construction programme nacka
TRANSCRIPT
![Page 1: Construction programme nacka](https://reader038.vdocument.in/reader038/viewer/2022100604/55979d351a28abd2488b4636/html5/thumbnails/1.jpg)
E-COP – Project no. 167127-LLP-1-2009-1-IT-KA1-KA1ECETB
Example of Practice:
Byggprogrammet
Nacka Gymnasium
![Page 2: Construction programme nacka](https://reader038.vdocument.in/reader038/viewer/2022100604/55979d351a28abd2488b4636/html5/thumbnails/2.jpg)
E-COP – Project no. 167127-LLP-1-2009-1-IT-KA1-KA1ECETB
Short Description:
In this project, it is a former construction worker who works as a pupil
assistant. The pupil assistants task is to support those students who have
high absenteeism and skip school much.
Sometimes the student assistant drive home to the student and fetch him if
truancy is suspected. During the semesters the pupil assistant keep close
contact with pupils that shows a pattern that could lead to drop out.
The assistant work with these pupils, at present 7-8 pupils, help them with
school work, keep in touch when they not show up in school.
![Page 3: Construction programme nacka](https://reader038.vdocument.in/reader038/viewer/2022100604/55979d351a28abd2488b4636/html5/thumbnails/3.jpg)
E-COP – Project no. 167127-LLP-1-2009-1-IT-KA1-KA1ECETB
3
Some students who have high
absenteeism and skip school
much needed support to come
to school.
Problem
![Page 4: Construction programme nacka](https://reader038.vdocument.in/reader038/viewer/2022100604/55979d351a28abd2488b4636/html5/thumbnails/4.jpg)
E-COP – Project no. 167127-LLP-1-2009-1-IT-KA1-KA1ECETB
4
Hire a pupil assistant for students
who have high absenteeism and
support them both in school and
social.
Solution
![Page 5: Construction programme nacka](https://reader038.vdocument.in/reader038/viewer/2022100604/55979d351a28abd2488b4636/html5/thumbnails/5.jpg)
E-COP – Project no. 167127-LLP-1-2009-1-IT-KA1-KA1ECETB
Main objective
• Increase school attendance
• Reduce truancy
• Help more students achieve a pass grade