    PRESERVATION PLAN FOR

    PLAYS AND PLAYERS THEATER1714 DELANCEY STREET

    PHILADELPHIA, PA

  • 7/30/2019 Condition Assessment Maint Plan Pp

    2/10

    PLAYS AND PLAYERS THEATER1714 DELANCEY STREET

    PHILADELPHIA, PA

    Graduate Program in Historic PreservationUniversity o Pennsylvania

    School o Design

    Preservation Studio 2011

    ADVISORS:

    Randall MasonAssociate Professor and Chair

    Fon WangInstructor

    STUDENTS:

    Jason CantuLaura DiPasqualeLarry ParraSarah PetersonLauren SzeberGladysa VegaTom Wilson

  • 7/30/2019 Condition Assessment Maint Plan Pp

    3/10

    4 PLAYS AND PLAYERS THEATER

    TABLE OF CONTENTSVolume2: Individual Projects

    Oral Histories...................................................87Larry Parra

    Plays and Players Interpretation Proposal........95

    Tom Wilson

    Condition Assessment andMaintenance Plan or Plays & Players...........107Laura DiPasquale

    Frieze Conditions Assessment........................123Lauren Szeber

    Finishes Analysis............................................143Sarah Peterson & Gladysa Vega

    A contemporary lighting system thatrespects the Character-DefningElements o the main theatre space

    and adheres to the secretary o theinteriors standards or rehabilitation..............179Jason Cantu

  • 7/30/2019 Condition Assessment Maint Plan Pp

    4/10

    30 PLAYS AND PLAYERS THEATER

    CONDITION ASSESSMENT ANDMAINTENANCE PLAN FOR PLAYS& PLAYERS:

    LAURA DIPASQUALE

    M.S. Historic Preservation Candidate, University oPennsylvania

    CONTENTS:

    1. Narrative o Current Maintenance Programand Goals

    a. Purposeb. Current Programc. Scope

    2. Narrative o Current Conditions andRecommendations

    a. Faadeb. Exterior Side Wallsc. Lobbyd. Auditoriume. Roo

    3. Chart o Conditions and RelevantPreservation Bries

    4. Conditions Map and Illustration

    5. Maintenance Priorities6. Annual Maintenance Schedule

    1. NARRATIVE OF CURRENTMAINTENANCE PROGRAM AND GOALS

    a. PurposeTe purpose o a maintenance plan and

    schedule is to establish periodic inspections that canhelp identiy potential problems beore they occur,thus extending the lie o the building, preservingthe original and character-dening elements o thestructure, and minimizing emergency and large-scale damage and repair costs. A building conditionassessment is the rst step in restoring or preserving ahistoric building, as it helps to determine what issuesare most egregious and establish priorities or the

    renovation or rehabilitation o the structure. Aterthe initial condition assessment, keeping a log booko conditions, changes, repairs, and costs o repairscan also aid in uture budgeting and in preservationand restoration eorts. According to the NationalResearch Council, two to our percent o the currentreplacement value o a building should be spent everyyear on maintenance.1

    1 Committee on Advanced Maintenance Concepts orBuildings, Building Research Board, National Research Council,Committing to the Cost o Ownership: Maintenance and Repair o

    For a more comprehensive desmaintenance plans, please reerence thBuilding Maintenance Manual o MaCanadas Historic Places.2

    b. Current ProgramTe current maintenance meas

    Plays and Players takes place on an as-emergency basis. Te building is cleanbasis, Monday-Wednesday-Friday by tsta, one o whom cleans upstairs, thewhom cleans the auditorium, systems

    While the cleaning sta handles regulthere is no preventive maintenance plarecord o repairs made through the yethe organization would like to hire an manager, they have not done so at thisrentals manager, Andrew Beal, handlerepairs to the building, and notes that repaired, repatched or replaced within that the sprinkler system needs to be r2018. Beal notes that much work was1980s, such as the roo and window reTis also appears to have been when mmortar was repointed, or covered, usinbased mortar.

    c. ScopeDue to time restrictions impos

    academic semester, the scope o the coassessment and maintenance plan are

    the spaces containing the highest conco character dening el ements (the aand auditorium), plus the roo and sidthe primary barrier rom the elements,maintenance o the roo is essential to o the building as a whole. Te exterioo the building envelope, are also a pri

    2. CURRENT CONDITIONSFor a one hundred year old bui

    interior o Plays and Players is in remacondition. As noted numerous times the buildings continuous use as a theaa large number o original and charactelements intact and with high materiaTere is, however, some minor wear anlarger issues that i let untended, coulgreater material degradation and loss.

    a. Main FaadeCondition:

    Upon initial inspection, the aperectly intact, but photographs romrieze show that there are numerous coaecting the integrity o the rieze. Foinormation on this, see Lauren Szebe

    Public Buildings(Te National Academies Pre2 Heritage Building Maintenance ManuCanadas Historic Places, 2008).

    PROJECT INTRODUCTION/OBJECTIVES

    In accordance with the curriculum orthe University o Pennsylvania course HistoricPreservation Studio, (HSPV 710), this project hasbeen compiled to provide an instructive preservationplan or the Plays and Players Teatre located at 1714Delancey Street in Philadelphia, Pennsylvania. Byconducting extensive research, analyzing past studieson the property, and making requent site visits,our group was able to gain a solid understandingo actors contributing to the buildings historical,

    physical, national, and cultural signicance to shapeour nal ve-step preservation plan solution.Conversing with the wide array o

    stakeholders and discussing uture goals with currentbuilding stewards, the buildings distinct culturalsignicance and associated values were illuminated.Armed with this inormation, our group establisheda link between these values and the built abricitsel by establishing character-dening elements,explained and examined in detail in this report.Using these elements as a starting point in thedevelopment o the preservation plan, conclusionsand recommendations were made as to how bestpreserve the signicance embodied in the structureby protecting these most important eatures.

    It is our hope that this comprehensive dossierwill serve as a useul tool to uture building stewards,the inormation and instructions provided to guideuture building treatments in a way that is mostpractical and respectul o this incredible structure.

    ANALYSIS OF PREVIOUS STUDIES

    Due to the historic signicance o the theatre,Plays and Players has been the topic o severalresearch publications over the past ew decades. Tedepth o inormation ound in these documents hassignicantly contributed to our understanding o thebuilding. While these have been useul resources, wealso recognize the areas that need to be supplementedor enhanced or our preservation objectives.

    In 1985, graduate student David Harringtonwrote a thesis or the University o Pennsylvania,discussing the Little Teatres place in Philadelphiatheatre history, and the distinct personalitiesassociated with it. His worked includes accountso the theatres original opening in 1911, theounding o Plays and Players as an organization,and a biography o the architect Amos Barnes. Teoriginal appearance o the theatre, and the changesto the abric over time, are likewise described.While Harrington does make a case or the theatrespreservation, he rerains rom detailing specicelements and conservation conditions. Our workbuilds o o Harringtons oundation to provide amore in-depth discussion surrounding the buildingsphysical properties and areas requiring the mostconsideration.

    University o Pennsylvania graduate studentSarah Hyson penned a second Historic Preservation

  • 7/30/2019 Condition Assessment Maint Plan Pp

    5/10

    32 PLAYS AND PLAYERS THEATER

    Retain current upkeep Do not paint Investigate ceiling concealed by dropped ceiling

    & determine condition

    e. AuditoriumCondition:

    For the most highly tracked room in thebuilding, with the most intricate details and nishes,the auditorium is in good condition. Te primaryconditions o concern are water damaged plaster, andthe darkening, tearing, and loosening o the murals.Tere are some areas o mechanical damage to thepilasters and capitals, as well as the proscenium.Finally, there are lesser issues associated with use andwear, such as aking or missing paint.

    In the back let corner o the auditorium isan area o major water damage, which has causedthe plaster to powder, sag, and in come places,disintegrate entirely. According to rst personaccounts, this area has been in the same condition ormany years and was caused by ashing ailure on theroo, which was repaired. Te water damage on t heceiling towards the ront right o the auditorium wascaused by leaks rom the third oor bathroom andkitchen. It is unclear whether these issues have beenentirely resolved.

    Mechanical damage to the pilasters isgenerally consistent with the location o moveablelighting. Ladders are requently set up against thepilasters, and the movement o the ladders and

    lighting can nick the pilasters and capitals, causingdamage.Te Emerson murals also have numerous

    issues, including the act that they are detaching romthe walls, having ripped away rom the nails thatwere supposed to hold them in place. A proessionalconservator should be consulted to determine theproper treatment o murals. For more inormation,see 2005 University o Pennsylvania thesis by SarahHyson.

    Recommendations: Repair damaged plasterwork in corner and ceiling

    (remove damaged plaster and replicate ornament) Repaint as needed, or based on paint analysis

    (see accompanying report by Sarah Peterson andGladysa Vega)

    Have a proessional conservator conduct a ullassessment, and eventual treatment, o Emerson

    murals

    f. RoofCondition:

    Te roo is estimated to have been replacedsome time in the 1980s, and needs to be replaced orresuraced in the very near uture. Tere is poolingwater on the roo, as well as debris, cracking, blistersand clogged drains. A leak in the blackbox ceilingduring rain indicates that there is a leak somewheretowards the center o the roo.

    Te ront parapet is o particulas the mortar in the brick on the eastedisintegrated completely, causing the bTe section o roo above the stage anwhich is separated rom the main spacand parapet, has been replaced more rein decent condition, other than some pand debris. Te roong material itselappears intact.

    Recommendations:

    In terms o overall interventionhistoric and non-visible part o the struand Players has a great deal o exibilirepair and replacement. Te National permits the replacement o at roos thvisible rom the street, with modern mthat the most important thing is that tight roo is basic in the preservation oregardless o its age, size, or design.3

    According to Michael Stern oPreservation Alliance or Greater Philaverage lie cycle o a at roo is 10 yeait may last longer i regularly maintaintypes o at roos lasting up to 30 yearroong over the main space has certainis quickly approaching its lie cycl e anreplaced at the latest in the next two toSince the organization plans to replacesystems that are located on the roo, itpreerable to replace the roo at this ti

    Replacing beorehand would undoubtdamage to the surace.Te roo should be checked at

    three times per year, with any changes reported.

    Te roo should also be checkehours o any major storm (rain or snowthat there is no pooling water, snow buice blocking drains ater a thaw. Specishould be paid to ashings around all tpenetrations, particularly in areas whemay occur. 90% o all roo leaks and the ashings.

    Roo drains should be checkedper year, especially in the all when roolikely to become clogged with debris.

    What to look or: Pooling water or areas o debris Clogged drains Blisters- sections o the roo that

    underoot Cracked or alligator-like appeara Inspect seams/ashing and any co

    3 Sarah M. Sweetser, Roofng or HistoPreservation Brie (National Park Service, 1974 Michael Stern, Inspecting and MaiRoo, Vol. 12, no. 2 (Philadelphia: PreservatioGreater Philadelphia, Fall 1997).

    project, included in this report.Te pointing between the brick on the ront

    aade is original and mostly intact, although thereare some holes in the mortar where holes were drilledor signs hung in the past. Te areas o loss should berepaired with a non-concrete mortar, such as a lime-based mortar, depending on the composition o theoriginal mortar.

    Te marquee is in poor condition, withwater pooling on top. Although it had not rainedor several days, at the time o this inspection,roughly an inch o water was still pooled on the let(acing the building) side o the marquee. Tere iscorrespondingly damage underneath the marquee,which could end up rupturing, perhaps becoming asaety hazard or patrons. Te recommended courseo action is to nd a way to properly drain the rooo the marquee, or replace it entirely. Since it is notoriginal or character dening, and there is evidenceo the original marquee, replacement would beacceptable.

    Recommendations:Repoint lost mortar with sot lime-based

    mortar. Properly drain roo o marquee or replace itentirely.

    b. Back FaadeCondition:

    Te back aade has some areas o waterdamage, primarily at the base, with some areas that

    appear to have been repointed. Tere are two largeiron doors that are rusted, to the point o completeloss in some areas, and two windows whose woodenrames are seriously deteriorated. Tere are alsoplants growing at the base o the building.

    Recommendations: Repoint with sot mortar Remove plants and debris rom base o building Do not use cement mortar Do not paint or cover with water-resistant

    coating

    c. Exterior Side WallsCondition:

    Te side exterior walls o the building arenot in as good o condition as the ront and back,

    probably due to the act that they do not receivedirect sunlight or airow to help them dry. Teground oor o the western wall is in decent shape,with some areas o loss in the mortar due to risingdamp. Tis side has not been repointed, and i it is tobe, should use a lime-based or sot mortar.Te eastern side o the building is ripe with waterdamage. Almost the entire wall has been hastilyrepointed with thick application o concrete mortar,some o which was applied over the lime mor tar andis now popping o. S ince the brick is soter thanthe replaced concrete mortar, the brick has become

    the sacricial material. Unortunately, this hascaused moisture to travel through the brick, resultingin eforescence on the exterior (and undoubtedlyinterior) brick, and in some cases, the powdering othe original mortar and loss o brick itsel. Te risingdamp has traveled at least eight eet up the wallin some areas. Te areas o greatest water damageon the exterior correspond with the damaged backcorner o the auditorium. It is also likely that theplaster behind the murals is damaged, which couldbe the cause o the buckling and disadhesion o themurals rom the wall.

    Brie inspection o the third oor indicatesthat water ingress has not been localized to theground oor, but is pervasive along the entire easternwall. When the assembly room was renovated toorm the blackbox theatre, the plaster along theexterior wall was damp and ell o. Andrew Beal hasbeen removing the remaining plaster and coveringthe bare brick with a waterproo sealant. It is dicultto see the majority o the exterior side walls, but byleaning out a replaced side window, it was evidentthat much o the mortar has been replaced withconcrete. Similarly to the ground oor, the mortarreplacement corresponds with areas o water damage.It is likely that the brick was repointed due to waterdamage to the original sot mortar, but that theimpermeable nature o the concrete has exacerbatedmoisture ingress through the brick itsel into theinterior.

    It is unclear whether the western side o thebuilding is suering equal damage, as the interiorwalls o the bar are covered in wood paneling.However, in the ront interior corner o the room,the paneling has separated rom the wall, and whenpushed back, expels dust rom degraded plaster.Tis coincides with repointing o the mortar withconcrete, and eforescence on the brick on theexterior.

    Recommendations: Repoint with sot mortar Remove plants and debris rom base o building Do not use cement mortar Do not paint or cover with water-resistant

    coating

    d. Lobby

    Condition:Te lobby is composed almost entirely odense, non-porous suraces o tile and brick, makingit largely unsusceptible to physical damage. Tecondition o the original ceiling is unknown becauseit is covered by a painted acoustical t ile droppedceiling. Te paint prevents the acoustical tile romunctioning properly and absorbing sound, butaesthetically is in good condition.

    Recommendations:

    ; : . .

  • 7/30/2019 Condition Assessment Maint Plan Pp

    6/10

    34 PLAYS AND PLAYERS THEATER

    : ,

    ; : . .. ;

    : . .

    .

    :

    :,

    ,

    ,

    Auditorium Murals

    Detaching;

    Tears;Darkening;

    Buckling

    Age? Lighting

    Equipment?Water ingress?

    Yes 4

    Co

    proclea

    mu

    Auditorium Paint Chipping Age and use Yes 2

    Painting Historic Interiors: NPS

    Preservation Brief #28http://www.nps.gov/history/hps/tps/brief

    s/brief28.htm

    Remove chipping paint;Repaint as necessary

    (Se

    andadd

    histaud

    Roof Unknown

    Poor:

    Cracking;Ponding water;

    Debris

    5

    Roong for Historic Buildings: NPS

    Preservation Brief #4http://www.nps.gov/hps/tps/briefs/brief0

    4.htm

    Sweep debris offroof;Unclog downspouts;

    Remove ponding water

    Roovery

    R oo f: Pa ra pe t B ri ck

    Failing; Loss of

    mortar;Crumbling

    brick

    5: SAFETYHAZARD

    Loodan

    fab

    3. CHART OF CONDITIONS & RELEVANTPRESERVATION BRIEFS CONTINUED

    Location Material Condition CauseActive(Yes/No)

    Urgency(1not-5very)

    Relevant Preservation BriefRoutine MaintenanceNeeds

    Additional Notes

    Fa a de : F ro nt B ri ck

    Good: Some

    repointingneeded; Surface

    soiling

    Drilled holes No 2

    Assessing Cleaning and Water-Repellent

    Treatments for Historic MasonryBuildings: NPS Preservation Brief # 1

    http://www.nps.gov/history/hps/tps/briefs/brief01.htm Dangers of Abrasive

    Cleaning to Historic Buildings: NPSPreservation Brief # 6

    http://www.nps.gov/history/hps/tps/brief

    s/brief06.htm

    Check for crumblingmortar

    Cleaning of brick should bedone in consultation with

    preservation professional--Power washing or

    sandblasting may causeirreparable damage (see

    relevant preservation briefs)

    Faade: FrontPressedCement

    Poor (seeLauren Szeber's

    report)

    (see LaurenSzeber's report)

    Yes 5

    Maintenance,Repair and Replacement

    of Historic Cast Stone: NPSPreservation Brief # 42

    http://www.nps.gov/history/hps/tps/briefs/brief42.htm

    Faade: FrontCircular Wood

    WindowsFair 2

    Preservation of Historic Wooden

    Windows: NPS Preservation Brief #9http://www.nps.gov/hps/tps/briefs/brief0

    9.htm

    Check for chipping

    paint; Loss of glazing;Damage to frame;

    Weatherstripping

    Faade: FrontWoodenmarquee

    Poor: Pooling water Yes5: SAFETYHAZARD

    Remove pooling water

    If enough water builds up on

    top of marquee,it mayrupture,perhaps injuring

    someone below

    Fa a de : Si de s B ri ck

    Poor: WaterDamage

    (efflorescence,loss of mortar

    and brick)

    Rising damp; Rainwater from roof;

    Repointing withincompatible

    cement mortar

    Yes 5

    Repointing Mortar Joints in HistoricMasonry Buildings: NPS Preservation

    Brief #2http://www.nps.gov/history/hps/tps/brief

    s/brief02.htm Te Maintenance Series:NSW Heritage Office Info Sheet #2:

    Rising Damp

    http://www.heritage.nsw.gov.au/docs/maintenance2-1_risingdamp.pdf

    Repoint with soft,compatible mortar(based on mortar

    analysis)

    Repointing with cementmortar causes damage to

    bricks as it pushes moistureand salts through the brick

    rather than the mortar (theintended sacrifcial material)

    Fa a de : B ac k B ri ck

    Fair: Somewater damage;

    Some plantgrowth

    Rising damp;Incompatible

    mortar;

    Remove plant growth

    Fa a de : Ba ck I ro n ( do or ) Po or : Ru st M oi st ur e; A ge

    Lobby Brick GoodGentle cleaning,if

    necessary

    Use of abrasive chemicals,powerwashing/sandblasting

    or painting unacceptable

    Lobby Tile GoodGentle cleaning,ifnecessary

    Use of abrasive chemicals,

    powerwashing/sandblastingor painting unacceptable

    LobbyAcoustical Tile

    CeilingFair Paint No 1

    Painting of the acoustical tilehas negated its sound-absorbing properties,but the

    tiles themselves are not in badcondition. Exploration of

    underlying,possibly originalceiling,recommended

    Auditorium: Wall,

    corniceworkP la st er Wa te r D am age

    Flashing on roof;Rising damp;Incompatible

    exterior mortarcausing moisture

    ingress

    Yes 4

    Preserving Historic Flat Plaster: NPSPreservation Brief #21http://www.nps.gov/hps/tps/briefs/brief2

    1.htm; Preserving Historic Ornamental

    Plaster: NPS Preservation Brief #23

    http://www.nps.gov/hps/tps/briefs/brief23.htm

    Eliminate exterior watersource through

    maintenance of roof andexterior walls

    Auditorium:Ceiling

    P la st er Wa te r Da ma ge

    Leaks from thirdoor bathroomand kitchen

    No? 4 " "

    Auditorium:

    Pilasters,Proscenium

    PlasterMechanical

    Damage,loss

    Trauma fromladders,lighting

    installation/movement

    Yes 3" "

    ;;

    3. CHART OF CONDITIONS & RELEVANTPRESERVATION BRIEFS

  • 7/30/2019 Condition Assessment Maint Plan Pp

    7/10

    36 PLAYS AND PLAYERS THEATER

    4. CONDITIONS MAPS

    Maral:Wood

    (WindowFrame)

    C:Severe

    Deterioration

    Acvy:Active

    Cau:Age/Lackof

    Maintenance

    PlaGrwh

    Maral:Brick

    C:Rising

    Damp

    Acvy:Active

    Cau:Proximity

    towatersource/

    Incompatiblemortar

    Maral:Irondoor

    C:Corrosion

    Acvy:Active

    Cau:Age/Moisture

    CondtionsAssessMent:B

    ACkfACAde

    PAsAndPAesteAte|PiAdePiA,PA

    4. CONDITIONS MAPS

    Maa:Wood(Marquee)

    C:WaterDamage

    Acv:Active

    Cau:Poolingwater

    Maa:Stone

    C:Iron

    Staining

    Acv:Active

    Maa:Mortar

    C:Loss

    Acv:Notactive

    Cau:Rust

    Maa:PressedCementFrieze

    C:SeeLaurenSzebers

    individualreport

    Con

    dtionsAssessMent:M

    AinfACAde

    PlAysAndPlAyerstheAtre|PhilAdelPhiA,PA

    rpacm

    Ww,

    noga

    Maqu

    noga

  • 7/30/2019 Condition Assessment Maint Plan Pp

    8/10

    38 PLAYS AND PLAYERS THEATER

    4. CONDITIONS MAPS

    C

    sAssssm:Ws

    WAll

    PlAysAPlAysA|PlAlPA,P

    A

    Area

    epointedwith

    ncopatibe

    Ceent

    4. CONDITIONS MAPS

    Maa:Brick/Mortar

    C:Loss

    Acv:Active

    Cau:Incompatible

    cementmortar/Moisture

    Maa:Brick/Mor

    tar

    C:RisingD

    amp

    Acv:Active

    Cau:Incompatible

    cementmortar/Moisture

    CondtionsAssessMent:eAsternWAll

    PlAysAndPlAyerstheAtre|P

    hilAdelPhiA,PA

    Aalk

    rpw

    icmpab

    Cm

    PleAsenote:

    theentire

    eleVAtion

    WAsnot

    ACCessiBle.

    theAreA

  • 7/30/2019 Condition Assessment Maint Plan Pp

    9/10

    40 PLAYS AND PLAYERS THEATER

    4. CONDITIONS MAPS

    Maal:Roo

    ngmaterial

    C:PoolingwaterandDebris

    Acvy:Active

    Cau:Improperdrainage

    CondtionsAssessM

    ent:roof

    PLAYSADPLAYERSTHEATRE|PHILADELPHIA,P

    A

    Maal:Flatroof

    C:Cracking,Alligatoring,P

    ooling

    Water,Debris

    Acvy:Active

    Cau:Age

    WHoLeroofneedsrePLACinG

    HVACSystem

    4. CONDITIONS MAPS

    Maal:Plaster

    C:Severe

    WaterDamage&Loss

    Acvy:Possiblyactive

    Ca:Failedashing,

    waterfromexterior/

    moistureingressdueto

    incompatiblecement

    mortar

    Maal:Plaster/Paint

    C:ChippingPaint

    Acvy:Recentlyplastered

    Ca:Age?

    Maal:Plaster

    (PilastersandCapitals)

    C:Mechanical

    Damage/Loss

    Acvy:Unknown

    Ca:Lighting

    installation/movement,

    ladders

    Maal:Plaster

    C:Water

    Damage

    Acvy:Unknown

    Ca:Kitchenand

    BathroomLeaks

    Bathroom

    Kitchen

    C

    ondtionsAssessMent:AuditoriuM

    PLASADPLARSTATR|

    PLADLPA,P

    A

    Maal:Plaster

    (PilastersandCapitals)

    C:Mechanical

    Damage/Loss

    Acvy:Unknown

    Ca:Lighting

    installation/movement,

    ladders