ConnectDER Product Overview
MWCOG – BEEAC Meeting
7/17/14
![Page 2: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14](https://reader035.vdocument.in/reader035/viewer/2022062216/56649d6f5503460f94a51c15/html5/thumbnails/2.jpg)
2
A Home Goes Solar Every 4 Minutes
![Page 3: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14](https://reader035.vdocument.in/reader035/viewer/2022062216/56649d6f5503460f94a51c15/html5/thumbnails/3.jpg)
3
Wiring Can Be Complicated
Equipment + Labor = $800 5% of cost
![Page 4: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14](https://reader035.vdocument.in/reader035/viewer/2022062216/56649d6f5503460f94a51c15/html5/thumbnails/4.jpg)
4
The ConnectDER (xDER)
“Plug-and-play” solar via meter case
Integration and revenue models for utilities
Key installation costs eliminated
![Page 5: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14](https://reader035.vdocument.in/reader035/viewer/2022062216/56649d6f5503460f94a51c15/html5/thumbnails/5.jpg)
Inverter
Solar panels
ConnectDER
Power grid
cellular wifi
zigbee AMI Cloud
API
Reporting& controls
Home
5
![Page 6: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14](https://reader035.vdocument.in/reader035/viewer/2022062216/56649d6f5503460f94a51c15/html5/thumbnails/6.jpg)
Connector
Metering Circuit Breaker
Hardware
6
![Page 7: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14](https://reader035.vdocument.in/reader035/viewer/2022062216/56649d6f5503460f94a51c15/html5/thumbnails/7.jpg)
Connection
Software
7
Metering
Status
![Page 8: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14](https://reader035.vdocument.in/reader035/viewer/2022062216/56649d6f5503460f94a51c15/html5/thumbnails/8.jpg)
8
MEA Game Changer 2.0 Project• Install xDER on 10 MD homes; Demonstrate positive user
experience and cost savings from technology
• Team of Infinite, Standard Solar, Bill Brooks (Solar and NEC code expert), PEPCO