Connections for Concrete-Filled Steel Tubes in Bridge Applications
Dawn E. Lehman and Charles W. Roederand Muzi Zhao (Graduate Student)
University of Washington
![Page 2: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/2.jpg)
> Authors have jointly researched CFST for nearly 20 years
> Past research described here funded by –• National Science Foundation• US Army• California Dept of Transportation• Washington State Dept of Transportation
> Current research on RC pier to CFST pile connections funded by—• FIU Accelerated Bridge Construction UTC for nonlinear analysis• Pacific Earthquake Engineering Research Center (PEER) for
experimental work
Acknowledgements
![Page 3: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/3.jpg)
> Brad Cameron> Mark Gaines> Ryan Thody> Angela Kingsley> Travis Williams> Kenneth ONeill
> Eric Bishop> Arni Gunnerson> Jie Chen > Max Stephens> Jiho Moon> Lisa Berg
> Ashley Heid> Todd Maki> Muzi Zhao> Xin Zhang> Spencer Lindsley
Many graduate students worked on this sequence of CFT projects
There may be others I have missed. But theydid most of the work I take credit for today.
![Page 4: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/4.jpg)
Why concrete filled steel tubes (CFST)?
![Page 5: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/5.jpg)
This presentation will make statements and recommendations based upon extensive prior experimental and analytical research. The experimental research shown in this presentation are large scale tests, but not full scale tests. Full scale tests are possible but extremely expensive and research agencies do not want to pay the costs. However, the behavior observed in these approximately half scale tests likely reflects the behavior of full scale specimens.
5
![Page 6: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/6.jpg)
Extensive Testing of Members
62005 - 2007
![Page 7: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/7.jpg)
B6KJM31TTBYW
Simple, filled-tube push-through tests
t = ¼” d = 19 ½”
strain gagelocation typ.
rigid basesupport
air gap toallow slip
concrete filllength = 60”
appliedload
welded wiregage locationtyp.
Applied Load2.4m lb. UTM
Instrumented20 in. Dia. Tube
Tube Concrete
Conventional
LowShrinkage
Conventional
LowShrinkage
StraightSeam
SpiralWeld
4-Test Matrix
Extensive Testing of Specific Behaviors - Bond Tests
1990’s with additionalTests 2012 - 2014
![Page 8: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/8.jpg)
Extensive Testing of Components or Specific Behaviors – Shear Resistance of CFST
82014 - 2017
![Page 9: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/9.jpg)
Extensive Testing of Connections and Subassemblages
92007 - Present
![Page 10: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/10.jpg)
Application of CFSTqCFST can be used as piers or columns in
highway bridgesqCFST can be used as piles or for drilled
shafts in deep foundationsqFocus of this presentation
qOverview of CFSTqCFST for Bridge Piers
qConnections of CFST Pier Columns to Pier Caps or Foundations
qCFST Connections for Deep FoundationsqPractical applications10
![Page 11: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/11.jpg)
CFST is a Composite Solution
q Improved seismic performance, blast and collapse resistance
q Reduced size relative to RCq Eliminates labor and cost for formwork and
reinforcementq Tube confines and reinforces concrete fill q Concrete restrains against buckling of the tubeq Integration with precast superstructure. Lighter
columns for placement.
11
![Page 12: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/12.jpg)
Composite Action Requires Shear Stress Transfer Between Steel and Concrete
12
![Page 13: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/13.jpg)
This Shear Stress
> Normally developed by friction between the steel tube and concrete fill
> With significant bending this natural friction is more than enough to assure composite behavior in CFST, because the concrete fill and steel tube have different stiffness characteristics which induce binding and subsequent friction forces.
> With no bending moment and large axial force, mechanical transfer may be required.– Shear studs are not effective and should not be used.– A stiff single rib to prevent slip between the steel tube and concrete
fill will prevent slip and assure that friction will occur. 13
![Page 14: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/14.jpg)
Internal Rib
14
![Page 15: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/15.jpg)
Bridges Collapsed in 1995 Kobe Earthquake
![Page 16: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/16.jpg)
Some were Rebuilt with CFST Piers
![Page 17: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/17.jpg)
Application of CFST for ABC of Bridge Piers
> CFST can be used as piles or pier columns in highway bridges> Inelastic deformation can be isolated to CFST component for
use in seismic regions – Surrounding concrete components remain essentially elastic for large
reversed cyclic displacement demands
17
2012 to Present
![Page 18: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/18.jpg)
Accelerated Construction Sequence
18
![Page 19: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/19.jpg)
Accelerated Construction Sequence
19
![Page 20: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/20.jpg)
Accelerated Construction Sequence
20
![Page 21: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/21.jpg)
Accelerated Construction Sequence
21
![Page 22: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/22.jpg)
Accelerated Construction Sequence
22
![Page 23: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/23.jpg)
Accelerated Construction Sequence
23
![Page 24: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/24.jpg)
Accelerated Construction Sequence
24
![Page 25: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/25.jpg)
Accelerated Construction Sequence
25
![Page 26: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/26.jpg)
Accelerated Construction Sequence
26
![Page 27: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/27.jpg)
Application of CFST to ABC of Deep Foundations
> CFST columns fulfill ABC objectives while providing excellent structural performance in extreme events (e.g., earthquakes)
> Direct advantages of CFST for ABC– Can be integrated with precast
components– Length and diameters can
easily vary– Smaller diameters than RC
columns– Lighter than precast columns
Photo Courtesy of MDT
27
![Page 28: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/28.jpg)
CFST for ABC of Bridge Piers
28
2010 - 2014
![Page 29: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/29.jpg)
CFST Column to Cap Beam Connections
29
![Page 30: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/30.jpg)
o Fully restrained (Full Strength) CFST moment connection
o Tube embedded in foundation concrete
o Annular ring used to transfer overturning forces
Embedded Ring Connection
30
![Page 31: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/31.jpg)
Test Apparatus – Long.
31
![Page 32: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/32.jpg)
Embedded Ring Connection
32
![Page 33: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/33.jpg)
Response of Embedded Ring Connectionwith Adequate Embedment
buckling visible initiation of tearing
� Failure mode and loss of lateral load initiated by ductile tearing of steel tube
� Buckling does not impact performance
� Theoretical plastic moment capacity achieved
� Axial load capacity maintained after tearing
①
② ③
④
33
![Page 34: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/34.jpg)
Performance of Embedded Ring Connection
~3.5%-4% Drift Tube Buckling Develops
Tube Buckling Increases
~7%-8% DriftInitiation of Tearing
Final State
![Page 35: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/35.jpg)
Welded Dowel Connection
D (in) t (in) D/t P/Po Reinforcing Steel Fy (ksi) f’c (ksi) ρL(%) (fy/f’c)ρL
25.75 0.25 103 0.10 A706 Grade 60 68 7.7 3 0.335
![Page 36: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/36.jpg)
Performance of Welded Dowel Connection
� Achieved symmetric drifts of up to 9% with no degradation
� Theoretical plastic moment capacity of CFST achieved due to similar mechanical reinforcing ratio
36
![Page 37: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/37.jpg)
Performance of Welded Dowel Connection
3.5% Drift 7.5% Drift
9% Drift
slightrocking
Increasedrocking
Groutdamage
Exposed Spiral
37
![Page 38: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/38.jpg)
Key Considerations of the Reinforced Concrete (RC) Connection
38
![Page 39: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/39.jpg)
Performance of RC Connection
north barfracture northwest and
northeastbar fracture
south barfracture
southwest andsoutheastbar fracture
qFailure mode fracture of reinforcing bars (~8% drift)
qStrength limited by reinforcing ratio and moment arm
39
![Page 40: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/40.jpg)
Performance of RC Connection7.5% Drift
12% Drift
Final State
Groutdamage
Groutdamage
Deformedspiral
40
![Page 41: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/41.jpg)
Hysteretic Comparison
Reinforced. Concrete
Embedded CFST,D/t = 96
Welded Dowel
41
![Page 42: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/42.jpg)
Comparison of CFST and RC Pier Performance – Same diameter, similar
aspect ratio
• Well outside allowable AASHTO limits
• Significantly stronger but larger reinforcement ratio
• First significant loss of resistance at 8% drift
• Satisfies AASHTO seismic• Significant loss of
resistance at 6% drift• 2.2% total reinforcement
(shear + flexure)
CFST RCPier
![Page 43: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/43.jpg)
CFST vs. RC Damage Comparison at same Scale
43
3% 5% Cycle 2
Conc
rete
Fille
d Tu
beRe
info
rced
Conc
rete
3% Drift 5% Drift
![Page 44: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/44.jpg)
Comparison of RC and CFST
CFST at 10% Drift
CFST at 8.9% Drift
![Page 45: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/45.jpg)
CFST for ABC and Seismic Design of Pile and Drilled Shaft Foundations
2014 - Present
![Page 46: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/46.jpg)
> Steel tube is stiffer and stronger than RC member of same size
> No internal reinforcement or formwork is required> Field work rapidly accomplished> Avoid costly placement of slender Rebar cage> Eliminate or reduce concerns of voids in concrete due to
interference with internal reinforcement
Concrete Filled Steel Tubes (CFST) are ideal for seismic design and ABC of piles and drilled shafts
![Page 47: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/47.jpg)
However, a reliable direct connection between bridge pier and CFST pile or shaft is required
![Page 48: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/48.jpg)
Nonlinear FEM with the LSDyna is performed to study this direct connection
![Page 49: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/49.jpg)
> Different force and moment transfer mechanisms > Effect of supplemental ribs inside the tube > Connection performance due to effects of:
– rib location, – tube diameter, – reinforcing bar diameter,– embedment depth
> Damage to concrete fill and plastic deformation documented
Parameter study evaluated
![Page 50: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/50.jpg)
Effect of CFST diameter and embedment Length with same RC column
Note that the RC column develops smaller resistance with smaller CFST than the larger CFST particularly with shallower embedment depths
![Page 51: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/51.jpg)
Concrete damage with different CFST diameter, same RC column, and AASHTO embedment length
Note that less concrete damage with larger CFST diameter
Smaller CFST Larger Diameter CFST
![Page 52: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/52.jpg)
Addition of a rib increases resistance and reduces deterioration
![Page 53: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/53.jpg)
Effect of Rib Size Investigated
![Page 54: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/54.jpg)
Effect of Rib location Investigated
Regardless of reinforcing bar size, the most reliable resistance and least deterioration In resistance occurs with rib 50 mm below top of CFST
![Page 55: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/55.jpg)
> Analysis suggests that the direct connection can develop the full resistance and achieve the inelastic deformation required of seismic design without excessive deterioration
> Resistance and deterioration capacity depend upon the relative diameters of the CFST tube and RC column and the embedment length of rebar
> Supplemental rib increase resistance and reduce deterioration
> Optimal rib is 50 mm at 50 mm below top for sizes investigated
Summary of Analysis
![Page 56: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/56.jpg)
Experimental program is in progress to verify the results and potentially improve mode with PEER funding.
![Page 57: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/57.jpg)
>Two tests completed–Both have same pier column– Two different CFST tube diameters with no
rib>Data analysis is not complete for these
specimens but preliminary results are available
Experimental Program
![Page 58: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/58.jpg)
Specimen 1 – 20” RC Pier and 30” CFST
![Page 59: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/59.jpg)
Specimen 1
![Page 60: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/60.jpg)
Specimen 2 – 20” RC pier column – 48” CFST
![Page 61: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/61.jpg)
Specimen 2
![Page 62: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/62.jpg)
Comparison of Normalized Moment-Drift Response
Specimen 1 – 30” Pile Specimen 2 – 48” Pile
Smaller diameter CFST has greater deteriorationAs noted in the analytical study
![Page 63: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/63.jpg)
1. It is not possible to precisely place a pile or drilled shaft. As a result, the pier column many not be concentric to the pile or shaft. How does this affect the behavior of the connection?
Initial Study is in Progress
Further Issues
![Page 64: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/64.jpg)
Practical Implications
![Page 65: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/65.jpg)
Recent changes to the LRFD Design Specifications (AASHTO Articles 6.9.6 and 6.12.2.3.3)
make it practical to take advantage of the benefits of
CFST.
![Page 66: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/66.jpg)
Some recent applications of CFST in pile and drilled shaft bridge designs.
66
![Page 67: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/67.jpg)
CFST piles for Alaskan Way Viaduct (2010)
67
![Page 68: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/68.jpg)
CFST Shaft for Puyallip River Bridge (2015)
68
![Page 69: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/69.jpg)
Mukilteo Ferry Terminal (2018)
69
![Page 70: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/70.jpg)
Benefits and Cost Savings
> CFST provides performance that is at least as good as RC piles and shafts
> CFST saves labor in tying rebar, placing rebar, and building formwork and shoring
> The concrete fill enhances the performance of the steel by delaying local buckling
> CFST develops more strength and stiffness with smaller member sizes that RC construction
> Concrete fill will not have voids caused by closely spaced rebar in RC construction
70
![Page 71: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/71.jpg)
Cost Savings
Researchers are not very good at predicting construction costs. However, they can predict strength, stiffness, and the member sizes needed to develop the required strength and stiffness. They can also predict the total material weights required by these designs.
71
![Page 72: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/72.jpg)
Laguna de Santa Rosa Bridge
![Page 73: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/73.jpg)
Laguna de Santa Rosa BridgeOriginal RC Pier
CFST Pier
Concrete Strength (ksi) 6.0 6.0
Steel Strength (ksi) 60.0 50.0
Diameter (in.) 48 44
Tube Thickness (in.) - 0.5
Concrete Area (in.2) 1810 1452
Steel Area (in.2) 73 68
Weight/ft of Pier (kips) 2.1 1.7
Total Pier Weight (kips) 34 27
Difference in Pier Weight
20.5% Reduction
Reduction in Weight of Steel
7%
Reduction in Weight of Concrete
19%
![Page 74: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/74.jpg)
Ebey Slough Pier 2 – Recent WSDOT Drilled Shaft
• 6 ft diameter steel tube 1” wall thickness not considered in strength and stiffness
• 111 ft reinforcing cage with #6 spiral and 28 #14 bars
• 194 ft total shaft length
![Page 75: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/75.jpg)
Replace with CFST Member• Develop the required strength and stiffness with 60
inch diameter tube with 1” wall thickness and no internal reinforcement.
• Develops required strength using 75% of wall thickness to facilitate handling and provide corrosion allowance
• Eliminate– 11.85 tons steel rebar– 1.95 tons of spiral reinforcing– 12.4 tons less steel in tube– 31% reduction in concrete – eliminate 62 cubic yds– 30% less soil to remove
![Page 76: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/76.jpg)
Replace with CFST• Cost savings due to materials are fairly
obvious• Additional savings are expected in labor cost– Avoid tying and placing spindly rebar cages– Concrete placed more quickly since not working
around rebar– Smaller drilled shaft– Reduced concerns about voids in concrete
![Page 77: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/77.jpg)
We recognize that other factors affecting bridge design than required
strength and stiffness of members. Other factors affect the cost of a
bridge than cost of materials. However, there are significant potential savings in materials and labor combined with accelerated construction with CFST.
77
![Page 78: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/78.jpg)
What are the cost benefits of avoiding tying and placing a rebar cage and placing concrete around this
cage without voids in concrete? What is the risk of injury to workmen when this is done?
![Page 79: Connections for Concrete- Filled Steel Tubes in Bridge](https://reader030.vdocument.in/reader030/viewer/2022012703/61a56635b184df4eb2327298/html5/thumbnails/79.jpg)
79