consolidated rental car facility (conrac) y ( )
TRANSCRIPT
Consolidated Rental Car Facility (CONRAC)y ( )
Nashville International Airport
www.flynashville.com
CONRAC – HistoryCONRAC – History
DECEMBER 2004INTERSTATE 40INTERSTATE 40
DECEMBER 2004
•Remote Location
•90 acre Site; 150 ft of relief
•2 Level R/R Facility with a CSB
on top and individual Service Center Sites
•$88 million Project Costs
AUGUST 2006
•Conducted a studyy
•Multiple Locations
On Short Term Garage
Adjacent to Short Term GarageAdjacent to Short Term Garage
In Long Term Lot
Employee Lot
www.flynashville.com
Overflow Lot
CONRAC – History
NOVEMBER 2007
•Started Schematic Design
MAY 2008MAY 2008
•Brought on CM at Risk for
Pre-construction Services
OCTOBER 2008
•Project bid at $89
•Project Put on Hold
October 2009
•Project bid at $58,000,000
March 2010
•Began Construction
NOVEMBER 1 2011
www.flynashville.com
NOVEMBER 1, 2011
•Successfully Opened for Operation
CONRAC – Site Plan
Existing Long TermParking Lot
CUSTOMER ENTRY
READY/RETURN
TARI PHASE I
QTA
SERVICE
RETURN
CUSTOMER EXIT
EXISTINGGARAGE
TO SERVICE SITES
TERMINAL
RAC COUNTERSTO SERVICE SITES
www.flynashville.com
CONRAC – Project Statistics
•1.2 million-square-foot facility
•3 Level Ready/Return Facility
•2400 Ready/Return Stalls2400 Ready/Return Stalls
•9 Rental Car Brands with space for 10
•900 lf of moving walkways
C d E t Pl f Sh t T•Covered Entry Plaza from Short Term Garage
•On-Grade Quick Turn Around (QTA) FacilityFacility
•3-20,000 gallon Underground Storage Tanks
•54 Fueling Stations5 ue g S a o s
•10 Car Wash Bays
•Public Art Piece incorporated in facility
www.flynashville.com
CONRAC – Construction Photos
www.flynashville.com
CONRAC – Construction Photos
www.flynashville.com
CONRAC – Construction Photos
www.flynashville.com
CONRAC – Construction Photos
www.flynashville.com
CONRAC – Construction Photos
www.flynashville.com
CONRAC – Construction Photos
www.flynashville.com
CONRAC – Summary
Funding Source: 100% CFC @ $4.50/day
Total Design Cost: $4,929,507
Total Construction Cost: $58,000,000 GMP
Total Project Cost: $68,000,000
Design Team: Demattei Wong ArchitectureMoody Nolan (local)
General Contractor/Construction Manager: Austin CommericalDF Chase (local)
www.flynashville.com
CONRAC – Airport Contacts
Traci Cooper, P.E.Manager, Design
(615) 275 4139 t i @ hi tl(615) 275-4139 [email protected]
Robert Ramsey, P.E.Assistant Vice President PDC
Planning and Design
(615) 275 1461 robert ramsey@nashintl com(615) 275-1461 [email protected]
Christine Vitt, P.E.Assistant Vice President PDC
Construction and Environmental
(615-) 275-1783 christine vitt@nashintl com
www.flynashville.com
(615 ) 275 1783 [email protected]
www.flynashville.comA Six Sigma OrganizationA Six Sigma Organization