consultant - hse contractorss resume hse.pdfwater plant washing ‐ co ‐ coal, gas, o ... asalt...

10
O CONSU I m C P P C C D INDUST M O W C E H R K A H Lo M CHRON HSE Visi o Cons O - 602.358 156 LTANT mplement Pr PM Schedul rimavera So reparation o onstruction onstruction Database expe TRIES/PROJE Minerals Indu Oil & Gas Waste Water/ oal ROM & lectric Power Heavy Comme esorts & Ca 12 Schools Airports & per Heavy & Highocks & Dams Medical Facili t OLOGY Contractor s on Consultan o Primao Served o Worke o Engine sultant/Sr. P o CPM S o Expero Devel Design 8.8152 C - 601 N. 50 t i mavera Soft ing Expert, I olution Prov of Manuals, Claims Expe Industry Arb ert (FileMake ECT TYPES stry Continu /Water Plant Washing Co r Coal, gas, o ercial & Light sinos ripheral facili way Roads s ties s , Senior Con nts, LLC, Con vera Consultd as Primave ed with over eering & Con PM/ VP 1988 Scheduling/D t Witness (lar oped Severan (Mechanica 602-418-4 th Street, ware System nstructor, M ider & Certi procedures ert Witness a bitrator Am er, Access, SQ uous/batch p s oal Firing oil fired & cog t Commerciaties & Structures nsultant nsultant ant, Impleme ra Dealer Pri m 150 Compan struction Co8 — 1992 Delay Analysi s rgest Claim i n l Analysis Dat al, Structural , 4225 gor Scottsda ms within Com Mentor, Sche fied Instruc s, specificat and Impact/ merican Arbit QL) and repo processing M generation l Professiona enter & Instrmavera Instr nies/Agencies nsultant/Exp s Expert (USW n excess of $3 tabase System Process Flow don@hsec ale, Arizo mpanies, Age edule Creato ctor (Primav ions, & tech /Delay Analy tration Assoc rt designer (C Materials Han al Services 1uctor uctor/Consu s providing cpert Witness Wide) 32M) ms for CPM P w) contracto na 85254 ncies, & Ente or/Reviewer vera Instruct hnical graph ysis Expert ciation (29 y Crystal & Inf ndling 992 — Prese ltant ontractual se Process Plant ors.com 4 erprises. tor) hics years) oMaker) nt ervices t Layout and

Upload: buiduong

Post on 10-Apr-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

 

  

O

CONSU Im C P P C C D

 INDUST M O W C E H R K A H Lo M

 

CHRON

HSE 

 

Visio

 

Cons

O - 602.358156

LTANT mplement PrPM Schedulrimavera Soreparation oonstruction onstruction 

Database expe

TRIES/PROJEMinerals InduOil  &  Gas  Waste Water/oal ‐ ROM & lectric PowerHeavy Commeesorts  &  Ca‐12 Schools  Airports & perHeavy & Highwocks & DamsMedical Facilit

OLOGY 

Contractors

on Consultano Primavo Servedo Workeo Engine

sultant/Sr. P

o CPM So Experto Develo

Design

8.8152 C - 601 N. 50t

imavera Softing Expert, Iolution Provof Manuals,Claims ExpeIndustry Arbert (FileMake

ECT TYPES stry ‐ Continu

/Water PlantWashing ‐ Cor ‐ Coal, gas, oercial & Lightsinos 

ripheral facilitway ‐ Roads &s ties 

s, Senior Con

nts, LLC, Convera Consultad as Primaveed with over eering & Con

PM/ VP 1988

Scheduling/Dt Witness (laroped Severaln (Mechanica

602-418-4th Street,

ware Systemnstructor, Mider & Certi proceduresert Witness abitrator ‐ Amer, Access, SQ

uous/batch p

s oal Firing oil fired & cogt Commercial

ties & Structures

nsultant 

nsultant — ant, Implemera Dealer Prim150 Companstruction Con

8 — 1992 

Delay Analysisrgest Claim inl Analysis Datal, Structural,

4225 gor Scottsda

ms within ComMentor, Schefied Instrucs, specificatand Impact/merican ArbitQL) and repo

processing ‐ M

generation l 

Professionaenter & Instrumavera Instrnies/Agenciesnsultant/Exp

s Expert (US‐Wn excess of $3tabase System Process Flow

don@hsecale, Arizo

mpanies, Ageedule Creatoctor (Primavions, & tech/Delay Analytration Assocrt designer (C

Materials Han

al Services 19uctor uctor/Consus providing copert Witness

Wide) 32M) ms for CPM Pw) 

contractona 85254

ncies, & Enteor/Reviewer vera Instructhnical graphysis Expert ciation (29 yCrystal & Inf

ndling 

992 — Prese

ltant ontractual se

Process Plant

ors.com 4

erprises. 

tor) hics 

years) oMaker) 

nt 

ervices 

t Layout and 

 

  

O

 

Gene

 

Indus

1982 

 Worl

 Engin

 ProjectPerman

O - 602.358156

o Engineo CPM So Experto Develo

Designo Engineo Followo CPM so Manago Interfao Drafte

eral Contrac

o Head oo Interno Manago Projec

strial Equipm

o Manago Redeso Manag

ldwide Proc

o Helpeo Develoo Coordo Introdo Worke

neer to Sr. Po Projec

t Owner nente

8.8152 C - 601 N. 50t

eering GroupScheduling/Dt Witness (laroped Severaln (Mechanicaeering Groupw jobs to the fscheduling usged small andaced with othed Technical S

ctor, Sr. PM, 

of Schedulingal Claims Expged 3 Wastewct  Cl oser  

ment Manu

ged 11 PMs asigned their Pged the Com

cess Equipm

d integrate Uoped Processinated Plant duced Schedued on various

PM 1964 — 1ct Recap: 

Year D1979 L

602-418-4th Street,

p ManagemeDelay Analysisrgest Claim inl Analysis Datal, Structural,p Managemefield as Eng. Rsing Mainframd large Proceher EngineeriSpecifications

VP & Qualif

g and Contropert & Arbitrawater/Powe

facturing (C

and 2 PAs oveProject Procedmpany's Mini C

ent Supplie

US Practices ins Equipment/Requiremenuling and Projs projects and

1977 

Descriptiononghorn Preh

4225 gor Scottsda

nt and Drawis Expert (US‐Wn excess of $3tabase System Process Flownt and DrawiRep. me Computeessing Plant Ping Companies 

fying Party 1

ols (Primaveraator r Plant Projec

Claudius Pete

erseeing all cdures ManuaComputer an

r (KHD), Sen

nto a Europe/Plant Proposts with their ject Controls d new techno

heater Expans

don@hsecale, Arizo

ing ReleaseWide) 32M) ms for CPM Pw) ing Release

er Projects es 

1982 — 1988

a) 

cts and Heav

ers), Manag

company proal and Trainend terminals

nior Project 

ean Business sals other offices into US Officology worldw

sion

contractona 85254

Process Plant

vy Highway 

ger of PM/P

ojects d 

Manager 19

Culture 

s ce wide 

MS

ors.com 4

t Layout and 

PA Dept. 198

977 — 1980

My Job TitleSr. PM

80 – 

 

  

O

Genera

Cement

Lone St

Camarg

Genera

River Ce

Gresik C

Martin 

Martin 

Hawaiia

Lake On

Martin 

River Ce

Peabod

Hawaiia

Martin 

Martin 

Pacific CAggrega

Martin 

Genera

Utah Po

 CPM  

            

O - 602.358156

l Portland tos Tolteca tar Industries go Correa l Portland ement Cement Marietta Marietta an Cement ntario Cemen

Marietta ement dy Coal an Cement Marietta Marietta Cement & ates Marietta l Portland ortland

Scheduling

8.8152 C - 601 N. 50t

1979 L

1977 T

1977 P

1976 B

1976 N

1976 E

1975 In

1975 P

1975 R

1974 B

nt 1974 M

1973 M

1972 C

1971 R

1970 N

1970 N

1968 N

1968 3

1967 P

1966 M

1965 C

g Throughou

602-418-4th Street,

ebec Preheat

Turnkey Ceme

Plant Expansio

Brazilian Ceme

New Plant in T

Emissions Red

ndonesia – M

Plant Improve

Roberta, AL ‐ E

Basalt Handlin

Major Plant St

Major Plant Ex

Coal mill & Kil

R.O.M. new Fa

New Processin

New Raw Mill

New (Last) We

30 mile overla

Plant Mods. &

Major Plant St

Complete New

ut my Career

4225 gor Scottsda

ter Expansion

ent Plant

on

ent Industry P

Texas

duction Projec

Major Plant Ex

ements

EPA and Majo

ng Project

tudy

xpansion

n Firing Syste

acility

ng Line

ing System

et Process Pla

and conveyor

& Improvemen

tudy of Trinity

w Raw proces

r: 

don@hsecale, Arizo

n

Project

ct ‐ EPA

pansion

or Exp

em Project

ant ‐Maine

& Ship Loadi

nts

y Division ‐ Te

ssing & Feed S

contractona 85254

S

S

S

E

S

S

S

P

P

P

P

P

P

E

E

E

E

ng E

F

exas P

System E

ors.com 4

Sr. PM Sr. PM ‐ PC

Sr. PM Engineering M

Sr. PM ‐ PC

Sr. PM Sr. PM – PC

PM – Eng. Mg

PM – PC PM – Eng. Mg

PM – Analyst

PM PM – Eng. Mrg

Engineering M

Eng. Mgr. – PC

Eng. Mgr. – PC

Eng. Mgr. – PC

Eng. Mgr. – PC

Field Eng. – PC

PM – Analyst

Eng.

Manager

r.

r.

g.

Manager

C

C

C

C

C

 

  

O

 Excerpts Novembe   

 

 

 

October

 

 

 

 

 

 

March 22

 

 

 

 

 

not anti

 add

momenexcellen

  is o

his 

excepti

 

O - 602.358156

s from Letter

er 11, 1985

18, 1985

2, 1999

 cipate how th

the  tapply to 

ition to his te 

 the  oand te

t to  dnt   in  idenis 

one of the on

ionally gratify

in the at hand.  In o

more than one to the 

8.8152 C - 601 N. 50t

rs of Recom

Douglas Se

Edward F.

Christine K

 

common heir   o explain the

 

chnical   in a 

f my echnical.  He difficulty ntifying futur

 

ly  I kn

to legal a

ying   

 of field

our option for   an

602-418-4th Street,

mmendation 

eegmiller, Po

Mitchell, Att

K. Barrett, La

aboumight be ir   in

Gordon  

 with Mr.an 

  He e  and 

now who 

and accountin

d,  o 

a d  of the

4225 gor Scottsda

received by

oole, Tinnin

torney 

s Vegas Valle

ut   by othe

   

that th 

 I of what i during m

cu

the  o

ng   w

and theour he   

requireme different 

don@hsecale, Arizo

y Gordon: 

& Martin, At

ey Water Dis

that they areer  and

e role of an 

his important my urrent 

of 

with 

ir   comov

ment. During wit

contractona 85254

ttorney

strict 

e not prompt,  that they f

  None o

in 

  ofmay be 

 with him,   H

and common

ombined with ve quickly throI this time he thin  the 

ors.com 4

  that theyfail to f 

is to 

f   both at the 

 His 

n  to app

and 

his  ofough the 

and oriented  

do 

ply 

 

  

O

June 11,

 

 

 

Novembe

 

 

 

October

 

 

 

 

January 3

 

 

 

 

Septembe

of contr

 

on

 

 the is   

the a very vvery 

exceptioHe work

O - 602.358156

1982 Walte

er, 1991

1, 1991

3, 1990

er 29, 1983

 his ract 

 exhibited    

n the 

 into the 

which noteworthy. 

  a  … In

of  vervaluable contr

 is technicalonal.  He is thks hard – very

8.8152 C - 601 N. 50t

r Laidlaw, Pr

Charles P.

Laurence H

David H. G

Thomas N.

Mr. him

  He  

in    to comple

 His   

 in n working ry complex anribution 

ly   he y   

602-418-4th Street,

resident, Cla

Guess, P.E.,

Hampton, P.

Gartshore, Jo

. Frisby, Fris

 m an 

aboutvery 

both  He 

ex  of discompu

 andGordon

nd difficult  a plan to 

 

in th 

4225 gor Scottsda

audius Peters

, High-Point

E., High-Poi

ordan, Keeler

by & Assoc.,

 valuable 

t the with 

h in the fielda 

spute.  His uter  a

d delay impacn 

 

he  a

don@hsecale, Arizo

, Inc. 

Schaer

nt Schaer  

r & Seligman

, Attorney

 valued in 

  this know

and the office ability toto deal w

nd 

ct  w a and,  a 

 … Gor

  His nd he is 

contractona 85254

n, Attorney  

nput, and inti

  we wledge  key 

e, o  both the with   

equal

well  the pritalent

of his rdon is a high

for dvery 

ors.com 4

mate 

  wou

valuable big picture a

ly 

imary  ft for  to

 makily motivated,

detail is   

 uld 

nd 

 

for o ng , 

 

  

O

Construc

 

Major Co

 

 

SacrameClaim fileCounty JObata  aSenior Cand  speAs as‐buwas madsettled. 

 

As A Cla

O - 602.358156

ction Claims/

onstruction 

ento County Jaed by the ContJail facility in thnd  Kassebaumonsultant.  I diecific issues.  Thilt schedule wde.  All  issues w

aims Consu

8.8152 C - 601 N. 50t

/Expert Wit

Claims Expe

ail, Sacramentotractor, Bechtee center of dom (HOK), throuirected all of there were overas reconstrucwere  read, con

ultant 

602-418-4th Street,

tness: 

erience:   

o, CA (approximel Corporationowntown Sacrgh CNA their Ehe delay analyr 3000  issues fted from contnsidered, qua

4225 gor Scottsda

mately 1‐year)n, for direct andramento.  RetaErrors and Omysis, loss of prodrom RFIs and otemporaneountified and ap

don@hsecale, Arizo

‐ $19.9 Milliond delay damagained by the a

missions Insuranductivity analyother documeus documentapplied if deeme

contractona 85254

n ges on $75.7 architectural fince carrier.  Myysis and  reviewents to deal reation and a Bued pertinent.  

ors.com 4

million multi‐strm of Helmuthy position was

w of all the  impeview and anaut‐For style anaDeposition, 

tory h, s pacts lyze.  alysis 

 

  

O

Seattle CoClaim fileconventito condunotificatsettled.  Cabrillo BClaim file

harbor p

as well a

Consulta

and cost

Flagstaff HClaim levThe clienPosition 

Harvey’s RAssisted construcDesign‐Bscope, caProject M

Phoenix InWe wereerector, due to lieSettled. 

Pima CouWe werePosition 

Light Rail I was parassignme1/2 year

 

O - 602.358156

onvention Center, ed by the Contraion center projeuct the delay anaion.  All issues w

each Marina, Ported by Crowley C

project.  I conduc

s a cost analysis

ant. Depositions

 over original co

High School, Flagstvied by the Contnt was Project CProject Manage

Resort Hotel and Cthe Contractor,ction/renovationBuild Contract foaused delays anManager. Depos

nternational Racewe retained by theour client, withhes told by our cl

nty Prison, Tucsone retained by thewas Project Ma

Project in Los Angrt of the presentent to High Poins while develop

8.8152 C - 601 N. 50t

Seattle Washingtoactor, Paschen Cect in downtownalysis as Senior Cwere reviewed a

t of Los Angeles (aConstructors, Inc

cted all fact‐find

s and testified o

, attended oppo

ontract amounts

taff, AZ (approximtractor, Sletten Control, on behaer.

Casino, Lake Tahoe, Q & D Construcn of the hotel’s cor failure to perfd extra costs to sition, settled. 

ways, Phoenix, AZe steel supplier/held facts that sient.  It shows t

n, AZ (approximatee mechanical conager.  Depositi

geles, Ongoing Assting team that wnt Schaer and alling analyses and

 

602-418-4th Street,

on (approximatelyContractors, Inc.n Seattle.  RetainConsultant.  Thend retained in t

pproximately 11 mc., for work perfo

ding investigatio

n the basis of ou

osing deposition

s.  I was brought

mately 4‐5 months)Construction, onlf of the Flagstaf

e, NV (approximatction, research acasinos and restform and providthe Contractor,

Z (approximately 7/erector to devesurfaced under  hat you must be

ely 4‐months) ‐ $6ontractor to asseion, settled. 

signment over 1‐1/won over other mowing the opend rebuttals to co

4225 gor Scottsda

y 14 months) ‐ $27., for direct and ned by the Ownee claim consistedhe analysis if de

months) ‐ $3.7 Milormed as the wa

on, constructed a

ur analyses.  Ret

s, settled by ord

t‐in late to try to

) ‐ $4 million n the delays expff School District

tely 8‐months) ‐ $6and develop its caurants.  The clae an efficient de, Q & D.  Case se

‐months) ‐ $750Kelop a claim for doath in depositie totally open an

600K ert a delay and d

/2 years major claims firmning of an LA offiontractor claims

don@hsecale, Arizo

7.8 Million delay damages er and Architectd of over 6500 iseemed pertinent

llion ater‐side contra

an as‐built sched

tained by Crawle

der of court.  To

o help bring to c

perienced duringt.  Claim mostly 

6 million claim for the woaim was againstesign.  Their worettled just prior t

delay and extra ons.  The case snd truthful with 

disruption claim

ms, such as O’Brice.  I worked ous on two subway

contractona 85254

recovery on a $t.  Was brought ssues via RFIs ant and substantia

actor on a new $

dule and perfor

ey Maritime, Inc

otal litigation had

conclusion. 

g construction odismissed, with

ork they did on tt the Contractorrk product, far bto arbitration he

material cost dasettled, mostly in your attorney a

.  Case settled ju

rien Kretzberg, gut of this office oy stations in dow

ors.com 4

$100 Million in from Phoenixnd other forms oal.  Deposition, 

$22 million boat

med a delay ana

c.  Position was 

d lasted over 5‐y

of a new high schh small payment

the interior r’s architect in a beyond  the bid earing.  Position

amages.  The sten favor of the owand consultant. 

ust prior to trial

giving this work of approximatelwntown LA. 

x of 

alysis, 

Senior 

years 

hool.  t.  

n was 

eel wner,  

.  

ly 1‐

 

  

O

  

HighschooThe City,incorrectwork andsettleme$1.5 mill

Major NewProvidedplus projconsortiuThis wasall or parClaim wa

City of PhI assistedForcon’sassertedthe cont

Yearout MLamb Enhire by tthe majobonding exposure  

 

 

 

City of SaDevelopepiping, tand revie

As Vis

For M

O - 602.358156

ol, Joseph City, AZ, through the higt work performed created detail ent.  Estimated vlion.  Settled. 

w Toll Road, Orand delay analysis ject to build 17‐um, claim for des an analysis of trt of the Contracas finally settled

oenix Multiple‐sitd Forcon Engines client, the gene by the City of Practor’s fault.  T

Mechanical in Albugineering & Conhe Arizona USPFor part of Lamb’scompany), Lame to Lamb’s claim

anta Fe, NM, Wed a claim headhat caused majoew of shop draw

sion Consu

My Employ

8.8152 C - 601 N. 50t

 gh school hired ed by the generareports that wevalue was 

ge  County, CA thrservices to URS miles of new Toelay damages duhe merits of thector’s delay claimd.  I worked on th

e Cross‐Generatioers to make a sueral Contractor. Phoenix.  This boThe plans used fo

uquerque, NM Depnstruction Co., oFO to Analyze ans claim.  Shortlyb’s delay case inm cost. 

Waste Water  Ted for Federal Cor delays and diswings.  I acted as

ultants 

yer 

602-418-4th Street,

Vision to reviewal contractor, were then used to

rough URS ConsultEngineers who woll Highway.  Theue to an injunctie Contractor’s clm.  It also involvhis claim off‐and

on Recreational Faurvey and assess I produced a boook was used to or construction 

partment of the Naout of Salt Lake Cnd defend the N after my analysn its entirety wa

Treatment PlanCourt based on isruption to the cs both a percipie

4225 gor Scottsda

w what they beliho refused to fixo negotiate (med

tants. were the Oversie specific claim Ion involving a seaim and an evalved the theory od‐on for about  1

cilities sment of the assook that evaluatnegotiate awaywere to a great 

avy – Trident MotCity, UT sued theNavy against the sis and report was dropped.  This

nt mproper fabricaconstruction of ent and expert w

don@hsecale, Arizo

eved to be “shox and/or complediate) with the c

ight group  to O was involved wection of the prluation of concuof the Contracto13 months. 

serted deficiencted and if possiby most of the clapart deficient a

tor Storage Facilitye navy for both  Delay portion o

was delivered to s saved the navy

ation of major pthis plant.  It alswitness.  Supplie

contractona 85254

otty” work and inete the work.  Wcontractor and f

Orange County owith was the Conoject due to envurrent delays thar’s Right to Early

cies in the constble rebutted  theaims, except for and ambiguous. 

y – Camp Navajo, BDelay issues anof the Lawsuit.  TLamb’s attorneyy further defens

process concreteso involved imprer went into ban

ors.com 4

ncomplete or We evaluated thefinally reach a 

n the $870 millintractors, a largevironmental reaat might have ofy Completion.  T

ructed project be deficiencies a few which we Settled. 

Bellmont, AZ d direct costs. I The delay costs y (provided by tse costs and 

e  and epoxy‐lineroper specificatinkruptcy during 

on e asons.  ffset The 

by 

ere 

was were he 

ed ions 

 

  

O

litigationManagerhighly te

City of DuraI assistedour favo 

 

 

Fossil FuI was hirwitness delays odecision  

EDUCATI

St R S P M W A P P In V

Oracle Primtaught eve

Asta Powe

Deltek Acu

Microsoft Access, Vis

As An

O - 602.358156

n.  Finally settledr, having taken oechnical and fore

ango, CO, Waste Wated the PM and otr.  Amount unkn

uel Power Planred by the suppto  the  fact  thatf the project.    I by the Judge. 

ON/PROFES

tructural & MRegistered Pchool of ArMI Membe

Member of OWebinars foAuthor, BooPapers PreseMICOS Papenternet ArtiVarious Profe

mavera (P6 Proery Primavera s

rproject, Spide

umen Fuse, Tilo

Office (Word,sio) 

n Independ

8.8152 C - 601 N. 50t

d for about  $2 mover for prior PMensic investigati

er Treatment Plant thers to developnown. 

t, Mechanical plier and  installet  they  supplied did the analysi

SSIONAL 

Mechanical Professionarchitectureer (Retired Oracle Univeor Turnarouoks & Articlented at 12er (Project Micles‐ 3‐yearessional Soft

o & EPPM, Risksystem DOS an

er and Phoenix

os Linear Sched

, Excel, Power

dent 

602-418-4th Street,

million plus remoM who was remon. 

p a large delay an

Piping, Grantser of basalt‐lineand performeds, was deposed

Engineeringal Engineer ‐ Washingtmember sinersity ‐ Primnd Schedulies, Present2 Primaveraanagement rs of Monthlytware System

k, CM) Began und Windows. 

x Project Mana

duling

rPoint, Publish

4225 gor Scottsda

oval of previousoved.  The colle

nd direct cost cl

, NM d pipe through d  the  job within and testified  in

g Degrees ‐ W‐ Multiple Ston Universitnce 1980)mavera Certing ter at Industa ConferencInstitute ‐ Coy Articles on ms: 

sing Primavera

ager Minjet 

FileMa

her, Adobe ( 

Flash, In

don@hsecale, Arizo

sly charged liquiection and analy

aim against the 

their attorney n  industry standn Federal Court

Washington Utates (Activety ‐ St. Louis

tified 

try Conference Papersollege of Scheprojectcont

a in 1983 as a b

MindManag

ker Pro Exte

Photoshop, Illu

Design, Image 

contractona 85254

dated damagessis of evidence b

City of Durango

in Albuquerquedards and did n.   Decision was 

University ‐ Ste in AZ) s, MO 

nces 

eduling) trols.com 

beta user of P3

ger

nded thru ver

strator, PageMa

Styler), Serif S

ors.com 4

.  I was Project became part of 

o.  It was settled

e to act as an eot participate  ialmost a 50‐50

t. Louis, MO

3, was certified

rsion 13 aker, DreamWe

Suite 

d in 

xpert n  the 0 split 

d and 

eaver, 

 

  

O

Timeline 

Rox io Cantasia 

Snag i t  9 Dragon N

TSQL & SQ

VBA Exce

Serif Full 

(This is not

O - 602.358156

Maker 

S t udio  7 

aturally Spea

QL 2005 & 20

Suite 

t all inclusive) 

8.8152 C - 601 N. 50t

aking 11 

008 

602-418-4th Street,

4225 gor Scottsda

InfoMa

Crystal

FoxPro

dBa s e

Window

JCreato

Microso

Xara So

don@hsecale, Arizo

aker

Reports

o

ws 2000 ‐ 7P

r Pro, FrameB

oft Studio 10

ftware Suite

contractona 85254

Pro

Builder, Basic 

ors.com 4

Java