constructed wetland group - wwoa.org · constructed wetlands group, inc. reed beds in operation...

83
An Innovative and Cost Effective Approach to Wastewater and Sludge Treatment Constructed Wetland Group Reed Bed Systems for Biosolids Treatment

Upload: others

Post on 29-Jun-2020

18 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

An Innovative and Cost Effective Approach to

Wastewater and Sludge Treatment

Constructed Wetland

Group

Reed Bed Systems

for Biosolids Treatment

Page 2: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

Aiken, MN

Aliquippa, PA

Amity Township, PA

Ancora State Hospital, Ancora, NJ

Appomattox, VA

Belgium, WI

Bethel, ME

Beverly, NJ

Birdsboro, PA

Blairsville, PA

Bowmanstown, PA

Brillion, WI

Burgettstown, PA

Caribou, ME

Central Carbon, PA

Culver, IN

Deer Lake, PA

Delano, MN

Denton, MD

Elizabethville, PA

Falls City, NE

Fleetwood, PA

Friendship, NY

Greencastle, IN

Green Lane, PA

Harrison Township, PA

Hawley Area Authority, PA

Indian Head, MD

Kasson, MN

Kewaunee, WI

Kirklin, IN

Kla-Mo-Ya Tribe, Chiloquin, OR

Kouts, IN

Kingsford Heights, IN

Kutztown, PA

Linton, IN

Lehigh Township, PA

Lomira, WI

Lowell, IN

Lyons Township, PA

Mabel, MN

Mahanoy City, PA

Constructed Wetlands Group, Inc.

Reed Beds in Operation Maiden Creek, PA

Marion, WI

Marlboro Developmental Ctr., Marlboro, NJ

Morysville, PA

Myerstown, PA

Mercersburg, PA

New Jersey School Of Conservation,

Branchville, NJ

New Paris, IN

Northern Lancaster County Authority,

Denver, PA

North Warren, PA

Oley, PA

Oneida Tribe of Wisconsin

Orbissonia Rockhill , PA

Orwigsburg, PA

Penn Yan, NY

Pine River, MN

Red Cliff Band of Chippewa, WI

Robeson, PA

Robesonia Wernersville, PA

Royersford, PA

Saint Michael, MN

Salem, MO

Schuylkill County MUA, Gordon, PA

Shade Gap, PA

Sherwood, WI

Shickshinny, PA

Sinking Spring, PA

Slatington, PA

South Middleton, PA

Susquehanna, PA

Union Township (Belleville), PA

U.S. Parks Service, Sandy Hook, NJ

Wanatah, IN

Washburn, WI

Washington Township, NJ

West Monmouth MUA, NJ

Winter Harbor, ME

Woodbine, NJ

Womelsdorf, PA

Page 3: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

On-Site Water and Wastewater Treatment

An effective, cost-saving approach to dewatering sludge

Page 4: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

History of Reed Beds

Original research and

seminal work conducted

by the Max-Plank Institute,

Ustersbach, Germany.

Research began in the

late 1950’s - early 1960’s.

Page 5: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Dr. Kaethe Seidel

A pioneer in the study of

the sewage treatment plant

Dr. Seidel’s

experiments

showed

the ability to

metabolize

and uptake

various organic

as well as inorganic

substances

Page 6: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Metabolizing Plants

Macrophytes grown

hydroponically,

and plants such as

Phragmites (common reed),

Scirpus (soft stemmed bulrush),

Juncus (bulrush), and

Typha (cattail)

Page 7: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Design Considerations for Reed Bed Biosolid Treatment

Volume of sludge

Sludge characteristics

including use of polymers

flocculent such as alum

Climatic conditions

Volatile solids concentration

of waste activated sludge

Stabilization process

(aerobic vs. anaerobic)

Page 8: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Design Considerations continued

Most aerobic biosolids systems have further stabilization of WAS

Efficacy of system dramatically diminished when volatile solids are consistently above 70 percent

Provide biosolids retention to comply with seasonal application cycles

winter application intervals may be 3-4 weeks

Land availability

Page 9: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Sludge Quality

Metal concentration

Oil and grease content

pH

Page 10: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Biodynamics and Mechanisms of the Reed Bed Process

Based on previously discussed

design considerations

application rates will vary from

20 to 50 gal./sq. ft./yr.

Application rates and intervals will

depend on

(est. 12-22 applications a year)

severity of winter as it relates to

freeze and thaw conditions

amount of precipitation

Page 11: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Root System Phragmites (common reed)

Extensive root structure

creates an environment for

diverse and active micro flora

microorganisms continually

help to degrade the

volatile solids

reduction in volatile

solids documented as

low as 20 percent

Root structure enhances

hydraulic conductivity and

drainage of supernatant and

water from the biosolids

Page 12: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Root System Phragmites continued

Voracious demand for water by the plants results in uptake and release of water by the leaf structure (evapotransporation)

Mature monoculture of reeds can effectively assimilate up to the equivalent of 40 inches of annual precipitation

Mature plants can transfer oxygen to its root system even against the pressure of six feet of water

Page 13: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Physical Characteristics of Phragmites

Rhizome and emergent stalk has a system of nodes

When nodes are engulfed by biosolids, they form adventitious secondary root system

Secondary root system provides enhanced attachment sites for microorganisms and aids in dewatering

Page 14: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Propagation of Phragmites

Phragmites are one of the world’s most opportunistic plant species

Found in over 40 states

Can survive in up to six feet of standing water for long periods of time

Can also be found in desert climates

Phragmites is native in many of the states in which it is found

Phragmites has been documented historically in almost all mid-western states

Page 15: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Propagation Issues

Phragmites is viewed as an

invasive species

It has been shown that

Phragmites propagates almost

exclusively by vegetative means

Scientists have proven in the

laboratory that

30 - 70% of the seeds

produced are viable

However, conditions necessary

for germination of the seed

make it extremely difficult to

propagate via seed.

Page 16: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Safeguards to Prevent Inadvertent Spread of Phragmites

Special care of harvested plant material

Use of rigid structural barriers

(concrete and treated timber)

Ultimate disposal of the biosolids together with the

plant material should be carefully monitored

Page 17: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Advantages of the Reed Bed System

Although there are significant capital costs in new construction, there are minimal operation and maintenance costs

Existing drying beds can be inexpensively converted to accommodate reed beds

Requires no removal of biosolids for six to ten years

Final bi-product may meet Class A limitations for final disposal

Page 18: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

More Advantages

Significant volume and volatile solids reduction

Long term dewatering and biosolids degradation

Page 19: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Construction of the Reed Beds

Typically Reed Beds

are constructed with

concrete side walls

Page 20: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Construction of Reed Beds (continued)

PVC liner is used to

make the beds

impermeable

Page 21: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Construction of Reed Beds (continued)

Perforated underdrain

system usually

connected to the

head of the plant

Page 22: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Construction of Reed Beds (continued)

Less than two feet of

gravel and sand required

3.5 - 4 feet wall of

freeboard or cement

Biosolids distribution system

Eight foot tongue and

groove pretreated side panels

Page 23: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Wastewater Treatment Plant

Page 24: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Clearing the Site

Page 25: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Clearing and Preparing the Site

Page 26: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Clearing and Preparing the Site

Page 27: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Preparing the Site

Page 28: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Adding Watering System and Walls

Page 29: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Adding Walls

Page 30: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Adding Walls

Page 31: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Adding Walls

Page 32: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Adding Entrance/Exit

Page 33: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

At Entrance/Exit

Page 34: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Construction

Page 35: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Watering System

Page 36: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Inspecting and Preparing for PVC Liner

Page 37: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Laying Out PVC Liner

Page 38: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Installing PVC Liner

Page 39: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Installing PVC Liner

Page 40: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Installing PVC Liner

Page 41: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Adding Gavel Layer over PVC Liner

Page 42: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Adding Sand Layer over Gravel Layer

Page 43: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Planting of Rhizomes in Sand

Page 44: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Watering Rhizomes

Page 45: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Watering Rhizomes

Page 46: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Flooding Bed

Page 47: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Flooding Bed

Page 48: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Early Phragmites/Reed Growth

Page 49: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Grown Mature Phragmites

Page 50: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Grown Mature Phragmites

Page 51: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Grown Mature Phragmites

Page 52: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Grown Mature Phragmites

Page 53: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Harvesting Phragmites/Reeds

Page 54: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Harvested Reed Piles – Ready for Mulching or Baling

Page 55: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Harvested Reed Piles – Mulched

Page 56: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Harvested Reed Piles – Mulched

Page 57: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Seasonal Burning of Unneeded Phragmites/Reeds

Page 58: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Dormant Winter Tubular Reeds Allow Air Flow

Page 59: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Solids Prior to Screening of Rhizomes – with Topsoil Consistency

Page 60: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Removal of Solids Built-up over 8 to 10 years

Page 61: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Removal of Solids After 8 to 10 years

Page 62: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Applying to Agricultural Land – Consistency of Nutrient-Rich Topsoil

Page 63: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Reworking the Bed Bottom

Page 64: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Flooding for New Season

Page 65: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

New Season Growth

Page 66: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

The Process

Grown Mature Phragmites

Page 67: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Preparing for Planting

Spacing of rhizomes

12 inches apart

Watering new roots

Page 68: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Preparing for Planting

Watering covered rhizomes

Flooding of bed

Page 69: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Planting of Phragmites

Planting season from mid

April to November

Vegetative root stock is

planted on one foot centers

Watering is required for a

period of 4-8 weeks after

planting depending on the

season

Application of biosolids

within 4-6 weeks after

planting

Page 70: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Operational Concerns & Common Problems

Over loading or application

of poorly digested biosolids

may cause plant stress or

plant mortality

formation of anaerobic slime

layers and potential for

odor problems

diminished drainage resulting

in significant downtime

Immature reeds can be

susceptible to nitrogen burn,

heat stress, ammonia toxicity

and damage by aphids

Page 71: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Solution to Common Problems

Early recognition and prompt re-mediation

increased levels of DO in biosolids stabilization process

longer retention time

conservative application rates

avoidance of loading on hot sunny days (causes burn)

taking beds out of service for extended periods of time

Page 72: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Control of Biological Pests (Aphids)

During the first year of plant growth,

aphids can cause serious damage

Aphids can be managed with

chemical and biological controls

During the first year it is often

necessary to use systemic

insecticides such as Cygon

With established plants aphids can be

controlled by the release of ladybugs

Page 73: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Harvesting of Reed Beds

Harvesting is normally done in the winter when the

biosolid layer is frozen

provides firm footing

plants are dormant

Harvesting can be completed by several methods

use of sickle bar mower

weed trimmer with metal blade

burning

Page 74: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Why Do We Harvest the Reeds?

Significant biomass (10-13 foot high plants) will

dramatically add to the sludge blanket if not

removed

Although metal uptake by plants is not significant,

removal of the reeds helps to lower metal levels in

the accumulated biosolids layer over time

reeds have the greatest

affinity for copper and zinc

Page 75: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Harvesting continued

Nine to twelve inches of plant stalk

should be left after harvesting

Remaining stalk is dead

plant material, which will

not renew itself

important conduit for air to

the rhizome which promotes

new growth the following

season

creates hydraulic

conductivity promoting

drainage during the winter

Page 76: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Disposal of Harvested Material

Disposal methods for

reed stalks

composting on-site

chipping/mulching

burning

disposal to landfill

baling

Page 77: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Evacuation of Reed Beds

Eventually biosolids will

accumulate to 3 – 3.5 depths

Beds are taken out of

service for six months,

beginning in the fall

Allowing time for the

biosolids to dry and degrade

Following six month down

time, water content

becomes as low as 50%

Beds can be walked

upon, biosolids are friable

Page 78: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Evacuation continued

Volatile solids are as low as 20 - 25%

Metal values in the accumulated biosolids have

consistently been lower or equivalent to the liquid

that has been applied

Pathogen and Helminth ova alues at a number of

facilities are well within Class A limits

Page 79: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Removal of the Biosolids

Removal can be accomplished by excavation equipment set up outside the bed

Use of floatation type vehicles within the bed

Care should be taken to drag biosolids, avoiding disturbance of underlying sand and gravel layer

Facilities often leave 3 or 4 inches of residual biosolids

Page 80: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Reeds after Evacuation

Reeds will regenerate as a

result of the undisturbed

underlying root structure

Beds need to be watered

following biosolids removal

Page 81: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Disposal of Biosolids

Land fill

Beneficial Use

cover for solid waste land fill

used to stabilize mine land reclamation sites

Agricultural application

provided that biosolids have been screened for vegetative matter

Page 82: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Costs

Construction costs of reed beds will vary from

$20.00 per square foot to $40.00 per square foot

Constructed Wetland Group, Inc.

costs for reed beds will vary from $1.00 per square

foot to $5.00 per square foot

Page 83: Constructed Wetland Group - WWOA.org · Constructed Wetlands Group, Inc. Reed Beds in Operation Marion, WI Marlboro Developmental Ctr., Marlboro, NJ Morysville, PA Myerstown, PA New

www.reedbed.com

Email:[email protected]

Constructed Wetlands Group, Inc.

Scope of Services

Technical support to engineer

during feasibility and cost studies

Provides design criteria and

assistance during design phase

Site inspection during

construction

Provide botanical material,

planting supervision, and guarantee

Create site specific written

operation and maintenance

guidelines

Regular on site support during

the first two years of start-up