CONSTRUCTION PROGRESS UPDATE Vol. 02 January 2016 TO VALUED BUYERS OF BODAIJU RESIDENCES

Upload: others

Post on 15-Feb-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp...Site-Progress-Report... · foundation. Pile Cap is the starting point of all footing (foundation) related

CONSTRUCTION PROGRESS

UPDATE

Vol. 02

January 2016

TO VALUED BUYERS OF

BODAIJU RESIDENCES

Page 2: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp...Site-Progress-Report... · foundation. Pile Cap is the starting point of all footing (foundation) related

©Torreya Asset Holdings Co., Ltd.

Construction Schedule Payment Schedule

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2017

Jan

Feb

Mar

Nov.

2015

Oct.

Dec

2016

Jan

Feb

Parking 1

Parking 2

Garden Deck

Vol.02 January 2016

Bodaiju Site Progress Report - Building A and B -

1

GENERAL SCHEDULE (October 2015 – March 2016) CONSTRUCTION PROGRESS

Currently, the foundation and pilling works are being carriedout at the site and are expected to be completed by

January 2016. As of end-December 2015, we have

completed 73.5% of piling work.

Piling works

Architectural

works

Interior works

MEP

works

Completion of

foundation

Completion of

1st floor structure

Completion of

7th floor structure

Completion of

RF floor structure

Preliminary

works - Mine investigation

- Ultimate load test, etc.

RC

Superstructure

※Construction’s Schedule might vary to take weather conditions and other factors into account.

Building ABuilding B

※The diagram above only serves to illustrate the construction progress. Actual construction may not be carried out as per the illustration.

P1

P2

1F

2F

3F

5F

6F

7F

8F

9F

10F

11F

12F

13F

RF

P1

P2

1F

2F

3F

5F

6F

7F

8F

9F

10F

11F

12F

13F

RF

Page 3: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp...Site-Progress-Report... · foundation. Pile Cap is the starting point of all footing (foundation) related

©Torreya Asset Holdings Co., Ltd. 2

PILING WORK OF BUILDING B PILE CAP EXCAVATION WORKSince the completion of piling works for Building A, Pile Cap Excavation Work has commenced to provide a stable foundation. Pile Cap is the starting point of all footing (foundation) related works.

Piling work of Building A was completed and piling work ofBuilding B has commenced. Overall piling work of Building A andB is 73.5% complete.

Vol.02 January 2016

Bodaiju Site Progress Report - Building A and B -

Page 4: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp...Site-Progress-Report... · foundation. Pile Cap is the starting point of all footing (foundation) related

©Torreya Asset Holdings Co., Ltd. 3

PILE CAP SOIL COMPACTION (BUILDING A) LEAN CONCRETE WORK (BUILDING A)

After excavation and soil compaction, the foundation isprepared with Lean Concrete for Pile Cap Reinforcement.

After excavation, compaction is properly carried out on the soil. We have also started on the soil survey work before commencing with Lean Concrete Work as an additional safety measure.

Vol.02 January 2016

Bodaiju Site Progress Report - Building A and B -

Page 5: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp...Site-Progress-Report... · foundation. Pile Cap is the starting point of all footing (foundation) related

©Torreya Asset Holdings Co., Ltd. 4

PILE CAP REINFORCEMENT WORK (BUILDING A) FORM WORK (BUILDING A)

Erection of Pile Cap Form Work has started.While piling at Building B is smoothly underway, installation of Pile Cap Reinforcement at Building A is also in good progress.

Vol.02 January 2016

Bodaiju Site Progress Report - Building A and B -

Page 6: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp...Site-Progress-Report... · foundation. Pile Cap is the starting point of all footing (foundation) related

©Torreya Asset Holdings Co., Ltd. 5

SAFETY PRACTICE ACTIVITIES

Regular safety briefings are held on site, where safety shoes,uniforms and helmets are distributed to workers.

Vol.02 January 2016

Bodaiju Site Progress Report - Building A and B -

Page 7: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp...Site-Progress-Report... · foundation. Pile Cap is the starting point of all footing (foundation) related

©Torreya Asset Holdings Co., Ltd. 6

CUSTOMERS SITE VISIT EVENTOur customers were also invited to visit our construction siteby our engineers, in order to gain a better understanding ofconstruction progress.

On 19th December 2015, valued customers were invited to oursales gallery, where they were offered refreshments and briefedon current construction progress and activities.

Vol.02 January 2016