construction projectsfacilities.usc.edu/uploads/hsc_construction_w2013... · rmr 67 mr 108 mca...
TRANSCRIPT
Alcazar St
Southern Pacific RR
Zonal Ave
Ricard
o St
N Stat
e St
Tremo
nt St
Murch
ison S
t
San P
ablo
St
Alta S
t
Lancaster Ave
Charlotte St
Biggy St
Norfolk St
Verde St
Lambie St
N North Main St
Soto
St
Playg
round
St
Mark
St
Hospital Pl
Cleme
nt St
Kingst
on Av
e
Unna
med A
lley 2
de Ne
ve Ln
N Henry St
Vane
gas L
n
N Jo
hnsto
n St
Ricardo
St
Medford St
N Chic
ago S
t
N Cum
mings
St
Marengo StN S
oto St
Eastlake Ave
N Mission Rd
Pomeroy Ave
Alhambra Ave
N Soto
St
Cornw
ell St
Darwin Ave
Norfolk St
Zonal Ave
N State St
N Main St Valley Blvd
GNH 603
SST 333
CSC 247
OPD 619
NTT 17
ZNI 282
SBA 329
SSB 235
EDM 96
HSP 190
HC2 287
GRH 612
CSA 249
KAM 70
IRD 631
CSB 183
MOL 618
NML 69
TRC 643HC1 269
GLB 611
MCH 108.1
PHH 620
BMT 68
CCC 12
RMR 67
MMR 108
MCA 108.6
TOW 622CRL 608
LRB 617
EVH 406
LRA 660
HSV 403
CLB 615
PMB 170HC4 610
UNH 640
UHP 642
NRT 288
CHP 255
BCC 266
NOR 81
DOH 609SRH 147
PSC 71
HMR 22
1
2
2
3
1 4
Parking LotSSP
Parking Lot71
Parking Lot 70
LOT P4
EdmondsonLot
MRILot
LOPP6
EastlakeLot
Norfolk Lot(P8)
San Pablo ParkingLot (P11)
2 7
19
2021
10
8
9
1817
1114
22
6
1
13 3
23
4
1215
24
16
5
University of Southern CaliforniaHSC Construction MapPath: K:\Active Projects\GIS2\Maps\02_Theme_Maps\Construction\2013-2014 Winter\HSC_Construction_W2013_11x17_2014.mxdDate Saved: 1/30/2014 4:39:50 PM Visit www.usc.edu/fms for the latest Map
Capital Construction DevelopmentFacilities Management Services
PLANNED SITE CONSTRAINTS
CAPITAL CONSTRUCTION DEVELOPMENT PROJECTS
FACILITIES MANAGEMENT SERVICES MAINTENANCE PROJECTS
UTILITIES PROJECTS
ITS PROJECTS
CURRENT SITE CONSTRAINTS
CAPITAL CONSTRUCTION DEVELOPMENT
CONSTRUCTION PROJECTSWINTER 2014
MAINTENANCE PROJECTS
UTILITY PROJECTS1 ALCAZAR ST ELECTRICAL DUCTBANK CONSTRUCTION 12/1/2012 3/31/2013 Jerald Evans (702) 301 81052 NTT NTT GENERATOR REPLACEMENT 5/1/2013 1/1/2014 Kelvin Khor (213) 821 6454
NO SITE PROJ DESCRIPTION START DATE END DATE PROJ MANAGER CONTACT
NO BLD CODE PROJ NO PROJ DESCRIPTION START DATE END DATE PROJECT MAN CONTACT24 <null> PRO022656 SOTO/ALCAZAR BUILD NEW
CAMPUS GATEWAY4/1/2014 7/31/2014 Maria Morgan (323) 442 3721
1 BCC USC0000236 BCC 5 NEW OFFICES AND 2 EQUIPMENT ROOMS
1/6/2014 4/15/2014 LaDrena Dansby
(323) 442 1544
2 CHP USC0000129 CHP BIOKINESIOLOGY & PHYSICAL THERAPY REMODEL
4/7/2014 6/6/2014 Aaron Henderson
(323) 442 1546
3 CSA USC0000537 CSA 2ND FLOOR LAB REMODEL (FEASIBILITY DESIGN STUDY)
<null> <null> Owen Dy (323) 442 2070
4 CSC USC0000550 CSC 106: CT SYSTEM EQUIPMENT INSTALLATION
<null> 4/1/2014 Owen Dy (323) 442 2070
5 CSC PR026895 CYCLONTRON REPLACEMENT PROJECT
12/16/2013 10/31/2014 LaDrena Dansby
(323) 442 1544
6 EDM USC0000472 EDM EDMONDSON PARKING LOT IMPROVEMENT (pending)
11/4/2013 11/29/2013 Kelly Estes (323) 442 3718
7 HCC III PR028013 NEW MEDICAL OFFICE BUILDINGS
5/14/2014 8/16/2016 Maria Morgan (323) 442 3721
8 NOR USC0000147 NORRIS HOSPITAL OSHPD SB 1953 SEISMIC COMPLIANCE
11/5/2012 2/28/2013 LaDrena Dansby
(323) 442 1544
9 NOR USC0000312 NOR (NCH): DATA CLOSET COOLING SYSTEM
6/2/2014 7/30/2014 Aaron Henderson
(323) 442 1546
10 NOR PR018111 NOR & UNH OSHPD COMPLIANCE PROJECT
11/5/2012 12/31/2013 LaDrena Dansby
(323) 442 1544
11 NOR USC0000505 NOR: 3RD & 4TH FLOOR HANDWASHING STATIONS
9/2/2013 2/28/2014 Aaron Henderson
(323) 442 1546
12 NOR USC0000548 NOR 2ND FLOOR READING ROOM REMODEL, RM2321
9/9/2013 5/30/2014 Rick Sendele (323) 442 3738
13 NRT USC0000551 NRT 3509A: LAB REMODEL Lab Remodel (Tissue Culture Rm)
<null> 6/1/2014 Owen Dy (323) 442 2070
14 NTT USC0000493 NTT 4th TH FLOOR PATHOLOGY REMODEL FOR IMAGING/HISTOLOGY
9/2/2013 6/30/2014 Aaron Henderson
(323) 442 1546
15 NTT USC0000486 NTT PATH LAB EQUIPMENT CHANGE (HISTOLOGY)
<null> <null> Robert Scrofano
(323) 442-2071
16 PMB USC0000417 PMB DEMO BLDGS AND BUILD PARKING LOT
1/6/2014 5/30/2014 Maria Morgan (323) 442 3721
17 RMR USC0000003 PHASE II SEISMIC INVESTIGATION
5/27/2013 12/1/2014 Shelly Wong (213) 821 7900
18 RMR USC0000294 RMR RAULSTION RENOVATION/SEISMIC UPGRADE
9/23/2013 12/1/2014 Shelly Wong (213) 821 7900
19 UNH PR028929 UNH 2ND FLOOR BLOOD BANK EXPANSION
3/1/2014 8/1/2014 Aaron Henderson
(323) 442 1546
20 UNH PR028928 CONSTRUCT A THIRD CATH LAB BY REMODELING EXISTING PATIENT HOLDING AREA
1/6/2014 5/1/2014 Aaron Henderson
(323) 442 1546
21 UNH PR029343 REPLACE AN EXISTING MRI & CONTROL ROOM W/ NEW EQUIPMENT
2/3/2013 7/14/2014 Aaron Henderson
(323) 442 1546
22 UNH USC0000507 UNH/NIT: 1ST FLOOR WHEELCHAIR STRORAGE REMODEL
1/18/2014 2/28/2014 Aaron Henderson
(323) 442 1546
23 ZNI USC0000553 ZNI 210/307/309 LAB REMODEL (LASER ROOM)
<null> 6/1/2014 Owen Dy (323) 442 2070
NO BLD CODE PROJ NO PROJ DESCRIPTION START DATE END DATE PROJECT MAN CONTACT
1 NTT NTT DFM-HSC AH-2 Refurbushment
12/23/2013 3/28/2014 Ben Aghakoochek (213) 821 4583
2 MCA DFM-MCA Roof AH-1 replacement (Design)
2/10/2014 9/26/2014 Ben Aghakoochek (213) 821 4583
3 HCC HCC-Heating coil installation 2/10/2014 4/25/2014 Ben Aghakoochek (213) 821 45834 DFM DFM HSC NTT Generator
Replacement8/12/2013 3/17/2014 Kelvin Khor (213) 821 6454
NO BLD CODE PROJECT DESCRIPTION START DATE END DATE PROJ MANAGER CONTACT