construction projectsfacilities.usc.edu/uploads/hsc_construction_w2013... · rmr 67 mr 108 mca...

1
Alcazar St Southern Pa Zonal Ave Ricardo St te St Tremont St Murchison St San Pablo St A Lancaster Ave Charlotte St Biggy St Norfolk St Verde St Lambie St N North Main St Soto St Playground St Mark St Hospital Pl Clement St Ave Unnamed Alley 2 e Neve Ln N Henry St N Johnston St St Medfo go St N Cummings St Marengo St N Soto St Eastlake Ave sion Rd oy Ave Alhambra Ave N Soto St Norfolk St Zonal Ave N State St N Main St Valley Blvd GNH 603 SST 333 CSC 247 OPD 619 NTT 17 ZNI 282 SBA 329 SSB 235 EDM 96 HSP 190 HC2 287 GRH 612 CSA 249 KAM 70 IRD 631 CSB 183 MOL 618 NML 69 TRC 643 HC1 269 GLB 611 MCH 108.1 PHH 620 BMT 68 CCC 12 RMR 67 MMR 108 MCA 108.6 TOW 622 CRL 608 LRB 617 EVH 406 LRA 660 HSV 403 CLB 615 PMB 170 HC4 610 UNH 640 UHP 642 NRT 288 CHP 255 BCC 266 NOR 81 DOH 609 SRH 147 PSC 71 HMR 22 1 2 2 3 1 4 Parking Lot SSP Parking Lot 71 Parking Lot 70 LOT P4 Edmondson Lot MRI Lot LOP P6 Eastlake Lot Norfolk Lot (P8) San Pablo Parking Lot (P11) 2 7 19 20 21 10 8 9 18 17 11 14 22 6 1 13 3 23 4 12 15 24 16 5 University of Southern California HSC Construction Map Path: K:\Active Projects\GIS2\Maps\02_Theme_Maps\Construction\2013-2014 Winter\HSC_Construction_W2013_11x17_2014.mxd Date Saved: 1/30/2014 4:39:50 PM Visit www.usc.edu/fms for the latest Map Capital Construction Development Facilities Management Services PLANNED SITE CONSTRAINTS CAPITAL CONSTRUCTION DEVELOPMENT PROJECTS FACILITIES MANAGEMENT SERVICES MAINTENANCE PROJECTS UTILITIES PROJECTS ITS PROJECTS CURRENT SITE CONSTRAINTS CAPITAL CONSTRUCTION DEVELOPMENT CONSTRUCTION PROJECTS WINTER 2014 MAINTENANCE PROJECTS UTILITY PROJECTS 1 ALCAZAR ST ELECTRICAL DUCTBANK CONSTRUCTION 12/1/2012 3/31/2013 Jerald Evans (702) 301 8105 2 NTT NTT GENERATOR REPLACEMENT 5/1/2013 1/1/2014 Kelvin Khor (213) 821 6454 NO SITE PROJ DESCRIPTION START DATE END DATE PROJ MANAGER CONTACT 24 <null> PRO022656 SOTO/ALCAZAR BUILD NEW CAMPUS GATEWAY 4/1/2014 7/31/2014 Maria Morgan (323) 442 3721 1 BCC USC0000236 BCC 5 NEW OFFICES AND 2 EQUIPMENT ROOMS 1/6/2014 4/15/2014 LaDrena Dansby (323) 442 1544 2 CHP USC0000129 CHP BIOKINESIOLOGY & PHYSICAL THERAPY REMODEL 4/7/2014 6/6/2014 Aaron Henderson (323) 442 1546 3 CSA USC0000537 CSA 2ND FLOOR LAB REMODEL (FEASIBILITY DESIGN STUDY) <null> <null> Owen Dy (323) 442 2070 4 CSC USC0000550 CSC 106: CT SYSTEM EQUIPMENT INSTALLATION <null> 4/1/2014 Owen Dy (323) 442 2070 5 CSC PR026895 CYCLONTRON REPLACEMENT PROJECT 12/16/2013 10/31/2014 LaDrena Dansby (323) 442 1544 6 EDM USC0000472 EDM EDMONDSON PARKING LOT IMPROVEMENT (pending) 11/4/2013 11/29/2013 Kelly Estes (323) 442 3718 7 HCC III PR028013 NEW MEDICAL OFFICE BUILDINGS 5/14/2014 8/16/2016 Maria Morgan (323) 442 3721 8 NOR USC0000147 NORRIS HOSPITAL OSHPD SB 1953 SEISMIC COMPLIANCE 11/5/2012 2/28/2013 LaDrena Dansby (323) 442 1544 9 NOR USC0000312 NOR (NCH): DATA CLOSET COOLING SYSTEM 6/2/2014 7/30/2014 Aaron Henderson (323) 442 1546 10 NOR PR018111 NOR & UNH OSHPD COMPLIANCE PROJECT 11/5/2012 12/31/2013 LaDrena Dansby (323) 442 1544 11 NOR USC0000505 NOR: 3RD & 4TH FLOOR HANDWASHING STATIONS 9/2/2013 2/28/2014 Aaron Henderson (323) 442 1546 12 NOR USC0000548 NOR 2ND FLOOR READING ROOM REMODEL, RM2321 9/9/2013 5/30/2014 Rick Sendele (323) 442 3738 13 NRT USC0000551 NRT 3509A: LAB REMODEL Lab Remodel (Tissue Culture Rm) <null> 6/1/2014 Owen Dy (323) 442 2070 14 NTT USC0000493 NTT 4th TH FLOOR PATHOLOGY REMODEL FOR IMAGING/HISTOLOGY 9/2/2013 6/30/2014 Aaron Henderson (323) 442 1546 15 NTT USC0000486 NTT PATH LAB EQUIPMENT CHANGE (HISTOLOGY) <null> <null> Robert Scrofano (323) 442-2071 16 PMB USC0000417 PMB DEMO BLDGS AND BUILD PARKING LOT 1/6/2014 5/30/2014 Maria Morgan (323) 442 3721 17 RMR USC0000003 PHASE II SEISMIC INVESTIGATION 5/27/2013 12/1/2014 Shelly Wong (213) 821 7900 18 RMR USC0000294 RMR RAULSTION RENOVATION/SEISMIC UPGRADE 9/23/2013 12/1/2014 Shelly Wong (213) 821 7900 19 UNH PR028929 UNH 2ND FLOOR BLOOD BANK EXPANSION 3/1/2014 8/1/2014 Aaron Henderson (323) 442 1546 20 UNH PR028928 CONSTRUCT A THIRD CATH LAB BY REMODELING EXISTING PATIENT HOLDING AREA 1/6/2014 5/1/2014 Aaron Henderson (323) 442 1546 21 UNH PR029343 REPLACE AN EXISTING MRI & CONTROL ROOM W/ NEW EQUIPMENT 2/3/2013 7/14/2014 Aaron Henderson (323) 442 1546 22 UNH USC0000507 UNH/NIT: 1ST FLOOR WHEELCHAIR STRORAGE REMODEL 1/18/2014 2/28/2014 Aaron Henderson (323) 442 1546 23 ZNI USC0000553 ZNI 210/307/309 LAB REMODEL (LASER ROOM) <null> 6/1/2014 Owen Dy (323) 442 2070 NO BLD CODE PROJ NO PROJ DESCRIPTION START DATE END DATE PROJECT MAN CONTACT 1 NTT NTT DFM-HSC AH-2 Refurbushment 12/23/2013 3/28/2014 Ben Aghakoochek (213) 821 4583 2 MCA DFM-MCA Roof AH-1 replacement (Design) 2/10/2014 9/26/2014 Ben Aghakoochek (213) 821 4583 3 HCC HCC-Heating coil installation 2/10/2014 4/25/2014 Ben Aghakoochek (213) 821 4583 4 DFM DFM HSC NTT Generator Replacement 8/12/2013 3/17/2014 Kelvin Khor (213) 821 6454 NO BLD CODE PROJECT DESCRIPTION START DATE END DATE PROJ MANAGER CONTACT

Upload: others

Post on 02-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONSTRUCTION PROJECTSfacilities.usc.edu/uploads/HSC_Construction_W2013... · RMR 67 MR 108 MCA 108.6 TOW 622 CRL 608 LRB 617 EVH 406 LRA 660 HSV 403 CLB 615 PMB 170 HC4 610 UNH 640

Alcazar St

Southern Pacific RR

Zonal Ave

Ricard

o St

N Stat

e St

Tremo

nt St

Murch

ison S

t

San P

ablo

St

Alta S

t

Lancaster Ave

Charlotte St

Biggy St

Norfolk St

Verde St

Lambie St

N North Main St

Soto

St

Playg

round

St

Mark

St

Hospital Pl

Cleme

nt St

Kingst

on Av

e

Unna

med A

lley 2

de Ne

ve Ln

N Henry St

Vane

gas L

n

N Jo

hnsto

n St

Ricardo

St

Medford St

N Chic

ago S

t

N Cum

mings

St

Marengo StN S

oto St

Eastlake Ave

N Mission Rd

Pomeroy Ave

Alhambra Ave

N Soto

St

Cornw

ell St

Darwin Ave

Norfolk St

Zonal Ave

N State St

N Main St Valley Blvd

GNH 603

SST 333

CSC 247

OPD 619

NTT 17

ZNI 282

SBA 329

SSB 235

EDM 96

HSP 190

HC2 287

GRH 612

CSA 249

KAM 70

IRD 631

CSB 183

MOL 618

NML 69

TRC 643HC1 269

GLB 611

MCH 108.1

PHH 620

BMT 68

CCC 12

RMR 67

MMR 108

MCA 108.6

TOW 622CRL 608

LRB 617

EVH 406

LRA 660

HSV 403

CLB 615

PMB 170HC4 610

UNH 640

UHP 642

NRT 288

CHP 255

BCC 266

NOR 81

DOH 609SRH 147

PSC 71

HMR 22

1

2

2

3

1 4

Parking LotSSP

Parking Lot71

Parking Lot 70

LOT P4

EdmondsonLot

MRILot

LOPP6

EastlakeLot

Norfolk Lot(P8)

San Pablo ParkingLot (P11)

2 7

19

2021

10

8

9

1817

1114

22

6

1

13 3

23

4

1215

24

16

5

University of Southern CaliforniaHSC Construction MapPath: K:\Active Projects\GIS2\Maps\02_Theme_Maps\Construction\2013-2014 Winter\HSC_Construction_W2013_11x17_2014.mxdDate Saved: 1/30/2014 4:39:50 PM Visit www.usc.edu/fms for the latest Map

Capital Construction DevelopmentFacilities Management Services

PLANNED SITE CONSTRAINTS

CAPITAL CONSTRUCTION DEVELOPMENT PROJECTS

FACILITIES MANAGEMENT SERVICES MAINTENANCE PROJECTS

UTILITIES PROJECTS

ITS PROJECTS

CURRENT SITE CONSTRAINTS

CAPITAL CONSTRUCTION DEVELOPMENT

CONSTRUCTION PROJECTSWINTER 2014

MAINTENANCE PROJECTS

UTILITY PROJECTS1 ALCAZAR ST ELECTRICAL DUCTBANK CONSTRUCTION 12/1/2012 3/31/2013 Jerald Evans (702) 301 81052 NTT NTT GENERATOR REPLACEMENT 5/1/2013 1/1/2014 Kelvin Khor (213) 821 6454

NO SITE PROJ DESCRIPTION START DATE END DATE PROJ MANAGER CONTACT

NO BLD CODE PROJ NO PROJ DESCRIPTION START DATE END DATE PROJECT MAN CONTACT24 <null> PRO022656 SOTO/ALCAZAR BUILD NEW

CAMPUS GATEWAY4/1/2014 7/31/2014 Maria Morgan (323) 442 3721

1 BCC USC0000236 BCC 5 NEW OFFICES AND 2 EQUIPMENT ROOMS

1/6/2014 4/15/2014 LaDrena Dansby

(323) 442 1544

2 CHP USC0000129 CHP BIOKINESIOLOGY & PHYSICAL THERAPY REMODEL

4/7/2014 6/6/2014 Aaron Henderson

(323) 442 1546

3 CSA USC0000537 CSA 2ND FLOOR LAB REMODEL (FEASIBILITY DESIGN STUDY)

<null> <null> Owen Dy (323) 442 2070

4 CSC USC0000550 CSC 106: CT SYSTEM EQUIPMENT INSTALLATION

<null> 4/1/2014 Owen Dy (323) 442 2070

5 CSC PR026895 CYCLONTRON REPLACEMENT PROJECT

12/16/2013 10/31/2014 LaDrena Dansby

(323) 442 1544

6 EDM USC0000472 EDM EDMONDSON PARKING LOT IMPROVEMENT (pending)

11/4/2013 11/29/2013 Kelly Estes (323) 442 3718

7 HCC III PR028013 NEW MEDICAL OFFICE BUILDINGS

5/14/2014 8/16/2016 Maria Morgan (323) 442 3721

8 NOR USC0000147 NORRIS HOSPITAL OSHPD SB 1953 SEISMIC COMPLIANCE

11/5/2012 2/28/2013 LaDrena Dansby

(323) 442 1544

9 NOR USC0000312 NOR (NCH): DATA CLOSET COOLING SYSTEM

6/2/2014 7/30/2014 Aaron Henderson

(323) 442 1546

10 NOR PR018111 NOR & UNH OSHPD COMPLIANCE PROJECT

11/5/2012 12/31/2013 LaDrena Dansby

(323) 442 1544

11 NOR USC0000505 NOR: 3RD & 4TH FLOOR HANDWASHING STATIONS

9/2/2013 2/28/2014 Aaron Henderson

(323) 442 1546

12 NOR USC0000548 NOR 2ND FLOOR READING ROOM REMODEL, RM2321

9/9/2013 5/30/2014 Rick Sendele (323) 442 3738

13 NRT USC0000551 NRT 3509A: LAB REMODEL Lab Remodel (Tissue Culture Rm)

<null> 6/1/2014 Owen Dy (323) 442 2070

14 NTT USC0000493 NTT 4th TH FLOOR PATHOLOGY REMODEL FOR IMAGING/HISTOLOGY

9/2/2013 6/30/2014 Aaron Henderson

(323) 442 1546

15 NTT USC0000486 NTT PATH LAB EQUIPMENT CHANGE (HISTOLOGY)

<null> <null> Robert Scrofano

(323) 442-2071

16 PMB USC0000417 PMB DEMO BLDGS AND BUILD PARKING LOT

1/6/2014 5/30/2014 Maria Morgan (323) 442 3721

17 RMR USC0000003 PHASE II SEISMIC INVESTIGATION

5/27/2013 12/1/2014 Shelly Wong (213) 821 7900

18 RMR USC0000294 RMR RAULSTION RENOVATION/SEISMIC UPGRADE

9/23/2013 12/1/2014 Shelly Wong (213) 821 7900

19 UNH PR028929 UNH 2ND FLOOR BLOOD BANK EXPANSION

3/1/2014 8/1/2014 Aaron Henderson

(323) 442 1546

20 UNH PR028928 CONSTRUCT A THIRD CATH LAB BY REMODELING EXISTING PATIENT HOLDING AREA

1/6/2014 5/1/2014 Aaron Henderson

(323) 442 1546

21 UNH PR029343 REPLACE AN EXISTING MRI & CONTROL ROOM W/ NEW EQUIPMENT

2/3/2013 7/14/2014 Aaron Henderson

(323) 442 1546

22 UNH USC0000507 UNH/NIT: 1ST FLOOR WHEELCHAIR STRORAGE REMODEL

1/18/2014 2/28/2014 Aaron Henderson

(323) 442 1546

23 ZNI USC0000553 ZNI 210/307/309 LAB REMODEL (LASER ROOM)

<null> 6/1/2014 Owen Dy (323) 442 2070

NO BLD CODE PROJ NO PROJ DESCRIPTION START DATE END DATE PROJECT MAN CONTACT

1 NTT NTT DFM-HSC AH-2 Refurbushment

12/23/2013 3/28/2014 Ben Aghakoochek (213) 821 4583

2 MCA DFM-MCA Roof AH-1 replacement (Design)

2/10/2014 9/26/2014 Ben Aghakoochek (213) 821 4583

3 HCC HCC-Heating coil installation 2/10/2014 4/25/2014 Ben Aghakoochek (213) 821 45834 DFM DFM HSC NTT Generator

Replacement8/12/2013 3/17/2014 Kelvin Khor (213) 821 6454

NO BLD CODE PROJECT DESCRIPTION START DATE END DATE PROJ MANAGER CONTACT