Connection Offer Policy Principles (COPP) Paper An Overview Overview to G3 Liaison Group 24 th of August 2010

Upload: leanh

Post on 03-May-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

Connection Offer Policy Principles (COPP) Paper – An Overview

Overview to G3 Liaison Group

24th of August 2010

Page 2: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

Agenda

(i) Overview of Topics for Consideration

(ii) Timetable for Delivery of COPP

2

Page 3: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

Overview

• Deals with application processing issues from application being submitted up to connection offer or modification being accepted

• Supplementary to:– CER Gate Directions

– Non GPA paper

– Contestability paper

– Pricing Principles paper

• Applies to both TSO and DSO

• Paper for CER consultation.

3

Page 4: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

Topics considered1. Capacity relocation

2. Internal network/connection point changes

3. Increasing/decreasing MECs

4. Reprocessing subgroups

5. Non-LCC Planning Related Charging Issues

6. Capacity Bond

7. Offer Validity Periods

8. Term and Transferability of Access Rights

9. Hybrid Plant

10. Phasing of Offers

11. Phasing of Connection

12. Temporary Connections

13. Non-Firm Connections

14. Change of Generation Type

4

Page 5: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

5

• Customer Costs & leadtimes

• UoS Costs

• SO costs and delivery times

• Practicality

• LCC

• Customer Preferred

• SO Preferred

• Pre-Gate

• During a Gate

• Post Gate (Live offer)

• Transmission demand

• Windfarms – onshore and off

• Non-GPA’s – CHP etc.

• Conventional

• Autoproducers

• Interconnectors

• HybridsCategories Timing

ImpactsConnection

Methods

Scope (i.e. stress test scenarios)

Page 6: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

1. Capacity Relocation

• What is the Issue?

• Policy Backdrop?– Paper issued for consultation

• Where does it fit?– A continuation of previously considered but unresolved issue.

6

“The relocation of a project, whereby an applicant wants to move the location of turbines, for example, from one site to another”

Page 7: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

2. Internal N/W Changes

• What’s the Issue?

• Policy Backdrop?– Policy previously agreed and signed off by CER – never published.

• Where does it fit?– A continuation of previously considered but unpublished.

7

“Applicants requesting lengthy internal networks or changes @ the connection point including mergers”

Page 8: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

3. Increase/Decrease MEC

• What’s the issue?

• Policy Backdrop?– 2007 GPA Pricing Principles Paper

• Where does it fit?– A change in existing policy on decreasing MEC.

8

“At what stage and under what circumstances can an applicant increase or decrease their Maximum Export Capacity (MEC)”

Page 9: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

4. Reprocessing Subgroups due to Fallout

• What’s the Issue?

• Policy Backdrop?– Group Processing Directions

• Where does it fit?– Clarification on existing policies

9

“Where applicants drop out of a subgroup at a particular juncture and the connection method must be reviewed”

Page 10: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

5. Non-LCC Planning Related Charging Issues

• What’s the Issue?

• Policy Backdrop?– CER 09/137a and CER 10/085 GPA Pricing Principles

• Where does it fit?– An elaboration of existing policy

10

“The process that underlines SO’s decision to deem it necessary to pursue a non-LCC connection method requiring either OHL or cable”

Page 11: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

6. Capacity Bond

• What’s the Issue?

• Policy Backdrop?– CER 09/138

• Where does it fit?– Clarification of new policy as set out in 09/138

11

“Timing of MEC bond in relation to phasing of connections”

Page 12: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

7. Offer Validity Periods

• What’s the Issue?

• Policy Backdrop?

– CER 08/260 and recent conventional direction

• Where does it fit?

– An elaboration of existing policy as directed by the CER.

12

“Applicants requesting an extension to the validity period of its offer beyond that directed by the CER”

Page 13: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

8. Term and Transferability of Access Rights

• What’s the Issue?

• Policy Backdrop?– Paper on issue currently in draft form.

• Where does it fit?– A new standalone topic.

13

“The transfer of capacity in connection agreements to different generators. A similar strand of the issue is also where multi-unit sites can transfer their Firm Access Quantity (FAQ) between units on a real time basis. The issue of increasing terms of connection agreements is linked to this”

Page 14: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

9. Hybrid Plant

• What’s the Issue?

• Policy Backdrop?– None

• Where does it fit?– A new standalone topic.

14

“Projects with two parallel types of technology, or applications outside of the Group Processing Approach (GPA) that draw a portion of their capacity from wind”

Page 15: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

10. Combination of Offers

• What’s the Issue?

• Policy Backdrop?– None

• Policy Backdrop?– A continuation of previously considered but unresolved policy.

15

“When an applicant submits multiple applications for combinations of the same project.”

Page 16: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

11. Phasing Of Connections

• What’s the Issue?

• Policy Backdrop?– CER 09/138

• Where does it fit?– An elaboration of existing policy

16

“Where an applicant may reasonably wish to defer connection of part of their capacity and how this sits with the new requirement of MEC reducing to installed capacity 1 year after energisation. Also Capacity bond issue”

Page 17: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

12. Temporary Connections

• What’s the Issue?

• Policy Backdrop?– Scheduling and dispatch paper

– Ruleset for Gate 2

• Where does it fit?– A continuation of previously considered but unresolved policy.

17

“Whether or not to facilitate temporary connections for Gate 3”

Page 18: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

13. Non-Firm Connections

• What’s the Issue?

• Policy Backdrop?– Various firm/non-firm directions

• Where does it fit?– Clarification on existing policy

18

“Confirm policy in relation to non-firm connections to the Grid”

Page 19: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

14. Change of Generation Type

• What’s the Issue?

• Policy Backdrop?– None

• Where does it fit?– A new policy area

19

“Supplementing part of a facility with generation plant of a different technology, for example conventional with onsite wind, without increasing the original MEC”

Page 20: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

Next Steps

• Take on board any feedback from LG Meet today.

• Proceed as per proposed timeline.

• Go to consultation.

20

Page 21: Connection Offer Policy Principles (COPP) Paper An … · Connection Offer Policy Principles (COPP) Paper –An Overview ... Term and Transferability of ... their capacity and how

Timetable For Delivery

• Present @ August LG Meet 24th August

• SO 1st Draft end of September

• CER Feedback 1st Draft mid October

• SO 2nd Draft start of November

• CER feedback 2nd Draft mid November

• Final Paper & Consultation end of November