Construction Management Plan 2425 Oakton Street Evanston, Illinois 60202 Wednesday, June 10, 2020 (revs. February 12, 2020, March 6, 2020, May 18, 2020) General Contractor: RMJ Construction, Ltd. Architect: All Design Developers Corporation Sign Contractor: H.M. Witt & Co. Signs Car Wash Supplier: Badger Land Car Wash Equipment and Supplies Co. Traffic Devices: TBD Owner: HPCW, LLC This Construction Management Plan has been prepared by RMJ Construction, Ltd. It outlines practices and procedures during construction of the project at 2425 Oakton Street, Evanston. To the extent permit plans deviate from the below summary, the plans control.

Upload: others

Post on 25-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Construction Management Plan - City of Evanston

Construction Management Plan 2425 Oakton Street Evanston, Illinois 60202 Wednesday, June 10, 2020 (revs. February 12, 2020, March 6, 2020, May 18, 2020)

General Contractor: RMJ Construction, Ltd. Architect: All Design Developers Corporation Sign Contractor: H.M. Witt & Co. Signs Car Wash Supplier: Badger Land Car Wash Equipment and Supplies Co. Traffic Devices: TBD Owner: HPCW, LLC

This Construction Management Plan has been prepared by RMJ Construction, Ltd. It outlines practices and procedures during construction of the project at 2425 Oakton Street, Evanston. To the extent permit plans deviate from the below summary, the plans control.

Page 2: Construction Management Plan - City of Evanston

2425 Oakton Street CMP Page 2

Contents: Traffic Control and Logistics Page 2 Protection for Pedestrians Page 3 Demolition Page 4 Construction Page 4 Project Schedule Page 5 Work Hours Page 5 Contractor Parking Page 5 Delivery Routes and Staging Page 6 Verification of Existing Conditions Page 6 Work Site Communication Page 6

EXHIBIT A – Construction Site Map (rev. 6/10/20) EXHIBIT B – Crane Plan

EXHIBIT C – Street Closure Plan (rev. 6/9/20) EXHIBIT D – Truck Routes

Traffic Control and Logistics:

The attached EXHIBIT A is Sheet C-6 from the civil engineering drawings, titled Erosion Control Plan. This exhibit reflects the site planning for the access and washout area, the portable toilet and the trailer that will be used during the majority of the construction. Deviations in the plan will be reported as necessary and in advance. The site, with the exception of the furthest portion of the southeast corner, will remain enclosed by the existing chain link fence to prevent public access into the construction site. An area used pursuant to license by the easterly neighbor will remain unenclosed in order to allow loading operations to continue except at times when work does not allow this (and the general contractor will engage the neighbor in advance of any needs for alteration of access over the apron). The construction fence has a top rail and windscreens installed as required by Evanston. A 16-plus foot wide inward swinging gate will exist along the south lot line near the west of the traffic signals, at roughly the same location as the existing curb depression west of the traffic signals (roughly 90 feet west of the loading alley for 2405 Oakton Street). This is the existing gate and no secondary access will be provided. The gate will feature a Knox box padlock for fire/emergency access if deemed necessary by staff.

Appropriate communications between the general contractor, architect and ComEd have been in progress. Authorization to relocate the overhead transmission lines has been obtained. Mylars concerning the abrogation of the existing easement and the platting of the new easement were circulating as of March 2, 2020. Staging of the relocation will occur according to ComEd’s authorization requirements which have been, or will be, reported to City staff. No interruption of ComEd service is anticipated during any further work following the relocation.

For limited periods, the sidewalk and/or certain Oakton Street vehicular lanes will be closed to allow for (a) the ComEd transmission line relocation, (b) the installation of new sanitary and storm services (combined system connection), (c) for driveway and apron construction, and (d) for traffic signal relocation. The traffic plan attached hereto is intended to

Page 3: Construction Management Plan - City of Evanston

2425 Oakton Street CMP Page 3

remain consistent for any remaining work related to the ComEd lines or work touching the right of way. Altering the planning for lane reductions seemed inconsistent with safety due to the various merging patterns and intersection movements near the site. Proper traffic controls and signage will be used to redirect and manage vehicular and pedestrian traffic as justified by the extent of the closure. To the extent feasible, the general contractor will endeavor to maintain two-way, four lane Oakton Street traffic at all times during the construction of the project. The general contractor will obtain all required right-of-way permits prior to commencement of any work impacting Oakton Street, including the sidewalk. The signal contractor will execute a maintenance transfer agreement with the City.

Deliveries will occur through the relocated westerly gate at all times. This is an existing depressed curb area with tapers of roughly 11 feet (west) and 7.5 feet (east). If necessary, the contractor will alter the radius and tapers in the field, but the existing width seems sufficient with the existing radius and taper configuration. Vehicles will be directed not to stage on Oakton Street or on neighboring properties or streets unless the general contractor obtains prior permission. Field personnel will be available on site during the most material deliveries in case flaggers are required for safety and maneuvering purposes.

One (1) thirty (30)-yard Groot waste container will be utilized to manage construction refuse.

Protection for Pedestrians:

The public sidewalk and parkway located on the north side of Oakton Street in front of the construction site will be closed for the length of the span in front of the site and extending 10-15 feet in each direction during portions of the construction involving: (a) the ComEd transmission line relocation; (b) the installation of the freestanding sign; (c) the necessary disconnection and reconnection work involving utilities; (d) work relating to traffic signals; and (e) driveway construction. The sidewalk closures will not involve the rerouting of pedestrians along the north side of Oakton Street into the Oakton Street right of way due to the limited pedestrian activity in the area. Signs will be posted at corners with marked crosswalks so that pedestrians are aware of the closure and can cross to the south side of Oakton Street. (There is no available street parking to allow for diversion of pedestrians and the preservation of two-directional, four lane traffic requires avoidance of closures of a lane for such infrequent pedestrian use of the sidewalk.) Due to the distance of nearby lights, four pedestrian warnings will be posted as shown in the attached Traffic Plan—two adjacent to the site, one on the northeast corner of Oakton and McCormick and one at the northwest corner of the signalized Home Depot entrance.

During construction, there will be alterations and temporary backfilling to the sidewalk. Poles or horses will be posted with flashing lights and reflectors at each point where the sidewalk is in such a temporary condition. Temporary sheets of wood, anchored appropriately at each side, will be installed to comply with ADA guidelines. Notably, the pedestrian path is at least 35 feet from any construction involving a structure within the project. The sole exception ties to work relating to the freestanding sign, the ComEd transmission line relocation and traffic control devices.

Page 4: Construction Management Plan - City of Evanston

2425 Oakton Street CMP Page 4

The project will comply with the pedestrian protection mandates in Title 4, Chapter 2 of the City's Building Code. Upon review of Table 3306.1, and after reviewing the distance from the pedestrian path to any structure, no barrier is required for pedestrian protection. The proposed 8-foot construction fence will provide all necessary protection. All temporary facilities such as fencing, barricades, and site infrastructure will be removed near or upon project completion.

Demolition:

The building on the site has been demolished. A portion of the former building’s foundation wall exists along the west wall of the north building at 2405 Oakton Street. During construction, this remaining portion of the foundation wall will be evaluated for preservation and field adjustments in order to avoid disturbance to the north building at 2405 Oakton. During construction, the existing sidewalk adjacent to the site will be removed and replaced. The removal and replacement of the sidewalk will occur from the south lot line area.

Construction:

The construction timeline has five phases. Between June/July 2020 and October 2020, there is a high likelihood that two or more phases will overlap as a result of the project size. During all phases, close attention will be paid to areas for which permeable pavers are planned because their construction and installation require excavation, construction, backfilling, excavation and paver installation.

The first phase will consist of silt fence installation, basic site civil engineering (cleanout area, inlet protection and preparation of fuel and pollutant storage areas), site grading, utility services and storm drainage. New sewer (combined) and water services will be installed during the Phase 1 mobilization. Traffic control measures for the disconnection of the existing services and installation of the new services are shown in EXHIBIT C. Underground utilities work will occur in the northern two lanes of Oakton Street to the extent necessary. Phase 1 will include the relocation of the ComEd transmission lines. The sewer main connection will be coordinated with the City, MWRD and the Oakton Street contractor.

The second phase (occurring during Phase 1 or immediately upon the conclusion of Phase 1) will include excavation for building, foundation construction and concrete slab pours. Underground utility work (interior and exterior) will occur during Phase 2. Phase 2 will also include excavations for permeable paver areas. Whether Phase 2 will include the relocation of any traffic control devices depends on the status of the Oakton Street project. The relocation of traffic signals is a distinct matter handled with the City (not part of this CMP), but the contractor will adjust matters explained herein to adapt them to the City’s directives in relation to relocation of the traffic signals.

The third phase will overlap with Phase 2 and will include the vertical construction of the building shell, including walls, windows, doors, and masonry. EXHIBIT B illustrates the crane location in relation to the location of the truck from which it receives precast materials for the roof. A crane will be necessary for one day of work.

Page 5: Construction Management Plan - City of Evanston

2425 Oakton Street CMP Page 5

The fourth phase will involve the installation of exterior equipment (pay machines and vacuums), interior build-out of the car wash building, installation of canopies, tunnel equipment installation, completion of lighting work and landscaping. Landscaping enhancements to the City right-of-way will be done during this phase. Some Phase 4 work could overlap with Phase 3 efforts. The site perimeter fence will remain in place until completion of the fourth phase, at a minimum, and longer if safety and security remain a concern.

The final phase will involve sign installation. Signs other than the freestanding sign may be installed during Phase 4, but the freestanding sign would be the last improvement subject to any work remaining on punch lists. H.M. Witt & Company Signs will work in conjunction with general contractor to ensure a safe and smooth install without affecting pedestrian or auto traffic along Oakton Street. Attention will be focused on pedestrian safety at any time when construction occurs near the sidewalk. H.M. Witt’s union installers have installed thousands of signs all over the country and H.M. Witt backs its work with a strong safety record. Once the site is properly prepared for installation, sign installation typically requires a full day (often during regular business hours).

The general staging area for the project will be on the southeast end of the property east of the access gate from Oakton Street. There will be an on-site trailer or site office situated in the southeast portion of the site.

Project Schedule:

Phase 1: June/July 2020 Phase 2: July/August 2020 Phase 3: July/August 2020

Phase 4: August 2020 Phase 5: August/September 2020

Completion: August 2020

Construction Work Hours:

Monday-Friday: 7:00 AM to 7:00 PM Saturday: 8:00 AM to 5:00 PM

Sunday: None unless special permission obtained from the City

Contractor Parking:

Contractors will be directed not to park on residential city streets. Any contractors or construction personnel who park on residential city streets will be directed to relocate their vehicles to an approved location.

Contractors and construction personnel will be directed to park on site or in one of the parking lots nearby provided that the general contractor and owner of that lot have reached a prior agreement. Parking restrictions will be communicated weekly to all on-site personnel. The

Page 6: Construction Management Plan - City of Evanston

2425 Oakton Street CMP Page 6

construction site can host necessary vehicles during excavation and utility work. A large area will be available for parking during all site work (situated in the northeast portions of the site). All contractors and trades will be allowed to park on-site. The site can accommodate 25 parking stalls for passenger and service vehicles as well as 3-4 larger trucks.

Delivery Routes and Staging:

Traffic entering the site will only use the approved truck routes to access Oakton Street and the site while keeping in mind any regulatory height restrictions as noted in EXHIBIT D. Traffic exiting the site will only exit onto Oakton Street, turning west in all but the most limited circumstances, to reach follow approved truck routes (see EXHIBIT D). All deliveries will be aware of the 8,000 lb. weight limit on area streets east of the site. Staging of trucks on local streets will not be permitted.

Any exceptions to the foregoing will be addressed with and approved by City staff in advance. Any contractor or subcontractor whose personnel do not adhere to the foregoing terms will be required to utilize other drivers for their subsequent deliveries.

Verification of Existing Conditions:

In light of surrounding activities, land uses and structural improvements, a vibration monitoring system should not be required. Off-site buildings are sufficiently removed from excavation and foundation work. No piles or deep bores are being utilized. Background vibration is likely greater than that which will be caused by the very limited grading work for the detention and for the excavation for the car wash building and vacuum and stacking areas.

Prior to commencement of construction activities, detailed photos and video of the building façade at 2405 Oakton Avenue (the only building of any concern due to its proximity to the site) will be performed to document the existing conditions at the following properties. A mark will be placed on the 2405 Oakton Street foundation wall prior to any major ground disturbance to monitor settlement. A mark in the form of a bolt, anchor or nail will be relied on for the as-built before and after ground disturbances to monitor any settlement. There is no need to provide settlement or vibratory monitoring to any other structure due to the distance of these structures from the site.

There are only 3-4 trees on the perimeter of the site (no trees on the interior). The contractor will separately provide a tree inventory and preservation plan, but it respectfully invites the arborist to the site to observe the trees and determine if a typical protection plan will suffice. The flexibility with regard to timing on delivery of the inventory and plan is appreciated.

Work Site Communication:

The project team will update the property owners or management companies of buildings on the same block (within 300 feet east or west of the site) and within the opposing block (within 300 feet east or west of the site). The notifications will be in writing delivered by U.S. mail, email, and/or other means supported by the property owners or management companies. The

Page 7: Construction Management Plan - City of Evanston

2425 Oakton Street CMP Page 7

initial notification will be made at least one week prior to mobilization for the project. Updates will be delivered.

All public right of way closures will have posted notifications 48 hours prior to their start. Notice to the City of sidewalk closures will be provided 3 days in advance, with notice of a lane reduction being provided to the City and CTA being provided 10 days in advance.

A sign with emergency contact information for the general contractor's key employees will be posted on, or on the fence panel next to, the primary access gate. A development sign with the project name, rendering and project description will be provided on the gate or the fence panel adjacent thereto and a board at this location will provide project updates.

As necessary, COVID-19 precautions will be taken. Contractor acknowledges the City of Evanston Order requiring all persons working in or patronizing "essential businesses and operations" as defined in the Governor's Stay-at-Home Order to wear cloth face coverings. Further, contractor will continue to monitor and abide by the Governor’s Executive Orders to the extent they apply to operations on site, including Executive Order Number 39. Pursuant to Executive Order 30, contractor will post the guidance from the Illinois Department of Public Health (IDPH) and Office of the Illinois Attorney General regarding workplace safety during the COVID-19 emergency (guidance available on the IDPH webpage).

Page 8: Construction Management Plan - City of Evanston

2631

Gin

ger W

oods

Par

kway

, Sui

te 1

00, A

uror

a, IL

605

02ph

one

630-

375-

1800

fa

x 63

0-23

6-98

00

ww

w.w

ater

mar

k-en

gine

erin

g.co

m

AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
)>
AutoCAD SHX Text
)>
AutoCAD SHX Text
)>
AutoCAD SHX Text
)>
AutoCAD SHX Text
)>
AutoCAD SHX Text
)>
AutoCAD SHX Text
)>
AutoCAD SHX Text
)>
AutoCAD SHX Text
)>
AutoCAD SHX Text
)>
AutoCAD SHX Text
>
AutoCAD SHX Text
)>
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
6" WATERMAIN PER REC. & FIELD MARKINGS
AutoCAD SHX Text
COMBINED SEWER MH RIM = 602.74 E. INV.=583.28 (24") W. INV.=583.16 (24")
AutoCAD SHX Text
COMBINED SEWER MH RIM = 597.58 W. INV. = 583.82(24") E. INV. =583.84 (24") NE. INV. =585.43 SE. INV. =585.27
AutoCAD SHX Text
CATCH BASIN RIM = 597.30 SW INV=594.25 (WITH 6" RESTRICTOR)
AutoCAD SHX Text
COMBINED SEWER MH RIM = 597.57 W INV = 583.53 (24") S INV = 585.11 (18") E INV =583.67 (24") N INV = 586.31 NW INV = 587.50
AutoCAD SHX Text
12" WATERMAIN PER REC. & FIELD MARKINGS
AutoCAD SHX Text
CURB CATCH BASIN FLOW LINE = 597.24 NW. INV. =±594.54 (RESTRICTOR)
AutoCAD SHX Text
CATCH BASIN FLOW LINE = 599.30 INV. INACCESSIBLE
AutoCAD SHX Text
VAULT RIM = 600.32 TOP OF PIPE = 592.22
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
>
AutoCAD SHX Text
>
AutoCAD SHX Text
>
AutoCAD SHX Text
>
AutoCAD SHX Text
FIN/FL=597.76
AutoCAD SHX Text
FIN/FL=597.97
AutoCAD SHX Text
CATCH BASIN RIM = 598.14 10" RCP NW INV±590.6312" RCP E INV=590.85
AutoCAD SHX Text
FLARED END SECTION 18" INV=591.13
AutoCAD SHX Text
FLARED END SECTION 18" INV=591.89
AutoCAD SHX Text
CATCH BASIN RIM = 597.15
AutoCAD SHX Text
SANITARY SEWER MH RIM = 597.71
AutoCAD SHX Text
12"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
8"
AutoCAD SHX Text
30"
AutoCAD SHX Text
18"
AutoCAD SHX Text
12"
AutoCAD SHX Text
24"
AutoCAD SHX Text
16"
AutoCAD SHX Text
8"
AutoCAD SHX Text
6"
AutoCAD SHX Text
24"
AutoCAD SHX Text
8"
AutoCAD SHX Text
20"
AutoCAD SHX Text
8"
AutoCAD SHX Text
6"
AutoCAD SHX Text
12"
AutoCAD SHX Text
8"
AutoCAD SHX Text
8"
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
602.4
AutoCAD SHX Text
602.2
AutoCAD SHX Text
601.0
AutoCAD SHX Text
601.1
AutoCAD SHX Text
600.0
AutoCAD SHX Text
600.8
AutoCAD SHX Text
600.1
AutoCAD SHX Text
598.3
AutoCAD SHX Text
598.6
AutoCAD SHX Text
598.2
AutoCAD SHX Text
598.2
AutoCAD SHX Text
597.7
AutoCAD SHX Text
598.4
AutoCAD SHX Text
597.8
AutoCAD SHX Text
599.5
AutoCAD SHX Text
598.7
AutoCAD SHX Text
600.6
AutoCAD SHX Text
597.5
AutoCAD SHX Text
598.8
AutoCAD SHX Text
597.8
AutoCAD SHX Text
598.6
AutoCAD SHX Text
598.3
AutoCAD SHX Text
597.5
AutoCAD SHX Text
598.9
AutoCAD SHX Text
598.7
AutoCAD SHX Text
598.1
AutoCAD SHX Text
597.9
AutoCAD SHX Text
600.2
AutoCAD SHX Text
597.6
AutoCAD SHX Text
598.2
AutoCAD SHX Text
599.1
AutoCAD SHX Text
598.3
AutoCAD SHX Text
597.8
AutoCAD SHX Text
600.0
AutoCAD SHX Text
599.2
AutoCAD SHX Text
598.9
AutoCAD SHX Text
598.3
AutoCAD SHX Text
597.7
AutoCAD SHX Text
597.1
AutoCAD SHX Text
600.2
AutoCAD SHX Text
599.1
AutoCAD SHX Text
597.6
AutoCAD SHX Text
600.1
AutoCAD SHX Text
597.1
AutoCAD SHX Text
600.6
AutoCAD SHX Text
600.8
AutoCAD SHX Text
602.0
AutoCAD SHX Text
600.1
AutoCAD SHX Text
599.9
AutoCAD SHX Text
597.2
AutoCAD SHX Text
599.9
AutoCAD SHX Text
597.0
AutoCAD SHX Text
600.4
AutoCAD SHX Text
600.7
AutoCAD SHX Text
599.9
AutoCAD SHX Text
597.3
AutoCAD SHX Text
596.9
AutoCAD SHX Text
599.7
AutoCAD SHX Text
600.4
AutoCAD SHX Text
600.6
AutoCAD SHX Text
597.4
AutoCAD SHX Text
597.1
AutoCAD SHX Text
596.8
AutoCAD SHX Text
597.1
AutoCAD SHX Text
598.0
AutoCAD SHX Text
598.0
AutoCAD SHX Text
598.4
AutoCAD SHX Text
597.8
AutoCAD SHX Text
598.0
AutoCAD SHX Text
597.7
AutoCAD SHX Text
596.8
AutoCAD SHX Text
597.3
AutoCAD SHX Text
597.3
AutoCAD SHX Text
597.0
AutoCAD SHX Text
599.2
AutoCAD SHX Text
596.8
AutoCAD SHX Text
597.2
AutoCAD SHX Text
596.9
AutoCAD SHX Text
599.4
AutoCAD SHX Text
601.9
AutoCAD SHX Text
601.3
AutoCAD SHX Text
601.3
AutoCAD SHX Text
600.3
AutoCAD SHX Text
597.5
AutoCAD SHX Text
598.4
AutoCAD SHX Text
597.3
AutoCAD SHX Text
597.1
AutoCAD SHX Text
597.9
AutoCAD SHX Text
595.8
AutoCAD SHX Text
592.8
AutoCAD SHX Text
592.2
AutoCAD SHX Text
594.6
AutoCAD SHX Text
598.0
AutoCAD SHX Text
595.7
AutoCAD SHX Text
593.3
AutoCAD SHX Text
592.8
AutoCAD SHX Text
596.5
AutoCAD SHX Text
594.6
AutoCAD SHX Text
595.7
AutoCAD SHX Text
593.9
AutoCAD SHX Text
596.8
AutoCAD SHX Text
594.3
AutoCAD SHX Text
596.0
AutoCAD SHX Text
597.4
AutoCAD SHX Text
593.7
AutoCAD SHX Text
591.8
AutoCAD SHX Text
591.1
AutoCAD SHX Text
592.7
AutoCAD SHX Text
593.3
AutoCAD SHX Text
593.7
AutoCAD SHX Text
596.3
AutoCAD SHX Text
597.7
AutoCAD SHX Text
601.6
AutoCAD SHX Text
600.7
AutoCAD SHX Text
601.4
AutoCAD SHX Text
595.5
AutoCAD SHX Text
595.4
AutoCAD SHX Text
597.6
AutoCAD SHX Text
593.8
AutoCAD SHX Text
593.2
AutoCAD SHX Text
602.1
AutoCAD SHX Text
602.2
AutoCAD SHX Text
600.1
AutoCAD SHX Text
602.43
AutoCAD SHX Text
602.17
AutoCAD SHX Text
601.69
AutoCAD SHX Text
602.08
AutoCAD SHX Text
601.82
AutoCAD SHX Text
602.21
AutoCAD SHX Text
602.20
AutoCAD SHX Text
602.16
AutoCAD SHX Text
601.94
AutoCAD SHX Text
602.20
AutoCAD SHX Text
602.21
AutoCAD SHX Text
601.82
AutoCAD SHX Text
601.91
AutoCAD SHX Text
602.34
AutoCAD SHX Text
602.52
AutoCAD SHX Text
602.08
AutoCAD SHX Text
602.20
AutoCAD SHX Text
602.02
AutoCAD SHX Text
601.88
AutoCAD SHX Text
602.21
AutoCAD SHX Text
601.82
AutoCAD SHX Text
601.90
AutoCAD SHX Text
602.19
AutoCAD SHX Text
601.63
AutoCAD SHX Text
601.59
AutoCAD SHX Text
601.56
AutoCAD SHX Text
601.89
AutoCAD SHX Text
601.47
AutoCAD SHX Text
601.93
AutoCAD SHX Text
601.46
AutoCAD SHX Text
601.47
AutoCAD SHX Text
601.83
AutoCAD SHX Text
601.84
AutoCAD SHX Text
601.51
AutoCAD SHX Text
601.50
AutoCAD SHX Text
601.04
AutoCAD SHX Text
601.65
AutoCAD SHX Text
601.18
AutoCAD SHX Text
601.38
AutoCAD SHX Text
601.80
AutoCAD SHX Text
601.26
AutoCAD SHX Text
600.79
AutoCAD SHX Text
600.82
AutoCAD SHX Text
601.56
AutoCAD SHX Text
601.36
AutoCAD SHX Text
601.20
AutoCAD SHX Text
601.13
AutoCAD SHX Text
601.13
AutoCAD SHX Text
601.16
AutoCAD SHX Text
601.49
AutoCAD SHX Text
601.36
AutoCAD SHX Text
600.98
AutoCAD SHX Text
601.30
AutoCAD SHX Text
601.13
AutoCAD SHX Text
600.64
AutoCAD SHX Text
601.11
AutoCAD SHX Text
601.41
AutoCAD SHX Text
600.07
AutoCAD SHX Text
599.64
AutoCAD SHX Text
599.75
AutoCAD SHX Text
599.58
AutoCAD SHX Text
599.58
AutoCAD SHX Text
599.51
AutoCAD SHX Text
599.57
AutoCAD SHX Text
600.15
AutoCAD SHX Text
599.47
AutoCAD SHX Text
599.02
AutoCAD SHX Text
598.83
AutoCAD SHX Text
599.12
AutoCAD SHX Text
598.87
AutoCAD SHX Text
598.84
AutoCAD SHX Text
600.12
AutoCAD SHX Text
600.11
AutoCAD SHX Text
599.69
AutoCAD SHX Text
600.87
AutoCAD SHX Text
601.00
AutoCAD SHX Text
601.02
AutoCAD SHX Text
599.81
AutoCAD SHX Text
599.91
AutoCAD SHX Text
599.97
AutoCAD SHX Text
600.15
AutoCAD SHX Text
600.77
AutoCAD SHX Text
601.24
AutoCAD SHX Text
600.82
AutoCAD SHX Text
600.37
AutoCAD SHX Text
599.17
AutoCAD SHX Text
598.72
AutoCAD SHX Text
599.09
AutoCAD SHX Text
598.78
AutoCAD SHX Text
599.23
AutoCAD SHX Text
599.19
AutoCAD SHX Text
598.83
AutoCAD SHX Text
598.90
AutoCAD SHX Text
598.76
AutoCAD SHX Text
598.71
AutoCAD SHX Text
598.60
AutoCAD SHX Text
598.95
AutoCAD SHX Text
599.39
AutoCAD SHX Text
599.27
AutoCAD SHX Text
599.20
AutoCAD SHX Text
599.16
AutoCAD SHX Text
598.84
AutoCAD SHX Text
598.77
AutoCAD SHX Text
598.67
AutoCAD SHX Text
598.84
AutoCAD SHX Text
598.85
AutoCAD SHX Text
598.87
AutoCAD SHX Text
598.53
AutoCAD SHX Text
599.11
AutoCAD SHX Text
598.57
AutoCAD SHX Text
598.48
AutoCAD SHX Text
598.99
AutoCAD SHX Text
598.99
AutoCAD SHX Text
598.83
AutoCAD SHX Text
599.30
AutoCAD SHX Text
598.67
AutoCAD SHX Text
598.71
AutoCAD SHX Text
599.00
AutoCAD SHX Text
598.55
AutoCAD SHX Text
598.99
AutoCAD SHX Text
598.62
AutoCAD SHX Text
598.48
AutoCAD SHX Text
598.56
AutoCAD SHX Text
598.90
AutoCAD SHX Text
598.40
AutoCAD SHX Text
598.86
AutoCAD SHX Text
598.84
AutoCAD SHX Text
599.18
AutoCAD SHX Text
599.42
AutoCAD SHX Text
598.47
AutoCAD SHX Text
598.51
AutoCAD SHX Text
600.04
AutoCAD SHX Text
600.71
AutoCAD SHX Text
598.33
AutoCAD SHX Text
597.97
AutoCAD SHX Text
597.89
AutoCAD SHX Text
598.12
AutoCAD SHX Text
597.95
AutoCAD SHX Text
598.39
AutoCAD SHX Text
598.47
AutoCAD SHX Text
598.75
AutoCAD SHX Text
598.51
AutoCAD SHX Text
598.38
AutoCAD SHX Text
598.99
AutoCAD SHX Text
598.76
AutoCAD SHX Text
598.41
AutoCAD SHX Text
598.51
AutoCAD SHX Text
598.38
AutoCAD SHX Text
598.63
AutoCAD SHX Text
598.59
AutoCAD SHX Text
597.63
AutoCAD SHX Text
597.80
AutoCAD SHX Text
597.59
AutoCAD SHX Text
597.51
AutoCAD SHX Text
598.52
AutoCAD SHX Text
597.88
AutoCAD SHX Text
597.83
AutoCAD SHX Text
597.85
AutoCAD SHX Text
597.85
AutoCAD SHX Text
598.29
AutoCAD SHX Text
597.89
AutoCAD SHX Text
597.77
AutoCAD SHX Text
597.85
AutoCAD SHX Text
598.04
AutoCAD SHX Text
597.96
AutoCAD SHX Text
597.74
AutoCAD SHX Text
597.51
AutoCAD SHX Text
598.05
AutoCAD SHX Text
597.96
AutoCAD SHX Text
597.40
AutoCAD SHX Text
598.16
AutoCAD SHX Text
598.32
AutoCAD SHX Text
598.44
AutoCAD SHX Text
598.29
AutoCAD SHX Text
598.32
AutoCAD SHX Text
598.33
AutoCAD SHX Text
597.85
AutoCAD SHX Text
598.54
AutoCAD SHX Text
598.18
AutoCAD SHX Text
598.16
AutoCAD SHX Text
598.33
AutoCAD SHX Text
598.78
AutoCAD SHX Text
598.80
AutoCAD SHX Text
598.29
AutoCAD SHX Text
598.41
AutoCAD SHX Text
598.25
AutoCAD SHX Text
598.22
AutoCAD SHX Text
598.02
AutoCAD SHX Text
598.11
AutoCAD SHX Text
598.09
AutoCAD SHX Text
598.11
AutoCAD SHX Text
598.14
AutoCAD SHX Text
598.06
AutoCAD SHX Text
598.05
AutoCAD SHX Text
597.98
AutoCAD SHX Text
597.98
AutoCAD SHX Text
597.61
AutoCAD SHX Text
597.62
AutoCAD SHX Text
597.13
AutoCAD SHX Text
597.63
AutoCAD SHX Text
597.61
AutoCAD SHX Text
597.29
AutoCAD SHX Text
597.70
AutoCAD SHX Text
597.88
AutoCAD SHX Text
597.73
AutoCAD SHX Text
597.85
AutoCAD SHX Text
597.55
AutoCAD SHX Text
597.81
AutoCAD SHX Text
598.03
AutoCAD SHX Text
597.99
AutoCAD SHX Text
597.76
AutoCAD SHX Text
597.61
AutoCAD SHX Text
597.54
AutoCAD SHX Text
597.38
AutoCAD SHX Text
597.67
AutoCAD SHX Text
597.64
AutoCAD SHX Text
597.74
AutoCAD SHX Text
598.04
AutoCAD SHX Text
598.25
AutoCAD SHX Text
598.45
AutoCAD SHX Text
598.51
AutoCAD SHX Text
597.57
AutoCAD SHX Text
597.52
AutoCAD SHX Text
597.71
AutoCAD SHX Text
597.63
AutoCAD SHX Text
597.57
AutoCAD SHX Text
597.51
AutoCAD SHX Text
597.53
AutoCAD SHX Text
597.71
AutoCAD SHX Text
597.60
AutoCAD SHX Text
597.73
AutoCAD SHX Text
597.54
AutoCAD SHX Text
597.81
AutoCAD SHX Text
597.79
AutoCAD SHX Text
597.43
AutoCAD SHX Text
597.47
AutoCAD SHX Text
597.51
AutoCAD SHX Text
597.51
AutoCAD SHX Text
597.38
AutoCAD SHX Text
597.73
AutoCAD SHX Text
597.58
AutoCAD SHX Text
597.65
AutoCAD SHX Text
597.60
AutoCAD SHX Text
597.40
AutoCAD SHX Text
597.60
AutoCAD SHX Text
597.63
AutoCAD SHX Text
597.69
AutoCAD SHX Text
598.01
AutoCAD SHX Text
605.84
AutoCAD SHX Text
603.35
AutoCAD SHX Text
598.09
AutoCAD SHX Text
598.20
AutoCAD SHX Text
598.73
AutoCAD SHX Text
598.01
AutoCAD SHX Text
598.57
AutoCAD SHX Text
598.10
AutoCAD SHX Text
598.07
AutoCAD SHX Text
597.89
AutoCAD SHX Text
598.44
AutoCAD SHX Text
597.94
AutoCAD SHX Text
597.72
AutoCAD SHX Text
598.26
AutoCAD SHX Text
603.75
AutoCAD SHX Text
603.80
AutoCAD SHX Text
603.19
AutoCAD SHX Text
602.48
AutoCAD SHX Text
602.41
AutoCAD SHX Text
601.94
AutoCAD SHX Text
602.05
AutoCAD SHX Text
602.45
AutoCAD SHX Text
SL
AutoCAD SHX Text
SL
AutoCAD SHX Text
SL
AutoCAD SHX Text
SL
AutoCAD SHX Text
SL
AutoCAD SHX Text
SL
AutoCAD SHX Text
SL
AutoCAD SHX Text
SL
AutoCAD SHX Text
T/W=600.68
AutoCAD SHX Text
T/W=600.70
AutoCAD SHX Text
T/W=600.68
AutoCAD SHX Text
T/W=600.88
AutoCAD SHX Text
T/W=601.19
AutoCAD SHX Text
T/W=601.60
AutoCAD SHX Text
T/W=601.57
AutoCAD SHX Text
T/W=601.33
AutoCAD SHX Text
2' WIDE CONCRETE RET. WALL
AutoCAD SHX Text
2' WIDE LARGE CONCRETE BLOCK RET. WALL
AutoCAD SHX Text
CELL TOWER
AutoCAD SHX Text
(NO ACCESS)
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
//
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
0.85' WIDE CONCRETE FOUNDATION REMAINS
AutoCAD SHX Text
STEEL DOOR
AutoCAD SHX Text
METAL STAIRS
AutoCAD SHX Text
WOOD FENCE
AutoCAD SHX Text
WOOD FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
STOP LINE
AutoCAD SHX Text
STOP LINE
AutoCAD SHX Text
DOUBLE YELLOW STRIPES
AutoCAD SHX Text
G
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE POST
AutoCAD SHX Text
GATE POST
AutoCAD SHX Text
TRAFFIC SIGNAL HANDHOLE
AutoCAD SHX Text
TRAFFIC SIGNAL HANDHOLE
AutoCAD SHX Text
TRAFFIC SIGNAL HANDHOLE
AutoCAD SHX Text
TRAFFIC SIGNAL HANDHOLE
AutoCAD SHX Text
99.88'
AutoCAD SHX Text
64.07'
AutoCAD SHX Text
100.01'
AutoCAD SHX Text
43.65'
AutoCAD SHX Text
56.83'
AutoCAD SHX Text
37.33'
AutoCAD SHX Text
39.98'
AutoCAD SHX Text
1 STORY BRICK BUILDING # 2405
AutoCAD SHX Text
1 STORY BRICK BUILDING # 2405
AutoCAD SHX Text
1 STORY FRAME BUILDING
AutoCAD SHX Text
DETENTION AREA
AutoCAD SHX Text
598
AutoCAD SHX Text
599
AutoCAD SHX Text
599
AutoCAD SHX Text
598
AutoCAD SHX Text
597
AutoCAD SHX Text
596
AutoCAD SHX Text
595
AutoCAD SHX Text
594
AutoCAD SHX Text
593
AutoCAD SHX Text
592
AutoCAD SHX Text
598
AutoCAD SHX Text
598
AutoCAD SHX Text
598
AutoCAD SHX Text
593
AutoCAD SHX Text
594
AutoCAD SHX Text
595
AutoCAD SHX Text
596
AutoCAD SHX Text
597
AutoCAD SHX Text
598
AutoCAD SHX Text
599
AutoCAD SHX Text
600
AutoCAD SHX Text
603
AutoCAD SHX Text
602
AutoCAD SHX Text
601
AutoCAD SHX Text
603
AutoCAD SHX Text
602
AutoCAD SHX Text
601
AutoCAD SHX Text
600
AutoCAD SHX Text
599
AutoCAD SHX Text
598
AutoCAD SHX Text
598
AutoCAD SHX Text
597
AutoCAD SHX Text
597
AutoCAD SHX Text
598
AutoCAD SHX Text
597
AutoCAD SHX Text
599
AutoCAD SHX Text
600
AutoCAD SHX Text
601
AutoCAD SHX Text
600
AutoCAD SHX Text
601
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
602
AutoCAD SHX Text
DOUBLE YELLOW STRIPES
AutoCAD SHX Text
WHITE STRIPE
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
B6-12 CURB & GUTTER
AutoCAD SHX Text
CISTERN
AutoCAD SHX Text
WHITE STRIPE
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
B6-12 CURB & GUTTER
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
WV
AutoCAD SHX Text
W
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
WV
AutoCAD SHX Text
EV
AutoCAD SHX Text
S
AutoCAD SHX Text
C.O.
AutoCAD SHX Text
D
AutoCAD SHX Text
Y
AutoCAD SHX Text
H
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
C
AutoCAD SHX Text
OAKTON STREET
AutoCAD SHX Text
VENDING
AutoCAD SHX Text
Pay Station
AutoCAD SHX Text
VACUUMS
AutoCAD SHX Text
EXIT ONLY
AutoCAD SHX Text
YIELD
AutoCAD SHX Text
VACUUMS
AutoCAD SHX Text
T
AutoCAD SHX Text
VACUUMS
AutoCAD SHX Text
ONLY
AutoCAD SHX Text
ONLY
AutoCAD SHX Text
Pay Station
AutoCAD SHX Text
599
AutoCAD SHX Text
598
AutoCAD SHX Text
599
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
601
AutoCAD SHX Text
600
AutoCAD SHX Text
599
AutoCAD SHX Text
598
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
598
AutoCAD SHX Text
EXISTING ELECTRIC AND TELEPHONE EASEMENT FOR PURPOSE FOR ANCHOR AND GUY WIRE
AutoCAD SHX Text
EXISTING ELECTRIC AND TELEPHONE EASEMENT.
AutoCAD SHX Text
600
AutoCAD SHX Text
6" WATER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESIGN BY:
AutoCAD SHX Text
M.HANSEN
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
1" = 20'
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
JUNE 28. 2019
AutoCAD SHX Text
M.H., K.P.
AutoCAD SHX Text
17-067
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
J.MILLER
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
X
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
LEGEND SILT FENCE INLET FILTER BASKET INLET PROTECTION
AutoCAD SHX Text
SILT FENCE (TYP.)
AutoCAD SHX Text
INLET PROTECTION -BASKET ONLY (1-LOC)
AutoCAD SHX Text
A.D.D.C. 2704 West Peterson Avenue Chicago, IL. 60659
AutoCAD SHX Text
EVANSTON CAR WASH 2425 Oakton Street Evanston, Illinois
AutoCAD SHX Text
Prepared For:
AutoCAD SHX Text
Prepared By:
AutoCAD SHX Text
J:\dwgs\17jobs\17067\17067.dwg, 17-067
AutoCAD SHX Text
TEMPORARY CONSTRUCTION ENTRANCE - REUSE EXISTING DRIVEWAY APRON. - PROVIDE TEMPORARY "STOP" SIGN AT PROPERTY LINE.
AutoCAD SHX Text
INLET PROTECTION (7-LOC.) -INLET FILTER BASKET -4'x4' SILT FENCE
AutoCAD SHX Text
N
AutoCAD SHX Text
20
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
80
AutoCAD SHX Text
0
AutoCAD SHX Text
C-6
AutoCAD SHX Text
SOIL EROSION CONTROL PLAN
AutoCAD SHX Text
SOIL EROSION CONTROL PLAN
AutoCAD SHX Text
GENERAL NOTES: 1. THESE PLANS ARE BASED ON THE (TOPOGRAPHIC SURVEY) THESE PLANS ARE BASED ON THE (TOPOGRAPHIC SURVEY) (SURVEY PROJECT #18-20902 DATED 03/22/18) PREPARED BY: GENTILE AND ASSOCIATES, IN 550 EAST ST. CHARLES PLACE, LOMBARD, IL 60148 (630) 916-6262 2. PRIOR TO CONSTRUCTION, CONTRACTOR TO CONTACT THE PRIOR TO CONSTRUCTION, CONTRACTOR TO CONTACT THE DESIGN ENGINEER AND ARCHITECT TO VERIFY THAT THEY ARE WORKING FROM THE MOST CURRENT SET OF PLANS AND SPECIFICATIONS.
AutoCAD SHX Text
SEE EROSION CONTROL NOTES AND DETAILS ON SHEET C-7
AutoCAD SHX Text
CONSTRUCTION TRAILER
AutoCAD SHX Text
PORTABLE TOILET
AutoCAD SHX Text
DUMPSTER LOCATION (BY GROOT)
AutoCAD SHX Text
FUEL AND OTHER POLLUTANT STORAGE
AutoCAD SHX Text
TEMPORARY CONCRETE WASHOUT AREA WITH SIGN
AutoCAD SHX Text
12/17/19
AutoCAD SHX Text
1
AutoCAD SHX Text
01/31/2020
AutoCAD SHX Text
2
AutoCAD SHX Text
ALL CONTRACTORS SHALL PROTECT ALL PERMEABLE PAVER AREAS FROM SOIL/FINES INFILTRATION. ALL LAY DOWN AREAS AND STOCKPILES OF ANY MATERIALS ARE TO BE LOCATED ON VISQUEEN WITH PERIMETER COIL LOGS. SEE DETAIL THIS SHEET.
AutoCAD SHX Text
EEL COILS (TYP.)
AutoCAD SHX Text
POSSIBLE STOCKPILE LOCATION
AutoCAD SHX Text
POSSIBLE STOCKPILE LOCATION
AutoCAD SHX Text
NO REVISIONS
AutoCAD SHX Text
PER MWRD AND CITY REVIEWS
AutoCAD SHX Text
02/24/2020
AutoCAD SHX Text
3
AutoCAD SHX Text
NO REVISIONS
AutoCAD SHX Text
06/10/2020
AutoCAD SHX Text
4
AutoCAD SHX Text
PER CITY REVIEW COMMENTS DATED 6/9/2020
AutoCAD SHX Text
PROVIDE TEMPORARY FENCING AROUND PERIMETER OF PROPERTY. PROVIDE GATES AT TEMPORARY CONSTRUCTION ENTRANCE THAT SWING INTO THE PROPERTY.
AutoCAD SHX Text
PUBLIC SIDEWALK TO BE CLOSED ACROSS PROPERTY FRONTAGE DURING CONSTRUCTION
AutoCAD SHX Text
STREET/ROW TO BE FREE OF DEBRIS AND CLEANED/SWEPT AS NEEDED
AutoCAD SHX Text
PUBLIC SIDEWALK TO BE CLOSED ACROSS PROPERTY FRONTAGE DURING CONSTRUCTION
Page 9: Construction Management Plan - City of Evanston

""- ,. .,,•r:.ti1 {1 / ,i- / (" 1.-f'; I ,,-

/ ~-•'~ 4~ /// ., ~ \ "' ,I- ~/,//:/ "' \ go ,§{1/'(•/•0 \ ~f!.i 1///C:>q/ror;S• \ R,..... <D,; /,(

-11f"..,·i I.! i .fc>" i l/,~~~1.....i!: ix/ I / rJ-· I , / J::tl i t-

i ., 1 1 :'D' 1 1 I m ~ 1 I 1 , ~/>J , , / m [,I:' I I I I I ! I / I I I f I I I I I I I / / I flo' ;:.JI / "'

I '"if S! q, ,.J5/ I I "'• I I •ff] t I J 1.,.~~ \ ol' 9~• \ \ \ o\ol' I • //

I Cb I

I

l

I I

I

I

1, r:,$' .

D"! ,i' .,,.._..f}~O . ...,&t I

~, ~ I ">-'I, ,! , ;'~

(

I I

I I

I

I I I I I I I I I I I I )

I I

I

I

1 ••"s1r 1

~

xi

j I I

~ j /~ ~111/

I l1 I /

I I

r I I I I I I I I I I I I I I \

\ \

\ \

\

&· •

~

~~ do\) -

12" WA TERMAIN PER REC. & FIELD MARKINGS

:IA A,.-"''~ .... ~~ 'b'\, ~ ~~\ n,)·~"OJ §r.~ lt?·

I ol'• I \ " \ \ \ \ \ \ FLARED END SECTION~ \ \

x \ \ \ 18" INV-59113 [\,~ I \

\~ \ \ •• \ ~ \ ,592~:,, \ \ \ \~~ \... ?J"'J· - \ t,

\ \ -::. -59a__ ~ I \ - -----S ~-s~- --_,., I ', 9s..____ - ------------\ ---596.. ,,, - -\ ro~ ---20j I .,•

/!- ~ CATCH BASIN ,,-f>• ., FLOW LINE - 599.3tr- - :E , INV. INACCESS~IBLE ~ 9~"'),

....... 9 "'OJ'' ~- f9'b' ,i'~f> ~- 90J",;_:f>~ 86-12 CURB &~mR r":5 r••- _p ,":/1 -:--= ~

'-.

' -...

XXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXC

RA

NE LO

CA

TION

EAST O

F FOU

ND

.

FLATB

ED LO

CA

TION

EAST O

F CR

AN

E

EXHIBIT B

EXH B

Page 10: Construction Management Plan - City of Evanston

OAKTON SREET

SIDEWALK CLOSED

USE OTHER SIDE SIGN

SIDEWALK CLOSED

USE OTHER SIDE SIGN

Traffic Plan Notes:

1- All lane closers are to follow IDOT Standards.

2- Truck traffic to enter and exit from the west, no semi truck traffic to travel through down town Evanston.

3- Open trench's within public way are to be plated during off work hours.

4- Street is to be maintained free of dirt and debris from trucks existing site.

5- Sidewalk closure only when absolutely necessary.6- Contractor to specify the start and end of the sidewalk closures to City 3 business days in advance.7- Contractor to notify City and CTA of lane reduction 10 calendar days in advance.8- Contractor to post notice signs 48 hours prior to lane reduction warning of lane closure.

TRAFFIC CONTROL PLAN

1" - 1

0'

04

-3

0-2

02

0

STAF

F N

OTE

S PR

E-D

APR

(6/9

/20)

06/1

0/20

CE

NT

UR

IO

N P

LU

MB

IN

G C

OM

PA

NY

10

34

0 W

. B

el

de

n A

ve

.

Me

lr

os

e P

ar

k I

L.

60

16

4

84

7-2

88

-05

65

SIDEWALK CLOSED AT2425 OAKTON USE

OTHER SIDE SIGN

TO BE PLACE AT NE CORNER OF OAKTON & MCCORMICK

SIDEWALK CLOSED AT2425 OAKTON USE

OTHER SIDE SIGN

TO BE PLACE AT NW CORNER OF HOME DEPOT CONTROLLED ENTRANCE

Page 11: Construction Management Plan - City of Evanston

X X

XX

X

XX

XX

X

X

X

XX

X

XX

XX

XX

XX

X XX

X

X

XXXXX

XX

XXX

XXX

X XX

XX

XX

X

XXXXXXXXXXXXXX XX

XX

XX X

XXX

XX

XX

XXX

XX

XX

X

XX

XX

X

XXXXXX

XX

XX

XX

XXXX

XX

XXX

XXXX

XXX

XXX

XXX

XXX

XXXX

XX

XX

XXX

XX

XX

XX

XXX

XXX

XXX

XXX

XX

XXX

XX

XX

XX

XX

XXX

XXX

XXX

XXX

XX

XX

X

XXXXXXX

XXXXX

XX

XX

XX

XXXXX

XX

XX

XX

X

XX

XX

X

XX

XX

XX

XX

X

XXXXX

XX

X

XXXXX

XXXXXX

XX

X

X

X

X

X

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÙÙ

ÜÜ

ÙÙ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÙÙ

ÙÙ

ÜÜ

ÖÖ

ÜÜ

ÜÜÜÜ

ÜÜ

ÜÜ ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

ÜÜ

NORT

H S

HORE

CHA

NNEL

NORTH SHORE CHANNEL

L A KEM

I CH

I GA N

McCO

RMIC

K BLV

D

SHERIDAN RD

PARK PL

ASHL

AND

AVE

DODG

E A

VE

HURD

AVE

GIRA

RD

AVE

LEE ST

OAK AVE

SHERIDAN PL

RIDGE

C

T

GREEN BAY RD

THAYER ST

PRAT

T CT

GRANT

JENKS ST

HAVEN ST

PAYNE ST

LEON PL

POPLAR AVE

GREY

A

VE

HARRISON ST

PRAIRIE AVE

REBA PL

COLFAX STLE

MAR A

VE

MARCY AVE

DAVIS ST

MAPL

E A

VE

HARTZELL ST

LIBRARY PL

SIMPSON ST

CLYDE AVE

BROW

N

AVE

GREE

LEY

PITNE

R ALY

LAUR

EL A

VE

HINMA

N A

VE

DEWE

Y A

VE

EWING

A

VE

COWPER AVE

KIRK ST

HOVL

AND

CT

JUDS

ON A

VE

GARRETT PLARBORLN

FOREST AVE

INGLESIDE PK

GREY

AVE

ST. MARK'S CT

EMERSON ST

CAMP

US

DRSHER

MAN

A

VEWILDER ST

MILBURN PK

GARR

ISON

AVE

THELIN CT

FORE

ST PL

ASBU

RY

AV

E

MICHIGAN AVE

WESLE

Y

AVE

LELA

ND

AVE

CENTRAL ST

CALLAN AVE

RIDGE TER

HULL TER

HOWARD ST

ISABELLA ST

GROSS

POINT R

D

CUSTER AVE

EMERSON ST

LYONS ST

FOWL

ER

A

VE

CLARK ST

DARR

OW A

VE

PIONE

ER

RD

HASTINGS AVE

HART

REY

AVE

BRUMMEL ST

PRINC

ETON

AVE

PROS

PECT

A

VE

HAMLIN STPAYNE

ELM A

VE

CASE PL

RIDGEWAY AVE

MULFORD ST

MICH

IGAN

AVE

LAWNDALE AVE

CHURCH ST

CRAIN ST

DEMPSTER ST

JACK

SON

A

VE

KEDZIE ST

CLINTON PL

McDA

NIEL

AVE

ELMWO

OD A

VE

SEWARD ST

ROSLYN PL

EAST RAILROAD AVE

FLORE

NCE A

VE

BENS

ON A

VE

SHERMAN PL

CULVER

FORE

STVIEW

RD

MART

HA L

N HAWTHORNE LN

WADE CT

BROW

N AV

E

CROFT LN

COLFAX TER

BROW

N

GREY

BRIDGE

ST

CALVIN CIR

BROW

N A

VE

RICHM

OND

AVE

NORMANDY PL

WOODLAND RD

ELINOR PL

KEENEY STSOUTH BLVD

HAMILTON ST

GREENWOOD ST

UNIVERSITY PL

REES

E A

VE

AUTOBARN PL

GAFFIELD PL

LINCO

LNWO

OD D

R

CRAW

FORD

A

VE

LEONARD PL

CENTRAL PARK AVE

BENN

ETT

AVE

MADISON PL

BRADLEY PL

GREENLEAF ST

WALN

UT

AVE

ROSALIE ST

BURNHAM PL

WARREN ST

LIVINGSTON

WASHINGTON ST

CLEVELAND ST

MONTICELLO PL

NATHANIEL PL

HARVARD TER

WOOD

BINE A

VE

MAPL

E A

VE

DOBSON ST

DEWE

Y A

VEDA

RROW

AVE

DEWE

Y

A

VE

INGLESIDE PL

RIDGE

AVE

ASBU

RY

AVE

FOWL

ER

AVE

HART

REY

AVE

CASE ST

SOUTH BLVD

ASHL

AND

AVE

SHER

MAN

AVE

LYONS ST

STEWART AVE

MARC

Y A

VE

WELLINGTO

N

CT

CLEVELAND STMONROE ST

LINDEN PL

LAKE

S

HORE

B

LVD

KNOX CIR

HILLSIDE LN

TRINITY CT

SHERIDAN

SQEDGEMERE

CT

GREEN BAY RD

GARNETT PL

CENTRAL STHARRISON

RIDGEA VE

PAYNE ST

WESLE

Y A

VECHURCH ST

HARTZELL ST

PRAIRIE AVE

DODG

E AVEOAKTON ST

SOUTH BLVD

CRAIN

McDA

NIEL

AVE

PITNE

R A

VE

LEE ST

ASHL

AND

A

VE

GROVE ST

FOSTER ST

ASBU

RY

AVE

BART

ON

AVE

GRANT ST

BRYA

NT A

VE

JUDS

ON A

VE

SHER

MAN

AVE

COLFAX ST

ISABELLA ST

DAVIS ST

MAIN ST

RIDGE AVE

ASBU

RY A

VE

THAYER CT

THAYER ST

ISABELLA ST

HAYES

DARTMOUTH PL

COLFAX PL

THAYERTHAYERST

CRAWFORD

LINCO

LNWO

OD

DR

LIVINGSTON ST

CHANCELLOR ST CHANCELLORLIVINGSTON

MILBURN ST

LAKESIDE CT

EUCLIDPARK PL

WESLE

YCLARK STLYONS ST

GREY

A

VE

DEWE

Y A

VE

PAYNE ST

MAIN ST

DODG

E AVE

CENTRAL ST

McDA

NIEL

AVE

EWING

A

VE

SHERIDAN RD

BRUMMEL ST

PITNE

R AVE

LINCOLN ST

HINMAN AVE

SEWARD ST

WESLE

Y

A

VE

CENTRAL ST

KEENEY ST

RIDGE AVE

OAK

AVE

JACK

SON

SHER

MAN

A

VE

DOBSON ST

LINCOLN ST

SEWARD ST

DARR

OW A

VE

GREY

A

VE

PARK PL

NOYES ST

LAKE ST

THAYER ST

WASHINGTON ST

LAKE STMcDA

NIEL A

VE

BROW

N

AVE

AUSTIN ST

ASHL

AND

AVE

WESLE

Y A

VE

TECH DR

NOYES CT

HAMP

TON

PKYOTTO

LN

BERN

ARD

PL

MEAD

OW-

LARK

LN

RIDGE AVE

ELGIN RD

ELMWO

OD

A

VE

COLFAX ST

HINMA

N AV

E

SIMPSON ST

WESLE

Y A

VE

OAKTON ST

SHERIDAN RD

SHERIDAN RD

DEMPSTER ST

GREY

AVE

LEE ST

SIMPSON ST

CHICAGO AVE

CHICAGO AVE

BENN

ETT

AVE

MADISON ST

KEENEY ST

OAK

RIDGE

AVE

SHER

IDAN

RD

GRANT ST

ASBU

RY A

VE

GROVE ST

ELGIN RDFLO

RENC

E AVE

FORE

ST A

VE

DODG

E

AVE

FOSTER ST

MULFORD ST

GREENLEAF ST

HILLSIDE RD

HART

REY

A

VEHA

RTRE

Y AVE

GREY

AVE

ARNOLD PL

PITNE

R

AVE

LINCOLN ST

McCORMICK

BLVD

FOSTER ST

GREENWOOD ST

CALLAN

PARK PL

JUDSON AVE

NOYES ST

DARR

OW

AVE

ASHL

AND

AVE

HARRISON ST

HOWARD ST

NOYES

GLENVIEW RD

PRINC

ETON

CLIFFORD ST

HIGHLAND AVE

LAWNDALE AVE

DARTMOUTH PL

ARTSCIRCLE DR

ORRIN

GTON

A

VE

EASTW

OOD

AVE

BROA

DWAY

AVE

WASHINGTON ST

NORTHWESTERNPL

DRYDEN PL

700

400

500

300

600

800

200

90010

0

2600

1700

3100

1200

1900

1000

1300

1400

2200

2300

1100

1800

2800

1500

3600

2000

2400

2700

3400

2100

2500

2900

1600

3000

3200

3300

300

600

2800

1900

1000

2700

400

2500

1400

800

1700

1600

700

2200

2400

1400

200

500

1400

200

2300

2000

700

800

2600

1200

2200

1500

1600

1200

100

1500

1300 100

2900

1900

1000

500

2100

2200

2400

1100

1100

200

1300

2800

1000

1200

2600

1500

2300

1800

2000

700

300

900

600

400

240025

00

2000

1300

1800

300

800

600

1100

100

500

250027

00

1600

1700

3500

2600

1700

1800

900

1900 900

2100

2300

2100

400

3800

3700

13'-5"

13'-1"

12'-9"

11'-7"

12'-0"

11'-5"

13'-9"

11'-7"12'-5"

12'-4"14'-1"

13'-0"11'-8"12'-0"14'-2"13'-3"14'-3"12'-1"

12'-7" 12'-3"11'-9"

11'-7"11'-7"11'-9"

11'-9"

11'-9"

11'-7"11'-7"12'-5"

12'-0"

11'-9"

11'-11"

13'-11"

11'-10"

12'-10"

City of Evanston Truck Routes

BridgesÜÜ Posted Height (2" less than actual)ÙÙ Actual HeightÖÖ IDOT Posted Height

IDOT StreetTruck Routes

Truck RouteX X X Truck Prohibited

Street (8,000 Pound Limit)RailroadWaterCity of Evanston

8/21/2018

´

This map is provided "as is" without warranties of any kind. See www.cityofevanston.org/mapdisclaimers.html for more information.

0 10.5 Mile

1:31,6801 inch = 0.5 mile

TruckRoutesBWLetter.mxd

<<

SITEEXHIBIT DXXXXX

Mark Daniel
Highlight