construction - emap

4
Job Job No Date Scale Blackbird 18063 September 2018 1:100@A3 Construction Proposed - Lower Ground Floor Plan 18063-GA-102-C1 Status Drawing Name Drawing No Date Rev Revision description GENERAL NOTES (DRAWING TO BE READ IN CONJUNTION WITH DESIGN TEAM INFORMATION) Do not scale from this drawing. Base survey carried out by others. Use figured dimensions only and bring any discrepancies to the attention of the architect. Figured dimensions are in millimetres. All specified products and materials to be fitted and installed according to manufacturers specifications and instructions. All building works to be carried out in accordance with current Building Regulations, British Standards and relevant codes of practice. C Studio 204, 120-150 Hackney Road, London. E2 7QS t: 0207 012 1284 e: studio@hamishandlyons.com NORTH Washing machine SVP 2 FROM ABOVE SVP 1 FROM ABOVE SVP 3 FROM ABOVE C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C2 C2 C2 C2 1 3 3 1 DLG - 01 LG-01 Store LG-02 Entrance LG-03 Plant room XX.XX.XX X X CONSTRUCTION JAN-2020 DLG - 02 DLG - 03 DLG - 04

Upload: others

Post on 23-Mar-2022

10 views

Category:

Documents


0 download

TRANSCRIPT

JobJob NoDateScale

Blackbird18063September 20181:100@A3

ConstructionProposed - Lower Ground Floor Plan

18063-GA-102-C1

StatusDrawing Name

Drawing No

Date Rev Revision descriptionGENERAL NOTES (DRAWING TO BE READ IN CONJUNTION WITH DESIGN TEAM INFORMATION)

Do not scale from this drawing. Base survey carried out by others.

Use figured dimensions only and bring any discrepancies to the attention of the architect. Figured dimensions are in millimetres.

All specified products and materials to be fitted and installed according to manufacturers specifications and instructions.

All building works to be carried out in accordance with current Building Regulations, British Standards and relevant codes of practice.C

Studio 204, 120-150 Hackney Road, London. E2 7QS

t: 0207 012 1284

e: [email protected]

NORTH

Washing machine

SVP 2 FROM ABOVE

SVP 1 FROM ABOVE

SVP 3 FROM ABOVE

C1 C1 C1 C1 C1 C1 C1 C1

C1 C1 C1 C1 C1 C1 C1 C1

C2 C2

C2 C2

1

3

3

1

DLG - 01

LG-01Store

LG-02 Entrance

LG-03Plant room

XX.XX.XX X X

CONSTRUCTION

JAN-2020

DLG - 02

DLG - 03

DLG - 04

JobJob NoDateScale

Blackbird18063September 20181:100@A3

ConstructionProposed - Raised Ground Floor Plan

18063-GA-103-C1

StatusDrawing Name

Drawing No

Date Rev Revision descriptionGENERAL NOTES (DRAWING TO BE READ IN CONJUNTION WITH DESIGN TEAM INFORMATION)

Do not scale from this drawing. Base survey carried out by others.

Use figured dimensions only and bring any discrepancies to the attention of the architect. Figured dimensions are in millimetres.

All specified products and materials to be fitted and installed according to manufacturers specifications and instructions.

All building works to be carried out in accordance with current Building Regulations, British Standards and relevant codes of practice.C

Studio 204, 120-150 Hackney Road, London. E2 7QS

t: 0207 012 1284

e: [email protected]

NORTH

Bedroom 1

Hallway

Bathroom

Stairs

Living spaces

Walk In Wardrobe

Master Bedroom

Bedroom 2

RAMP

TimberColumn

WRAP AROUND WALKWAY / VERANDA

XX.XX.XX X X

CONSTRUCTION

JAN-2020

1

3

3

1

JobJob NoDateScale

Blackbird18063September 20181:100@A3

ConstructionProposed - Section 1

18063-GA-109-C1

StatusDrawing Name

Drawing No

Date Rev Revision description

XX.XX.XX X X

GENERAL NOTES (DRAWING TO BE READ IN CONJUNTION WITH DESIGN TEAM INFORMATION)

Do not scale from this drawing. Base survey carried out by others.

Use figured dimensions only and bring any discrepancies to the attention of the architect. Figured dimensions are in millimetres.

All specified products and materials to be fitted and installed according to manufacturers specifications and instructions.

All building works to be carried out in accordance with current Building Regulations, British Standards and relevant codes of practice.C

Studio 204, 120-150 Hackney Road, London. E2 7QS

t: 0207 012 1284

e: [email protected]

LIVING SPACES MASTER SUITE

SVP

3 TO

BEL

OW

GRO

UND

BEDROOMS UTILITY/STAIRSTUDIO

CONSTRUCTION

JAN-2020

JobJob NoDateScale

Blackbird18063September 20181:50@A3

ConstructionProposed - Section 03

18063-GA-111-C1

StatusDrawing Name

Drawing No

Date Rev Revision description

XX.XX.XX X X

GENERAL NOTES (DRAWING TO BE READ IN CONJUNTION WITH DESIGN TEAM INFORMATION)

Do not scale from this drawing. Base survey carried out by others.

Use figured dimensions only and bring any discrepancies to the attention of the architect. Figured dimensions are in millimetres.

All specified products and materials to be fitted and installed according to manufacturers specifications and instructions.

All building works to be carried out in accordance with current Building Regulations, British Standards and relevant codes of practice.C

Studio 204, 120-150 Hackney Road, London. E2 7QS

t: 0207 012 1284

e: [email protected]

Section A - AGA

CONSTRUCTION

JAN-2020