Construction of the GSIS Legazpi Branch Office Building Alternate Road, Legazpi City Bill of Quantities Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2) DIV. 1 GENERAL REQUIREMENTS 1.1 Complete Temporary Facilities (Temporary Water Service and Distribution; Electric Power and Lighting Services; Heating, Cooling and Ventilation; Telephone and Service Data; Temporary Facilities including Drinking Water; Storm and Sanitary Sewer; Storm Water Pollution Control lot 1.00 1.2 Complete Support Utilities (Field Office for the General Contractor/Consultant; Storage and Fabrication Sheds; Dewatering Facilities and Drains; Temporary Enclosure; Temporary Stairs, Lifts, and Hoists; Temporary Exterior Lighting; Collection and Disposal of Waste and Clearing; Temporary Environmental Controls; and Temporary Barracks for On-Site Laborers/Man Power lot 1.00 1.3 Complete Supply of Health, Safety and Security (First Aid Facilities; Health and Safety Officer; Security Guards for Site and Agency; Temporary Fire Protection; Barricades, Warning Signs and Lights; Environmental Protection and Traffic Ways lot 1.00 1.4 Supply and Installation of Project Signs, Complete lot 1.00 1.5 Mobilization and Demobilization lot 1.00 1.6 Securing of Government Regulated Permits and Certifications including Building Permit, Occupancy Permit & Meralco Application Facilitation inlucluding plan reproduction to be submitted at the City Hall (building permit/occupancy permit plans, specifications, structural calculations and other pertinent permits) lot 1.00 1.7 Field Survey / Building Layout, Complete. lot 1.00 1.8 Bonds & Insurances lot 1.00 1.9 As-Built Drawings, Complete. lot 1.00 1.10 Operation and Maintenance Manual, Complete. lot 1.00 1.11 Others (Please specify) lot 1.00 SUB - TOTAL OF GENERAL REQUIREMENTS DIV. 3 CONCRETE 3.1 Complete Supply and Installation of Formworks as per Plans, Drawing Details and Specifications (Main Building, Utility Building, Guard House, Covered Parking & Walkway) 3.1.1 Footing Foundation/Mat Foundation sq.m. 301.54 3.1.2 Footing Tie Beams sq.m. 387.75 3.1.3 Wall Footing sq.m. 217.33 3.1.4 Slab on Grade sq.m. 937.90 3.1.5 Columns sq.m. 484.85 3.1.6 Beams sq.m. 1,322.28 3.1.7 Suspended Slab & Cantilever Slab sq.m. 1,050.93 3.1.8 Main Stair sq.m. 69.52 3.1.9 Fire Exit Stairs sq.m. 32.03 3.1.10 Cistern Tanks (Fire Reserved Water Tank, Rain Harvesting Tank & Domestic Water Tank) sq.m. 371.85 3.1.11 Septic Tank sq.m. 116.55 3.1.12 Covered Parking Foundation & Column sq.m. 130.68 3.1.13 Covered Walkway Foundation & Column sq.m. 25.54 3.1.14 Flag Pole Foundation sq.m. 14.28 3.1.15 Perimeter Fence Foundation & Column sq.m. 1,027.79 Total Cost Unit Cost Construction of GSIS Legazpi Branch Office Building Alternate Road, Legazpi City Bill of Quantities ITEM NO. DESCRIPTION MATERIALS LABOR Direct Cost MARK UPS Indirect Cost Page 1

Upload: others

Post on 23-Feb-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

DIV. 1 GENERAL REQUIREMENTS

1.1

Complete Temporary Facilities (Temporary Water Service and Distribution; Electric Power

and Lighting Services; Heating, Cooling and Ventilation; Telephone and Service Data;

Temporary Facilities including Drinking Water; Storm and Sanitary Sewer; Storm Water

Pollution Control

lot 1.00

1.2

Complete Support Utilities (Field Office for the General Contractor/Consultant; Storage and

Fabrication Sheds; Dewatering Facilities and Drains; Temporary Enclosure; Temporary

Stairs, Lifts, and Hoists; Temporary Exterior Lighting; Collection and Disposal of Waste and

Clearing; Temporary Environmental Controls; and Temporary Barracks for On-Site

Laborers/Man Power

lot 1.00

1.3

Complete Supply of Health, Safety and Security (First Aid Facilities; Health and Safety

Officer; Security Guards for Site and Agency; Temporary Fire Protection; Barricades,

Warning Signs and Lights; Environmental Protection and Traffic Ways

lot 1.00

1.4 Supply and Installation of Project Signs, Complete lot 1.00

1.5 Mobilization and Demobilization lot 1.00

1.6

Securing of Government Regulated Permits and Certifications including Building Permit,

Occupancy Permit & Meralco Application Facilitation inlucluding plan reproduction to be

submitted at the City Hall (building permit/occupancy permit plans, specifications,

structural calculations and other pertinent permits)

lot 1.00

1.7 Field Survey / Building Layout, Complete. lot 1.00

1.8 Bonds & Insurances lot 1.00

1.9 As-Built Drawings, Complete. lot 1.00

1.10 Operation and Maintenance Manual, Complete. lot 1.00

1.11 Others (Please specify) lot 1.00

SUB - TOTAL OF GENERAL REQUIREMENTS

DIV. 3 CONCRETE

3.1

Complete Supply and Installation of Formworks as per Plans, Drawing Details

and Specifications (Main Building, Utility Building, Guard House, Covered

Parking & Walkway)

3.1.1 Footing Foundation/Mat Foundation sq.m. 301.54

3.1.2 Footing Tie Beams sq.m. 387.75

3.1.3 Wall Footing sq.m. 217.33

3.1.4 Slab on Grade sq.m. 937.90

3.1.5 Columns sq.m. 484.85

3.1.6 Beams sq.m. 1,322.28

3.1.7 Suspended Slab & Cantilever Slab sq.m. 1,050.93

3.1.8 Main Stair sq.m. 69.52

3.1.9 Fire Exit Stairs sq.m. 32.03

3.1.10Cistern Tanks (Fire Reserved Water Tank, Rain Harvesting Tank & Domestic Water

Tank)sq.m. 371.85

3.1.11 Septic Tank sq.m. 116.55

3.1.12 Covered Parking Foundation & Column sq.m. 130.68

3.1.13 Covered Walkway Foundation & Column sq.m. 25.54

3.1.14 Flag Pole Foundation sq.m. 14.28

3.1.15 Perimeter Fence Foundation & Column sq.m. 1,027.79

Total Cost Unit Cost

Construction of GSIS Legazpi Branch Office BuildingAlternate Road, Legazpi City

Bill of Quantities

ITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

Page 1

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

3.1.16 PWD Ramps sq.m. 18.15

3.1.17 Concrete Pylon sq.m. 13.34

3.2

Complete Supply and Installation of Reinforcing Bars including tie wires as per

Plans, Drawing Details and Specifications (Main Building, Utility Building,

Guard House, Covered Parking & Walkway)

3.2.1 Footing Foundation/Mat Foundation

3.2.1.1 Grade 60 kgs. 15,868.76

3.2.2 Footing Tie Beams

3.2.2.1 Grade 60 kgs. 6,429.28

3.2.2.2 Grade 40 kgs. 3,435.39

3.2.3 Wall Footing

3.2.3.1 Grade 40 kgs. 1,971.01

3.2.4 Slab on Grade

3.2.4.1 Grade 40 kgs. 5,631.98

3.2.5 Columns

3.2.5.1 Grade 60 kgs. 17,005.02

3.2.5.2 Grade 40 kgs. 8,682.75

3.2.6 Beams

3.2.6.1 Grade 60 kgs. 32,379.58

3.2.6.2 Grade 40 kgs. 14,095.74

3.2.7 Suspended Slab & Cantilever Slab

3.2.7.1 Grade 40 kgs. 16,088.80

3.2.8 Main Stair

3.2.8.1 Grade 60 kgs. 2,931.65

3.2.8.2 Grade 40 kgs. 493.76

3.2.9 Fire Exit Stair

3.2.9.1 Grade 60 kgs. 1,378.30

3.2.9.2 Grade 40 kgs. 206.65

3.2.10Cistern Tanks (Fire Reserved Water Tank, Rain Harvesting Tank & Domestic Water

Tank)

3.2.10.1 Grade 60 kgs. 8,280.38

3.2.10.2 Grade 40 kgs. 2,344.55

3.2.11 Septic Tank

3.2.11.1 Grade 60 kgs. 3,245.43

3.2.11.2 Grade 40 kgs. 882.03

3.2.12 Covered Parking Foundation & Column

3.2.12.1 Grade 60 kgs. 1,000.22

3.2.12.2 Grade 40 kgs. 666.34

3.2.13 Covered Walkway Foundation & Column

3.2.13.1 Grade 60 kgs. 684.66

3.2.13.2 Grade 40 kgs. 399.20

3.2.14 Flag Pole Foundation

3.2.14.1 Grade 40 kgs. 521.59

3.2.15 Perimeter Fence Foundation & Column

3.2.15.1 Grade 60 kgs. 20,889.24

3.2.15.2 Grade 40 kgs. 3,590.06

3.2.16 PWD Ramps

Page 2

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

3.2.16.1 Grade 40 kgs. 7,009.20

3.2.17 Concrete Pylon

3.2.17.1 Grade 60 kgs. 780.00

3.2.17.2 Grade 40 kgs. 405.60

3.3

Complete Supply and Installation of Concrete as per Plans, Drawing Details and

Specifications (Main Building, Utility Building, Guard House, Covered Parking &

Walkway)

3.3.1 Footing Foundation/Mat Foundation (3,000 PSI, 3/4) cu.m. 185.90

3.3.2 Footing Tie Beams (3,000 PSI, 3/4) cu.m. 46.53

3.3.3 Wall Footing (3,000 PSI, 3/4) cu.m. 35.23

3.3.4 Slab on Grade (3,000 PSI, G1) cu.m. 113.13

3.3.5 Columns (5,000 PSI, 3/4) cu.m. 64.63

3.3.6 Beams (5,000 PSI, 3/4) cu.m. 195.60

3.3.7 Suspended Slab & Cantiliver Slab (5,000 PSI, 3/4) cu.m. 131.36

3.3.8 Main Stair (5,000 PSI, 3/4) cu.m. 11.59

3.3.9 Fire Exit Stair Stair (5,000 PSI, 3/4) cu.m. 5.42

3.3.10Cistern Tanks (Fire Reserved Water Tank, Rain Harvesting Tank & Domestic Water

Tank) (5,000 PSI, 3/4)cu.m. 95.60

3.3.11 Septic Tank (5,000 PSI, 3/4) cu.m. 23.11

3.3.12 Covered Parking Foundation (3,000 PSI, 3/4) cu.m. 3.94

3.3.13 Covered Parking Column (5,000 PSI, 3/4) cu.m. 2.43

3.3.14 Covered Walkway Foundation (3,000 PSI, 3/4) cu.m. 2.30

3.3.15 Covered Walkway Column (5,000 PSI, 3/4) cu.m. 1.19

3.3.16 Flag Pole Foundation (3,000 PSI, 3/4) cu.m. 1.13

3.3.17 Perimeter Fence Foundation & Column (3,000 PSI, 3/4) cu.m. 167.15

3.3.18 PWD Ramps (3,000 PSI, 3/4) cu.m. 53.54

3.3.19 Concrete Pylon (5,000 PSI, 3/4) cu.m. 2.86

3.4 Complete Supply and Installation of Glass Fiber Reinforced Concrete (GFRC)

Panels as per Plans, Drawing Details and Specifications

3.4.1 GFRC Panels for Area 1 at Front Elevation sq.m. 23.20

3.4.2 GFRC Panels for Area 2 at Front Elevation sq.m. 24.13

3.4.3 GFRC Panels for Area 3 at Left Side Elevation sq.m. 23.32

3.4.4 GFRC Panels for Area 4 at Right Side Elevation sq.m. 36.93

3.4.5 GFRC Panels for Area 5 at Rear Elevation sq.m. 21.16

3.5 Complete Supply and Installation of Bris Soleil Panels as per Plans, Drawing

Details and Specifications

3.5.1 Bris Soleil Panels at Front Elevation (5900mm x 4000mm) set 1.00

3.6 Others (Please specify) lot 1.00

SUB-TOTAL OF CONCRETE

DIV. 4 MASONRY

4.1 Complete Supply and Installation of Concrete Hollow Blocks (CHB) as per Plan,

Drawing Details and Specifications (Perimeter Fence)

4.1.1 150mm \ 6"Thk. CHB, Including Steel Reinforcement, Mortar and Tie Wires, complete sq.m. 574.20

4.2

Complete Supply and Installation of Load Bearing Blocks as per Plan, Drawing

Details & Specifications (Main Building, Ancillary Building, Pedestrian & Guard

House)

4.2.1 150mm Thk. Load Bearing Blocks sq.m. 2,291.21

4.2.2 100mm Thk. Load Bearing Blocks sq.m. 868.13

Page 3

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

SUB - TOTAL OF MASONRY

DIV. 5 METALS

5.1 Complete Supply and Installation of Main Entrance Canopy Framing System complete with

accessories as per Plan, Drawing Details and Specificationslot 1.00

5.2

Complete Supply and Installation of Covered Walkway Framing System including 12mm

thk. Tempered Tinted Glass complete with accessories as per plans, drawing details and

Specifications.

lot 1.00

5.3 Complete Supply and Installation of Covered Parking Framing System complete with

accessories as per plans, drawing details and Specifications.lot 1.00

5.4

Complete Supply and Installation of Skylight Framing System, including 12mm thk.

Tempered Glass complete with accessories as per plans, drawing details and

Specifications.

lot 1.00

5.5 Complete Supply and Installation of Steel Works for Brise Soliel complete with accessories

as per Plan, Drawing Details and Specificationslot 1.00

5.6 Complete Supply and Installation of Steel Works for GFRC (Glass Fiber Reinforced

Concrete) complete with accessories as per Plan, Drawing Details and Specificationslot 1.00

5.7 Complete Supply and Installation of Steel Works for ACP (Aluminum Composite Panels)

complete with accessories as per Plan, Drawing Details and Specificationslot 1.00

5.8

Complete Supply and Installation of Second Floor Hallway Railing including the 12mm thk.

Tempered Glass Railing complete with accessories as per Plan, Drawing Details and

Specifications

lot 1.00

5.9

Complete Supply and Installation of Stainless Steel Hand Railing including the 12mm thk.

Tempered Glass Railing @ Main Stair (GF-2F) complete with accessories as per Plan,

Drawing Details and Specifications

lot 1.00

5.10 Complete Supply and Installation of Stainless Steel Hand Railing @ Fire Exit Stair (GF-2F)

complete with accessories as per Plan, Drawing Details and Specificationslot 1.00

5.11 Complete Supply and Installation of Fire Exit Stair complete with accessories as per Plan,

Drawing Details and Specificationslot 1.00

SUB - TOTAL OF METALS

DIV. 6 WOODS AND PLASTICS AND COMPOSITES

6.1

Complete Supply and Installation of Pantry (Pantry Sink, Faucet, Grease Traps,

Granite Stone Slab/Countertop/Backsplash, concrete slab, Cabinets, shelves,

carcass, drawers framings, sidings and backboards complete with fixtures,

fittings, hardwares and accessories) as per Plan, Drawing Details and

Specifications.

6.1.1 Pantry (Ground Floor) set 1.00

6.1.2 Pantry (Second Floor) set 1.00

6.1.3 Laundry Area & Kitchenette (Second Floor) set 1.00

6.2

Complete Supply and Installation of Cabinetry (Closets, Cabinets, door shelves

carcass, drawers, framing, sidings, backboards, hinges, handle, complete with

fixtures, fittings, hardwares and accessories) as per Plan, Drawing Details and

Specifications.

6.2.1 Cabinet at Janitor's Room (Ground Floor and Second Floor), (800mmL x 400mmW x

2400mmH)sets 2.00

6.2.2 Cabinet at Bedroom 1-2 (Second Floor), (1800mmL x 500mmW x 2400mmH) sets 2.00

6.3

Complete Supply and Installation of Counter (Countertop, Desktop, Counter

Shelves and Drawers, Framing and Sub-framing, Counter Baseboard cover,

Ledge & Concrete complete with fixtures, fittings, hardwares and accessories)

as per Plan, Drawing Details and Specifications.

6.3.1 Information/Reception Counter (Ground Floor) set 1.00

6.3.2 Cashier Counter (Ground Floor) sets 2.00

6.3.3 Transaction Counter - Billing and Collection (Ground Floor) sets 3.00

6.3.4 Transaction Counter - Loans and E-Service Unit (Ground Floor) sets 3.00

Page 4

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

6.4

Complete Supply and Installation of ACP (Aluminum Composite Panel)

including sub-framing, hangers supports, stiffener supports complete with

fittings and accessories as per Plan, Drawing Details and Specifications.

6.4.1 ACP-1 (1100mm x 1100mm) sets 50.00

6.4.2 ACP-2 (1100mm x 1000mm) sets 40.00

SUB - TOTAL OF WOODS AND PLASTICS AND COMPOSITES

DIV. 7 THERMAL AND MOISTURE PROTECTION

7.1

Complete Supply and Installation of Waterproofing System as per Plan,

Drawing Details and Specifications (Main Building, Utility Builiding, Pedestrian

& Guard House)

7.1.1 WP-1 - Fluid Applied Membrane Coating System sq.m. 270.90

7.1.2 WP-2 - Vapor Barrier Polyethylene Sheet sq.m. 930.99

7.1.3 WP-3 - Waterproof Elastomeric Coating System sq.m. 498.18

7.1.4 WP-4 - Cementitious Capillary Crystallization Waterproofing System sq.m. 280.87

7.1.5 WP-5 - Cementitious Capillary Crystallization Waterproofing System with Tank Lining sq.m. 74.10

7.2

Complete Supply & Installation of Roofing System including insulation

complete with roofing accessories and hardwares, as per Drawing Details &

Specifications (Main Building, Covered Parking, Covered Walkway & Guard

House)

7.2.1 Roofing - complete with insulation, hardwares and other accessories sq.m. 962.89

7.2.2Roofing Accessories (Flashing, Gutter and Ridge Roll/Cover and others accessories,

complete)lot 1.00

7.3 Others (Please specify) lot 1.00

SUB - TOTAL OF THERMAL & MOISTURE PROTECTION

DIV. 8 DOORS AND WINDOWS

8.1

Complete Supply and Installation of Doors, Door Jambs complete with door

knobs/locksets, handles, hinges, patch fittings, U-Channel Hinges & other

accessories needed as per Plan, Drawing Details and Specifications (Main

Building)

8.1.1D-1 - Frameless Swing Glass Door with Aluminum Framed Typed Fixed Glass Panels

and Transom (8000 x 3000)set 1.00

8.1.2D-2 - Frameless Swwing Glass Door with Fixed Glass Panel and Transom (9400 x

3000)set 1.00

8.1.3D-3 - Frameless Swing Glass Door with Fixed Glass Panel and Transom (±7925 x

3000)set 1.00

8.1.4 D-4 - Frameless Swing Glass Door With Fixed Glass Panel and Transom (5400 x 3000) set 1.00

8.1.5 D-5 - Frameless Swing Glass Door With Fixed Glass Panel and Transom (4400 x 3000) set 1.00

8.1.6 D-6 - Frameless Swing Glass Door With Fixed Glass Panel and Transom (3925 x 3000) set 1.00

8.1.7 D-7 - Frameless Swing Glass Door With Fixed Glass Panel and Transom (3900 x 3000) set 1.00

8.1.8 D-8 - Frameless Swing Glass Door With Fixed Glass Panel and Transom (3850 x 3000) set 1.00

8.1.9 D-9 - Frameless Swing Glass Door With Fixed Glass Panel and Transom (3700 x 3000) set 1.00

8.1.10D-10 - Frameless Swing Glass Door With Fixed Glass Panel and Transom (3625 x

3000)set 1.00

8.1.11D-11 - Frameless Swing Glass Door With Fixed Glass Panel and Transom (2850 x

3000)set 1.00

8.1.12D-12 - Frameless Swing Glass Door With Fixed Glass Panel and Transom (2625 x

3000)set 1.00

Page 5

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

8.1.13D-13 - Frameless Swing Glass Door With Fixed Glass Panel and Transom (1925 x

3000)sets 2.00

8.1.14D-14 - Frameless Swing Glass Door With Fixed Glass Panel and Transom (1850 x

3000)set 1.00

8.1.15D-15 - Frameless Swing Glass Door With Fixed Glass Panel and Transom (1000 x

3000)sets 3.00

8.1.16 D-16 - Aluminum Framed Sliding Glass Door with Fixed Panel (2850 x 3000) set 1.00

8.1.17 D-17 - Semi-solid Wooden Door with Fixed Glass Transom (1000 x 2500) sets 2.00

8.1.18 D-18 - Semi-solid Wooded Door (900 x 2100) sets 2.00

8.1.19 D-19 - Semi-solid Wooded Door (800 x 2100) set 1.00

8.1.20 D-20 - Steel Door With Vision Glass Panel and Fixed Glass Transom (1600 x 3000) set 1.00

8.1.21 D-21 - Steel Door With Vision Glass Panel and Fixed Glass Transom (1000 x 3000) sets 2.00

8.1.22 D-22 - Steel Door with Vision Glass Panel and Fixed Glass Transom (700 x 2500) set 1.00

8.1.23 D-23 - Steel Door with Bottom Louvers and Fixed Glass Transom (1000 x 2500) set 1.00

8.1.24 D-24 - Steel Door with Bottom Louvers and Fixed Glass Transom (800 x 2500) sets 5.00

8.1.25 D-25 - Steel Door with Bottom Louvers and Fixed Glass Transom (600 x 2500) sets 2.00

8.1.26 D-26 - Steel Door with Bottom Louvers (900 x 2100) set 1.00

8.1.27 D-27 - Steel Door with Fixed Glass Transom (900 x 2500) sets 8.00

8.1.28 D-28 - Steel Door (1600 x 2100) set 1.00

8.1.29 D-29 - Steel Door (800 x 2100) set 1.00

8.1.30 D-30 - Steel Louver Door (1600 x 2100) set 1.00

8.1.31 D-31 - Vault Door (1200 x 2100) set 1.00

8.2 Complete Supply and Installation of Windows complete with hardware &

accessories as per Plan, Drawing Details and Specifications (Main Building)

8.2.1 W-1 - Aluminum Framed Fixed Glass Panels with Awning Transom (11700 x 2100) sets 2.00

8.2.2 W-2 - Aluminum Framed Fixed Glass Panels with Awning Transom (10300 x 2100) set 1.00

8.2.3 W-3 - Aluminum Framed Fixed Glass Panels with Awning Transom (8600 x 2100) set 1.00

8.2.4 W-4 - Aluminum Framed Fixed Glass Panels with Awning Transom (8000 x 3000) set 1.00

8.2.5 W-5 - Aluminum Framed Fixed Glass Panels with Awning Transom (7600 x 2100) sets 2.00

8.2.6 W-6 - Aluminum Framed Fixed Glass Panels with Awning Transom (6600 x 2100) set 1.00

8.2.7 W-7 - Aluminum Framed Fixed Glass Panels with Awning Transom (6300 x 2100) sets 2.00

8.2.8 W-8 - Aluminum Framed Fixed Glass Panels with Awning Transom (4300 x 2100) set 1.00

8.2.9 W-9 - Aluminum Framed Fixed Glass Panels with Awning Transom (4000 x 3000) sets 2.00

8.2.10 W-10 - Aluminum Framed Fixed Glass Panels with Awning Transom (2400 x 2100) sets 2.00

8.2.11 W-11 - Aluminum Framed Fixed Glass Panels with Awning Transom (2200 x 2100) set 1.00

8.2.12 W-12 - Aluminum Framed Fixed Glass Panels with Awning Transom (1800 x 2100) set 1.00

8.2.13 W-13 - Aluminum Framed Fixed Glass Panels with Awning Transom (1200 x 2100) sets 3.00

8.2.14W-14 - Aluminum Framed Sliding Glass Windows with Fixed Glass Panels and Awning

Transom (3300 x 2100)set 1.00

8.2.15W-15 - Aluminum Framed Sliding Glass Windows with Fixed Glass Panels and Awning

Transom (3100 x 2100)set 1.00

8.2.16W-16 - Aluminum Framed Sliding Glass Windows with Fixed Glass Panels and Awning

Transom (3000 x 2100)set 1.00

8.2.17 W-17 - Aluminum Framed Sliding Glass Window (1500 x 1500) set 1.00

8.2.18 W-18 - Aluminum Framed Awning Glass Window (1200 x 600) sets 8.00

8.3

Complete Supply and Installation of Glass Wall Partition complete with

hardware & accessories as per Plan, Drawing Details and Specifications (Main

Building)

8.3.1 GP - 1 - Glass Wall Partition (6325 x 3000) set 1.00

8.3.2 GP - 2 - Glass Wall Partition (5350 x 3000) set 1.00

8.3.3 GP - 3 - Glass Wall Partition (5075 x 3000) set 1.00

8.3.4 GP - 4 - Glass Wall Partition (4775 x 3000) set 1.00

8.3.5 GP - 5 - Glass Wall Partition (3630 x 3000) set 1.00

8.3.6 GP - 6 - Glass Wall Partition (2275 x 3000) set 1.00

8.3.7 GP - 7 - Glass Wall Partition (1725 x 3000) set 1.00

Page 6

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

8.4

Complete Supply and Installation of Doors, Door Jambs complete with door

knobs/locksets, handles, hinges, patch fittings, U-Channel Hinges & other

accessories needed as per Plan, Drawing Details and Specifications (Utility

Building)

8.4.1 D-1 - Steel Louvered Door (1000 x 2100) set 1.00

8.4.2 D-2 - Steel Louvered Door (2000 x 2100) sets 2.00

8.4.3 D-3 - Rool Up Door (5000 x 3000) set 1.00

8.5 Complete Supply and Installation of Windows complete with hardware &

accessories as per Plan, Drawing Details and Specifications (Utility Building)

8.8.1 W-1 - Steel Louvered Windows (3000 x 1650) sets 2.00

8.8.2 W-2 - Steel Louvered Windows (2300 x 1650) sets 2.00

8.8.3 W-3 - Steel Louvered Windows (2000 x 1650) sets 2.00

8.6

Complete Supply and Installation of Windows complete with hardware &

accessories as per Plan, Drawing Details and Specifications (Guardhouse &

Pedestrian Gate)

8.6.1 GH-W - 1 - Aluminum Framed Fixed Glass Window (800 x 1100mm) sets 2.00

SUB - TOTAL OF DOORS AND WINDOWS

DIV. 9 FINISHES

9.1

Complete Supply and Installation of Ceiling Finishes as per Plan, Drawing

Details and Specifications (from plastering complete up to painting works if

needed) (Main Building, Utility Building, Pedestrian & Guard House)

9.1.1

CF-1 - Regular Gypsum Board Ceiling Finish: For General Interior Ceiling. Ceiling finish

shall be coated with high performance low VOC, odorless, ultra-premium water-based

acrylic coating

sq.m. 442.61

9.1.2

CF-2 - Moisture Resistant Gypsum Board: For Toilet & Kitchen/Pantry Ceiling. Ceiling

finish shall be coated with high performance low VOC, odorless, ultra-premium water-

based acrylic coating

sq.m. 106.85

9.1.3CF-3 - Lay-in Beveled Tegular Edge Mineral Fiber Acoustical Ceiling Board – Fine

Texturedsq.m. 493.30

9.1.4

CF-4 - U-Baffle Ceiling (Front Line Services @ Ground Floor). U-baffle ceiling shall be

painted with high performance low VOC, odorless, ultra- premium water-based acrylic

paint in “black” color finish.

sq.m. 55.00

9.1.5 CF-5 - Aluminum Composite Panel sq.m. 282.08

9.1.6

CF-6 - Exposed Reinforced Concrete Slab (for Main Stairs & Fire Exit Stairs). Ceiling

finish shall be coated with high performance low VOC, odorless, ultra-premium water-

based acrylic coating

sq.m. 60.81

9.1.7

CF-7 - Exposed Reinforced Concrete Slab (for Pump Room and Main EE Room, EE

Room, I.D.F. Room). Ceiling finish shall be coated with semi-gloss 100% water-based

acrylic latex paint with excellent hiding, durability and dirt pick-up resistance.

sq.m. 232.58

9.1.8CF-8 - Glass Fiber Reinforced Concrete (GFRC) Ceiling. Ceiling finish shall be coated

with semi-gloss water-based 100% acrylic paint sq.m. 281.70

9.1.9CF-9 - Fiber Cement Board for Exterior Laundry Ceiling. Ceiling finish shall be coated

with plain semi-gloss 100% acrylic water-based elastomeric paintsq.m. 12.53

9.1.10CF-10 - Exposed Ledge Ceiling and Exterior Fire Exit Stairs Painted Finish. Ceiling finish

shall be coated with plain semi-gloss water-based 100% acrylic paint.sq.m. 99.88

9.1.11

CF-11 - Decorative Gypsum Board Ceiling. Slab finishes above the ceiling shall be

painted with high performance low VOC, odorless, ultra- premium water-based acrylic

paint in “black” color finish

sq.m. 30.39

9.1.12 CF-12 - Glass Canopy sq.m. 9.35

9.1.13 Cove Light l.m. 13.75

9.2

Complete Supply and Installation of Floor Finishes as per Plan, Drawing Details

and Specifications (complete up to painting works if needed) (Main Building,

Utility Building, Pedestrian & Guard House)

Page 7

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

9.2.1FF-1a - Matte Finish Homogenous Porcelain Tiles with Decorative Natural

Granite/Marble Stone Flooring (Dark Color), 10mm thick x 600mm x 600mmsq.m 58.37

9.2.2

FF-1b - Matte Finish Homogenous Porcelain Tiles with Decorative Natural

Granite/Marble Stone Flooring (Granite/Marble Stone), 18mm to 20mm x 600mm x

600mm

sq.m 26.49

9.2.3FF-2 - Matte Finish Homogenous Porcelain Tiles (Light Color),10mm thick x 600mm x

600mmsq.m 854.11

9.2.4 FF-3 - Matte Finish Homogenous Porcelain Tiles, 10mm thick x 600mm x 600mm sq.m 163.56

9.2.5

FF-4 - Matte Finish Homogenous Porcelain Tiles with Natural Granite Nosing (Main

Staircase), 10mm thick x 300mm x 600mm (for steps) 10mm thick x 600mm x 600mm

(for landing)

sq.m 39.52

9.2.6

FF-5 - Plain Cement Floor Finish with Non-Skid Nosing (Fire Exit Stair), with concrete

hardener coated with a high performance, two component water-based acrylic epoxy

paint which has a superior chemical, solvent and stain resistance, odorless and UV

resistant finish.

sq.m 33.62

9.2.7 FF-6 - Carpet Tiles, 4mm thick (min.) x 600mm x 600mm sq.m 22.24

9.2.8 FF-7 - Vinyl Composite Tiles, 3mm thick x 300mm x 300mm sq.m 25.34

9.2.9FF-8 - Plain Cement Plaster Floor Finish with Epoxy Paint, with concrete hardener

coated with a high performance, two component water-based acrylic epoxy paintsq.m 397.30

9.2.10 FF-9 - Plain Cement Concrete Pavement with Expansion Grooves 1 sq.m 115.02

9.2.11 FF-10 - Plain Cement Concrete Pavement with Expansion Grooves 2 sq.m 121.44

9.2.12 FF-11 - Aluminum Entrance Flooring System sq.m 4.40

9.2.13FF-12 - Flamed & Polished Finish Granite Stone, , 18 to 20mm thick x 600mm x

600mm premium high-quality granite flooringsq.m 24.64

9.3

Complete Supply and Installation of Floor Termination as per Plan, Drawing

Details and Specifications (Main Building, Utility Building, Pedestrian & Guard

House)

9.3.1

FT-1 Natural Granite Stone Nosing 1 (for exterior floor termination) - shall be 18 to

20mm thick x 100mm premium high quality natural granite stone in honed/flamed

finish

l.m. 7.44

9.3.2

FT-2 Natural Granite Stone Nosing 2 (for interior floor termination) - shall be 18 to

20mm thick x 100mm/150mm premium high quality natural granite stone in polished

finish

l.m. 14.52

9.3.3

FT-3 Natural Granite Stone Nosing 3 (for interior floor termination and toilet entry floor

nosing) - shall be 18 to 20mm thick x 150mm premium high quality natural granite

stone in polished finish

l.m. 15.84

9.4

Complete Supply and Installation of Wall Finishes as per Plan, Drawing Details

and Specifications (complete from plastering up to painting works if needed)

(Main Building, Utility Building, Pedestrian & Guard House)

9.4.1WF-1a - Exterior AAC Wall in Painted Finish, coated with plain semi-gloss water-based

100% acrylic paint sq.m 1,297.56

9.4.2WF-2a - Exterior Concrete Columns, Shear Wall and Ledge, coated with plain semi-

gloss water-based 100% acrylic paint sq.m 398.71

9.4.3WF-3a - Aluminum Composite Panel Wall Cladding, 4mm thick aluminum composite

panel sq.m 267.30

9.4.4

WF-4a - Exterior AAC Wall, Reinforced Concrete Column/Shear Wall Cladded with

Natural Stone Wall Finish, cladded with 10mm to 12mm thick x 300mm x 600mm high-

quality natural stone slate

sq.m 315.72

9.4.5WF-5a - Exterior Build-up Wall (GFRC), coated with plain semi-gloss water-based 100%

acrylic paintsq.m 300.22

9.4.6WF-6a - Brise Soleil Wall Finish – GFRC Decorative Circular Hole Wall, coated with plain

semi-gloss water-based 100% acrylic paint sq.m. 36.08

9.4.7WF-1b - Interior AAC Wall in Painted Finish 1, coated with high performance low VOC,

odorless, ultra-premium water-based acrylic coating sq.m. 2,901.30

9.4.8WF-2b - Interior AAC Wall in Painted Finish 2 (EE Room, I.D.F. Room, Utility Room),

coated with semi-gloss 100% water-based acrylic latex paint sq.m. 197.23

9.4.9

WF-3b - Interior Build-up AAC Wall in Painted Finish (for Main Stair and Fire Exit Stairs

below the beam), coated with high performance low VOC, odorless, ultra-premium

water-based acrylic coating

sq.m. 88.00

Page 8

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

9.4.10

WF-4b - Interior AAC Wall and or Concrete Column with Matte Finish Homogenous

Porcelain Tiles, with 10mm thick 300mm x 600mm anti-stain, matte finish

homogenous porcelain tiles with 18-20mm x 50mm high quality granite tile trim in

polished finish

sq.m. 473.74

9.4.11WF-5b - Interior Concrete Column and Shear Wall, coated with high performance low

VOC, odorless, ultra-premium water-based acrylic coating sq.m. 311.85

9.4.12WF-6b - Interior Drywall Partition, coated with high performance low VOC, odorless,

ultra-premium water-based acrylic coating sq.m. 146.21

9.4.13WF-1c - Back Painted Glass for Second Floor Open Below, 6mm thick chemically

bonded back painted tempered glasssq.m. 58.96

9.4.14WF-2c - Interior Decorative Wall 2 – HPL Laminates with Accent Mirror for Branch

Manager’s Officesq.m. 23.68

9.4.15WF-3c - Interior Decorative Wall 1 – White Board Wall Cladding (for Conference Room

Side Wall), 6mm thick chemically bonded back painted annealed glasssq.m. 77.00

9.4.16WF-1d - Exterior AAC Wall in Painted Finish, coated with plain semi-gloss water-based

100% acrylic paint sq.m. 243.23

9.4.17WF-2d - Exterior Parapet AAC Wall in Painted Finish, coated with plain semi-gloss water-

based 100% acrylic paint sq.m. 36.00

9.4.18WF-3d - Exterior Concrete Columns and Ledges, coated with plain semi-gloss water-

based 100% acrylic paintsq.m. 59.20

9.4.19WF-1e - Interior AAC Wall in Painted Finish (for Pump Room, Genset Room, Main EE

Room), coated with semi-gloss 100% water-based acrylic latex paint sq.m. 308.00

9.4.20WF-4e - Interior Concrete Column in Painted Finish, coated with semi-gloss 100%

water-based acrylic latex paint sq.m. 53.60

9.5 Others (Please specify) lot 1.00

SUB - TOTAL OF FINISHES

DIV. 10 SPECIALTIES

10.1 Complete Supply and Installation of Compartments and Cubicles (Toilet Cubicle

Doors and Partitions) as per Plan, Drawings Details and Specifications

10.1.1 Urinal Partition

10.1.1.1 Urinal Partition (UP-1) - Wall Hung Straight Edge sets 10.00

10.1.2 Toilet Cubicle Ledge

10.1.2.1 Toilet Cubicle Ledge (TCL-1) sets 17.00

10.1.3 Toilet Cubicle Partition

10.1.3.1 Male Toilet Enclosed unit with 2 cubicles, 1 dividers and 2 doors set 1.00

10.1.3.2 Female Toilet Enclosed unit with 3 cubicles, 2 dividers and 3 doors set 1.00

10.1.3.3 Male Toilet Enclosed unit with 2 cubicles, 2 dividers and 2 doors, corner unit sets 2.00

10.1.3.4 Female Toilet Enclosed unit with 3 cubicles, 2 dividers and 3 doors, corner unit sets 2.00

10.2 Complete Supply and Installation of Toilet Accessories as per Plan, Drawing

Details and Specifications

10.2.1TH-1 (Tissue Paper Holder-1) – Shall be Grade A white vitreous china, semi-recessed

wall-mounted tissue paper holder, complete with accessories.sets 10.00

10.2.2

TH-2 (Tissue Paper Holder-2) – Shall be anchored to partition wall (compact laminated

partition walls – verify drawings for location), shall be black PV nylon-coated, wall-

mounted tissue paper holder with lid cover and concealed screws, complete with

accessories.

sets 7.00

10.2.3

BD (Bidet Hose) –Shall be chrome plated bidet hose and holder with 12mm diameter x

1200mm long stainless-steel hose. Complete with 12mm x 12mm chrome plated single

angle valve with filter without nut.

sets 17.00

10.2.4

GR-1 Disabled Grab Rail 1 – Shall be wall to wall type fixed grab rail made from made

from grade 304, schedule 40, stainless steel in hairline finish; connected to wall thru a

concealed flange complete with tenon plate and screws for concealed attachment

sets 7.00

Page 9

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

10.2.5

HD Hand Dryer – Shall be a sensor type, 1.2 mm thick steel/stainless steel white epoxy

high speed hand dryer with infrared automatic, self-adjusting circuit operation, 51mm

to 30mm adjustable sensor range and dries hand completely in 10-15 seconds

sets 7.00

10.2.6LSD-1 (Liquid Soap Dispenser) – Shall be chrome-plated with push top control liquid

soap dispenser, mechanism secured by a grub screw complete with 1 liter bottle.sets 7.00

10.3 Complete Supply and Installation of Plumbing/Toilet Fixtures complete with

fittings and accessories as per Plan, Drawing Details and Specifications

10.3.1

WC (Water Closet) – Shall be Grade A vitreous china, floor mounted, closed-coupled

elongated front, top push button dual flush (3/4.5 LPF water consumption with siphon

jet/wash down flush action) type water closet with slow closing seat cover, pre-

installed tank fittings and two-bolt caps with concealed syphon legs complete with anti-

bacterial technology, fittings angle valve and accessories.

sets 17.00

10.3.2

UR (Urinal) – Shall be Grade A white vitreous china, washout flush action wall hung

urinal with flushing rim extending from wall, top inlet, push button type flush valve and

widened sides, complete with anti-bacterial technology, fittings and accessories.

sets 9.00

10.3.3

LAV-1 (Lavatory 1 – Under-the-Counter Lavatory) – Shall be Grade A white vitreous

china, under-the-counter wash basin rectangular type complete with anti-bacterial

technology, chrome plated brass P-trap, angle valve, and pop-up drain.

sets 14.00

10.3.4

LAV-2 (Counter Top Lavatory 2) – Shall be Grade A white vitreous china, single whole

countertop lavatory wash basin with straight rectangular edges, complete with anti-

bacterial technology, chrome plated brass P-trap, angle valve, and pop-up drain.

set 1.00

10.3.5

LAV-3 (Wall Mounted Lavatory) – Shall be Grade A white vitreous china, wall mounted

wash basin with half pedestal cover, complete with anti-bacterial technology, chrome

plated brass P-trap, angle valve, and pop-up drain.

set 1.00

10.3.6LF-1 (Lever Type Single Hole Basin Mixer Faucet) – Shall be low lead, chrome-plated

brass, lever type, single hole basin mixer, with pop-up waste.sets 16.00

10.3.7

SHO-1 - Shower Head, Mixer and Spout 1– In Wall Type – Shall be low lead, chrome-

plated brass finish, in wall mount rain fall water shower head with spout and mixer

with lime scale protection technology.

set 1.00

10.3.8UFV (Push Button Type Urinal Flush Valve) – Shall be low lead, chrome-plated push

button type flush valvesets 9.00

10.3.9

FD1 (Floor Drain for Toilets) – Shall be 102mm x 102mm x 57mm, grade 304, polished

stainless steel floor drain with lift-up cover and strainer, with high flow rate that

increases as water volume increases; has anti clogging effect and anti-odor qualities.

sets 14.00

10.4 Complete Supply and Installation of Bath Accessories as per Plan, Drawings

Details and Specifications

10.4.1SH (Soap Holder) – Shall be Grade A white vitreous china, semi-recessed wall mounted

soap holderset 1.00

10.4.2TB-1 (Towel Bar – for Shower Area) – Shall be corrosion-resistant stainless steel with

chrome finish towel shelfset 1.00

10.4.3

WH - Water Heater (Multi-Point Type) – Shall be open outlet type, 230V/60Hz, 6.0KW,

320mmx 185mmx 90mm, instant water heater with 3-step switch type power control

and built-in ELCB and thermal cut-out

sets 2.00

10.4.4TW - Towel Ring – Shall be 155mmL x 155mmH, corrosion-resistant stainless steel

with chrome finish towel ringset 1.00

10.4.5RH - Robe Hook – Shall be corrosion-resistant stainless steel with chrome finish robe

hooksets 15.00

10.5 Complete Supply and Installation of Facial Mirrors as per Drawing Details and

Specifications

10.5.1

FM-1 (Facial Mirror for Male and Female Toilets, Mirror @ Offices) - shall be 6mm thick

(for small mirrors) and 12mm thick frameless, silver-coated float glass mirror with

2mm thick chamfered edges on both sides, glued to 12mm thick marine plywood

backing by tile adhesive or mirror mastic with sponge tape on one side, facing wall.

Provide screws with expansion shield and chrome plated screw cap. (Dim. 900mmH x

600mmL)

sets 16.00

Page 10

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

10.6 Complete Supply and Installation of Interior Signages & Logo as per Plan,

Drawing Details and Specifications

10.6.1

Interior Room Signages - shall be 6mm thk. opaque acrylic plastic with 3M sticker for

lettering, logo and design, on 1.5mm thk. U-shaped aluminum top and bottom support

with end clips on both sides in hairline finish 1.5mm thk. Aluminum backing in hairline

finish

10.6.1.1 Interior Room Signages - 120mm Ht. x 400mm Width (S1 - S22 & S27) sets 28.00

10.6.1.2Interior Room Signages - Counter Signages (like Cashier 1, Counter 1 & E-Card

Service 1) (S32 - S34)sets 8.00

10.6.2

Signage for Controlled Areas - shall be 6mm thick opaque acrylic plastic with 3M sticker

for lettering, logo and design, on 1.5mm thk. U-shaped aluminum top and bottom

support with end clips on both sides in hairline finish 1.5mm thick aluminum backing in

hairline finish

10.6.2.1 Utility Signages - 120mm Ht. x 400mm Width (S23 to S26 & S28) sets 11.00

10.6.2.2Signage for Controlled Areas (Unauthorized Persons Keep Out) - 200mm Ht. x

300mm Width (S40 - S42)sets 3.00

10.6.3 Toilet Entry Signage - 120mm Ht. x 120mm Width (S29 - S31) sets 5.00

10.6.4

Exit Signage - shall be 2 Watts, double-sided, ceiling mounted LED lamps in electro

galvanized steel with Epoxy powder-coated fitting construction and fire-retardant

moulder acrylic diffuser.

10.6.4.1 Exit Signage - 280mm Ht. x 435mm Width (S35 - S36) sets 8.00

10.6.5Interior Signage- 1.2mm thk.Stainless steel powder coated finish built-up with 100mm

wide sidings background

10.6.5.1 Interior Logo & Signage - Logo and GSIS (S37) set 1.00

10.6.6Interior Signage- 1.2mm thk.Stainless steel powder coated finish built-up with 150mm

wide sidings

10.6.6.1 Interior Signage - Government Service Insurance System (S38) set 1.00

10.7 Complete Supply and Installation of Exterior Signages as per Plan, Drawing

Details and Specifications

10.7.1 Exterior Logo & Signage - Logo Signage at Exterior Building (S39) set 1.00

10.8

Complete Supply and Installation of Slop Sink at Janitor's Room including the

tiles, hose bib/faucet, floor drain and other accessories as per Plan, Drawing

Details and Specifications

10.8.1 Slop Sink sets 2.00

10.9

Complete Supply and Installation of Toilet Lavatory Counter Top including the

concrete, granite tiles and other accessories as per Plan, Drawing Details and

Specifications

10.9.1 Toilet Lavatory Counter, 2900mmL x 600mmW sets 2.00

10.9.1 Toilet Lavatory Counter, 2100mmL x 600 mmW set 1.00

10.9.1 Toilet Lavatory Counter, 1800mmL x 600 mmW sets 3.00

10.10 Others (Please specify) lot 1.00

SUB - TOTAL OF SPECIALTIES

DIV. 22 PLUMBING

22.1

Complete Supply and Installation of Water Distribution System complete with

fittings and accessories as per Plan, Drawing Details and Manufacturer's

Specifications

22.1.1Supply and Installation of Cold Water Lines (for risers, downfeeds and distribution lines)

complete with fittings and accessories

22.1.1.1 20mm dia. PWL/PPR l.m. 110.00

22.1.1.2 25mm dia. PWL/PPR l.m. 33.00

22.1.1.3 32mm dia. PWL/PPR l.m. 22.00

22.1.1.4 40mm dia. PWL/PPR l.m. 77.00

22.1.1.5 50mm dia. PWL/PPR l.m. 94.00

22.1.1.6 65mm dia. PWL/PPR l.m. 33.00

Page 11

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

22.1.1.7 75mm dia. PWL/PPR l.m. 11.00

22.1.2 Gate Valves

22.1.2.1 20mm dia. pcs 11.00

22.1.2.2 25mm dia. pcs 11.00

22.1.2.3 32mm dia. pcs 7.00

22.1.2.4 40mm dia. pcs 7.00

22.1.2.5 50mm dia. pcs 7.00

22.1.2.6 65mm dia. pcs 3.00

22.1.2.7 75mm dia. pc 1.00

22.1.3 Check Valves

22.1.3.1 40mm dia. pc 1.00

22.1.3.2 50mm dia. pc 1.00

22.1.3.3 65mm dia. pcs 2.00

22.1.4 Y-Strainer

22.1.4.1 65mm dia. pcs 2.00

22.1.5 Pressure Reducing Valve

22.1.5.1 65mm dia. pcs 2.00

22.1.6 Water Meter

22.1.6.1 75mm dia. pc 1.00

22.1.7 Hose Bibb

22.1.7.1 20mm dia. pcs 4.00

22.1.8 Float Valve

22.1.8.1 75mm dia. pcs 4.00

22.2 Complete Supply and Installation of Sewer, Waste and Vent System complete

with fittings and accessories as per Plan, Drawing Details and Specifications

22.2.1 Supply and Installation of Soil pipes complete with fittings and accessories

22.2.1.1 100mm dia. Soil Stacks and Collector l.m. 72.00

22.2.1.2 150mm dia. Soil Stacks and Collector l.m. 66.00

22.2.1.3 75mm dia. Soil Stacks and Collector l.m. 52.00

22.2.1.4 50mm dia. Horizontal Pipes l.m. 99.00

22.2.2 Supply and Installation of Waste pipes complete with fittings and accessories

22.2.2.1 75mm dia. Waste Stacks and Collector l.m. 11.00

22.2.2.2 100mm dia. Waste Stacks and Collector l.m. 135.00

22.2.2.3 150mm dia. Waste Stacks and Collector l.m. 56.00

22.2.3 Supply and Installation of Ceiling Clean Out complete with fittings and accessories

22.2.3.1 75mm dia. Ceiling Cleanouts pcs 2.00

22.2.3.2 100mm dia. Ceiling Cleanouts pcs 3.00

22.2.3.3 150mm dia. Ceiling Cleanouts pcs 3.00

22.2.4 Supply and Installation of Floor Drains complete with fittings and accessories

22.2.4.1 50mm dia. Floor Drains pcs 18.00

22.2.5 Supply and Installation of Floor/Ground Cleanout complete with fitting and accessories

22.2.5.1 75mm dia. Floor/Ground Cleanouts pcs 5.00

22.2.5.2 100mm dia. Floor/Ground Cleanouts pcs 9.00

22.2.5.3 150mm dia. Floor/Ground Cleanouts pcs 5.00

22.2.6 Supply and Installation of Vent Stack and Vent Lines complete with fittings and accessories

Page 12

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

22.2.6.1 50mm dia. l.m. 90.00

22.2.6.2 75mm dia. l.m. 99.00

22.2.7 Sewer Junction Box sets 2.00

22.3

Complete Supply and Installation of Storm Drainage System like downspout,

collector and perforated perimeter pipe complete with fittings and accessories

as per Plan, Drawing Details and Specifications

22.3.1Supply and Installation of Inside Downspout and Collector complete with fittings and

accessories

22.3.1.1 100mm dia. Inside Downspout and Collector l.m. 105.00

22.3.2 Supply and Installation of Outside Drainage Pipe complete with fittings and accessories

22.3.2.1 100mm dia. Outside Drainage Pipe l.m. 18.00

22.3.2.2 150mm dia. Outside Drainage Pipe l.m. 57.00

22.3.2.3 200mm dia. Outside Drainage Pipe l.m. 29.00

22.3.2.4 250mm dia. Outside Drainage Pipe l.m. 46.00

22.3.2.5 300mm dia. Outside Drainage Pipe l.m. 14.00

22.3.2.6 350mm dia. Outside Drainage Pipe l.m. 45.00

22.3.3 Supply and Installation of Ceiling Clean Out complete with fittings and accessories

22.3.3.1 50mm dia. Ceiling Clean Out pcs 24.00

22.3.3.2 75mm dia. Ceiling Clean Out pcs 3.00

22.3.4 Supply and Installation of Trench and Grating complete with fittings and accessories

22.3.4.1 100mm dia. Trench and Grating l.m. 20.00

22.3.5 Supply and Installation of Roof and Gutter Drain complete with fittings and accessories

22.3.5.1 100mm dia. Gutter Drain units 15.00

22.3.6Supply and Installation of Canopy, Balcony, Deck and Trench Drain complete with fittings

and accessories

22.3.6.1 100mm dia. units 2.00

22.3.7 Area Drain units 16.00

22.3.8 Catch Basin units 15.00

22.3.9Supply and Installation of Condensate Pipes complete with fittings, insulation and

accessories

22.3.9.1 25mm dia. l.m. 91.00

22.3.9.2 50mm dia. l.m. 220.00

22.3.9.3 75mm dia. l.m. 22.00

22.3.10 Supply and Installation of Floor Drain complete with fittings and accessories

22.3.10.1 75mm dia. pcs 5.00

22.4 Complete Supply and installation of equipments, controller and accessories as

per Plans, Drawing Details and Specifications

22.4.1 Hydropneumatic Tank (Diaphragm Type) - Cap. 119 US Gals set 1.00

22.4.2 Hydropneumatic Tank (Diaphragm Type) - Cap. 70 US Gals set 1.00

22.4.3

Duplex Type Constant Pressure Booster Pump (Potable) - Cap/Unit. 90GPM, 160 FT.

TDH, Approx. 7.5HP, 1 Duty, 1 Stand-by (complete with controller, fittings &

accessories)

set 1.00

22.4.4Duplex Type Constant Pressure Booster Pump - Cap/Unit. 25GPM, 160 FT. TDH,

Approx. 2HP, 1 Duty, 1 Stand-by (complete with controller, fittings & accessories)set 1.00

22.5 Complete Testing and Commissioning lot 1.00

22.6 Others (Please specify) lot 1.00

SUB-TOTAL OF PLUMBING

Page 13

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

DIV. 26 ELECTRICAL WORKS

26.1

Complete Supply and Installation of Panel Boards including panelboard

complete with protection, neutral and grounding busbar, wire gutter and other

accessories as per Plan, Drawing Details and Specifications

26.1.1Panel "ATS" complete with Automatic Transfer Switch Main - 2-600AT/800AF,

3P; assy. 1.00

26.1.2Panel "MDP" Main - 1-600AT/800AF, 3P; Branches - 1-300AT,3P; 1-225AT,3P; 2-

100AT,3P; 2-50AT,3P; 1-30AT,3P; 1-SPACE,3Passy. 1.00

26.1.3Panel "DP1" Main - 1-350AT/400AF, 3P; Branches - 1-125AT,3P; 1-60AT,3P; 3-

50AT,3P; 1-SPACE,3P;assy. 1.00

26.1.4Panel "DP2" Main - 1-200AT/225AF, 3P; Branches - 1-70AT,3P; 1-60AT,3P; 2-

50AT,3P;assy. 1.00

26.1.5Panel "FPP" complete with Automatic Transfer Switch Main - 2-600AT/600AF, 3P;

Branches - 1-125AT,3P; 1-100AT,3P; 1-SPACE,3P;assy. 1.00

26.1.6Panel "PPMC/STP" Main - 1-100AT/100AF, 3P; Branches - 1-40AT,3P; 2-20AT,1P; 1-

SPACE,3P;assy. 1.00

26.1.7Panel "PAC1" Main - 1-200A, 3P LUGS ONLY; Branches - 1-200AT,3P; 12-20AT,1P; 1-

SPACE,3Passy. 1.00

26.1.8 Panel "PAC2" Main - 1-70AT/100AF,3P; Branches - 1-70AT,3P; 9-20AT,1P; assy. 1.00

26.1.9 Panel "LPSL" Main - 1-50AT/100AF, 3P; Branches - 10-20AT,1P; assy. 1.00

26.1.10 Panel "LP-AUX" Main - 1-30AT/100AF, 3P; Branches - 6-20AT,1P; assy. 1.00

26.1.11 Panel "LP1" Main - 1-50A, 3P LUGS ONLY; Branches - 3-30AT,1P; 14-20AT,1P; assy. 1.00

26.1.12 Panel "LP2" Main - 1-50A, 3P LUGS ONLY; Branches - 2-30AT,1P; 14-20AT,1P; assy. 1.00

26.1.13 Panel "PP1A" Main - 1-50A, 3P LUGS ONLY; Branches - 1-40AT,1P; 23-20AT,1P; assy. 1.00

26.1.14 Panel "PP1B" Main - 1-50A, 3P LUGS ONLY; Branches - 12-20AT,1P; assy. 1.00

26.1.15 Panel "PP2" Main - 1-50A, 3P LUGS ONLY; Branches - 1-40AT,1P; 21-20AT,1P; assy. 1.00

26.1.16 ECB, 200AT/225AF, 3P, 400V, NEMA-3R assy. 1.00

26.1.17 ECB, 125AT/225AF, 3P, 400V, NEMA-3R assy. 1.00

26.1.18 ECB, 100AT/100AF, 3P, 400V, NEMA-3R assy. 1.00

26.1.19 ECB, 40AT/100AF, 3P, 400V, NEMA-3R assy. 1.00

26.1.20 ECB, 30AT/100AF, 1P, 230V NEMA-3R assy. 3.00

26.1.21 ECB, 20AT/100AF, 1P, 230V NEMA-3R assy. 53.00

26.1.22 Wire Gutter and Pull Boxes lot 1.00

26.2 Complete Supply and Installation of Conduit complete with fittings and other

accessories as per Plan, Drawing Details and Specifications

26.2.1 90mm dia, 3m/length, IMC length 11.00

26.2.2 65mm dia, 3m/length, IMC length 6.00

26.2.3 50mm dia, 3m/length, IMC length 28.00

26.2.4 40mm dia, 3m/length, IMC length 58.00

26.2.5 32mm dia, 3m/length, IMC length 5.00

26.2.6 25mm dia, 3m/length, IMC length 61.00

26.2.7 20mm dia, 3m/length, IMC length 30.00

26.2.8 15mm dia, 3m/length, uPVC length 3,641.00

26.2.9 Miscellaneous Materials including fittings and accessories lot 1.00

26.3 Complete Supply and Installation of wires & cables complete with consumable

materials as per Plan, Drawing Details and Specifications

26.3.1 Wire, 200mm² THHN/THW l.m. 1,067.00

26.3.2 Wire, 80mm² THHN/THW l.m. 80.00

26.3.3 Wire, 60mm² THHN/THW l.m. 59.00

26.3.4 Wire, 50mm² THHN/THW l.m. 286.00

Page 14

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

26.3.5 Wire, 30mm² THHN/THW l.m. 419.00

26.3.6 Wire, 22mm² THHN/THW l.m. 59.00

26.3.7 Wire, 8.0mm² THHN/THW l.m. 1,283.00

26.3.8 Wire, 5.5mm² THHN/THW l.m. 1,043.00

26.3.9 Wire, 3.5mm² THHN/THW l.m. 20,630.00

26.3.10 Wire, 30mm² THHN/THW, green l.m. 339.00

26.3.11 Wire, 22mm² THHN/THW, green l.m. 15.00

26.3.12 Wire, 14m² THHN/THW, green l.m. 204.00

26.3.13 Wire, 8.0mm² THHN/THW, green l.m. 15.00

26.3.14 Wire, 5.5mm² THHN/THW, green l.m. 442.00

26.3.15 Wire, 3.5mm² THHN/THW, green l.m. 10,631.00

26.3.16 Consumable Materials lot 1.00

26.4 Complete Supply and Installation of the following Electrical Devices including

boxes and accessories as per Drawing Details and Specifications

26.4.1

Duplex Convenience Outlets with Grounding (Wall Mounted CO, Ceiling Mounted CO,

Partition Mounted CO, Over the Counter CO, Under the Counter CO,

Printer/Photocopy/Fax CO & Overhead CO)

sets 188.00

26.4.2

Special Purpose Outlets with Grounding (Refrigerator CO, Induction Stove CO, Water

Dispenser CO, Rangehood CO, Multipoint Heater CO, Microwave Oven CO, Hand Dryer

CO & Washing Machine/Dryer CO)

sets 21.00

26.4.3 Single Convenience Outlet with Grounding (for Emergency Light) sets 49.00

26.4.4 Weatherproof Convenience Outlet with Grounding sets 13.00

26.4.5 Floor Mounted Convenience Outlet with Grounding sets 26.00

26.4.6 1-pole, 1-gang Switch sets 24.00

26.4.7 1-pole, 2-gang Switch sets 26.00

26.4.8 1-pole, 3-gang Switch sets 27.00

26.4.9 3-way, 1-gang Switch sets 2.00

26.4.10 Utility Boxes pcs 414.00

26.4.11 Junction Boxes pcs 560.00

26.5 Complete Supply and Installation of the following Lighting Fixtures as per

Drawing Details and Specifications

26.5.1

IL-1 – Panel LED Lighting 1 - Recessed Mounted - shall be 20 watts, 4000 lumens,

6000K, daylight LED light, IP40, 120° beam angle with 595mm x 595mm x 10mm

height.

sets 73.00

26.5.2

IL-2 – Panel LED Lighting 2 - Recessed Mounted - shall be 36 watts, 3500 lumens,

6000K, daylight LED light, IP 40, 120° beam angle with 295mm x 1195mm x 10mm

height

sets 11.00

26.5.3IL-3/UL-1 – Troffer Lighting - Suspended/Surfaced Mounted - shall be 1x18watts T-8,

6000K cool white LED tube, with 177mm x 1218mm x 75mm heightsets 31.00

26.5.4IL-4 – Polycarbonate Lighting - Surfaced Mounted - shall be 2 x 18 watts T-8, 6000K

cool white LED Tube with 155mm x 1265mm x 110mm heightsets 36.00

26.5.5IL-5 – Luminaire with Prismatic Diffuser - Recessed Mounted - shall be 1x18 watts T-8,

6000K cool white LED tube. With 298mm x 1213mm x 100mm heightsets 9.00

26.5.6IL-6 – Downlight 1 - Recessed Mounted - shall be 1 x 12 watts, 6000K daylight, LED

Bulb, in in 170mm diameters x 25mm heightsets 133.00

26.5.7IL-7 – Downlight 2 - Recessed Mounted - High Ceiling - shall be 20 watts LED, 6000K,

daylight in 110mm diameters 120mm height sets 17.00

26.5.8IL-8 – Downlight 3 - Surfaced Mounted - shall be 1x12 watts LED, 6000K daylight in

120mm diameters x 55mm heightsets 5.00

26.5.9IL-9 – 3 Head Downlights - Recessed Mounted - shall be 3x5 watts, 6000K daylight,

LED Light, in 345mm x 138mm x 145mm heightsets 3.00

Page 15

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

26.5.10IL-10 – Linear Lighting - Suspended Mounted - shall be 18 watts, 6000K daylight LED

light, in 100mm x 75mm x 1200mm heightsets 52.00

26.5.11IL-11 – Flexible LED Strip Light - Coved Lighting - shall be 26.88watts per meter,

6000K daylight with 1260 luminous flux LED strip lightssets 39.00

26.5.12IL-12/UL-2 – Emergency Lights - Wall Mounted - shall be 3 watts LED 44 x 0.7watts

(22 LEDS/lamp head)sets 40.00

26.5.13IL-13 – Exit Lights - Ceiling Mounted - shall be 3 watts LED 44 x 0.7watts (22

LEDS/lamp head)sets 9.00

26.5.14

UL-3 – Exterior Wall Lamp (Exterior - Genset Area) - shall be 20 watts LED 13 deg

narrow beam, 3000K warm white, 1627 lumens, in 195mm diameters x 240 height

cylindrical LED wall mounted lights

sets 3.00

26.5.15

EL-1 – Surfaced Mounted Downlight (Exterior - Guard House) - shall be 1x19 watts,

6000K daylight LED bulb with reflector beam angle of 32° and 1700 lumens, in 111mm

diameters x 160mm height

sets 9.00

26.5.16

EL-2 - Wall Mounter Light - shall be 30 watts LED lights, 6000K daylight in 352mm x

352mm x 121mm square perimeter lights wall mounted, made from vandal resistant

polycarbonate with durable silicon gasket, IP66

sets 3.00

26.5.17

EL-3 – Recessed Mounted Downlight - shall be 30 watts LED light, 6000K, daylight,

with 45° beam angle in 166mm diameters x 219mm height recessed mounted

downlight made from aluminum extrusion with weatherproof durable silicon gasket and

external screws made of stainless steel, IP66

sets 7.00

26.5.18

EL-4 – Polycarbonate Lighting - Suspended Mounted (Covered Parking) - shall be 1 x

18 watts T-8, 6000K cool white LED tube with 100mm x 1265mm x 110 height,

moisture and dustproof IP65 luminaire fitted to BJB rotary lock lamp holder in

polycarbonate housing, suspended mounted installed by a suspension mounting

sets 5.00

26.5.19

EL-5 – Solar LED Light Post (Perimeter Light/Exterior Areas) - shall be 60 watts light

output with polycrystalline solar panel, 5500 to 6500K daylight LED SMD, 6000LM

luminous flux; made from ABC housing with lithium iron phosphate battery and built-in

motion sensor, IP65. Pole height shall be 5 to 6meters

sets 10.00

26.5.20

EL-6 – Exterior Wall Lamp (for Covered Walkway) - shall be 20 watts LED lights, 4000K

cool white with luminous flux of 1755-1802 lumens, in 100mm diameters x 2200mm

height wall mounted, 37 deg down beam angle, made from aluminum in black color

finish complete with surface mounting box, IP65

sets 7.00

26.5.21

EL-7 – Recessed In-ground Adjustable Uplights - shall be 30 watts LED lights, 3000K,

warm white, 188mm diameters x 321mm diameters depth, recessed in-ground

adjustable uplight with anti-slip lens and made from brass metal suitable for harsh

environment complete with drivers and hardware.

sets 7.00

26.5.22 Miscellaneous Materials including hangers complete with fittings and accessories lot 1.00

26.6

Complete Supply and Installation of Service Entrance Pedestal and Manhole

complete with protection and other accessories as per Plan, Drawing Details

and Specifications

26.6.1Service Entrance Concrete Pedestal complete with conduit, rebars, concrete, formworks

and other accessorieslot 1.00

26.6.2Service Entrance Main Circuit Breaker (3P, 600AT/800AF) complete with neutral and

grounding busbar and with space heater, NEMA-4xunit 1.00

26.6.3Ducting Works embedded with 4 sets of 110mmØPVC and complete with others

accessories like endbell, concrete, rebars and etc.l.m. 10.00

26.6.4Ducting Works embedded with 2 sets of 110mmØPVC and complete with others

accessories like endbell, concrete, rebars and etc.l.m. 80.00

26.6.5Electrical Manhole complete with others accessories concrete, rebars, formworks and

etc.units 5.00

26.7

Complete Supply and Installation of Equipment (Transformer and TVSS)

complete with protection and other accessories as per Plan, Drawing Details

and Specifications

26.7.1150KVA Pole Mounted Power Transformer, 34.5KV-400Y/230V, 3P, 60Hz (Electrical

Cooperative Supplied)units 3.00

26.7.2 TVSS, 100KA/Phase unit 1.00

26.7.3 TVSS, 30KA/Phase unit 1.00

26.8

Complete Supply and Installation of Generator Set including the Generator

Synchronizing Panel and Fuel Tank complete with protection and other

accessories as per Plan, Drawing Details and Specifications

NOT APPLICABLE

Page 16

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

26.90 COMPLETE TESTING AND COMMISSIONING lot 1.00

SUB - TOTAL OF ELECTRICAL WORKS

DIV. 27 COMMUNICATIONS

27.1

Complete Supply, Installation of Structured Cabling - Horizontal Cabling (Data

and Voice) System complete with fittings and accessories as per Plan, Drawing

Details and Specifications

27.1.1 2-port faceplate pcs 138.00

27.1.2 Cat 6 Modular Jack pcs 138.00

27.1.3 Cat 6 Stranded Patch Cord - 2m pcs 138.00

27.1.4 Cat 6 Stranded Patch Cord - 3m pcs 138.00

27.1.5 Cat 6 UTP rolls 31.00

27.1.6 Patch Panel 24 ports 1U with wire management sets 8.00

27.1.7 Open Bay Rack with Vertical Wire Manager 6ft x19 set 1.00

27.1.8 Conduits, Fittings, Hangers, Support / Roughing-In Materials lot 1.00

27.1.9 Testing & Commissioning lot 1.00

27.2 Complete Supply, Installation of Structured Cabling - IP-PBX System complete

with fittings and accessories as per Plan, Drawing Details and Specifications

27.3 Complete Supply, Installation of Wireless Systems System complete with

fittings and accessories as per Plan, Drawing Details and Specifications

27.4 Complete Supply, Installation of Public Address System complete with fittings

and accessories as per Plan, Drawing Details and Specifications

SUB - TOTAL OF COMMUNICATIONS

DIV. 28 ELECTRONIC SAFETY AND SECURITY

28.1 Complete Supply and Installation of Security System (CCTV) complete with

fittings and accessories as per Plan, Drawing Details and Specifications

28.1.1 2 MP Bullet Network Camera sets 6.00

28.1.2 2 MP Dome Network Camera with Audio sets 11.00

28.1.3 2 MP PTZ Network Camera sets 6.00

28.1.4 16 Channel H.265 Network Video Recorder set 1.00

28.1.5 8 Channel H.265 Network Video Recorder set 1.00

28.1.6 8 Port POE Switch set 1.00

28.1.7 24 Port POE Switch set 1.00

28.1.8 Network Storage for 8 TB sets 2.00

28.1.9 55" LED TV set 1.00

28.1.10 2KVA UPS set 1.00

28.1.11 1KVA UPS set 1.00

28.1.12 UTP CAT 6 Cable boxes 7.00

28.1.13 Conduits, Fittings, Hangers, Support / Roughing-In Materials lot 1.00

28.1.14 Testing & Commissioning lot 1.00

28.2 Complete Supply and Installation of Fire Detection Alarm System (FDAS) as per

Plan, Drawing Details and Specifications

28.2.1 Addressable Fire Alarm Control Panel 220V set 1.00

28.2.2 Optical smoke detector (Addressable) sets 68.00

28.2.3 Heat Detector (Addressable) sets 8.00

28.2.4 Detector base (Addressable) sets 76.00

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

Page 17

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

28.2.5 Addressable Call Station or Call point sets 9.00

28.2.6 Sounder/Strobe sets 9.00

28.2.7 Addressable Monitor Module sets 9.00

28.2.8 Addressable Control/Interface Module sets 9.00

28.2.9 Fireman's Telephone set 1.00

28.2.10 Graphical Annunciator set 1.00

28.2.11 #18 TF Shielded Twisted Pair rolls 20.00

28.2.12 #16 TF Shielded Twisted Pair rolls 14.00

28.2.13 Conduits, Fittings, Hangers, Support / Roughing-In Materials lot 1.00

28.2.14 Testing & Commissioning lot 1.00

28.3 Others (Please specify) lot 1.00

SUB - TOTAL OF ELECTRONIC SAFETY AND SECURITY

DIV. 31 EARTHWORKS

31.1 Clearing and Grubbing, complete sq.m 2,737.56

31.1 Complete Building Excavation as per Specifications, complete cu.m. 1,523.32

31.2 Complete Supply and Application of Backfilling & Compaction of Excavated Materials, as

per Specifications, completecu.m. 5,099.88

31.3 Complete Supply and Installation of Gravel Bedding as per Plans, Drawing Details and

Specifications, completecu.m. 186.87

31.4 Complete Supply and Application of Soil Poisoning as per Drawing Details and

Specifications, completesq.m. 1,148.95

31.5 Disposal of Excess Soil/Materials, complete cu.m. 1,425.33

31.6 Others (Please specify)

SUB - TOTAL OF EARTHWORKS

DIV. 32 EXTERIOR IMPROVEMENTS

32.1

Complete Supply and Installation of Concrete Curb and Gutter as per Drawing

Details and Specifications (start from concreting complete up to painting works

if needed)

32.2

Complete Supply and Installation of Parking Bumper as per Drawing Details

and Specifications including the concreting works (start from concreting

complete up to painting works if needed)

32.3

Complete Supply and Installation of Exterior/Site Development Floor Finishes

as per Plan, Drawing Details and Specifications including the concreting works

(complete up to painting works if needed)

32.4

Complete Supply and Installation of Decorative Fence and Gates as per Plan,

Drawing Details and Specifications including the concreting works (complete

from plastering to painting works if needed)

DIV. 48 SOLAR ENERGY ELECTRICAL POWER GENERATION EQUIPMENT

TOTAL COST FOR BUILDING CONSTRUCTION Php -

Name of Authorized Representative and Signature: _____________________________________

Complete Address: ______________________________________________________________

Signature Over Printed Name

Name of Contractor: _____________________________________________________________

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

Page 18

Construction of the GSIS Legazpi Branch Office Building

Alternate Road, Legazpi City

Bill of Quantities

Unit Qty Unit Cost Amount Unit Cost Amount OCM Profit VAT

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

(2 x 3) (2 x 5) (4 + 6 ) Php Php Php (8 + 9 + 10) (7 + 11) (12 /2)

Total Cost Unit CostITEM

NO.DESCRIPTION

MATERIALS LABOR Direct Cost

MARK UPS Indirect Cost

Email Address : __________________________________________________________________

Telephone No. (Mobile and Landline) : _______________________________________________

Date : ______________

Page 19