Constraint Technology for Real
Applications Methodology Requirements on CP
![Page 2: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/2.jpg)
Applications
Cisco TunnelBuilder Pro
Cosytec CHIP
ILOG OPL Cplex Solver/Scheduler/Dispatcher/Configurator
Others SAP, I2, Manugistix Air Liquide Nurse Rostering/Call Centre Rostering/Timetabling/etc.
![Page 3: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/3.jpg)
Summary
Hardware design Compilation Financial problems Placement Cutting problems Stand allocation Air traffic control Frequency allocation Network configuration Product design Production step planning Production sequencing
Production scheduling Satellite tasking Maintenance planning Product blending Time tabling Crew rotation Aircraft rotation Transport Personnel assignment Personnel requirement planning
![Page 4: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/4.jpg)
TunnelBuilder-Pro (Cisco)
Fast Rerouter Problem Solver
Linear relaxation Interleaved search
Constraints Maximum flows Shared Risk Groups
Status Cisco Product
![Page 5: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/5.jpg)
SERVAIR – CREW (French Railways)
Crew rostering system assign service staff to TGV train timetable joint implementation with GSI
Problem solver generates tours/cycles assigns skilled personnel
Constraints union, physical, calendar
Status operational since Mar 1995 cost reduction by 5%
![Page 6: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/6.jpg)
Air Planner (Parc Technologies)
Schedule Retimer Plan seasonal flight schedule
Problem Solver Minimum perturbation: linear relaxation constraint propagation
Constraints #Aircraft Maximum retiming Airport slots
Status Used for IATA meetings In-house use at BA
![Page 7: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/7.jpg)
Constraint Technology for Real
Applications Methodology Requirements on CP
![Page 8: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/8.jpg)
Real Problems
Wrong solutions Problem formalisation
Software reports no solution Problem formalisation
No solutions found Algorithm
![Page 9: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/9.jpg)
Wrong Solutions
Implicit Constraints
“Can’t unload where cars are parked”
Data errors
“If we don’t know the weight, we just enter 0.0”
“Balance” not achieved Mon Tue Wed Thur Fri
A Off Off Off Off Off
B Day Day Day Off Off
C Off Off Off Day Day
D Night Night Night Night Night
![Page 10: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/10.jpg)
Software reports no solution
Planners break their own rules “Trains depart every 30 minutes”
Current business practice confused with constraints Always use machine1 before machine2
10:30 16:30
11:00 17:00
11:30 17:30
12:05 18:05
12:30 18:30
13:00 19:00
![Page 11: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/11.jpg)
No solutions found
Attempting complete search Bus+train+tube+walking
Poor heuristics Start from origin Start from time zero
Bugs!! Poor propagation Unnecessary waking Repeated discovery of same partial solutions
![Page 12: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/12.jpg)
Project Breakdown
Specification
Modeling
Algorithms
Delivery
Specification
Modeling
Algorithms
Delivery
![Page 13: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/13.jpg)
Project Plan
Time
Specification
Modeling
Algorithms
Delivery
![Page 14: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/14.jpg)
Problem Specification
Business Objectives
Operational Constraints
Solution EvaluationIdentification of evaluation criteria
Definition of cost function
User and System InterfaceUser interactivity
System requirements
Specification
Modeling
Algorithms
Delivery
![Page 15: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/15.jpg)
Modeling
Constraint ModelingOperational Resource Constraints
Operational Time Constraints Marketing and QOS Constraints
Optimisation Function Alternative evaluation functions
User InterfaceSystem architecture
Specification
Modeling
Algorithms
Delivery
![Page 16: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/16.jpg)
Algorithm DevelopmentProblem Analysis
Operational Constraints Detailed study of problem components
Identification of AlgorithmsPotential solvers for problem components
Heuristics
Construction of Algorithms Coding alternative configurations
Evaluation of Algorithms
Specification
Modeling
Algorithms
Delivery
![Page 17: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/17.jpg)
Product Delivery
Graphical User Interface
Schedule/Despatch Editors
Control
Data Feeds
Semi-constant
Dynamic User input
Acceptance Testing
Documentation
Specification
Modeling
Algorithms
Delivery
![Page 18: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/18.jpg)
Timeboxing
Regular Meetings Every 2-4 weeks
Involving multiple stakeholders Technicians Users
Reporting Progress Achievements Demos Obstacles
Planning ahead Tasks Priorities
![Page 19: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/19.jpg)
Constraint Technology for Real
Applications Methodology Requirements on CP
![Page 20: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/20.jpg)
Requirements on Modelling
Logical Specification “All tasks assigned a resource”
High-Level Constraints “At least two days off in any consecutive ten days”
User-definable constraints “Each overseas task requires a full-skills team”
![Page 21: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/21.jpg)
Requirements on Solving
Each solution must satisfy the model All constraints correctly checkable
Performance must be better than current approach All state-of-the-art algorithms available Search control able to mimic current heuristics
Solutions must be found Full and incomplete search Tailored algorithms
Fast prototyping and development Plug and play with algorithms Orthogonal reasoning and search
![Page 22: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/22.jpg)
CLP – Nature and Scope
RepairRepairLibraryLibrary
Linear Linear ProgrammingProgramming
LibraryLibrary
Interval Interval ReasoningReasoning
LibraryLibrary
Finite Finite DomainDomainLibraryLibrary
Algorithm
ModelModel
CPLEXCPLEXXpress-MPXpress-MP
![Page 23: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/23.jpg)
Three Application Algorithms
Cisco Fast Rerouter
BA Schedule Retimer
Wincanton Transport Cooled goods transportation
![Page 24: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/24.jpg)
Fast Rerouter
![Page 25: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/25.jpg)
Problem statement
Reserve 10 for ce on le Reserve 20 for cf on lf Reserve 20 not 30 for ce and cf on kl
10
30
20
.
max
ce
cf
cecf
cecf
Q
Q
st
![Page 26: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/26.jpg)
Problem model
dfdfe
ofof
ffefe
nOe nIefefe
f efe
Qdcd
eQoco
st
QX
ece
otherwise
fdn
fon
XXnf
st
X
)(
)(
)( )(
)(:
)(:
.
*max
)(:
0
)(1
)(1
:,
.
min
Xfe = 0/1 if flow f is diverted through edge e
![Page 27: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/27.jpg)
Our Algorithm
(1) Find an alternative route for each flow (2) Find an edge E supporting several alternative routes,
that can’t, in the worst case, support them all. If there aren’t any, we are done!
(3) Choose a flow that must not use edge E (choice point) and go to (1)
![Page 28: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/28.jpg)
Results and Comparison
network
(N,E) flows
opt
obj
MIP
cpu,vars,cstrs
Our
Algorithm
a(38,172) 54 132 18.77, 33, 26 3.38, 5
d(50,464) 178 410 TO, 274, 200 517.60, 29
e(50,464) 418 890 TO, 626, 453 4033.98, 64
f(208,676) 28 256 TO, 73, 60 252.44, 23
j(212,734) 154 fail TO, 380, 300 95.33, 5
k(365,1526) 178 422 OOM, 900, 694 310.90, 12
![Page 29: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/29.jpg)
BA Schedule Retimer
![Page 30: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/30.jpg)
IC-Parc 31
Activity Overlaps ~ Fixed TimesS1
S2S3
E1E2
E3
No. ofResourcesRequired
Time
321
Activities
321
S1 S2S3
Potentialresourcebottleneckpoints
![Page 31: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/31.jpg)
Probing
1. Send temporal constraints to linear solver
2. Set flight times to linear optimum
3. Generate resource profile
4. Identify bottleneck: if there isn’t one we are done!
5. Add temporal precedence constraint on two bottleneck tasksand go back to (1)
![Page 32: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/32.jpg)
Experimental Results
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
10 20 50
Number of Activities
LP
No
des
Integer/Linear Programming
Our Algorithm
Integer/Linear vs Our Algorithm: LP Nodes
![Page 33: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/33.jpg)
Logistics with Depots
![Page 34: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/34.jpg)
Subtasks
![Page 35: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/35.jpg)
Logistics with Depots Decomposition
(A) consignment routing (B) load consolidation (C) vehicle routing (D) inter-depot consolidation (E) vehicle assignment (F) driver allocation
Hybridisation Solve subproblems sequentially For each subproblem utilise feedback from the next one
![Page 36: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/36.jpg)
Results
Problem constraints respected Result took a scheduler 3 months to assess He thinks it is good Please don’t ask him to check another result
![Page 37: Constraint Technology for Real u Applications u Methodology u Requirements on CP](https://reader035.vdocument.in/reader035/viewer/2022062309/56649d405503460f94a1a098/html5/thumbnails/37.jpg)
Consultation
Demand this week?