o Lining and slopes
cement silo
aggregate batching plant
concrete mixer
Concrete Mixing Plant
Batching and Mixing
Transporting amp Delivery of Concrete
ready-mix agitator truck
mobile concrete pump
Shotcreting
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 2: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/2.jpg)
Concrete works
bull Concrete is a man-made (rock) construction material which is a mixture of portland cement water aggregates and in some cases admixtures
bull The cement and water form a paste that hardens and bonds the aggregates together
bull Can be placed or molded into virtually any shape and reproduce any surface texture
bull Concrete is strong durable versatile and economical
Concrete works
bull Concrete will not warp or undergo change in dimensions
bull When properly designed and placed it is nearly impermeable and extremely resistant to corrosion
bull Has good resistance to natural and processing chemicals
bull Economical but requires significant quality control
Basic concrete works process
Batching
Proportioning
Mixing
Transporting
Placing
Compacting
Finishing
Curing Stripping Out CONCRETE in
PLACE
Batching
Proportioning
Mixing
Transporting
Placing
Compacting
Finishing
Curing Stripping Out CONCRETE in
PLACE
Batching
Proportioning
Mixing
Transporting
Placing
Wood Steel
Plastics Formworking
Compacting
Finishing
Curing Stripping Out CONCRETE in
PLACE
Reinforcement
Aggregates
Cement
Water
additive
The overall Quality of Finished Product depends on
bull Quality of raw material
bull Quality of handling material andor products
bull Quality of workmanship
PROBLEMS in CONCRETE WORKS Bad materials
Improper batching mixing handling transporting
Improper formwork
Improper curing and finishing
Make sure all things are taken care of according to recommended practices and codes
INSPECTION INSPECTION INSPECTION INSPECTION hellip
Types of Portland cement
Cement type
Use
I1 General purpose cement when there are no extenuating conditions
II2 Aids in providing moderate resistance to sulfate attack
III When high-early strength is required
IV3 When a low heat of hydration is desired (in massive concrete structures)
V4 When high sulfate resistance is required
IA4 A type I cement containing an integral air-entraining agent
IIA4 A type II cement containing an integral air-entraining agent
IIIA4 A type III cement containing an integral air-entraining agent
Concreting Techniques bull Regularcommon Concreting Techniques
o Pouring concrete into ready-made formwork (in-situ)
o Beams columns slabs faccedilades foundations etc
bull Special Concreting Techniques
o Precast Concrete
bull On-site Production
bull Off-site Production
o Slipform Construction (Traveling Formwork)
bull Vertical slipforming
bull Horizontal slipforming
o Tilt-Up Construction
o Lift-Slab Construction
o Shotcrete Construction
o Balloon construction
o Prepacked Aggregate
Design and Construction Considerations
bull Regular Formwork o Vertical loads and lateral concrete pressures
o Dimensions amp tolerances
o Curing finishing and stripping
o Shoring
bull Precast concrete o Joint system (wet vs dry)
o Transportation and handling loads
bull Vertical Slipforming o Jacking system (hydraulics)
o Slipforming operation
bull Horizontal Slipforming o Lining and slopes
cement silo
aggregate batching plant
concrete mixer
Concrete Mixing Plant
Batching and Mixing
Transporting amp Delivery of Concrete
ready-mix agitator truck
mobile concrete pump
Shotcreting
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 3: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/3.jpg)
Concrete works
bull Concrete will not warp or undergo change in dimensions
bull When properly designed and placed it is nearly impermeable and extremely resistant to corrosion
bull Has good resistance to natural and processing chemicals
bull Economical but requires significant quality control
Basic concrete works process
Batching
Proportioning
Mixing
Transporting
Placing
Compacting
Finishing
Curing Stripping Out CONCRETE in
PLACE
Batching
Proportioning
Mixing
Transporting
Placing
Compacting
Finishing
Curing Stripping Out CONCRETE in
PLACE
Batching
Proportioning
Mixing
Transporting
Placing
Wood Steel
Plastics Formworking
Compacting
Finishing
Curing Stripping Out CONCRETE in
PLACE
Reinforcement
Aggregates
Cement
Water
additive
The overall Quality of Finished Product depends on
bull Quality of raw material
bull Quality of handling material andor products
bull Quality of workmanship
PROBLEMS in CONCRETE WORKS Bad materials
Improper batching mixing handling transporting
Improper formwork
Improper curing and finishing
Make sure all things are taken care of according to recommended practices and codes
INSPECTION INSPECTION INSPECTION INSPECTION hellip
Types of Portland cement
Cement type
Use
I1 General purpose cement when there are no extenuating conditions
II2 Aids in providing moderate resistance to sulfate attack
III When high-early strength is required
IV3 When a low heat of hydration is desired (in massive concrete structures)
V4 When high sulfate resistance is required
IA4 A type I cement containing an integral air-entraining agent
IIA4 A type II cement containing an integral air-entraining agent
IIIA4 A type III cement containing an integral air-entraining agent
Concreting Techniques bull Regularcommon Concreting Techniques
o Pouring concrete into ready-made formwork (in-situ)
o Beams columns slabs faccedilades foundations etc
bull Special Concreting Techniques
o Precast Concrete
bull On-site Production
bull Off-site Production
o Slipform Construction (Traveling Formwork)
bull Vertical slipforming
bull Horizontal slipforming
o Tilt-Up Construction
o Lift-Slab Construction
o Shotcrete Construction
o Balloon construction
o Prepacked Aggregate
Design and Construction Considerations
bull Regular Formwork o Vertical loads and lateral concrete pressures
o Dimensions amp tolerances
o Curing finishing and stripping
o Shoring
bull Precast concrete o Joint system (wet vs dry)
o Transportation and handling loads
bull Vertical Slipforming o Jacking system (hydraulics)
o Slipforming operation
bull Horizontal Slipforming o Lining and slopes
cement silo
aggregate batching plant
concrete mixer
Concrete Mixing Plant
Batching and Mixing
Transporting amp Delivery of Concrete
ready-mix agitator truck
mobile concrete pump
Shotcreting
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 4: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/4.jpg)
Basic concrete works process
Batching
Proportioning
Mixing
Transporting
Placing
Compacting
Finishing
Curing Stripping Out CONCRETE in
PLACE
Batching
Proportioning
Mixing
Transporting
Placing
Compacting
Finishing
Curing Stripping Out CONCRETE in
PLACE
Batching
Proportioning
Mixing
Transporting
Placing
Wood Steel
Plastics Formworking
Compacting
Finishing
Curing Stripping Out CONCRETE in
PLACE
Reinforcement
Aggregates
Cement
Water
additive
The overall Quality of Finished Product depends on
bull Quality of raw material
bull Quality of handling material andor products
bull Quality of workmanship
PROBLEMS in CONCRETE WORKS Bad materials
Improper batching mixing handling transporting
Improper formwork
Improper curing and finishing
Make sure all things are taken care of according to recommended practices and codes
INSPECTION INSPECTION INSPECTION INSPECTION hellip
Types of Portland cement
Cement type
Use
I1 General purpose cement when there are no extenuating conditions
II2 Aids in providing moderate resistance to sulfate attack
III When high-early strength is required
IV3 When a low heat of hydration is desired (in massive concrete structures)
V4 When high sulfate resistance is required
IA4 A type I cement containing an integral air-entraining agent
IIA4 A type II cement containing an integral air-entraining agent
IIIA4 A type III cement containing an integral air-entraining agent
Concreting Techniques bull Regularcommon Concreting Techniques
o Pouring concrete into ready-made formwork (in-situ)
o Beams columns slabs faccedilades foundations etc
bull Special Concreting Techniques
o Precast Concrete
bull On-site Production
bull Off-site Production
o Slipform Construction (Traveling Formwork)
bull Vertical slipforming
bull Horizontal slipforming
o Tilt-Up Construction
o Lift-Slab Construction
o Shotcrete Construction
o Balloon construction
o Prepacked Aggregate
Design and Construction Considerations
bull Regular Formwork o Vertical loads and lateral concrete pressures
o Dimensions amp tolerances
o Curing finishing and stripping
o Shoring
bull Precast concrete o Joint system (wet vs dry)
o Transportation and handling loads
bull Vertical Slipforming o Jacking system (hydraulics)
o Slipforming operation
bull Horizontal Slipforming o Lining and slopes
cement silo
aggregate batching plant
concrete mixer
Concrete Mixing Plant
Batching and Mixing
Transporting amp Delivery of Concrete
ready-mix agitator truck
mobile concrete pump
Shotcreting
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 5: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/5.jpg)
The overall Quality of Finished Product depends on
bull Quality of raw material
bull Quality of handling material andor products
bull Quality of workmanship
PROBLEMS in CONCRETE WORKS Bad materials
Improper batching mixing handling transporting
Improper formwork
Improper curing and finishing
Make sure all things are taken care of according to recommended practices and codes
INSPECTION INSPECTION INSPECTION INSPECTION hellip
Types of Portland cement
Cement type
Use
I1 General purpose cement when there are no extenuating conditions
II2 Aids in providing moderate resistance to sulfate attack
III When high-early strength is required
IV3 When a low heat of hydration is desired (in massive concrete structures)
V4 When high sulfate resistance is required
IA4 A type I cement containing an integral air-entraining agent
IIA4 A type II cement containing an integral air-entraining agent
IIIA4 A type III cement containing an integral air-entraining agent
Concreting Techniques bull Regularcommon Concreting Techniques
o Pouring concrete into ready-made formwork (in-situ)
o Beams columns slabs faccedilades foundations etc
bull Special Concreting Techniques
o Precast Concrete
bull On-site Production
bull Off-site Production
o Slipform Construction (Traveling Formwork)
bull Vertical slipforming
bull Horizontal slipforming
o Tilt-Up Construction
o Lift-Slab Construction
o Shotcrete Construction
o Balloon construction
o Prepacked Aggregate
Design and Construction Considerations
bull Regular Formwork o Vertical loads and lateral concrete pressures
o Dimensions amp tolerances
o Curing finishing and stripping
o Shoring
bull Precast concrete o Joint system (wet vs dry)
o Transportation and handling loads
bull Vertical Slipforming o Jacking system (hydraulics)
o Slipforming operation
bull Horizontal Slipforming o Lining and slopes
cement silo
aggregate batching plant
concrete mixer
Concrete Mixing Plant
Batching and Mixing
Transporting amp Delivery of Concrete
ready-mix agitator truck
mobile concrete pump
Shotcreting
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 6: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/6.jpg)
Types of Portland cement
Cement type
Use
I1 General purpose cement when there are no extenuating conditions
II2 Aids in providing moderate resistance to sulfate attack
III When high-early strength is required
IV3 When a low heat of hydration is desired (in massive concrete structures)
V4 When high sulfate resistance is required
IA4 A type I cement containing an integral air-entraining agent
IIA4 A type II cement containing an integral air-entraining agent
IIIA4 A type III cement containing an integral air-entraining agent
Concreting Techniques bull Regularcommon Concreting Techniques
o Pouring concrete into ready-made formwork (in-situ)
o Beams columns slabs faccedilades foundations etc
bull Special Concreting Techniques
o Precast Concrete
bull On-site Production
bull Off-site Production
o Slipform Construction (Traveling Formwork)
bull Vertical slipforming
bull Horizontal slipforming
o Tilt-Up Construction
o Lift-Slab Construction
o Shotcrete Construction
o Balloon construction
o Prepacked Aggregate
Design and Construction Considerations
bull Regular Formwork o Vertical loads and lateral concrete pressures
o Dimensions amp tolerances
o Curing finishing and stripping
o Shoring
bull Precast concrete o Joint system (wet vs dry)
o Transportation and handling loads
bull Vertical Slipforming o Jacking system (hydraulics)
o Slipforming operation
bull Horizontal Slipforming o Lining and slopes
cement silo
aggregate batching plant
concrete mixer
Concrete Mixing Plant
Batching and Mixing
Transporting amp Delivery of Concrete
ready-mix agitator truck
mobile concrete pump
Shotcreting
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 7: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/7.jpg)
Concreting Techniques bull Regularcommon Concreting Techniques
o Pouring concrete into ready-made formwork (in-situ)
o Beams columns slabs faccedilades foundations etc
bull Special Concreting Techniques
o Precast Concrete
bull On-site Production
bull Off-site Production
o Slipform Construction (Traveling Formwork)
bull Vertical slipforming
bull Horizontal slipforming
o Tilt-Up Construction
o Lift-Slab Construction
o Shotcrete Construction
o Balloon construction
o Prepacked Aggregate
Design and Construction Considerations
bull Regular Formwork o Vertical loads and lateral concrete pressures
o Dimensions amp tolerances
o Curing finishing and stripping
o Shoring
bull Precast concrete o Joint system (wet vs dry)
o Transportation and handling loads
bull Vertical Slipforming o Jacking system (hydraulics)
o Slipforming operation
bull Horizontal Slipforming o Lining and slopes
cement silo
aggregate batching plant
concrete mixer
Concrete Mixing Plant
Batching and Mixing
Transporting amp Delivery of Concrete
ready-mix agitator truck
mobile concrete pump
Shotcreting
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 8: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/8.jpg)
Design and Construction Considerations
bull Regular Formwork o Vertical loads and lateral concrete pressures
o Dimensions amp tolerances
o Curing finishing and stripping
o Shoring
bull Precast concrete o Joint system (wet vs dry)
o Transportation and handling loads
bull Vertical Slipforming o Jacking system (hydraulics)
o Slipforming operation
bull Horizontal Slipforming o Lining and slopes
cement silo
aggregate batching plant
concrete mixer
Concrete Mixing Plant
Batching and Mixing
Transporting amp Delivery of Concrete
ready-mix agitator truck
mobile concrete pump
Shotcreting
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 9: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/9.jpg)
cement silo
aggregate batching plant
concrete mixer
Concrete Mixing Plant
Batching and Mixing
Transporting amp Delivery of Concrete
ready-mix agitator truck
mobile concrete pump
Shotcreting
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 10: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/10.jpg)
Batching and Mixing
Transporting amp Delivery of Concrete
ready-mix agitator truck
mobile concrete pump
Shotcreting
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 11: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/11.jpg)
Transporting amp Delivery of Concrete
ready-mix agitator truck
mobile concrete pump
Shotcreting
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 12: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/12.jpg)
Shotcreting
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 13: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/13.jpg)
Shotcreting
concrete
pumping
hopper
nozzle
Dry-Mix Wet-Mix
Dry ingredient are placed into a hopper then pneumatically pumped out of a nozzle
Water is added at the nozzle
Concrete compound (cement fine aggregate) and water are mixed in a hopper then pumped out of a nozzle
Good for small and repair works
Best for work in large volume
Quantity of water is controlled t the nozzle
Less dusty less rebound less waste
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 14: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/14.jpg)
Tilt Up Construction
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 15: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/15.jpg)
Tilt-Up Construction
1 First the slabs of concrete are cast on-site either using the buildings floor as
a casting surface or using horizontal casting beds
2 After curing the slabs are lifted or tilted - into place with a crane and set on
concrete foundations to form the building exterior
3 The load-bearing panels are temporarily braced building steel is erected
and the panels and framework are connected
4 The roof structure is constructed and anchored to the walls to complete the
building system
5 Following removal of panel braces grout is applied at the base of the
panels and all vertical joints are caulked
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 16: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/16.jpg)
Tilt-Up Construction Process
form-working (flat slab)
steel reinforcing
pouring concret
e
curing finishing
erection
temporar
y shoring
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 17: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/17.jpg)
Tilt Up Construction
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 18: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/18.jpg)
Lift-Slab Construction
bull Slabs are poured on ground then lifted sequentially one by one onto their final position by means of a jacking system
bull At the final positions the slabs are fixed to the columns
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 19: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/19.jpg)
Lift Slab Construction Process
hydraulic jack for lifting
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 20: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/20.jpg)
Tilt-up construction process
single-stack
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 21: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/21.jpg)
Tilt-up construction process
stack-1
stack-2
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 22: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/22.jpg)
Tilt-up construction process
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 23: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/23.jpg)
Lift Slab Construction Process
Lift Slab can be Dangerous Construction Process
Progressive collapsed of LrsquoAmbiance Plaza
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 24: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/24.jpg)
Heavy Lifting Construction Process
hydraulic jack for
lifting
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 25: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/25.jpg)
Balloon Construction DOMES
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 26: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/26.jpg)
Balloon Construction DOMES
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 27: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/27.jpg)
Design and Construction Considerations
bull Traveling Forms o Traveling speed
o Symmetrical loading
bull Tilt-Up Construction o Lifting process (balancing)
o Temporary shoring
bull Lift-Slab Construction o Slab separation
o Lifting and supporting system (vertical amp horizontal alignment)
bull Shotcrete o Consistency of flows
o Dry vs wet mix
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 28: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/28.jpg)
Prestressed Concrete
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 29: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/29.jpg)
Important issues in Precast concrete
bull Structural efficiency
bull Flexibility in use
bull Optimum use of materials
bull Speed of construction
bull Quality consciousness
bull Adaptability
bull Protection of the environment
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 30: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/30.jpg)
Prestressed concrete bull Improve (loading) capacity of structural element
Professor Gustav Mangel from the
University of Ghent in Belgium described
the concept of pre-compressed concrete to
his students using his well-known
illustration of a stack of bookshellip
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 31: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/31.jpg)
Prestressed concrete bull Improve (loading) capacity of structural element
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 32: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/32.jpg)
The combination of high strength steel ndash to resist tensile stress ndash and concrete ndash to provide compressive strength and durability ndash make this composite material adaptable to many situations especially the design and construction of bridges
Pretensioning
Precasting plants and
in-plant pretensioninghellip
Single to 7-wrire strandshellip
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 33: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/33.jpg)
Anchorage System
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 34: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/34.jpg)
Anchorage System
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 35: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/35.jpg)
Post-tensioning for segmental bridge construction
bull Integrating (structural) elements
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 36: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/36.jpg)
Post-tensioning for segmental bridge construction
FABRICATION OF PRECAST CONCRETE
PRECAST CONCRETE ELEMENTS TRANSPORTATION OF PRECAST CONCRETE ELEMENTS
ERECTION OF PRECAST CONCRETE PIERS AND GIRDERS
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 37: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/37.jpg)
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 38: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/38.jpg)
Bridge precast concrete
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 39: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/39.jpg)
Bridge precast concrete
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 40: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/40.jpg)
Bridge precast concrete
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete
![Page 41: CONCRETE WORKS - UPJocw.upj.ac.id/files/Slide-TSP308-TSP-308-013-Metoda-dan-Peralatan... · Concrete works • Concrete is a man-made ... o Lift-Slab Construction ... (flat slab)](https://reader034.vdocument.in/reader034/viewer/2022051010/5aa65a377f8b9a7c1a8e9350/html5/thumbnails/41.jpg)
Concrete safety practices
bull Protruding steel bars must be covered
bull Improper loading of wet concrete