Construction UpdateJan, 2020
Sector- 73, Gurgaon
Architecture & Design by::UHA London – the principal architect of this architectural masterpiece possess notably expertise in high rise structure and large scale mixed use developments.
DG area casted
M3M Experia Sales Gallery
Tower crane installed to speedup the execution.
Filling up to Lower Ground floor Completed
Today CallidoraILC SattvaCHD Avenue 71
West side back filling in progress
Water tank roof casted
1. Ground floor casted.
2. Upper Ground floor shuttering and steel binding in progress.