construction technology - usm school of civil engineering construction
TRANSCRIPT
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
1/65
EAA 84 CONSTRUCTIONTECHNOLOGY
ARVINTHRAN RAJA KUMARAN
MOHAMAD FIKHRI BIN MOHD. NAJIB
MUHAMMAD TAUFIQ BIN ABDUL RASHID
NUR ATIKAH BT. SHUIB
SITI AISHAH BT. MOHD PILUS
SCHOOL OF CIVIL ENGINEERINGBUILDING CONSTRUCTION
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
2/65
OVERALL VIEW OF THE BUILDING
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
3/65
Pile Cap DrawingPile PointLayout
Pile Cap Details
Ground FloorPlan
BeamDrawing Roof TrussPlan
VARIOUS BUILDING PLANS
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
4/65
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
5/65
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
6/65
FRONT VIEW OF CIVIL
ENGINEERING SCHOOL
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
7/65
REAR VIEW OF CIVIL
ENGINEERING SCHOOL
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
8/65
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
9/65
CONSTRUCTIONSEQUENCE OFSCHOOL OF CIVIL
ENGINEERING
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
10/65
SETTING OUT
Setting out is the first step in construction and is done to mark out the
points and positions of a structure. This step is done once earthwork is
completed.
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
11/65
PILING (SPUN PILE)
Once the setting out is done and the pile points have been set, piledriving work can commence.
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
12/65
CONSTRUCTION OF PILE CAP
Once pile driving work has been completed, the piles are cut to the
desired level and pile cap construction can commence.
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
13/65
CONSTRUCTION OF GROUND BEAM AND
FLOOR SLAB
Once pile caps has been constructed, the ground beam and floor slab can
commence.
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
14/65
STRUCTURE WORK UNDERCONSTRUCTION
The skeleton of the building is visible and early shape of the building
can be seen.
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
15/65
STEPS INCONSTRUCTIONOF SCHOOL OF
CIVILENGINEERING
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
16/65
DESIGN AND ANALYSIS
SITEIDENTIFICATION
Site position, area, landform, existinginfrastructure and utilities.
SITE MEASUREMENT
Based on topography, map of geology,site location.
Stated bench mark or boundary.
SOILINVESTIGATION
To determine layer of soil, strength, type,characteristic & water table.
Produce a safe and economic design forfoundation.
Site investigation of information to be analyzed before construction, structural
and design work is done.
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
17/65
DESIGN
CONSTRUCTION
Three phase design.
Architecture, Civil & Structural.
PREPARING DRAWINGAND SPESIFICATION
OF WORK
Structure drawing, shop drawing, constructiondrawing.
Work specification, addendum specification.
COSTING
Lump sum
Bill of quantities (BQ)
DESIGN AND ANALYSIS
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
18/65
PREPARATION FOR CONSTRUCTION
SITE CLEARING
Clear, from all areas planned for the
work, buildings, materials, debris, prior tothe cutting and filling taking all necessaryprecautions to prevent damage to theexisting road structures and buildings orfacilities, in the area, which shall not bedemolished.
TEMPORARY ACCESS
Used during construction period before the realaccess road is constructed.
PROJECTSIGNBOARD
To inform that the project is beingimplemented or under construction.
Work of this section includes all measurement and materials required to
complete the supply, execution and construction of site preparation.
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
19/65
HOARDING
To prevent people from entering the constructionarea.
For safety purposes.
SAFETY SIGNAGE
For safety requirement, safety of workers andpeople surrounding the site.
STORAGE FORMATERIAL
Suitable space to keep or load material suchas rebar, piling and formwork.
PREPARATION FOR CONSTRUCTION
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
20/65
SITE OFFICE
For storage equipment,
document, drawing & computer.
TEMPORARYUTILITIES
For usage during construction period.
Water, electrical, telephone & sanitation.
TEMPORARY PLACEFOR WORKERS
For construction workers to stay duringconstruction period.
PREPARATION FOR CONSTRUCTION
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
21/65
From sub structure, super structure, steelwork(truss).
STRUCTURECONSTRUCTION
Complete man power, machinery, material,money, method.
PREPARATIONFOR
CONSTRUCTION
Clear all areas planned for the work, allbuildings, materials & debris.
SITE CLEARING
Should be identified and emphasized that all work carried out in
accordance with the requirements and specifications
CONSTRUCTION STAGE
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
22/65
Check the existing bench marks andreference points located on or out of the
site as indicated. Establish newly standardbench marks and points for the workswithin the site.
SURVEY
Prior to execution of the works the contractorshall check the existing reference points.
Principal points shall be established taking
advantage of the existing reference points.Individual principal point posts shall be of wood,15cm x 15 cm size, with an indicating nail onthe top, the surface of the post above theground shall be painted white.
TRANVERSING& PRINCIPAL
POINT
Establishment of temporary bench marks shallbe determined and posts shall be of wood,12cm x 12cm x 100cm in size, with anindicating nail on the top, the surface of thepost above ground shall be painted.
Setting out for survey shall be done with theagreement of the Engineer.
BENCH MARK &SETTING OUT
CONSTRUCTION STAGE
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
23/65
Work below level. Piling, pile cap, stump and ground beam.
SUB-STRUCTURE
Work on upper level
Slab, column, beam, roof beam, truss,roof.
SUPER-STRUCTURE
Mechanical, electrical, plumbing, sanitary,air conditioning, fire fighting, networking.
FACILITIES
CONSTRUCTION STAGE
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
24/65
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
25/65
SUB-STRUCTURE
PILING
PILE CAP
STUMP
GROUNDBEAM
The pile is designed to carry
as its part of the total support
of the foundation loading.
Specified in the drawings for
this building is 450mm spun
pile.
Test pile, pile record
Size, type, anti-termite, rebar,cover,
Formwork, concrete, lean
concrete.
Work below the surface of the ground
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
26/65
SUPER-STRUCTURE
SLAB
STAIRCASE
COLUMN
BEAM
STEEL TRUSS
ROOF BEAM
Apron and perimeter drain
Type
Bars
Formwork
Anti-Termite Treatment
Concrete Grade
Waterproofing (Damp
Proof Course)
Work above the surface of the ground.
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
27/65
FINISHING WORK
BRICKWORK
PLASTERING
TILING/RENDERING
DOOR & WINDOW
CEILING & ROOF COVER
Door and window frame
Exmet
Mortar
Wall
Painting
Skirting
Fascia board, gutter, rainwater down pipe
Roof insulation
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
28/65
MECHANICAL & ELECTRICAL WORK
Electrical
WiringConduit
Lights,socket,
fan,switchboard
Air-Cond
Split Unit,Ceiling
Cassettetype, WallMounted
UsingDOL
Starter
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
29/65
FIRE FIGHTHING
ActiveSmoke
detector,break glass,
heat detector
Passive
Hose reel
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
30/65
PLUMBING & SANITARY
Piping
Direct
Water tank
Sanitary
Manhole
ToiletFitting/Accessories
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
31/65
MATERIALS USED INTHECONSTRUCTION OFSCHOOL OF CIVIL
ENGINEERING
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
32/65
Polymer or cement-based binders, compounds or aggregate mixtures for
joining components and forming structures. Concrete is used for
making architectural structures, foundations, brick or block walls, pavements,
reservoirs, pipes and poles.
CONCRETE
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
33/65
Cement is the most important material in the construction world. It acts
as a binder for all constituent materials in concrete, mortar or
adhesives. Cement is made from limestone and other chemicals in
cement plants. Cement can be stored in silos, tankers or packed into
bags normally weighing 50kg each. There are various cement brandssuch as Lafarge, CIMA, Tasek Cement and YTL Cement.
CEMENT
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
34/65
Sand is a critical material in construction as it is the main building
material after cement. Sand is used to mix concrete, mortar and also
acts as a backfilling material. Sand can be dredged from rivers or
abandoned mining pools.
SAND
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
35/65
Steel reinforcement bars
provide tensional force
as concrete is a material
weak in tension but
strong in compression.
There are two types of
reinforcement bars
commonly used in the
construction industry
which is High Tensile
Bars (marked as T) and
Hot Rolled Mild Steel Bar(marked as R).
T bars are used for main
reinforcements while R
bars are used as shear
links for structural
STEEL REINFORCEMENT BAR
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
36/65
Tmber is a widely used material in construction mostly as formwork,
mould or falsework for concrete casting of various structural
components.
TIMBER
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
37/65
The purpose of this tank is to store and distribute water through a water
reticulation system that will be installed in the building.
WATER TANK (POLYURETHANE)
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
38/65
Paint is classified under architectural finishes,. Paint is actually a chemicalcompound consisting of petroleum by products and colour to create a
liquid mix that can be applied to any finished surface by means of brushing
or spraying to produce a smooth, colourful and attractive surface finish.
PAINT
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
39/65
Aluminium roof truss is new in roof construction. Previously, timber roof
trusses were used to hold roof structures. The aluminium roof truss system
consists of C-channels bolted together to form a complete truss.
ALUMINIUM ROOF TRUSS
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
40/65
Tiles come in various shapes and sizes to accommodate different needs in
order to cover a surface be it a floor or a wall. It comes under architectural
finishes in building. Tiles are bonded to the surface using mortar with bond
adhesives made specially for tile laying purposes.
TILES
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
41/65
Roof tiles are made of cement or clay and laid as the top most layer of
building roofs. They come in special shape to allow rain water to be
drained off to gutters. Mortar or any form of adhesive is not required to
interlock these roof tiles as they have grooves and interlock with eachother through the grooves.
ROOF TILES
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
42/65
CRUSHER RUN
Crusher Run is crushed aggregate mixed with sand or quarry dust which isideally used as a backfilling material for floor slabs or even the road base
for roads. It is a strong and tough material which does not soften
excessively with the presence of water therefore making it a suitable base
course. Sometimes crusher run is used as the top layer for estate or rural
roads.
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
43/65
LINTEL BEAMS
Lintel beams are solid lean concrete beams used to transfer the load of
brick walls above any fixtures such as doors or windows to prevent the
brick wall load from crushing the fixture frames.
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
44/65
BRICKS
Bricks are used as building blocks for building walls or to build a blockade or
partition of any kind. Bricks are mainly made out of clay but nowadays sandbricks have taken over the popularity of clay bricks as it is cheaper to
produce. Bricks are made in a single standard size and must be held
together in a certain configuration (arrangement) by the help of a binder
material such as mortar. In olden days, bricks were used in major structural
components such as bridge piers but nowadays that has been replaced byreinforced concrete.
( )
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
45/65
SPUN PILES (CIRCULAR PILES)
Spun piles are circular in shape and have the ability to hold more load as
they are prestressed spun piles. The concept of this foundation system isthe same as R.C square piles as it is also a large displacement pile and
has to be hammered or injected into the ground either until it hits bedrock
or it is held tightly by negative skin friction. Spun piles can come is lengths
of 6m and 12 m and is chosen depending on the Geotechnical engineers
instruction for foundation work based on the S.I report. One of the most
famous manufacturers of spun piles in Malaysia is ICP.
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
46/65
MACHINES USED INTHECONSTRUCTION OFSCHOOL OF CIVILENGINEERING
EXCAVATOR
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
47/65
An excavator is a machine that can excavate soil of various types
forcefully and then using hydraulic system a hydraulic force is
generated and utilizing this force bucket is pull back towards the
machine.
Bucket of excavator is replace able. If front bucket is exchange with
some other attachments then excavator can be used for multi-
EXCAVATOR
BACKHOE
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
48/65
Backhoe loaders are very common and can be used for a
wide variety of tasks such as small demolitions, light
transportation of building materials, powering building
equipment, digging holes/excavation, landscaping and
breaking asphalt.
BACKHOE
AGRICULTURE TRACTOR (BACK PUSHER)
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
49/65
AGRICULTURE TRACTOR (BACK PUSHER)
The back pusher proves to be a very good tool in all construction work
sites.
It was used to push large quantities of soil, sand, rubble and gravel.
Although it has less power than the bulldozer, rental fees and the spare
parts of the back pusher are much cheaper than the bulldozer.
MOBILE CRANE
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
50/65
A crane is a lifting machine. It
can be used both to lift and lowermaterials and to move them
horizontally.
Its mechanical advantage helps
move loads beyond the normalcapability of a human.
MOBILE CRANE
ROLLER COMPACTOR
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
51/65
Roller compactor are used tocompact soil, gravel,
concrete , or asphalt in the
construction of roads and
foundations.
It also use the weight of the
vehicle to compress the
surface being rolled (static)
or use mechanical
advantage (vibrating).
ROLLER COMPACTOR
PILING RIG
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
52/65
Piling rig is a construction machine
for piling in foundation engineering.
It is mainly applied to drill in sandy
soil, clay, silty clay and etc.
It used to drive piles into soil toprovide foundation support for
buildings or other structures
PILING RIG
CONCRETE TRUCKS
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
53/65
Concrete trucks are made to transport and mix concrete up to the
construction site.
It maintains the material's liquid state through agitation, or turning of the
drum, until delivery.
CONCRETE TRUCKS
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
54/65
VIBRO HAMMER
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
55/65
VIBRO HAMMER
A complete rig for driving and extracting sheet piles, incorporating all
control functions for vertically, rotation and position.
VIBRATOR
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
56/65
VIBRATOR
Vibration of concrete is carried out for the sake of consolidation.
The main objective of vibration is to compact the concrete and to
achieve the maximum possible density of concrete.
Vibration of concrete helps to remove air void without affecting much the
properties of fresh concrete.
PLATE TYPE VIBRATOR COMPACTOR
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
57/65
PLATE TYPE VIBRATOR COMPACTOR
A compactor is a machine that compact the layers of various materials
and reduce the thickness of the respective layer by reducing the air
voids.
PORTABLE LIFTING HOIST
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
58/65
PORTABLE LIFTING HOIST
A portable lifting hoist is used to carry small items in a bucket to higherfloors during construction. Materials such as sand, cement or bricks canbe carried using this small but powerful machine. It is convenient toused, takes up little pace and can be mounted to a floor slab. It can carry
a combined load of 300lbs and consists of a 5HP 4-stroke petrol engineand a 2HP 220V electric motor.
GENERATOR (GENSET)
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
59/65
Generators are used to supplypower tools at construction
sites.
Generators are also used for
emergencies or backup whereeither a redundant system is
required or no generator is on
site.
GENERATOR (GENSET)
WELDING SET
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
60/65
Welding sets are used to join
together metal pieces by
heating the surfaces to the point
of melting.
This is often done by melting thework pieces and adding a filler
material to form a pool of molten
material that cools to become a
strong joint.
WELDING SET
WATER PUMP
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
61/65
WATER PUMP
Dewatering purpose to get rid of water before concrete casting orconstructing structures below water level such as coffer dams.
AIR COMPRESSOR
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
62/65
AIR COMPRESSOR
Air compressors are used as a method to cut of piles or drill holes using
attachments such as cutter blades by introducing compressed air to cut
objects..
BAR BENDING MACHINE
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
63/65
Bar bending machine used forbending reinforcement bars and
various forms of round bars.
The automatic angle selection
permits precise bend at a presetangle making it one step
bending process for various
forms of bends and stirrups.
BAR BENDING MACHINE
BAR CUTTING MACHINE
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
64/65
Bar cutting machine is robustlybuilt to with stand the stress
while shearing of rebar and
various forms of steel bars.
Durable fast and easy to use,
this machine gives a one-shot
cutting operation with perfect
cutting accuracy thus minimizing
the use of labor and long drawn
cutting process for single cuts.
BAR CUTTING MACHINE
-
8/13/2019 Construction Technology - USM School of Civil Engineering Construction
65/65