construction of water kiosk, caretaker room, elevated
TRANSCRIPT
1
Kindly remember to sign and stamp each page of this document
Annex 1
Quotation Submission Form
Construction of water kiosk, caretaker room,
elevated water tank and Hand dug well in
Yaaqle Village, Balcad District Middle
Shabelle Somalia
2
Kindly remember to sign and stamp each page of this document
Quotation Submission Form
to be submitted by May 15th 2018 12.00 pm latest
Name of Company/ Candidate: ________________________________________________________
Name of person authorized by the Company/ Candidate to conclude the contract:________________
Address of Company/ Candidate: _______________________________________________________
Phone/fax: ________________________________________________________________________
E-mail address: _____________________________________________________________________
Registration number of Candidate/Company [PLEASE INSERT as provided in legal status documents]:
Bank account number: (including Bank’s name, SWIFT number and address) ____________________
__________________________________________________________________________________
We hereby declare that our company Quotations the delivery of the work, according to the terms and
conditions of the technical specifications listed in the Invitation to Submit a Quotation.
Total price of work including all costs is __________________________________________________
Price in words, including currency: _____________________________________________________
Delivery time of the subject of the contract (calendar days): _________________________________
Place of delivery of the subject of the contract: ____________________________________________
Warranty conditions: _________________________________________________________________
__________________________________________________________________________________
Payment conditions (no and % of installments):
__________________________________________________________________________________
__________________________________________________________________________________
The Company/ Candidate confirms its obligation to maintain the validity of this Quotation until the final
selection by the Company latest May 18th, 2018.
This Quotation has …………. pages.
Name and seal of the Company ________________________________________________________
Address ___________________________________________________________________________
Representative Name: _______________________________________________________________
Position with the Company ___________________________________________________________
Place, date:
Signature and stamp
Lp. Checklist of Schedules and Annexes to the Quotation No. of docs.
and pages
1. Quotation submission form
2. Company’s/Candidate’s Statement
3. Bill of Quantities
4. Valid Permissions and licenses required to carry out business activities in
Balcad district Middle, Shabelle Region
5 Previous work references
3
Kindly remember to sign and stamp each page of this document
Annex Candidate’s statement
Construction of water kiosk, caretaker room,
elevated water tank and Hand dug well in
YaaqleVillage, Balcad District Middle
Shabelle Somalia
4
Kindly remember to sign and stamp each page of this document
Company’s/Candidate’s Statement
I/We………………………………… [PLEASE CHOOSE I/we], representing
……………………………………….....…………………….....…………………….....……………………………………… [PLEASE INSERT
full name of the company] established in …………………………………………..[PLEASE INSERT city and country of
company’s establishment], under a Power of Attorney attached to the quotation, hereby declare that it
agrees to submit the Request for Quotations, in observance of the principles and declarations made
hereunder and that it is fully aware that any failure to comply therewith could lead to its exclusion from
the procurement procedure and the rejection of its quotation.
I/We………………………………… [PLEASE CHOOSE I/we] hereby declare that
……………………………….....…………………….....…………………….....…………………….....…………………….....……………………..
.... [PLEASE INSERT full name of the Company/ Candidate] has no conflict of interest with any other
commitment or contracts and that no corrupt, fraudulent, abusive or coercive practice is behind its actions
and that it shall carry out its duties to the highest professional standards in the best interests of the
Investor with no consideration linked to possibilities for future contracts and that it observes the following
principles and minimum basic standards throughout its commercial and procurement activities and has
procedures in place to ensure that respect for these principles and standards is upheld by its staff, co-
contractors and partners:
LABOR STANDARDS
1. Employment is freely chosen, i.e., there is no forced, bonded or involuntary prison labor, and
workers are not required to provide ‘deposits’ or surrender their identity papers to the employer
and are free to leave their employment after providing reasonable notice;
2. Freedom of association and the right to collective bargaining are respected, i.e., workers, have the
right to join or form trade unions of their own choosing and to bargain collectively. Where the
right to freedom of association and collective bargaining is restricted under law, the employer
facilitates and does not hinder the development of parallel means for independent and free
association and bargaining;
3. Working conditions are safe and hygienic;
4. Child labor shall not be used. For the purpose of this statement “child labor” is defined as work
that deprives children of their childhood, potential and dignity, and that is harmful to their physical
and mental development. There should be no recruitment of children, and children under 18 years
of age shall not be employed at night or in hazardous conditions, or for any work which is likely to
jeopardize their physical, mental or moral health;
5
Kindly remember to sign and stamp each page of this document
5. The wages and benefits paid for a standard working week meet the minimum, national legal
standards or industry benchmarks, whichever is higher. The wages paid should always be high
enough to meet basic needs and to provide some discretionary income;
6. Working hours are not excessive, i.e., they comply with national laws and benchmark industry
standards;
7. Discrimination is not practiced in relation to hiring, compensation, access to training, promotion,
termination or retirement based on race, caste, national origin, religion, age, disability, gender,
marital status, sexual orientation, union membership or political affiliation;
8. Regular employment is provided, i.e., the work must be performed on the basis of a recognized
employment relationship established through national law and practice;
9. No harsh or inhumane treatment is tolerated, i.e., physical abuse/discipline, threat of physical
abuse, sexual or other harassment or verbal abuse, or other forms of intimidation are prohibited.
ENVIRONMENTAL STANDARDS
Suppliers must comply with all statutory and other legal requirements regarding the environmental
impacts of their business and should aim to:
1. Minimize waste and recycle items whenever practicable;
2. Adopt effective controls of waste with respect to ground, air and water pollution;
3. Adopt emergency plans related to the use and handling of hazardous materials;
4. Avoid undue and unnecessary use of materials and use recycled material whenever appropriate;
5. Monitor processes and activities as necessary to ensure the conservation of scarce resources;
6. Maximize efficient energy usage to minimize harmful emissions.
TRANSPORT AND CARGO STANDARDS
1. Transport services should be provided by a company which adheres to the highest possible safety
and employment standards, does not engage in transporting illicit or illegal goods, ammunition or
other conflict-sensitive materials to or from territories subject to a UN or EU embargo, and which
respects human rights and observes international humanitarian law. In a situation when the
supplier of the goods is the one arranging the transport, the supplier should ensure that the
transport services meet these standards.
2. When air transport is required, preference shall be given to providers who are not on the EU Safety
Ban List and whose aircraft are registered in countries which meet the International Civil Aviation
Organization’s standards.
6
Kindly remember to sign and stamp each page of this document
CONFIDENTIALITY
………………………………………………………………………………[PLEASE insert the company’s name] agrees to hold in
trust and confidence any information or documents disclosed to it, discovered by it or prepared by it in
the course of or as a result of its participation in the above mentioned procurement procedure, and agrees
that shall only be used for the purposes of this procedure.
FINANCIAL RULES
[PLEASE CHOOSE I/we] furthermore hereby declare that
………………………………………….....…………………….....…………………….....……………………….. [PLEASE INSERT full
name of the Company/ Candidate]:
1. Is not subject to any conflict of interest in the ongoing procurement procedure for this contract
with other commitments or contracts recently concluded or to be concluded individually or
through any subsidiary or related company;
2. Is not bankrupt or being wound up or having its affairs administered by the courts, has not entered
into an arrangement with creditors or suspended business activities, is not the subject of
proceedings concerning those matters or any analogous situation arising from a similar procedure
provided for in national legislation or regulations;
3. Has never been convicted of any offence concerning its professional conduct by a judgment which
has the force of res judicata;
4. Had never been proven guilty of any grave professional misconduct by any means which the
contracting authority can justify;
5. Has fulfilled its obligations related to the payment of social security contributions and taxes in
accordance with the legal provisions of the country in which it is established or with those of the
country of the contracting authority or those of the country where the contract is to be performed;
6. Has never been the subject of a judgment which has the force of res judicata for fraud, corruption,
involvement in a criminal organization or any other illegal activity, as well as coercive or collusive,
detrimental to the EU’s financial interests;
7. Is not currently subject to any administrative penalty imposed by an EU funded donor for (i)
misrepresentation in supplying information required as a condition for participation in a
procurement procedure or failing to supply such information; (ii) a serious breach of its obligations
covered by the EU budget.
8. Is not currently subject to any administrative penalty imposed by an UN funded donor for (i)
misrepresentation in supplying information required as a condition for participation in a
procurement procedure or failing to supply such information; (ii) a serious breach of its obligations
covered by the UN budget.
7
Kindly remember to sign and stamp each page of this document
……… [PLEASE CHOOSE I/we] shall inform PAH about any of the above circumstances immediately after
they arise or immediately after ……….. [PLEASE CHOOSE I/we] or any other member of the Company learns
of such circumstances.
The ……………………………………………………………………………… [PLEASE insert the Company/Candidate] agrees that the
European Commission, or persons mandated by the European Commission, including the European Anti-
Fraud Office (OLAF), and the Court of Auditors shall exercise their powers of control on documents and on
the spot in the relation to the contract founded by Community funds.
Any terms not defined in this document shall have the meaning given to them in the Rules of Conduct
applicable to tenders and purchases organized by Polska Akcja Humanitarna.
Name and the seal of the Company _______________________________________________________
Address _____________________________________________________________________________
Representative Name: _________________________________________________________________
Position with the Company: _____________________________________________________________
Place, date: __________________________________________________________________________
____________________________________________________________________________________
Signature and stamp
8
Kindly remember to sign and stamp each page of this document
Ten taps Water kiosk(Five on each side)
Emergency BoQ for Water Kiosk in Yaaqle village
COMMUNAL WATER POINT
Item Description Unit Quantity Price $ Amount $
A Digging of trench,insert pipes & fittings & backfill L.M.
500
1
1 1/2" & 2'' pipes will be provided by PAH
2
T -2" x 1 1/2"
pcs 3
3 Reducer 1 1/2" x3/4 pcs 2
4 Glue can 2
5 Thread(scotch strip) pcs 2
7 Joint(Giunto) pcs 4
8 Elbow(Gomito) pcs 2
9 Cross pcs 10
11 Sleeve( Manicotto) pcs 3
12 Water tap(Rubinetto dell' acqua)-3/4" pcs 10
13 Cork(Tappo) pcs 1
13 Iron Saw(Sega ferro) pcs 1
9
Kindly remember to sign and stamp each page of this document
14 Gate valve(Valvola a saracinesca) pcs 1
15 Cement bags 20
16 Sand sacks 45
17 Concrete blocks pcs 180
18 Mason & helpers days 2
19 Plumber & assist. Plumbers days 2
20 Diggers of the soak pit (0.5mX0.5mX 1.00m) days 1
21 Water meter pcs 1
22 Feasibility Item
23 Transportation cost
lump sum
24 Sub-total
26
Total cost of two water kiosks(inclusive)
10
Kindly remember to sign and stamp each page of this document
BoQ of elevated water tank
Elavated Water Tank (3m x 3m x 6.00m high)
No. Description Unit Quant. Un. cost Amount-$
1 ELEVATED WATER TANK OF 20 M3 CAPACITY
2 Site Clearing of beginning work (phase one) and site clearing after completed work (phase two). M2 9
3 Excavate for footing foundation (wide 1 x 1 length x 1.5m)4 deep commencing from ground level M3 6
4 Excavate foundation trenches 0.5mx m x 12mx1m depth commencing from ground below level M3 6
5 Lean concrete in 0.05m thick blinding layer (1:4:8 mix ) under the foundation wall M3 0.24
6 Construction of RCC footing columns (1m wide x1m long x1.5m deep)4 with Y16 & Y16 rebar both way links with R8 @ 200mm c/c
M3 6
7 Construction of stone masonry 0.4 wide x 12m length x 1.5m depth in cement & sand mortar 1:4 M3 7.2
8 Compacted hardcore and well blinded with approved blinding layer(3mx3mx0.75m depth) M2 6.75
9 0.2m base slab (1:2:4) reinforced with Y10 & Y10 rebars both way links with R8 @ 200mm c/c M3 1.8
10 Construction of RCC columns ( 0.30x0.30x7.5ht) 4 at ratio (1:2:4) reinforced with Y18 & Y18 rebars both ways links with R8 @200mm c/c
M3 2.7
11 Construction of RCC interm ring beam (1:2:4) reinforced with Y12 & Y12 rebars both ways links with R8 @200mm c/c M3 0.64
12 Construction of RCC ring beam below bottom slab (1:2:4) reinforced with Y12 & Y12 rebars both ways links with R8 @200mm c/c
M3 0.64
13 0.2m bottom slab (1:2:4) with Y12 & Y12 rebars both ways links with R8 @200mm c/c inclusive of 600 x 500mm manhole cover and sleeves for inlet and outlet water pipes M3 1.8
14 Construction of RCC walls of water tank (1:2:4) reinforced with Y10 & Y10 rebars both ways links with R8 @200mm c/c M3 8.92
15 Prepare and lay 20mm thick cement flooring and walls screed finished smooth cement slurry
M3 1.8
11
Kindly remember to sign and stamp each page of this document
16 0.12m top slab (1:2:4) reinforced with Y10 rebars both ways links with R8 @200mm c/c inclusive of 600 x 500mm manhole cover and sleeves for inlet and outlet water pipes M3 1.08
17 25mm thick plaster and paint with two coats of white wash to all beams and columns
M2 31
18 Paint two coats of emulsion paint to the internal and external walls, beams and columns
M2 31
19
G.I pipe Ǿ1 1/2 inches PCS 1
20
Elbow Ǿ 1 1/2 Inches PCS 3
21
Union Ø2½ Pcs 3
22
ValveØ2½ Pcs 2
23
Nipples Ø2 inch Pcs 4
24
Socket Ǿ 1 1/2 Inches Pcs 5
25
Tee Ǿ1 1/2 Inches Pcs 4
26
Reducer Ø2__1/2inches Pcs 5
27
Plumbing work no 2
28
Taps Pcs 6
29 Labeling & drawing gender vissibility logo,picture & numbering item 1
30
Transportation L.S 1
12
Kindly remember to sign and stamp each page of this document
BILL OF QUANTITY & COST ESTIMATION OF CARE-TAKER ROOM
No. Description of work Unit Quantity U. Pr.$ Am. (USD)
A Construction of Generator room 3m X 3.5m
The walls are made of concrete hollow block
1 Clearing and preparation of the site 4m X 6m
including cutting down and removal of top soil up to
a depth of 150mm and disposed of as directed
M² 10.5
2 Excavation of foundation M³ 6.4
3 Remove surpuls excavated materials from site M³ 2.6
4 Stone M³ 1.5
5 Concrete hollow blocks pcs 210
6 Cement bags 15
7 Sand M³ 2
8 Aggregate from crusher plant M³ 2
9 Steel bar 12 mm @200c/c pcs 3.5
10 Steel bar 6 mm pcs 2
Install a ladder up to the tank roof L.S 1
Sub-total
Grand Total
13
Kindly remember to sign and stamp each page of this document
11 Binding wire kg 1
12 Stone M³ 3.5
13 Backfill around foundation M³ 2
14 Wood 20X2.5cm&Tavolo 20) pcs 4
18 Galvanized corrugated Iron sheet (2.45m X 0.80m) No 6
19 Steel window with burglar No 3
20 Fencing around the care taker room and the kiosk
with barbet wire of U-shaped steel at a height of
1.8m
L.m 12
21 Steel Door pcs 1
22 Door lock pcs 2
23 Hinges pair 1
24 Nails for construction Kg 5
25 White wash M³ 1
26 Paint(Muraline) Tin 2
27 Water for construction M³ 3
14
Kindly remember to sign and stamp each page of this document
28 Carpenter work M.
days
2
29 Mason M.
days
4
30 skilled laborers M.
days
4
31 Painter M.
days
3
32 Unskilled laborers M.
days
6
33 Labelling and drawing of gender visibility pics, logos
and numbering
No 1
35 Transportation Cost
36 Total Cost for one caretaker room
37 Grand Total for two care taker rooms
Quotation Form
Project Title: Bill of quantities of New hand-dug well with hand pump
Project Location: Yaaqle Village, Balad district, Hirshabele Region
Project Budget:
DATA:
1. Depth of the well = 25 meters
2. Thichness of the Rcc ring = 0.08 meter
Cost Estimation
No Description of work Unit Qty Rate($) Amount($)
Mobilization
1.1 Mobilization of all materials to the site Item
1.00
1.2 sub total 1
15
Kindly remember to sign and stamp each page of this document
2 Excavation & construction of casing
2.1 Excavation and removal of top sand/Soil SM
4.00
2.2 Pour siliciaous gravel rocks at the bottom of well for
filtration and protection sedimentation
CM
1.50
2.3 Construction of Rcc ring(casing) of one meter internal
diameter of which the thickness of the ring is 0.08 m.(8
centimeter wide)
L.M
25.00
2.4 Construction head of the well, 1meter above the ground in
concrete mix (1:2:4)
CM
4.00
2.5 Construction the apron of the well SM
5.00
2.6 Construction of Rcc well cover CM
0.24
Sub-total 2
3 Sock pits
3.1 Excavation the soak pit CM
3.00
3.2 Line the soak pit with retaining brick walls SM
12.00
3.3 Place Rcc cover on the soak pit (8mm) Pcs
1.00
3.4 Connect/Place PVC pipe 4" between apron and sock pit m
12.00
sub total 3
4 Solar panel
4.1 Solar panel & water pump will be provided by PAH
16
Kindly remember to sign and stamp each page of this document
4.2 Fixture of solar panel & water pump Item
1.00
4.3 Supply & fix 2'' GI pipes to the water pump No
4.00
4.4 Disinfection and chlorination of well Item
1.00
Sub total 4
5 Labour
5.1 Skilled and Unskilled Labour L.S
1.00
Sub total 5
6 Visibility logo
6.2 Labelling and drawing of gender visibility pics, logos and
numbering
No 1
Sub total 6
GRAND TOTAL FOR THE SHALLOW WELL
17
Kindly remember to sign and stamp each page of this document
SUMMARY OF THE PROJECT
No Description of work Amount($)
1 Mobilisation of all materials to site
2 Excavation & construction of Rcc casing
3
Soak pits
4
Installation of solar panel & water pump
5
Labour(Skilled & unskilled labour
6
Grand total
18
Kindly remember to sign and stamp each page of this document
19
Kindly remember to sign and stamp each page of this document
20
Kindly remember to sign and stamp each page of this document
21
Kindly remember to sign and stamp each page of this document
22
Kindly remember to sign and stamp each page of this document
23
Kindly remember to sign and stamp each page of this document
24
Kindly remember to sign and stamp each page of this document
25
Kindly remember to sign and stamp each page of this document