consultants legend for drawings reference plans drawi ... · gug gutter guard - refer m&f schedule...

12
Rev Date Description Drawing Title Project Revision Drawing No. Project No. Notes CD.A00.01 1709 Date 17 - 21 Garfield Road, Woodridge Qld 4114 December 2017 Department of Housing & Public Works HHS HPW 2017 - 006 Logan Youth Foyer Cover Sheet 07 5471 0340 07 5471 0343 0418 876 394 0412 127 904 [email protected] www.barkdesign.com.au Telephone Facsimile Steve Guthrie Lindy Atkin Email Web Bark Design Architects Queensland Australia 4567 PO Box 1355 Noosa Heads Use figured dimensions in preference to scale. All dimensions to be varified and checked on site. These designs,drawings, specifications and the copyright thereof are the property of Bark Design Pty Ltd and must not be used, retained or copied without the written authority of Bark Design Pty Ltd. 3668 (SG) 3664 (LA) Registration No. Architects RAIA Member 28409 Scale 1:1, 1:142.49, 1:2000, 1:200 @ A1 Contract Documentation - Not for Construction Approved By: LA, SG Drawn By: MR F C/OV C/OV F F F F F F F F F C/OV C/OV C/OV C/OV C/OV C/OV C/OV C/OV Sheet A03.01 Sheet A03.03 Sheet A03.03 Sheet A03.04 Unit 40 Unit 39 Unit 36 Unit 35 Unit 32 Unit 31 Unit 28 Unit 27 BUILDING 1 BUILDING 3 BUILDING 4 BUILDING 5 Sheet A10.01 Sheet A03.02 Sheet A10.02 Stair & Walkway 2 BUILDING 2 Sheet A10.03 Stair & Walkway 3 Unit 44 Unit 43 Stair & Walkway 1 Legend for Drawings Awn Fibre Cement Awning - Refer M&F Schedule & Structural Documentation AC Air Conditioning Unit - Refer Mechanical Drawings ASPT Asphalt - Refer Civil Documentation Bal# Metal Balustrade Type - Refer M&F Schedule BHD Bulkhead Bth J# Bathroom Joinery Type BRS# Brick Screen Type - Refer M&F Schedule & Structural Documentation BP# Brick Pier Type - Refer M&F Schedule & Structural Documentation BV# Brick Veneer Wall Type - Refer M&F Schedule & Structural Documentation BW# Blockwork Wall Type - Refer M&F Schedule & Structural Documentation C Cooker - Refer Appliances Schedule CBD Cupboard - Refer Joinery Drawings CD Clothes Drying Line - Refer M&F Schedule CFC# Compressed Fibre Cement Lining Type - Refer M&F Schedule Conc# Concrete Slab Type - Refer M&F Schedule & Structural Documentation CP Capping - Refer M&F Schedule Cpd J# Cupboard Joinery Type D.# Door Number - Refer Door Schedule D-# Detail Number - Refer Detail Drawings DB# Double Brick Solid Wall Type - Refer M&F Schedule & Structural Doc DBC# Double Brick Cavity Wall Type - Refer M&F Schedule & Structural Documentation DP Downpipe - Refer M&F Schedule & Hydraulic Documentation DPC Damp Proof Course DSB Distribution Switchboard - Refer Electrical Documentation EA Equal Angle F Refrigerator - Refer Appliances Schedule FFL Finished Floor Level FL Flashing - Refer M&F Schedule FSC Fascia FW Floor Waste GD Grated Drain - Refer M&F Schedule GPO General Purpose Outlet GU Gutter - Refer M&F Schedule & Hydraulic Documentation GUG Gutter Guard - Refer M&F Schedule HWU Hot Water Unit - Refer Mechanical Documentation HR Handrail - Refer M&F Schedule INS# Insulation Type - Refer M&F Schedule Ktn J# Kitchen Joinery Type LI Lintel - Refer Structural Documentation LWA Wet Area Laminate Wall Panelling - Refer M&F Schedule MR Mirror Type - Refer M&F Schedule & Joinery Drawings MSB Main Switchboard - Refer Electrical Documentation NTS Not to Scale OV Oven - Refer Appliances Schedule P Pantry - Refer Joinery Drawings P# Paint Finish type - Refer M&F Schedule PB# Plasterboard Lining Type - Refer M&F Schedule PBWA Wet Area Plasterboard Lining - Refer M&F Schedule PU Purlin - Refer Structural Drawings PWD Person with a Disability RB# Roof Beam - Refer Structural Drawings RH Range Hood - Refer Appliances Schedule & Mech Documentation RR Roof Rafter - Refer Structural Drawings RRV Rotary Roof Ventilator - Refer M&F Schedule RS# Roof Sheeting - Refer M&F Schedule SB Splashback - Refer Joinery Schedule SC# Steel Column Type - Refer M&F Schedule & Structural Documentation SCR# Screen Type - Refer M&F Schedule SHR Shower SHSC Shower Screen - Refer M&F Schedule and Plumbing Schedule SHST Shower Seat - Refer Plumbing Schedule SHS Square Hollow Section S Sink - Refer Plumbing Schedule SM Shower Mixer - Refer Plumbing Schedule SOP Set Out Point SS Stainless Steel TC# Timber Column - Refer M&F Schedule TGSI Tactile Ground Surface Indicators - Refer M&F Schedule TS# Timber Stud Wall Type - Refer M&F Schedule & Structural Documentation VF# Vinyl Flooring - Refer M&F Schedule W.## Window Number - Refer Window Schedule WC# Toilet / Water Closet - Refer Plumbing Schedule WPM Water Proof Membrane Note that 'M&F Schedule' refers to the Architectural Materials & Finishes Schedule. Consultants Architecture Bark Design Architects PO Box 1355 Noosa Heads, QLD Australia 4567 Ph ( 07 ) 5471 0340 Fax ( 07 ) 5471 0343 lindy @ barkdesign . com . au Note that the Architectural Documentation is to be read in conjunction with the Consultant documentation as prepared by: Landscape Architecture Penny Spiers Place Design Group 131 Robertson Street Fortitude Valley, QLD Australia 4006 Ph ( 07 ) 3852 3922 penny . s @ placedesigngroup . com Structural Engineering Peter Ide Westera Partners Level 3, 33 Longland Street Newstead, QLD Australia 4006 Ph ( 07 ) 3852 4333 peteri @ westerapartners . com . au Civil Engineering Jared Hill Westera Partners Level 3, 33 Longland Street Newstead, QLD Australia 4006 Ph ( 07 ) 3852 4333 jaredh @ westerapartners . com . au Geotechnical Investigation Peter Elkington Precise Geotechnical Suite 7/14 Fremantle Street Burleigh Heads, QLD Australia 4220 Ph ( 07 ) 3852 4333 info @ precisegeotechnical . com . au Electrical Engineering & Lighting Craig Littleton Webb Australia Group Capital One Complex, Suite 13A/9 Capital Place Birtinya, QLD 4571 Ph ( 07 ) 5438 8800 CLittleton @ webbs . net . au Mechanical Engineering Alastair Carr Webb Australia Group Capital One Complex, Suite 13A/9 Capital Place Birtinya, QLD 4571 Ph ( 07 ) 5438 8800 ACarr @ webbs . net . au Hydraulic & Wet Fire Engineering Terry McKendry MRP Hydraulics PO Box 646 Cotton Tree, QLD 4558 Ph ( 07 ) 3846 4379 terry @ mrp . com . au Dry Fire Engineering Kevin Yu i-Fire Engineers PO Box 968 Toowong DC, QLD 4066 Ph 0450 188 189 kevin . yu @ i - fire . com . au Building Certifier Rick Beardwood Certis 1/19 Finchley Street Milton, QLD Australia 4064 Ph ( 07 ) 3144 4611 RickBeardwood @ certis . com . au Energy Efficiency Andy Vo Certis Energy 1/19 Finchley Street Milton, QLD Australia 4064 Ph 0428 399 710 AndyVo @ certis . com . au Quantity Surveyor Colin Brien Rider Levett Bucknall Level 13, 10 Eagle Street Brisbane, QLD Australia 4000 Ph ( 07 ) 3009 6933 Colin . Brien @ au . rlb . com Town Planning James Stott Viva Property Group Suite 2, The Green House, 183 Wickham Terrace Spring Hill, QLD Australia 4000 Ph ( 07 ) 3831 5577 james @ vivapropertygroup . com . au Site Survey Andrew Hayes Statewide Survey Group Unit 3/123 Link Road Victoria Point, QLD Australia 4165 Ph 1300 362 094 ahayes @ statewidesurvey . com . au General Notes 1. Use Figured Dimensions in preference to scaling; 2. All Dimensions & Site Levels are to be verified & checked on site prior to construction commencing; 3. All Works are to comply with all relevant Australian Standards, NCC Regulations, the Building Act 1975 & all other Statutory Provisions as required; 4. Any discrepancies within Contract, Consultancy &/or Scheduling Documentation & on site conditions are to be referred to Bark Design Pty Ltd; 5. Refer Geotechnical Engineers Report/Documentation for all earthworks, footing, slab, articulation joints to brickwork and retaining wall details; 6. Moisture resistant linings to wet 'areas' in accordance to BCA; 7. Lift-off hinges to W.C doors of PWD bathrooms; 8. Smoke detection and alarm system in accordance with current BCA (Qld) Edition. Smoke alarms shall comply with AS 3786 and be connected to mains power (AS 3000); 9. Termite Protection: Any chemical treatment barriers of relevant areas to be in accordance with BCA and AS3660.1 and other parts thereof shall be installed by a licensed pest control operator and authorised by the manufacturer. 10. Generally provide physical barriers, caps and Termimesh(or approved equivalent) as applicable in accordance with BCA and AS3660.1; 11. Member sizing, Bracing and Structural Details are not valid without suitable certification from an Engineer, or as documented and certified by project Structural Engineer; 12. Refer to manufacturers' written advice, specifications and details for installation of all propriety item or systems. 13. Fire Resistance Levels of materials and all other requirements of I-Fire Engineer's 'Fire Engineering Report' are to be met. 14. The Insulation R values and slip rating values as listed in the Materials & Finishes Schedule are to be met. 15. The glass U values, SHGC and all other requirements of Certis Energy's 'DTS Report' are to be met. 16. All light switches to be located 1050mm above FFL. 17. All GPOs to be located at either 300mm or 1050mm above FFL, unless otherwise noted on the Joinery Elevations. 18. All door hardware to be located at 1050mm above FFL. 19. All Bathroom walls to have adequate reinforcement included to meet the requirements of Element 6 of the Liveable Housing Design Guidelines. 20. Units 29, 30, 33, 34, 37 & 38 are to comply with the Gold Standard of the Liveable Housing Design Guidelines 2017. Refer pages 36 - 41. 21. This Architectural Documentation is to be read in conjunction with all other Consultant's Documentation, inlcuding (but not limitied to) the Fire Engineering Report, Building Approval, Plumbing Approval, QFES Compliance Advice Report, Section J Energy Efficiency Report, Geotechnical Report, Stormwater Management Report, Safety in Design Report, Architectural Materials & Finishes Schedule and Architectural Specification. 22. Taping, overlapping and the correct application of sarking and insulation is to comply with Section J1.2(a)(iii), J1.2(b)(iv), J1.2(c), J3.6(b) & J3.6(c) of the NCC for Class 2 Dwellings. A00.01 A01.01 A01.02 A02.01 A02.02 A02.03 A02.04 A02.05 A02.06 A03.01 A03.02 A03.03 A03.04 A03.05 A06.01 A06.02 A07.01 A08.01 A09.01 A10.01 A10.02 A10.03 A12.01 A12.02 A12.03 Cover Sheet Existing Survey & Demolition Plan Site Plan Ground Floor Set Out Plan Deleted Ground Floor General Arrangement Plan First Floor General Arrangement Plan Roof Plan - Option A Roof Plan - Option B Building 1 Plans, Sections & Elevations Building 2 Plans, Sections & Elevations Building 3 & 4 Typical Plans, Sections & Elevations Building 5 Plans, Sections & Elevations Building 6 & 7 Plans, Sections & Elevations Typical Unit Section Details Typical Communal Area Section Details Plan Details Window Schedule Door Schedule & Door Hardware Stair & Walkway 1 Stair & Walkway 2 & 3 Stair & Walkway 2 & 3 PWD Joinery Elevations Typical Unit & Hub Joinery Elevations Joinery, Plumbing, Appliances & Signage Schedules Reference Plans Site Information Planning Information Address: 17-21 Garfield Road, Woodbridge Qld 4114 Lot & Plan: Lot 1 on RP160517 Site Coverage: 37.5% Local Authority: Logan City Council Zoning: Low-Medium Density Residential - Townhouse Precinct Garfield Road Pine Drive Railway Parade Pine Drive Garden Avenue Stubbs Road Station Road Woodridge Train Station Drawing List Existing Dwellings Proposed Ground Floor Dwellings Proposed First Floor Dwellings 24x Studio Units 6x One Bedroom Units 1x Office 1x Indoor Hub 1x Outdoor Hub 10x One Bedroom Units Units 1-24 Units 29, 30, 33, 34, 37 & 38 *Units 25 & 26 *Units 41 & 42 Units 27, 28, 31, 32, 35, 36, 39, 40, 43, 44 Class 3 Class 2 Class 5 Class 5 Class 10a Class 2 C/OV C/OV C/OV C/OV F F F F F C/OV C/OV C/OV C/OV F F Sheet A03.01 Sheet A03.05 Sheet A03.02 Sheet A03.03 Sheet A03.03 Sheet A03.04 Sheet A03.05 Unit 42 Indoor Hub Unit 38 Unit 37 Unit 34 Unit 33 Unit 30 Unit 29 Unit 26 Office Unit 25 Office Outdoor Hub Unit 41 Indoor Hub BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 BUILDING 6 Sheet A10.01 F Stair & Walkway 1 Stair & Walkway 3 Sheet A10.03 Stair & Walkway 2 Sheet A10.02 Pedestrian Entry BUILDING 7 Location Plan Development Information *Note that the Office and Indoor Hub have been designed to allow Units 25, 26, 41 & 42 to be converted into One Bedroom Units in the future. Certification Note that Building 2 & 3 are considered to be a 'Unified Building' for Certification and Fire Engineering Purposes. Note that Building 4 & 5 are considered to be a 'Unified Building' for Certification and Fire Engineering Purposes. View from Pine Drive Existing Unit Development Proposed Unit Development Legend for Line Types Site Boundary Setback Contour Structure Above Water Electricity Telecommunications Sewer Existing Fence Proposed Fence Civil and Landscape Works Existing Works to be Retaine Existing Works to be Demoli Structure Below Grid Line 1 Legend for Wall Types DBC1 Double Brick Cavity Wall BV1 Brick Veneer Wall BW1 Blockwork Party Wall Internal BW2 Blockwork Party Wall External TS1/TS2 Timber Stud Walls as noted TS3 Double Timber Stud Framed Wall DB1 Double Brick Wall BRS3 Hit & Miss Brick Screen within DB1 BRS1 Hit & Miss Brick Screen BRS2 Solid Brick Screen BW3 Blockwork Upstand Wall Bal# Balustrade / HR Handrail as noted - First Floor Reference Plan 1:200 - Location Plan 1:2000 - Ground Floor Reference Plan 1:200 D A 28.09.17 Preliminary 60% DD Issue to Consultants. B 06.10.17 60% Design Development Issue to Client. C 01.12.17 Preliminary 100% DD Issue to Consultants - Location Plan, Site Information, General Notes & Image added. Drawing List & Legend Updated. N D 15.12.17 100% DD Issue to Client - Contract Documentation. 1:2000, 1:200 @ A1

Upload: others

Post on 26-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • Rev Date Description Drawing TitleProject

    Revision

    Drawing No.

    Project No.Notes

    CD.A00.01

    1709

    Date

    17 - 21 Garfield Road,Woodridge Qld 4114

    December 2017

    Department of Housing &Public WorksHHS HPW 2017 - 006

    Logan Youth Foyer Cover Sheet07

    547

    1 03

    4007

    547

    1 03

    4304

    18 8

    76 3

    9404

    12 1

    27 9

    04in

    fo@

    bark

    desi

    gn.c

    om.a

    uw

    ww

    .bar

    kdes

    ign.

    com

    .au

    Tel

    epho

    neF

    acsi

    mile

    Ste

    ve G

    uthr

    ieLi

    ndy

    Atk

    inE

    mai

    lW

    eb

    Bar

    k D

    esig

    n A

    rchi

    tect

    s

    Que

    ensl

    and

    Aus

    tral

    ia 4

    567

    PO

    Box

    135

    5N

    oosa

    Hea

    dsUse figured dimensionsin preference to scale. Alldimensions to be varifiedand checked on site.These designs,drawings,specifications and thecopyright thereof are theproperty of Bark DesignPty Ltd and must not beused, retained or copiedwithout the writtenauthority of Bark DesignPty Ltd. 3668 (SG)3664 (LA)

    Registration No.Architects

    RAIA Member 28409

    Scale 1:1, 1:142.49, 1:2000, 1:200 @ A1

    Contract Documentation - Not for Construction

    Approved By: LA, SG

    Drawn By: MR

    F

    C/OV

    C/OV

    F

    F

    F

    F

    F

    F

    F

    F

    F

    C/OV

    C/OV

    C/OV

    C/OV

    C/OV

    C/OV

    C/OV

    C/OV

    Sheet A03.01

    Sheet A03.03

    Sheet A03.03

    Sheet A03.04

    Unit 40

    Unit 39

    Unit 36

    Unit 35

    Unit 32

    Unit 31

    Unit 28

    Unit 27

    BUILDING1

    BUILDING3

    BUILDING4

    BUILDING5

    Sheet A10.01

    Sheet A03.02

    Sheet A10.02Stair & Walkway 2

    BUILDING2

    Sheet A10.03Stair & Walkway 3

    Unit 44

    Unit 43

    Stair & Walkway 1

    Legend for Drawings

    Awn Fibre Cement Awning -Refer M&F Schedule & Structural Documentation

    AC Air Conditioning Unit - Refer Mechanical DrawingsASPT Asphalt - Refer Civil DocumentationBal# Metal Balustrade Type - Refer M&F ScheduleBHD BulkheadBth J# Bathroom Joinery TypeBRS# Brick Screen Type -

    Refer M&F Schedule & Structural DocumentationBP# Brick Pier Type -

    Refer M&F Schedule & Structural DocumentationBV# Brick Veneer Wall Type -

    Refer M&F Schedule & Structural DocumentationBW# Blockwork Wall Type -

    Refer M&F Schedule & Structural DocumentationC Cooker - Refer Appliances ScheduleCBD Cupboard - Refer Joinery DrawingsCD Clothes Drying Line - Refer M&F ScheduleCFC# Compressed Fibre Cement Lining Type -

    Refer M&F ScheduleConc# Concrete Slab Type -

    Refer M&F Schedule & Structural DocumentationCP Capping - Refer M&F ScheduleCpd J# Cupboard Joinery TypeD.# Door Number - Refer Door ScheduleD-# Detail Number - Refer Detail DrawingsDB# Double Brick Solid Wall Type -

    Refer M&F Schedule & Structural DocDBC# Double Brick Cavity Wall Type -

    Refer M&F Schedule & Structural DocumentationDP Downpipe -

    Refer M&F Schedule & Hydraulic DocumentationDPC Damp Proof CourseDSB Distribution Switchboard -

    Refer Electrical DocumentationEA Equal AngleF Refrigerator - Refer Appliances ScheduleFFL Finished Floor LevelFL Flashing - Refer M&F ScheduleFSC FasciaFW Floor WasteGD Grated Drain - Refer M&F ScheduleGPO General Purpose OutletGU Gutter -

    Refer M&F Schedule & Hydraulic DocumentationGUG Gutter Guard - Refer M&F ScheduleHWU Hot Water Unit - Refer Mechanical DocumentationHR Handrail - Refer M&F ScheduleINS# Insulation Type - Refer M&F ScheduleKtn J# Kitchen Joinery TypeLI Lintel - Refer Structural DocumentationLWA Wet Area Laminate Wall Panelling -

    Refer M&F ScheduleMR Mirror Type -

    Refer M&F Schedule & Joinery DrawingsMSB Main Switchboard - Refer Electrical DocumentationNTS Not to ScaleOV Oven - Refer Appliances ScheduleP Pantry - Refer Joinery DrawingsP# Paint Finish type - Refer M&F SchedulePB# Plasterboard Lining Type - Refer M&F SchedulePBWA Wet Area Plasterboard Lining - Refer M&F SchedulePU Purlin - Refer Structural DrawingsPWD Person with a DisabilityRB# Roof Beam - Refer Structural DrawingsRH Range Hood -

    Refer Appliances Schedule & Mech DocumentationRR Roof Rafter - Refer Structural DrawingsRRV Rotary Roof Ventilator - Refer M&F ScheduleRS# Roof Sheeting - Refer M&F ScheduleSB Splashback - Refer Joinery ScheduleSC# Steel Column Type -

    Refer M&F Schedule & Structural DocumentationSCR# Screen Type - Refer M&F ScheduleSHR ShowerSHSC Shower Screen - Refer M&F Schedule and

    Plumbing ScheduleSHST Shower Seat - Refer Plumbing ScheduleSHS Square Hollow SectionS Sink - Refer Plumbing ScheduleSM Shower Mixer - Refer Plumbing ScheduleSOP Set Out PointSS Stainless SteelTC# Timber Column - Refer M&F ScheduleTGSI Tactile Ground Surface Indicators -

    Refer M&F ScheduleTS# Timber Stud Wall Type -

    Refer M&F Schedule & Structural DocumentationVF# Vinyl Flooring - Refer M&F ScheduleW.## Window Number - Refer Window ScheduleWC# Toilet / Water Closet - Refer Plumbing ScheduleWPM Water Proof MembraneNote that 'M&F Schedule' refers to the Architectural Materials &Finishes Schedule.

    ConsultantsArchitectureBark Design ArchitectsPO Box 1355 Noosa Heads, QLD Australia 4567Ph (07) 5471 0340 Fax (07) 5471 [email protected]

    Note that the Architectural Documentation is tobe read in conjunction with the Consultantdocumentation as prepared by:

    Landscape ArchitecturePenny SpiersPlace Design Group131 Robertson Street Fortitude Valley, QLDAustralia 4006Ph (07) 3852 [email protected]

    Structural EngineeringPeter IdeWestera PartnersLevel 3, 33 Longland Street Newstead, QLDAustralia 4006Ph (07) 3852 [email protected]

    Civil EngineeringJared HillWestera PartnersLevel 3, 33 Longland Street Newstead, QLDAustralia 4006Ph (07) 3852 [email protected]

    Geotechnical InvestigationPeter ElkingtonPrecise GeotechnicalSuite 7/14 Fremantle Street Burleigh Heads,QLD Australia 4220Ph (07) 3852 [email protected]

    Electrical Engineering & LightingCraig LittletonWebb Australia GroupCapital One Complex, Suite 13A/9 Capital PlaceBirtinya, QLD 4571Ph (07) 5438 8800 [email protected]

    Mechanical EngineeringAlastair CarrWebb Australia GroupCapital One Complex, Suite 13A/9 Capital PlaceBirtinya, QLD 4571Ph (07) 5438 8800 [email protected]

    Hydraulic & Wet Fire EngineeringTerry McKendryMRP HydraulicsPO Box 646 Cotton Tree, QLD 4558Ph (07) 3846 4379 [email protected]

    Dry Fire EngineeringKevin Yui-Fire EngineersPO Box 968 Toowong DC, QLD 4066Ph 0450 188 189 [email protected]

    Building CertifierRick BeardwoodCertis1/19 Finchley Street Milton, QLD Australia 4064Ph (07) 3144 [email protected]

    Energy EfficiencyAndy VoCertis Energy1/19 Finchley Street Milton, QLD Australia 4064Ph 0428 399 710 [email protected]

    Quantity SurveyorColin BrienRider Levett BucknallLevel 13, 10 Eagle Street Brisbane, QLDAustralia 4000Ph (07) 3009 6933 [email protected]

    Town PlanningJames StottViva Property GroupSuite 2, The Green House, 183 WickhamTerrace Spring Hill, QLD Australia 4000Ph (07) 3831 [email protected]

    Site SurveyAndrew HayesStatewide Survey GroupUnit 3/123 Link Road Victoria Point, QLDAustralia 4165Ph 1300 362 [email protected]

    General Notes

    1. Use Figured Dimensions in preference to scaling;2. All Dimensions & Site Levels are to be verified & checked on siteprior to construction commencing;3. All Works are to comply with all relevant Australian Standards,NCC Regulations, the Building Act 1975 & all other StatutoryProvisions as required;4. Any discrepancies within Contract, Consultancy &/or SchedulingDocumentation & on site conditions are to be referred to Bark DesignPty Ltd;5. Refer Geotechnical Engineers Report/Documentation for allearthworks, footing, slab, articulation joints to brickwork and retainingwall details;6. Moisture resistant linings to wet 'areas' in accordance to BCA;7. Lift-off hinges to W.C doors of PWD bathrooms;8. Smoke detection and alarm system in accordance with currentBCA (Qld) Edition. Smoke alarms shall comply with AS 3786 and beconnected to mains power (AS 3000);9. Termite Protection: Any chemical treatment barriers of relevantareas to be in accordance with BCA and AS3660.1 and other partsthereof shall be installed by a licensed pest control operator andauthorised by the manufacturer.10. Generally provide physical barriers, caps and Termimesh(orapproved equivalent) as applicable in accordance with BCA andAS3660.1;11. Member sizing, Bracing and Structural Details are not validwithout suitable certification from an Engineer, or as documented andcertified by project Structural Engineer;12. Refer to manufacturers' written advice, specifications and detailsfor installation of all propriety item or systems.13. Fire Resistance Levels of materials and all other requirements ofI-Fire Engineer's 'Fire Engineering Report' are to be met.14. The Insulation R values and slip rating values as listed in theMaterials & Finishes Schedule are to be met.15. The glass U values, SHGC and all other requirements of CertisEnergy's 'DTS Report' are to be met.16. All light switches to be located 1050mm above FFL.17. All GPOs to be located at either 300mm or 1050mm above FFL,unless otherwise noted on the Joinery Elevations.18. All door hardware to be located at 1050mm above FFL.19. All Bathroom walls to have adequate reinforcement included tomeet the requirements of Element 6 of the Liveable Housing DesignGuidelines.20. Units 29, 30, 33, 34, 37 & 38 are to comply with the GoldStandard of the Liveable Housing Design Guidelines 2017. Referpages 36 - 41.21. This Architectural Documentation is to be read in conjunction withall other Consultant's Documentation, inlcuding (but not limitied to)the Fire Engineering Report, Building Approval, Plumbing Approval,QFES Compliance Advice Report, Section J Energy EfficiencyReport, Geotechnical Report, Stormwater Management Report,Safety in Design Report, Architectural Materials & Finishes Scheduleand Architectural Specification.22. Taping, overlapping and the correct application of sarking andinsulation is to comply with Section J1.2(a)(iii), J1.2(b)(iv), J1.2(c),J3.6(b) & J3.6(c) of the NCC for Class 2 Dwellings.

    Drawing No.A00.01

    A01.01

    A01.02

    A02.01

    A02.02

    A02.03

    A02.04

    A02.05

    A02.06

    A03.01

    A03.02

    A03.03

    A03.04

    A03.05

    A06.01

    A06.02

    A07.01

    A08.01

    A09.01

    A10.01

    A10.02

    A10.03

    A12.01

    A12.02

    A12.03

    Cover Sheet

    Existing Survey & Demolition Plan

    Site Plan

    Ground Floor Set Out Plan

    Deleted

    Ground Floor General Arrangement Plan

    First Floor General Arrangement Plan

    Roof Plan - Option A

    Roof Plan - Option B

    Building 1 Plans, Sections & Elevations

    Building 2 Plans, Sections & Elevations

    Building 3 & 4 Typical Plans, Sections & Elevations

    Building 5 Plans, Sections & Elevations

    Building 6 & 7 Plans, Sections & Elevations

    Typical Unit Section Details

    Typical Communal Area Section Details

    Plan Details

    Window Schedule

    Door Schedule & Door Hardware

    Stair & Walkway 1

    Stair & Walkway 2 & 3

    Stair & Walkway 2 & 3

    PWD Joinery Elevations

    Typical Unit & Hub Joinery Elevations

    Joinery, Plumbing, Appliances & Signage Schedules

    Reference Plans

    Site Information

    Planning InformationAddress: 17-21 Garfield Road, Woodbridge Qld 4114Lot & Plan: Lot 1 on RP160517Site Coverage: 37.5%Local Authority: Logan City CouncilZoning: Low-Medium Density Residential - Townhouse Precinct

    Garfield Road

    Pine Drive

    Railw

    ay Parade

    Pine DriveG

    arde

    n A

    venu

    e

    Stubbs Road

    Station Road

    Woodridge

    Train Station

    Drawing List

    Existing Dwellings

    Proposed GroundFloor Dwellings

    Proposed FirstFloor Dwellings

    24x Studio Units

    6x One Bedroom Units

    1x Office

    1x Indoor Hub

    1x Outdoor Hub

    10x One Bedroom Units

    Units 1-24

    Units 29, 30, 33, 34, 37 & 38

    *Units 25 & 26

    *Units 41 & 42

    Units 27, 28, 31, 32, 35, 36, 39, 40, 43, 44

    Class 3

    Class 2

    Class 5

    Class 5

    Class 10a

    Class 2

    C/OV

    C/OV

    C/OV

    C/OV

    F

    F

    F

    F

    F

    C/OV

    C/OV

    C/OV

    C/OV

    F

    F

    Sheet A03.01 Sheet A03.05

    Sheet A03.02

    Sheet A03.03

    Sheet A03.03

    Sheet A03.04

    Sheet A03.05

    Unit 42IndoorHub

    Unit 38

    Unit 37

    Unit 34

    Unit 33

    Unit 30

    Unit 29

    Unit 26Office

    Unit 25Office

    OutdoorHub

    Unit 41IndoorHub

    BUILDING1

    BUILDING2

    BUILDING3

    BUILDING4

    BUILDING5

    BUILDING6

    Sheet A10.01

    F

    Stair & Walkway 1

    Stair & Walkway 3Sheet A10.03

    Stair & Walkway 2Sheet A10.02

    Pedestrian EntryBUILDING 7

    Location Plan

    Development Information

    *Note that the Office and Indoor Hub have been designed to allow Units 25, 26, 41 & 42 to be converted into OneBedroom Units in the future.

    CertificationNote that Building 2 & 3 are considered to be a'Unified Building' for Certification and FireEngineering Purposes.Note that Building 4 & 5 are considered to be a'Unified Building' for Certification and FireEngineering Purposes.

    View from Pine DriveExisting Unit DevelopmentProposed Unit Development

    Legend for Line TypesSite BoundarySetbackContourStructure Above

    WaterElectricityTelecommunicationsSewerExisting FenceProposed FenceCivil and Landscape WorksExisting Works to be RetainedExisting Works to be Demolished

    Structure Below

    Grid Line1

    Legend for Wall TypesDBC1 Double Brick Cavity WallBV1 Brick Veneer WallBW1 Blockwork Party Wall InternalBW2 Blockwork Party Wall ExternalTS1/TS2 Timber Stud Walls as notedTS3 Double Timber Stud Framed WallDB1 Double Brick WallBRS3 Hit & Miss Brick Screen within DB1BRS1 Hit & Miss Brick ScreenBRS2 Solid Brick ScreenBW3 Blockwork Upstand WallBal# Balustrade / HR Handrail as noted

    -First Floor Reference Plan

    1:200

    -Location Plan

    1:2000

    -Ground Floor Reference Plan

    1:200

    D

    A 28.09.17 Preliminary 60% DD Issue to Consultants.B 06.10.17 60% Design Development Issue to Client.C 01.12.17 Preliminary 100% DD Issue to Consultants - Location Plan, Site Information, General Notes & Image added. Drawing List & Legend Updated.

    ND 15.12.17 100% DD Issue to Client - Contract Documentation.

    1:2000, 1:200 @ A1

  • Rev Date Description Drawing TitleProject

    Revision

    Drawing No.

    Project No.Notes

    CD.A01.01

    1709

    Date

    17 - 21 Garfield Road,Woodridge Qld 4114

    December 2017

    Department of Housing &Public WorksHHS HPW 2017 - 006

    Logan Youth Foyer Existing Survey &Demolition Plan

    07 5

    471

    0340

    07 5

    471

    0343

    0418

    876

    394

    0412

    127

    904

    info

    @ba

    rkde

    sign

    .com

    .au

    ww

    w.b

    arkd

    esig

    n.co

    m.a

    u

    Tel

    epho

    neF

    acsi

    mile

    Ste

    ve G

    uthr

    ieLi

    ndy

    Atk

    inE

    mai

    lW

    eb

    Bar

    k D

    esig

    n A

    rchi

    tect

    s

    Que

    ensl

    and

    A

    ustr

    alia

    456

    7P

    O B

    ox 1

    355

    Noo

    sa H

    eadsUse figured dimensions

    in preference to scale. Alldimensions to be varifiedand checked on site.These designs,drawings,specifications and thecopyright thereof are theproperty of Bark DesignPty Ltd and must not beused, retained or copiedwithout the writtenauthority of Bark DesignPty Ltd. 3668 (SG)3664 (LA)

    Registration No.Architects

    RAIA Member 28409

    Scale 1:200 @ A1

    Contract Documentation - Not for Construction

    Approved By: LA, SG

    Drawn By: MR

    37.44

    37.74

    38.60

    39.20

    39.41

    39.62

    39.73

    37.38

    37.70

    38.24

    38.52

    39.13

    39.35

    39.54

    38.78 39.1939.80 40.18

    40.33

    40.9141.37

    SL37.49

    SL38.10

    SL38.55

    SL38.82

    SL38.43

    SL39.31

    37.99

    38.87

    37.37

    37.99

    38.22

    38.51

    39.13

    39.35

    39.53

    40.02

    38.9238.57

    41.35

    41.42

    41.47

    38.45

    40.1338.65

    39.54

    39.30

    SL39.49

    SL39.67

    36.84

    37.21

    38.10

    38.37

    39.14

    Ridge45.84

    38.58

    40.65

    BOLs 38.56

    38.08

    38.13

    37.36

    39.21

    38.38

    37.62

    38.27

    39.09

    39.10

    37.98

    38.57

    IL 38.39

    IL 37.80 250

    38.23

    38.76

    39.46

    38.75 39.18 39.77 40.3241.00

    41.35

    SL39.59

    SL39.09SL41.72

    38.63

    38.58

    39.07

    IO 38.60

    IO 39.05

    IO 39.03

    38.66

    39.08

    39.18

    38.36

    38.56

    38.58

    38.61

    38.6638.6538.67

    38.38

    38.47

    38.78

    38.79

    39.12

    39.18

    39.54

    38.47

    38.61

    38.57

    38.60

    38.9038.96

    38.89

    38.83

    39.5039.1839.0038.67

    37.00

    37.50

    38.00

    38.50

    39.00

    39.50

    39.50

    39.75

    40.00 40.25

    40.50

    40.7539.25

    39.0038.75

    38.50

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HWHW

    RAMP 1:3

    0LET

    TER

    BOXES

    MSB

    HW

    HW

    38.2038.24 38.3838.35 38.48 38.75 38.91 39.04 39.14 39.32 39.56 39.97 40.06 40.37 40.71 40.87 41.07 41.21 41.47

    38.8638.9138.8138.5138.3838.27

    38.29

    38.37

    38.45

    38.50

    38.55

    38.08 38.25 38.36 38.65 38.83 38.92 39.02 39.23 39.45 39.91 39.97 40.25 40.61 40.78 40.98 41.13 41.34

    39.13

    38.97

    38.8538.8638.8538.7338.5138.2938.17

    39.02

    39.09

    38.35

    38.51

    38.39

    37.85

    37.86

    61.02

    61.03

    38.07 38.24 38.36 38.64 38.81 38.90 38.99 39.20 39.45 39.88 39.94 40.22 40.59 40.75 40.95 41.10 41.32

    38.8338.7038.5038.2738.14

    66.02 66.03

    66.01

    66.01

    63.27

    63.27

    66.0166.02

    66.02

    38.81

    38.7938.81

    67.24

    67.3767.36

    38.56

    38.55

    38.11

    38.7838.81

    38.71

    38.38

    38.03 38.06

    38.77

    38.75

    38.7538.79

    38.52

    38.56

    38.41

    38.59

    38.53

    38.45

    38.5338.46

    38.1038.2037.8437.83

    38.04

    38.08

    38.04

    37.99

    37.99

    37.91

    37.82

    40.05

    61.47

    38.7338.74

    38.7338.73

    39.03

    38.00

    38.5938.28

    38.73

    38.04

    38.560

    38.77

    39.21

    39.79

    39.10 39.1639.97

    Existing access gate andfence to Unit 13 backyard

    to be replaced andrelocated. Refer

    LandscapeDocumentation

    Existing accessgate and fence to

    Unit 10 backyard tobe relocated.

    Existing fenceand retainingwall to bedemolished.

    Existingpathway to be

    demolishedand relocated.

    Existing paths to bedemolished to make wayfor new drivewayconnection.

    Existing paths to bedemolished to make wayfor new drivewayconnection.

    Existing garden and gardenedging to be demolished tomake way for new drivewayconnection and pathways.

    Existing trees to beretained. Refer

    LandscapeDocumentation.

    Neighbour's colorbondfence to be removed andreinstated on top of newblockwork retaining wall.

    Refer LandscapeDocumentation.

    Landscaped area to berectified after installation

    and connection of newservices. Refer Consultants

    Documentation.

    Existing Road edgeto be retained inorder to retainadequate space forexisting tree roots.Refer CivilDocumentation.

    Portion of ExistingDriveway to bedemolished and re-instated to allow forservices connectionsto new development.Refer to ConsultantDocumentation.

    Existing retaining wall togarden bed to remain and isnot to be compromised bynew works.

    Existing timber fence toremain.

    Neighbour's existing wirefence to be demolished andreplaced with timber fenceon retaining wall.Refer LandscapeDocumentation

    Existing fence,pedestrian andvehicle gate toremain.

    Existing timberfence to remain.

    ExistingUnit 10

    FFL 38.620

    ExistingUnit 9

    FFL 38.620

    ExistingUnit 6

    FFL 38.550

    ExistingUnit 1

    FFL 38.450

    ExistingUnit 13

    FFL 39.200

    ExistingUnit 14

    FFL 39.200

    ExistingUnit 2

    FFL 38.450Adaptable Unit

    ExistingUnit 22

    FFL 38.870

    ExistingUnit 21

    FFL 38.870

    ExistingUnit 18

    FFL 39.250

    ExistingUnit 17

    FFL 39.250

    ExistingUnit 5

    FFL 38.550Bin

    Existing CarPort 2

    ExistingAdaptable Car

    ParkExisting Car

    Port 1

    Store

    39.10

    38.570

    38.25

    Existing road to bewidened.

    Refer CivilDocumentation.

    Existing trees tobe demolished.

    Refer LandscapeDocumentation.

    Lot 2 onRP 103392

    Lot 2 onRP 200350

    P I N E D R I V E

    G A R F

    I E L D

    R O A

    D

    Lot 1 onRP 160517

    90°15'62|272

    152°15'

    67|822

    332°16'97|023

    ExistingDriveway

    ExistingDriveway

    Lot CP onSP 185691

    242°17

    '

    55|01

    D

    A Preliminary 60% DD Issue to Consultants.28.09.1706.10.17 60% Design Development Issue to Client. More trees demolished, road widening shown, more of driveway to be demolished, two existing gates to be

    relocated - as per Consultant documents. Notes added.B

    Preliminary 100% DD Issue to Consultants - Section of existing driveway to be demolished adjusted based on required services locations. Siteinformation and road names added.

    CN

    01.12.17

    15.12.17 100% DD Issue to Client - Contract Documentation.D

  • Rev Date Description Drawing TitleProject

    Revision

    Drawing No.

    Project No.Notes

    CD.A01.02

    1709

    Date

    17 - 21 Garfield Road,Woodridge Qld 4114

    December 2017

    Department of Housing &Public WorksHHS HPW 2017 - 006

    Logan Youth Foyer Site Plan07

    547

    1 03

    4007

    547

    1 03

    4304

    18 8

    76 3

    9404

    12 1

    27 9

    04in

    fo@

    bark

    desi

    gn.c

    om.a

    uw

    ww

    .bar

    kdes

    ign.

    com

    .au

    Tel

    epho

    neF

    acsi

    mile

    Ste

    ve G

    uthr

    ieLi

    ndy

    Atk

    inE

    mai

    lW

    eb

    Bar

    k D

    esig

    n A

    rchi

    tect

    s

    Que

    ensl

    and

    A

    ustr

    alia

    456

    7P

    O B

    ox 1

    355

    Noo

    sa H

    eadsUse figured dimensions

    in preference to scale. Alldimensions to be varifiedand checked on site.These designs,drawings,specifications and thecopyright thereof are theproperty of Bark DesignPty Ltd and must not beused, retained or copiedwithout the writtenauthority of Bark DesignPty Ltd. 3668 (SG)3664 (LA)

    Registration No.Architects

    RAIA Member 28409

    Scale 1:200 @ A1

    Contract Documentation - Not for Construction

    Approved By: LA, SG

    Drawn By: MR

    39.75

    40.00

    40.25

    40.50

    40.7539.25

    39.0038.75

    38.50

    37.44

    37.74

    38.60

    39.20

    39.41

    39.62

    39.73

    37.38

    37.70

    38.24

    38.52

    39.13

    39.35

    39.54

    38.78 39.1939.80 40.18

    40.33

    40.9141.37

    SL37.49

    SL38.10

    SL38.55

    SL38.82

    SL38.43

    SL39.31

    37.99

    38.87

    37.37

    37.99

    38.22

    38.51

    39.13

    39.35

    39.53

    40.02

    38.9238.57

    41.35

    41.42

    41.47

    38.45

    40.1338.65

    39.54

    39.30

    SL39.49

    SL39.67

    36.84

    37.21

    38.10

    38.37

    38.58

    40.65

    BOLs 38.56

    38.08

    38.13

    37.36

    39.21

    38.38

    37.62

    38.27

    39.09

    39.10

    37.98

    38.57

    IL 38.39

    IL 37.80 250

    38.23

    38.76

    39.46

    38.75 39.18 39.77 40.3241.00

    41.35

    SL39.59

    SL39.09SL41.72

    38.63

    38.58

    39.07

    IO 38.60

    IO 39.05

    IO 39.03

    38.66

    39.08

    39.18

    38.36

    38.56

    38.58

    38.61

    38.6638.65

    38.38

    38.47

    38.78

    38.79

    39.12

    39.18

    39.54

    38.47

    38.61

    38.57

    38.60

    38.9038.96

    38.89

    38.83

    39.0038.67

    37.00

    37.50

    38.00

    38.50

    39.00

    39.50

    39.50

    Two StoreyWeatherboard Dwelling

    Tiled Roof

    Two StoreyWeatherboard Dwelling

    Tiled Roof

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HW

    HWHW

    RAMP 1:3

    0LET

    TER

    BOXES

    MSB

    HW

    HW

    38.2038.24 38.3838.35 38.48 38.75 38.91 39.04 39.14 39.32 39.56 39.97 40.06 40.37 40.71 40.87 41.07 41.21 41.47

    38.8638.9138.8138.5138.3838.27

    38.29

    38.37

    38.45

    38.50

    38.55

    38.08 38.25 38.36 38.65 38.83 38.92 39.02 39.23 39.45 39.91 39.97 40.25 40.61 40.78 40.98 41.13 41.34

    39.13

    38.97

    38.8538.8638.8538.7338.5138.2938.17

    39.02

    39.09

    38.35

    38.51

    38.39

    37.85

    37.86

    61.02

    61.03

    38.07 38.24 38.36 38.64 38.81 38.90 38.99 39.20 39.45 39.88 39.94 40.22 40.59 40.75 40.95 41.10 41.32

    38.8338.7038.5038.2738.14

    66.02 66.03

    66.01

    66.01

    63.27

    63.27

    66.0166.02

    66.02

    38.81

    38.7938.81

    67.24

    67.3767.36

    38.56

    38.55

    38.11

    38.7838.81

    38.71

    38.38

    38.03 38.06

    38.77

    38.75

    38.7538.79

    38.52

    38.56

    38.41

    38.59

    38.53

    38.45

    38.5338.46

    38.1038.2037.8437.83

    38.04

    38.08

    38.04

    37.99

    37.99

    37.91

    37.82

    61.47

    38.7338.74

    38.7338.73

    39.03

    38.00

    38.5938.28

    38.73

    38.04

    38.560

    38.77

    39.21

    39.79

    Shed

    Two StoreyWeatherboard Dwelling

    Tiled Roof

    Shed

    C/OV

    C/OV

    C/OV

    C/OV

    F

    F

    F

    F

    F

    C/OV

    C/OV

    C/OV

    C/OV

    F

    F

    38.00

    38.25

    39.25

    38.75

    38.25

    37.75

    37.25

    90°15'62|272

    ExistingUnit 10

    FFL 38.620

    ExistingUnit 9

    FFL 38.620

    ExistingUnit 6

    FFL 38.550

    ExistingUnit 1

    FFL 38.450

    ExistingUnit 13

    FFL 39.200

    ExistingUnit 14

    FFL 39.200

    ExistingUnit 2

    FFL 38.450Adaptable Unit

    ExistingUnit 22

    FFL 38.870

    ExistingUnit 21

    FFL 38.870

    ExistingUnit 18

    FFL 39.250

    ExistingUnit 17

    FFL 39.250

    ExistingUnit 5

    FFL 38.550Bin

    Existing CarPort 2

    ExistingAdaptable Car

    ParkExisting Car

    Port 1

    Store

    TerraceFFL 39.350

    CommunalTerrace

    FFL 38.850

    Unit 42Indoor HubFFL 38.850

    VF1

    Unit 38FFL 39.370

    VF1

    Unit 37FFL 39.370

    VF1

    Unit 34FFL 39.800

    VF1Unit 33

    FFL 39.800VF1

    Unit 30FFL 39.230

    VF1Unit 29FFL 39.230

    VF1Unit 26Office

    FFL 39.300VF1

    Unit 25Office

    FFL 39.300VF1

    Outdoor HubFFL 38.980

    Refer to LandscapeDocumentation

    TerraceFFL 39.350

    TerraceFFL 39.800

    TerraceFFL 39.800Terrace

    FFL 39.230Terrace

    FFL 39.230Terrace

    FFL 39.300

    Unit 41IndoorHub

    BUILDING 1

    BUILDING 2

    BUILDING 3

    BUILDING 4

    BUILDING 5

    BUILDING 6

    New Driveway and Car Park

    ASPTRefer to Civil

    Documentation forSpecification & Levels

    152°15'

    67|822

    332°16'97|023

    Crown of Road

    Crown

    of Road

    Edge of

    Bitume

    n

    Edge of

    Bitume

    n

    Back of

    Kerb

    Back of

    KerbCon

    crete P

    athway

    Concret

    e Pathw

    ay

    38.570

    One StoreyBrick Dwelling

    Iron Roof

    Crown of Road

    Crown

    of Road

    Edge of

    Bitume

    n

    Edge of

    Bitume

    n

    Back of

    Kerb

    Back of

    KerbCon

    crete P

    athway

    Concret

    e Pathw

    ay

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    TerraceFFL 39.300

    Lot 1 onRP 160517

    Lot 2 onRP 103392

    Lot 2 onRP 200350

    16

    17

    Crossover &Vehicle Entry

    ConcreteRefer to Civil

    Documentation

    P I N E D R I V E

    G A R F

    I E L D

    R O A

    D

    New Footpath

    ExistingCrossover &Vehicle Entry

    Proposed RoadWideningRefer Civil

    New Footpath

    Walkw

    ay 2

    Walkw

    ay 3

    Walkw

    ay 1

    90°15'62|272

    152°15'

    67|822

    332°16'97|023

    ExistingDriveway

    ExistingDriveway

    Lot CP onSP 185691

    242°17

    '

    55|01

    F

    New Driveway /Half Court Basketball

    ConcreteRefer to Civil & Landscape

    Documentation

    2x PWDCar BaysConcrete

    Vegetated SwaleRefer to Civil & LandscapeDocumentation

    ReinstatedDriveway &

    PathwayConcrete

    Refer to Civil &Landscape

    Documentation

    Existing Road EdgeRefer to Civil Documentation

    BUILDING 7Pedestrian Entry

    FFL 39.500Refer to Landscape

    Documentation

    New FenceRefer to andscapeDocumentation

    Retaining WallRefer to andscapeDocumentation

    Existing Fencerelocated on top of

    New Retaining WallRefer to Landscape

    Documentation

    Retained Treeson NE corner of Verge. Allother trees are new.Refer to LandscapeDocumentation

    New FenceRefer to andscape

    Documentation

    K

    D 04.10.17 Preliminary Issue to Landscape Architect - basic Civil elements added, walkways and columns updated.Preliminary Issue to Consultants - basic Civil elements added, walkways and columns updated, Landscape base revised.E 04.10.17

    06.10.17 60% Design Development Issue to Client. Screens added to underside of stairs. Unit 33, 34, 37 & 38 Terraces now flush with internal FFL.F

    NClient Meeting - Hallway widened to 1200mm in Units 33, 34, 37 & 38.02.11.17G

    15.11.17H DHPW Feedback Issue to Consultants - Hallway widened to 1200mm in Units 33, 34, 37 & 38. Clothesline to Indoor Hub removed. AC to Indoor Hubremoved. Some BRS1 (hit & miss brick screen) changed to BRS3 (solid brick screen). BW4 added where 'Art Wall' is to be located on west wall of Units42 & 44. Materiality of front fence adjusted. Landscape CAD base updated. Pine Drive Kerb adjusted.

    J 01.12.17 Preliminary 100% DD Issue to Consultants - Civil base updated. Section of existing driveway to be re-instated adjusted based on required serviceslocations. Unit 29 & 30 changed from PWD Studio Apartments to One Bedroom Units. All Unit Bathrooms re-arranged to include a separate Laundry tub.

    15.12.17 100% DD Issue to Client - Contract Documentation.K

  • Rev Date Description Drawing TitleProject

    Revision

    Drawing No.

    Project No.Notes

    CD.A02.01

    1709

    Date

    17 - 21 Garfield Road,Woodridge Qld 4114

    December 2017

    Department of Housing &Public WorksHHS HPW 2017 - 006

    Logan Youth Foyer Ground Floor Set OutPlan

    07 5

    471

    0340

    07 5

    471

    0343

    0418

    876

    394

    0412

    127

    904

    info

    @ba

    rkde

    sign

    .com

    .au

    ww

    w.b

    arkd

    esig

    n.co

    m.a

    u

    Tel

    epho

    neF

    acsi

    mile

    Ste

    ve G

    uthr

    ieLi

    ndy

    Atk

    inE

    mai

    lW

    eb

    Bar

    k D

    esig

    n A

    rchi

    tect

    s

    Que

    ensl

    and

    A

    ustr

    alia

    456

    7P

    O B

    ox 1

    355

    Noo

    sa H

    eadsUse figured dimensions

    in preference to scale. Alldimensions to be varifiedand checked on site.These designs,drawings,specifications and thecopyright thereof are theproperty of Bark DesignPty Ltd and must not beused, retained or copiedwithout the writtenauthority of Bark DesignPty Ltd. 3668 (SG)3664 (LA)

    Registration No.Architects

    RAIA Member 28409

    Scale 1:100 @ A1

    Contract Documentation - Not for Construction

    Approved By: LA, SG

    Drawn By: MR

    W29

    D26

    W21 D

    17

    W23

    W22

    W24

    D21 W26

    W28

    W27

    W25

    D22

    W19

    W20

    D16

    D07

    W14

    W13

    W12

    W15

    D11 W17

    W18

    W16

    D12

    D01

    W38

    D36

    W47

    W46

    D37

    D10

    D08D09

    D15

    D13D14

    W43

    D39

    C/OV

    C/OV

    13,600

    4,925

    4,995

    5,480

    4,925

    4,995

    3,880

    4,925

    4,995

    2,278

    5,200

    10,200

    3,600

    10,200

    2000

    12,220

    7,815

    12,220

    5,590

    6,480

    4,000

    12,220

    16,300

    12,220

    2,000

    10,200

    3,600

    10,200

    1,200

    10,000

    2,000

    2,000

    9,015

    12,220

    10,200

    2,850

    2,90

    0

    3,90

    0

    3,90

    04,600

    2,300

    3,000

    6,000

    1,700

    4,100

    1,500

    11,235

    10,035

    200

    7,050

    2,750

    1,200

    2,800

    2,020600

    1,780

    10,200

    3,110 1,200 3,110

    230

    500

    7,420

    3,000 445

    760

    1,000

    4,200

    280

    +39,800

    +39,800

    +38,980

    +38,850

    +39,370

    +39,300

    +39,230

    +39,230

    +39,300+3

    9,300

    +38,850

    +39,370 +39

    ,370

    +39,110

    +39,150

    +38,700

    +38,600

    +38,850

    +39,490

    +39,590

    +39,060

    +39,230

    +39,800

    +39,50

    0

    4m Road Setback

    5.5m Clear Width

    C/OV

    C/OV

    W04

    W03

    W02

    D04

    F

    F

    F

    F

    F

    C/OV

    C/OV

    C/OV

    C/OV

    F

    F

    D19D18

    D20

    D25D24

    D23

    D03

    W30 D27

    W32

    W31

    W33

    D31

    W44

    W45

    D40

    MeetingRoom

    VF1

    BathVF1

    BedVF1

    BathVF1

    TerraceFFL 39.370

    CommunalTerraceFFL 38.850

    Unit 42Indoor Hub

    51m2FFL 38.850

    VF1

    Unit 3851m2

    FFL 39.370VF1

    Unit 3751m2

    FFL 39.370VF1

    Unit 3451m2

    FFL 39.800VF1

    Unit 3351m2

    FFL 39.800VF1Unit 30

    51m2FFL 39.230

    VF1Unit 29

    51m2FFL 39.230

    VF1

    Unit 26Office

    51m2FFL 39.300

    VF1

    Unit 25Office

    51m2FFL 39.300

    VF1

    Outdoor Hub62.5m2

    FFL 38.980Refer to Landscape

    Documentation

    AC

    Awn A

    bove

    Awn A

    bove

    Awn

    Above

    Awn A

    bove

    Awn A

    bove

    Awn A

    bove

    Awn A

    bove

    Awn A

    bove

    BalconyAbove

    BalconyAbove

    BalconyAbove Balcony

    Above

    BalconyAbove

    Balcony Above

    TerraceFFL 39.370

    TerraceFFL 39.800

    TerraceFFL 39.800

    CBD

    CBD

    CBD

    CBD

    CBD

    CBD

    BathVF1

    BedVF1

    BathVF1

    BedVF1

    BathVF1

    BedVF1

    TerraceFFL 39.230

    TerraceFFL 39.230

    P

    P Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    TerraceFFL 39.300

    BedVF1

    BathVF1

    MeetingVF1

    BedVF1

    P

    P

    PP

    PP

    Unit 41Indoor Hub

    51m2FFL 38.850

    VF1

    BalconyAbove

    BalconyAbove

    Stair 1Conc 2

    Stair 2Conc 2

    Stair 3Conc 2

    Walkw

    ay 2

    Walkw

    ay 3

    Walkw

    ay 1

    ExistingUnit 13FFL 39.200

    ExistingUnit 14FFL 39.200

    ExistingUnit 10FFL 38.620

    ExistingUnit 9

    FFL 38.620

    1:201:20

    1:20.5

    1:22

    1:22

    1:22

    1:23

    1:20

    1:20

    1:20

    1:201:20

    1:23

    1:22

    WM

    PP

    WM

    DR

    GrassedAreaRefer to

    LandscapeDocumentation

    DSB

    BUILDING 1BUILDING 2

    BUILDING 3

    BUILDING 4

    BUILDING 5

    BUILDING 6

    BUILDING 7Pedestrian

    EntryFFL 39.300

    LdryVF1

    LdryVF1

    WM

    Walkw

    ay Above

    WM

    WM

    WM

    WM

    CBD

    WM

    CBD

    PPP

    LdryVF1

    LdryVF1

    LdryVF1

    LdryVF1

    S

    S

    S

    S

    S

    SS

    S

    S

    S

    S

    S

    S

    S

    SS

    S

    S

    S

    S

    SHR

    SHR

    SHR

    SHR

    SHR

    SHR

    SHR

    SHR

    S

    S

    Walkw

    ay Above

    Walkw

    ay Abo

    ve

    Flush

    Bins

    Bins

    Bins

    Bins

    Bins

    Bins

    1

    1

    A

    A

    F

    2

    2

    3

    3

    4

    4

    5

    5

    6

    6

    7

    7

    8

    8

    9

    B

    B

    F

    F

    G

    G

    K

    K

    L

    L

    H

    H

    J

    J

    M

    M

    N

    C

    C

    D

    D

    E

    E

    W11

    W10

    W01

    W05

    D05

    W07

    W08

    W09

    W06

    D06

    W35

    W37

    W36

    W34

    D32

    D29D28

    D30

    D35

    D34

    D33

    W39

    W42

    D38

    D41

    D02

    W41

    W40

    AP1

    AP2

    2.0m Side Setback

    1.5m Side Setback

    2.5m Side Setback

    2.5m Side Setback

    2.0m Side Setback

    1.5m Side Setback

    K

    Preliminary Issue to Consultants - Stair treads adjusted. Columns adjusted to match Structural documentation. Walkway moved over 100mm as clouded.Handrails added to stairs.

    24.10.17E

    N

    F Client Meeting - Hallway widened to 1200mm in Units 33, 34, 37 & 38.02.11.17G DHPW Feedback Issue to Consultants - Hallway widened to 1200mm in Units 33, 34, 37 & 38, internal walls adjusted to suit. Clothesline to Indoor Hub

    removed. AC to Indoor Hub removed. Some BRS1 (hit & miss brick screen) changed to BRS3 (solid brick screen). BW4 added where 'Art Wall' is to belocated on west wall of Units 42 & 44. PWD vanities reduced in depth.

    10.11.17

    H Preliminary Issue to Hydraulic Engineer - Shower head locations clarified.13.11.17J Preliminary 100% Issue to Consultants - General notes added. Additional dimensions added. Unit 29 & 30 changed from PWD Studio Apartments to One

    Bedroom Units. All Unit Bathrooms re-arranged to include a separate Laundry tub. Door & Window numbers updated.01.12.17

    15.12.17 100% DD Issue to Client - Contract Documentation.K

  • Rev Date Description Drawing TitleProject

    Revision

    Drawing No.

    Project No.Notes

    CD.A02.03

    1709

    Date

    17 - 21 Garfield Road,Woodridge Qld 4114

    December 2017

    Department of Housing &Public WorksHHS HPW 2017 - 006

    Logan Youth Foyer Ground Floor GeneralArrangement Plan

    07 5

    471

    0340

    07 5

    471

    0343

    0418

    876

    394

    0412

    127

    904

    info

    @ba

    rkde

    sign

    .com

    .au

    ww

    w.b

    arkd

    esig

    n.co

    m.a

    u

    Tel

    epho

    neF

    acsi

    mile

    Ste

    ve G

    uthr

    ieLi

    ndy

    Atk

    inE

    mai

    lW

    eb

    Bar

    k D

    esig

    n A

    rchi

    tect

    s

    Que

    ensl

    and

    A

    ustr

    alia

    456

    7P

    O B

    ox 1

    355

    Noo

    sa H

    eadsUse figured dimensions

    in preference to scale. Alldimensions to be varifiedand checked on site.These designs,drawings,specifications and thecopyright thereof are theproperty of Bark DesignPty Ltd and must not beused, retained or copiedwithout the writtenauthority of Bark DesignPty Ltd. 3668 (SG)3664 (LA)

    Registration No.Architects

    RAIA Member 28409

    Scale 1:100 @ A1

    Contract Documentation - Not for Construction

    Approved By: LA, SG

    Drawn By: MR

    SL38.82

    SL38.43

    38.92

    38.57

    38.58

    40.65

    39.09

    39.10

    IL 38.39

    IL 37.80 25038.63

    38.58

    IO 39.03

    38.6638.65

    38.89

    38.83

    39.0038.67

    HW

    HW

    HW

    HW

    38.8638.91

    38.29

    38.37

    38.85

    38.8638.85

    39.09

    38.51

    38.39

    37.85

    37.86

    61.02

    61.03

    38.83

    66.03

    66.01

    66.01

    63.27

    63.27

    66.01

    66.02

    66.02

    67.24

    67.3767.36

    38.56

    38.03 38.06

    38.59

    38.53

    38.45

    38.1038.20

    37.8437.83

    38.04

    38.08

    38.04

    37.99

    37.99

    37.91

    37.82

    38.0038.04

    38.560

    W29

    D26

    W21 D

    17

    W23

    W22

    W24

    D21 W26

    W28

    W27

    W25

    D22

    W19

    W20

    D16

    D07

    W14

    W13

    W12

    W15

    D11 W17

    W18

    W16

    D12

    D01

    W38

    D36

    W47

    W46

    D37

    D10

    D08D09

    D15

    D13D14

    W43

    D39

    C/OV

    C/OV

    +39,800

    +39,800

    +38,980

    +38,850

    +39,370

    +39,300

    +39,800

    +39,800

    +39,370

    +38,850 +38

    ,850

    +39,230

    +39,230

    +39,300+3

    9,300

    +38,850

    +39,370 +39

    ,370

    +39,230

    +39,370

    +39,110

    +39,150

    +38,700

    +38,600

    +38,850

    +39,490

    +39,590

    +39,060

    +39,230

    +39,800

    +39,50

    0

    4m Road Setback

    5.5m Clear Width

    C/OV

    C/OV

    W04

    W03

    W02

    D04

    Kitchen

    BBQ

    F

    F

    F

    F

    F

    C/OV

    C/OV

    C/OV

    C/OV

    F

    F

    D19D18

    D20

    D25D24

    D23

    D03

    W30 D27

    W32

    W31

    W33

    D31

    W44

    W45

    D40

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16PWD

    17PWD

    Vehicle Entry

    MeetingRoom

    VF1

    BathVF1

    BedVF1

    BathVF1

    TerraceFFL 39.370

    CommunalTerraceFFL 38.850

    Unit 42Indoor Hub

    51m2FFL 38.850

    VF1

    Unit 3851m2

    FFL 39.370VF1

    Unit 3751m2

    FFL 39.370VF1

    Unit 3451m2

    FFL 39.800VF1

    Unit 3351m2

    FFL 39.800VF1Unit 30

    51m2FFL 39.230

    VF1Unit 29

    51m2FFL 39.230

    VF1

    Unit 26Office

    51m2FFL 39.300

    VF1

    Unit 25Office

    51m2FFL 39.300

    VF1

    Outdoor Hub62.5m2

    FFL 38.980Refer to Landscape

    Documentation

    New Drivewayand Car Park

    ASPTRefer to Civil

    Documentation forSpecification & Levels

    AC

    Awn A

    bove

    Awn A

    bove

    Awn

    Above

    Awn A

    bove

    Awn A

    bove

    Awn A

    bove

    Awn A

    bove

    Awn A

    bove

    BalconyAbove

    BalconyAbove

    BalconyAbove Balcony

    Above

    BalconyAbove

    Balcony Above

    TerraceFFL 39.370CD

    CDCD

    CDCD

    CD

    TerraceFFL 39.800

    TerraceFFL 39.800

    CBD

    CBD

    CBD

    CBD

    CBD

    CBD

    BathVF1

    BedVF1

    BathVF1

    BedVF1

    BathVF1

    BedVF1

    TerraceFFL 39.230

    TerraceFFL 39.230

    P

    P Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    TerraceFFL 39.300

    BedVF1

    BathVF1

    MeetingVF1

    LibraryVF1

    DiningVF1

    LoungeVF1

    KitchenVF1

    BedVF1

    P

    P

    PP

    PP

    Unit 41Indoor Hub

    51m2FFL 38.850

    VF1

    CrossoverRefer to Civil

    Documentation

    BalconyAbove

    BalconyAbove

    Stair 1Conc 2

    Stair 2Conc 2

    Stair 3Conc 2

    152°15'

    67|822

    332°16'97|023

    90°15'62|272

    38.570

    New P

    ath

    Refer

    to Land

    scape

    Docum

    entatio

    n

    ExistingDriveway

    New Footpath

    Walkw

    ay 2

    Walkw

    ay 3

    Walkw

    ay 1

    ExistingUnit 13FFL 39.200

    ExistingUnit 14FFL 39.200

    ExistingUnit 10FFL 38.620

    ExistingUnit 9

    FFL 38.620

    1:201:20

    1:20.5

    1:22

    1:22

    1:22

    1:23

    1:20

    1:20

    1:20

    1:201:20

    1:23

    1:22

    WM

    PP

    WM

    DR

    SharedZone

    Existing CarPort 2

    Existing CarPort 1

    New Footpath

    GrassedAreaRefer to

    LandscapeDocumentation

    DSB

    BUILDING 1BUILDING 2

    BUILDING 3

    BUILDING 4

    BUILDING 5

    BUILDING 6

    LdryVF1

    LdryVF1

    WM

    Walkw

    ay Above

    WM

    WM

    WM

    WM

    CBD

    WM

    CBD

    PPP

    LdryVF1

    LdryVF1

    LdryVF1

    LdryVF1

    S

    S

    S

    S

    S

    SS

    S

    S

    S

    S

    S

    S

    S

    SS

    S

    S

    S

    S

    SHR

    SHR

    SHR

    SHR

    SHR

    SHR

    SHR

    SHR

    S

    S

    Walkw

    ay Above

    Walkw

    ay Abo

    ve

    GD GD

    GDGD

    GD

    GDGD G

    D

    GD GD

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Flush

    Bins

    Bins

    Bins

    Bins

    Bins

    Bins

    1

    1

    A

    A

    F

    2

    2

    3

    3

    4

    4

    5

    5

    6

    6

    7

    7

    8

    8

    9

    B

    B

    F

    F

    G

    G

    K

    K

    L

    L

    H

    H

    J

    J

    M

    M

    N

    C

    C

    D

    D

    E

    E

    W11

    W10

    W01

    W05

    D05

    W07

    W08

    W09

    W06

    D06

    W35

    W37

    W36

    W34

    D32

    D29D28

    D30

    D35

    D34

    D33

    W39

    W42

    D38

    D41

    D02

    W41

    W40

    AP1

    AP2

    New Driveway & HalfCourt Basketball /

    PWD Parking BaysConcrete

    Refer to Civil & LandscapeDocumentation

    ReinstatedDrivewayConcrete to matchExistingRefer to Civil &LandscapeDocumentation

    UndergroundDetention Tank

    Refer to CivilDocumentation

    Vegetated SwaleRefer to Civil &LandscapeDocumentation

    LetterboxesRefer to LandscapeDocumentation

    BUILDING 7Pedestrian Entry8.5m2 FFL 39.500Refer to Landscape Documentation

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    ArbourRefer to Landscape

    Documentation

    Max 1:33RampedLanding

    Max 1:33RampedLanding

    Max 1

    :33

    Ramp

    ed

    Landin

    g

    Max 1

    :33

    Ramp

    ed

    Landin

    g

    Max 1:33RampedLanding

    Open BicycleStore Under

    StairsRefer Materials &

    Finishes Schedule

    Open

    Bicycle

    Store U

    nder

    Stairs

    Refer

    Materi

    als &

    Finish

    es Sch

    edule

    Open

    Bicycle

    Store

    Under

    Stairs

    Refer

    Materi

    als &

    Finish

    es Sch

    edule

    HWU U

    nder

    Bench

    HWU U

    nder

    Bench

    HWU U

    nder

    Bench

    HWU U

    nder

    Bench

    HWU U

    nder

    Bench

    HWU U

    nder

    Bench H

    WU Un

    der

    Bench

    HWU U

    nder

    Bench

    IrrigationController

    Refer to LandscapeDocumentation

    2.0m Side Setback

    1.5m Side Setback

    2.5m Side Setback

    2.5m Side Setback

    2.0m Side Setback

    1.5m Side Setback

    L

    06.10.17 60% Design Development Issue to Client. Screens to underside of stairs added.FPreliminary Issue to Consultants - Stair treads adjusted. Walkway moved over 100mm as clouded.24.10.17G

    NClient Meeting - Hallway widened to 1200mm in Units 33, 34, 37 & 38.02.11.17H

    J DHPW Feedback Issue to Consultants - Hallway widened to 1200mm in Units 33, 34, 37 & 38. Clothesline to Indoor Hub removed. AC to Indoor Hubremoved. Some BRS1 (hit & miss brick screen) changed to BRS3 (solid brick screen). BW4 added where 'Art Wall' is to be located on west wall of Units42 & 44. Materiality of front fence adjusted. Landscape CAD base updated. Pine Drive Kerb adjusted.

    10.11.17

    K Preliminary 100% Issue to Consultants - General notes added. Civil base updated. Unit 29 & 30 changed from PWD Studio Apartments to One BedroomUnits. All Unit Bathrooms re-arranged to include a separate Laundry tub. Door & Window numbers updated.

    01.12.17

    15.12.17 100% DD Issue to Client - Contract Documentation.L

  • Rev Date Description Drawing TitleProject

    Revision

    Drawing No.

    Project No.Notes

    CD.A02.04

    1709

    Date

    17 - 21 Garfield Road,Woodridge Qld 4114

    December 2017

    Department of Housing &Public WorksHHS HPW 2017 - 006

    Logan Youth Foyer First Floor GeneralArrangement Plan

    07 5

    471

    0340

    07 5

    471

    0343

    0418

    876

    394

    0412

    127

    904

    info

    @ba

    rkde

    sign

    .com

    .au

    ww

    w.b

    arkd

    esig

    n.co

    m.a

    u

    Tel

    epho

    neF

    acsi

    mile

    Ste

    ve G

    uthr

    ieLi

    ndy

    Atk

    inE

    mai

    lW

    eb

    Bar

    k D

    esig

    n A

    rchi

    tect

    s

    Que

    ensl

    and

    A

    ustr

    alia

    456

    7P

    O B

    ox 1

    355

    Noo

    sa H

    eadsUse figured dimensions

    in preference to scale. Alldimensions to be varifiedand checked on site.These designs,drawings,specifications and thecopyright thereof are theproperty of Bark DesignPty Ltd and must not beused, retained or copiedwithout the writtenauthority of Bark DesignPty Ltd. 3668 (SG)3664 (LA)

    Registration No.Architects

    RAIA Member 28409

    Scale 1:100 @ A1

    Contract Documentation - Not for Construction

    Approved By: LA, SG

    Drawn By: MR

    D65

    W75 D

    66

    D73

    D57

    D81

    W60

    D53

    W61

    D54

    D55D56

    D42

    W51

    D45

    W52

    D46

    D43

    D44

    D49

    D48

    D47

    W84 D

    74

    W87

    D77

    D79D80

    +42,800

    +42,800

    +42,780

    +42,210

    +41,830

    +42,350

    +42,210

    +41,830

    +42,230 +42

    ,230

    +41,850

    +41,850

    +42,300+4

    2,300

    +42,370

    +42,370

    +42,280

    4m Road Setback

    2.0m Side Setback

    1.5m Side Setback

    2.5m Side Setback

    F

    C/OV

    C/OV

    W74

    W68

    D59

    D60

    D63D64

    W67

    D75

    D76

    W90

    W83

    W77

    D67

    D68

    D71D72

    W76

    D51

    D52

    W63

    W56

    W48

    W49

    F

    F

    F

    F

    FF

    F

    FF

    C/OV

    C/OV

    C/OV

    C/OV

    C/OV

    C/OV

    C/OV

    C/OV

    W66 D

    58

    W69

    D61

    W71

    W73

    W72

    W78

    D69 W80

    W82

    W81

    W65

    W64

    W59

    W62

    W57

    W58

    1

    1

    A

    A

    2

    2

    3

    3

    4

    4

    5

    5

    6

    6

    7

    7

    8

    8

    9

    B

    B

    F

    F

    G

    G

    K

    K

    L

    L

    H

    H

    J

    J

    M

    M

    N

    C

    C

    D

    D

    E

    ERoof Over

    Outdoor HubRefer Roof Plan

    152°15'

    67|822

    332°16'97|023

    Roof Over EntryStructure

    Refer Roof Plan

    90°15'62|272

    Balcony11.9m2

    FFL 41.830Conc1

    Cover

    ed Wa

    lkway

    3

    Conc2

    Unit 4451m2

    FFL 41.850VF1

    Unit 4351m2

    FFL 41.850VF1

    Unit 4051m2

    FFL 42.370VF1

    Unit 3951m2

    FFL 42.370VF1

    Unit 3651m2

    FFL 42.800VF1

    Unit 3551m2

    FFL 42.800VF1

    Unit 3251m2

    FFL 42.230VF1

    Unit 3151m2

    FFL 42.230VF1

    Unit 2851m2

    FFL 42.300VF1

    Unit 2751m2

    FFL 42.300VF1

    20mm

    Step 20

    mm

    Step 20m

    m

    Step 20

    mm

    Step

    20mm

    Step 20

    mm

    Step

    20mm

    Step20m

    m

    Step

    20mm

    Step20m

    m

    Step

    BedVF1

    Bath / LdryVF1

    Bath /LdryVF1

    BedVF1

    Bath /

    Ldry

    VF1

    BedVF1

    Bath / LdryVF1

    BedVF1

    Bath / LdryVF1

    BedVF1

    Bath / LdryVF1

    BedVF1

    Bath /LdryVF1

    Bath /LdryVF1

    CBD

    CBD

    CBD

    CBD

    CBD

    CBD

    CBD

    CBD

    CBD

    CBD

    PP

    PP

    PP

    BedVF1

    BedVF1

    PP

    PP

    PP

    Balcony12.9m2

    FFL 41.830Conc1

    BedVF1

    Bath / LdryVF1

    Bath /LdryVF1

    BedVF1

    PP

    20mm

    Step

    Cover

    ed Wa

    lkway

    2

    Conc2Co

    vered

    Walkw

    ay 1

    Conc1

    Stair 1Conc 2

    Stair 2Conc 2

    Stair 3Conc 2

    Roof Above

    Aw

    n Above

    Roof AboveRoof Above

    Roof Above

    Roof Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Aw

    n Above

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    Roof A

    bove

    20mmStep

    20mmStep

    20mmStep

    20mmStep

    20mmStep

    P

    P

    P

    Stair 4Conc 2

    Stair 5Conc 2

    WM

    BUILDING1

    BUILDING2

    BUILDING 3

    BUILDING4

    BUILDING5

    BUILDING 6

    BUILDING 7

    WM

    WM

    WM

    WM

    WM

    WM

    WM

    WM

    S

    S

    S

    S

    S

    S

    S

    S

    S

    S

    S

    S

    S

    S

    S

    S

    S

    SS

    S

    S

    S

    S

    S

    S

    S

    S

    S

    S

    S

    WM

    SHR

    SHR

    SHR

    SHR

    SHR

    SHR

    SHR

    SHR

    SHR

    SHR

    Balcony11.9m2

    FFL 41.830Conc1

    Balcony12.9m2

    FFL 41.830Conc1

    Balcony11.9m2

    FFL 41.830Conc1

    Balcony12.9m2

    FFL 41.830Conc1Balcony

    11.9m2FFL 41.830

    Conc1

    Balcony12.9m2

    FFL 41.830Conc1

    Balcony11.9m2

    FFL 41.830Conc1

    Balcony12.9m2

    FFL 41.830Conc1

    RRV

    Above

    RRV

    Above

    RRV

    Above

    RRV

    Above

    RRV

    Above

    RRV

    Above

    RRV

    Above

    RRV

    Above

    RRV

    Above

    RRV

    Above

    Bal3

    Bal3

    Bal3

    Bal3

    Bal3 Ba

    l3

    Bal3

    Bal3

    SC

    R1 S

    CR

    1

    SC

    R1

    SC

    R1

    SCR1 S

    CR1

    SCR1

    SCR1

    Bal3

    Bal3

    Bal3

    Bal3

    Bal3

    Bal3

    W70

    D62

    W91

    W92

    W86

    W89

    W88

    D78

    W85

    W79

    D70

    D50

    W50

    W53

    W54

    W55

    HWU U

    nder

    Bench HW

    U Unde

    r

    Bench

    HWU U

    nder

    Bench

    HWU U

    nder

    Bench

    HWU U

    nder

    Bench

    HWU U

    nder

    Bench

    HWU U

    nder

    BenchH

    WU Un

    der

    Bench

    HWU U

    nder

    Bench

    HWU U

    nder

    Bench

    2.5m Side Setback

    2.0m Side Setback

    1.5m Side Setback

    L

    Preliminary Issue to Consultants - Elevated walkways adjusted to suit ground floor walkways. Columns adjusted to match Structural documentation.Stairs shifted back 400mm. Steel columns to external walls added. W47, W56 & W61 moved over slightly. W70 & W71 locations corrected. Handrailsadded to walkways.

    24.10.17F

    NClient MeetingG 02.11.17DHPW Feedback Issue to Consultants - Some BRS1 (hit & miss brick screen) changed to BRS3 (solid brick screen). 100mm gap added between BW3upstand and BW2 party wall to allow drainage to east balconies. BW4 added where 'Art Wall' is to be located on west wall of Units 42 & 44.

    10.11.17H

    J Preliminary Issue to Hydraulic Engineer - Shower head locations clarified.13.11.17K Preliminary 100% Issue to Consultants - General notes added. All Unit Bathrooms re-arranged to include a separate Laundry tub. Door & Window

    numbers updated.01.12.17

    15.12.17 100% DD Issue to Client - Contract Documentation.L

  • Rev Date Description Drawing TitleProject

    Revision

    Drawing No.

    Project No.Notes

    CD.A02.05

    1709

    Date

    17 - 21 Garfield Road,Woodridge Qld 4114

    December 2017

    Department of Housing &Public WorksHHS HPW 2017 - 006

    Logan Youth Foyer Roof Plan - Option A07

    547

    1 03

    4007

    547

    1 03

    4304

    18 8

    76 3

    9404

    12 1

    27 9

    04in

    fo@

    bark

    desi

    gn.c

    om.a

    uw

    ww

    .bar

    kdes

    ign.

    com

    .au

    Tel

    epho

    neF

    acsi

    mile

    Ste

    ve G

    uthr

    ieLi

    ndy

    Atk

    inE

    mai

    lW

    eb

    Bar

    k D

    esig

    n A

    rchi

    tect

    s

    Que

    ensl

    and

    A

    ustr

    alia

    456

    7P

    O B

    ox 1

    355

    Noo

    sa H

    eadsUse figured dimensions

    in preference to scale. Alldimensions to be varifiedand checked on site.These designs,drawings,specifications and thecopyright thereof are theproperty of Bark DesignPty Ltd and must not beused, retained or copiedwithout the writtenauthority of Bark DesignPty Ltd. 3668 (SG)3664 (LA)

    Registration No.Architects

    RAIA Member 28409

    Scale 1:100 @ A1

    Contract Documentation - Not for Construction

    Approved By: LA, SG

    Drawn By: MR

    4m Road Setback

    2.0m Side Setback

    1.5m Side Setback

    2.5m Side Setback

    1

    1

    A

    A

    2

    2

    3

    3

    4

    4

    5

    5

    6

    6

    7

    7

    8

    8

    9

    B

    B

    F

    F

    G

    G

    K

    K

    L

    L

    H

    H

    J

    J

    M

    M

    N

    C

    C

    D

    D

    E

    E

    RS1 5° CustomOrb RoofSheeting

    RS1 5° CustomOrb RoofSheeting

    RS1 5° CustomOrb RoofSheeting

    RS1 5° CustomOrb RoofSheeting

    RS1 5° CustomOrb RoofSheeting RS1 5° Custom

    Orb RoofSheeting

    RS1 5° CustomOrb RoofSheeting

    RS1 5° CustomOrb RoofSheeting

    RS1 5° CustomOrb RoofSheeting

    RS1 5° CustomOrb RoofSheeting

    RS2 5° CustomOrb RoofSheeting

    RS2 2° CustomOrb RoofSheeting

    Awn Below

    Awn Below

    Awn Below

    Awn Below

    Awn Below

    Awn Below

    Awn Below

    Awn Below

    Awn Below

    Awn Below

    Awn Be

    low

    Awn Be

    low Awn Be

    low

    Awn Be

    low

    Awn Be

    low

    Awn Be

    low

    Awn

    Below

    Awn

    Below

    200mmStep

    200mmStep

    200mmStep

    200mmStep

    200mmStep

    DP

    DP

    DP

    DP

    DP

    DP

    DPDP

    DP

    DP

    DP

    DP

    DP

    DP

    DP

    DPDP

    DP

    DP

    DP

    DP

    DP DP

    DP

    870mmStep

    750mmStep

    200mmStep

    200mmStep

    BUILDING 1 BUILDING 2

    BUILDING 3

    BUILDING 4

    BUILDING 5BUILDING 6

    BUILDING 7

    BRS3 Wallbelow

    RRV

    BRS3 Wallbelow

    BRS3 Wallbelow

    Top of brick veneer

    wall below

    Top of brickveneer wall

    below

    Top of brick veneer

    wall below

    GU

    GU

    GU GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    BRS3 W

    all

    below

    RRV

    RRV

    RRV

    RRV

    RRV

    RRV

    RRV

    RRV

    RRV

    BW2 Wall Below

    BW2 Wall Below

    BW2 W

    all

    Below

    BW2 Wall Below

    BRS3 W

    all

    Below

    GU

    BW2 W

    all

    Below

    BRS3 W

    all

    Below

    BRS3 W

    all

    Below

    GU

    2.5m Side Setback

    2.0m Side Setback

    1.5m Side Setback

    Notes

    Note that two roof options have been provided in order to allowTenderer's to separate the costs for both options. The two options areas follows:- Roof Option A on A02.05: This option incorporates a roof to the entirityof all three first floor walkways with all columns shown on plansincluded.- Roof Option B on A02.06: This option does not incorporate a roof tothe first floor walkways. A portion of roof is included which extends overthe first floor unit entries as shown, which is to include the necessarycolumns.

    Note that documentation throughout based on 'Roof Option A'.

    Refer to Hydraulic Documentation for further information regarding roofdrainage.

    Refer to A03 Drawing series for further information regarding roofdimensions.

    Note that location of aerials to be approved by Architect prior toinstallation.

    H

    A 18.09.17 Preliminary Issue to ConsultantsB 28.09.17 Preliminary 60% DD Issue to Consultants.

    Preliminary Issue to Consultants - Roof over elevated walkways adjusted. Pedestrian entry roof adjusted to match Landscape base.C 04.10.1706.10.17 60% Design Development Issue to Client.D24.10.17 Preliminary Issue to Consultants - Gutter and Downpipe locations shown. Roof over walkway adjusted slightly.E N

    DHPW Feedback Issue to Consultants - Some BRS1 (hit and miss) changed to BRS3 (solid brick wall). Covered Walkway roof stepdowns noted.10.11.17F

    SEPARABLE PORTION - Roof Option A

    G Preliminary 100% Issue to Consultants - Building extent below rooves shown dashed. General Notes added.01.12.1715.12.17 100% DD Issue to Client - Contract Documentation.H

  • Rev Date Description Drawing TitleProject

    Revision

    Drawing No.

    Project No.Notes

    CD.A03.01

    1709

    Date

    17 - 21 Garfield Road,Woodridge Qld 4114

    December 2017

    Department of Housing &Public WorksHHS HPW 2017 - 006

    Logan Youth Foyer Building 1 Plans,Sections & Elevations

    07 5

    471

    0340

    07 5

    471

    0343

    0418

    876

    394

    0412

    127

    904

    info

    @ba

    rkde

    sign

    .com

    .au

    ww

    w.b

    arkd

    esig

    n.co

    m.a

    u

    Tel

    epho

    neF

    acsi

    mile

    Ste

    ve G

    uthr

    ieLi

    ndy

    Atk

    inE

    mai

    lW

    eb

    Bar

    k D

    esig

    n A

    rchi

    tect

    s

    Que

    ensl

    and

    A

    ustr

    alia

    456

    7P

    O B

    ox 1

    355

    Noo

    sa H

    eadsUse figured dimensions

    in preference to scale. Alldimensions to be varifiedand checked on site.These designs,drawings,specifications and thecopyright thereof are theproperty of Bark DesignPty Ltd and must not beused, retained or copiedwithout the writtenauthority of Bark DesignPty Ltd. 3668 (SG)3664 (LA)

    Registration No.Architects

    RAIA Member 28409

    Scale 1:100 @ A1

    Contract Documentation - Not for Construction

    Approved By: LA, SG

    Drawn By: MR

    39.80

    W12

    D01

    +39,300

    +39,300

    01

    02

    03

    04 Bth J1A12.01

    01

    02 Ktn J1A12.01

    01

    02

    Cpd J1A12.01

    W04

    W03

    W02

    D04

    F

    C/OV

    D03

    MeetingRoom

    VF1

    Unit 26Office

    51m2FFL 39.300

    VF1

    Unit 25Office

    51m2FFL 39.300

    VF1

    Awn Above

    BalconyAbove

    Aw

    n A

    bove

    Aw

    n A

    bove

    TerraceFFL 39.300

    AC

    BathVF1

    Aw

    n A

    bove

    Aw

    n A

    bove

    Refer to LandscapeDocumentation for

    Terrace PavingLayout

    TerraceFFL 39.300

    Refer to LandscapeDocumentation for

    Terrace PavingLayoutBalconyAbove

    P

    Roof Above

    Refer to A10.01 forStair and Walkway1 Documentation.

    Note: VF1 tocontinue underKitchen Joinery

    WMS

    SSHR

    Stair Above

    1

    A

    2 3

    B B

    C C

    W11

    W10

    W01

    W05D05

    W07

    W08

    W09

    W06 D06

    D02

    1,78

    02,

    220

    12,2

    203,

    797

    4,925 4,995

    2801,4752,170230850270

    8502302,1701,395280

    10,800600

    4,00

    010

    ,000

    2,90

    023

    050

    1,57

    01,

    055

    920

    560

    1,81

    087

    52,

    650

    280

    2,55

    035

    028

    03,

    415

    110

    3,40

    011

    02,

    405

    280

    280 3,300 110 6,230 280

    5,0051905,00510355102,650765850

    2301907508503,405685350

    270 2,890 90 1,675 350 4,655 270

    10,0

    001,

    500

    750

    280

    2,65

    01,

    590

    2,65

    074

    01,

    810

    280

    600

    280

    9,44

    028

    04,

    425

    5,01

    5

    7523

    0

    HWUUnder Sink

    Ktn J1

    BW2

    BP1

    DBC1

    Bth J1

    SHST

    Cpd J1

    RHAbove

    BW1

    BRS3

    DBC1

    BW2

    BP1

    BRS1

    DBC1

    BP1

    Plumbing Stackwithin Cpd

    GD

    GD

    DBC1BRS3

    1 in 33 fallto landingaway fromentry door.

    DP DP

    DP

    DP

    DP

    WC2

    CD

    SM

    Irrigation ControllerExact Location TBCon SiteRefer LandscapeDocumentation

    AA03.01

    AA03.01

    CA03.01

    CA03.01

    BA03.01

    BA03.01

    DA03.01

    DA03.01

    NorthA03.01

    SouthA03.01

    WestA03.01

    EastA03.01

    D42

    W51D45

    W52 D46

    D43

    D44

    D49

    D48

    D47

    D-33A07.01

    12,2

    203,

    797

    4,00

    010

    ,000

    2,90

    094

    523

    011

    01,

    810

    680

    2,65

    01,

    590

    2,65

    028

    02,

    550

    350

    785

    160

    260

    1,89

    011

    03,

    220

    110

    4,29

    411

    63,

    694

    600

    7523

    0

    350

    750

    116

    3,69

    460

    011

    03,

    220

    110

    1,89

    026

    0

    2,10

    01,

    120

    2,10

    01,

    120

    100

    50110

    5014

    0

    1,02

    51,

    250

    1.450

    4,100

    1,350

    4,050

    3,64

    076

    0

    +42,300

    +42,300

    W56

    W48

    W49

    F

    F

    C/OV

    C/OV

    1

    A

    2 3

    B B

    C C

    BalconyFFL 42.280

    12.9m2, Conc1

    Unit 2851m2

    FFL 42.300VF1

    Unit 2751m2

    FFL 42.300VF1

    20mmStep

    20mmStep

    BalconyFFL 42.280

    11.9m2, Conc1

    BedVF1

    Bath /LdryVF1

    Bath /LdryVF1

    BedVF1

    P

    P

    Awn Above

    Aw

    n A

    bove

    Aw

    n A

    bove

    Aw

    n A

    bove

    Aw

    n A

    bove

    Refer to A10.01 forStair and Walkway1 Documentation.

    Note: VF1 tocontinue under

    Ktn Joinery.

    WM

    S S

    S

    S

    SSWM

    SHR

    SHR

    SM

    SM

    RRVAbove

    RRVAbove

    W50

    W53

    W54

    W55

    4,925 4,995

    250 1,425 2,170 230 850350

    850 230 2,170 1,425 250

    85910,200900

    3,555 110 1,000 350 1,000 110 3,5556002,955

    1,50

    010

    ,000

    4,40

    01,

    100

    270

    2,65

    01,

    600

    2,65

    068

    01,

    870

    280

    600

    5,0051905,0051,027600 4,005 920

    80 190 230850 3,925 600

    3,555 1,655 1,900

    2,955600

    4,665 350 4,665

    AA03.01

    AA03.01

    CA03.01

    CA03.01

    BA03.01

    BA03.01

    DA03.01

    DA03.01

    NorthA03.01

    SouthA03.01

    WestA03.01

    EastA03.01

    HWUUnder Sink

    HWUUnder Sink

    Ktn J3

    SB

    RHAbove

    CpdJ2

    WC

    Bth J3BW1

    Cpd J2

    Ktn J3 SB

    RHAbove

    Bth J3

    BW2

    BP1

    BW1

    DBC1

    BW2

    Bal1

    Bal2

    Bal1

    Bal2

    BW3 Upstand

    BW3 Upstand

    BP1

    BRS1

    CD

    DBC1

    BP1

    BRS3

    BRS3

    Bal4100mm gap inBW3 fordrainage.

    SC1

    SC1

    SC1

    SC1

    SC1

    SC1DP DP

    DP

    DPDPWC

    SHSC

    SHSC

    CD

    3,00

    02,

    400

    2,40

    060

    02,

    050

    W07

    W53

    W54

    W08W09

    W55

    FFL39.300

    FFL42.300

    CFC1

    DBC1

    BV1

    BW2

    BW3BW3

    BW2

    B AFRS1 5° Slope

    Bal 2

    BW3Upstand

    Bal1

    Awn

    SC1

    RS1 5°Slope

    BP1

    BP1

    RRV

    CFC1 SheetJoins Dashed

    BRS3 BRS1

    Bal 2

    Bal1

    GU

    DP

    RRV

    FSC

    SC1AwnAwn

    Awn Awn

    GU

    3,00

    02,

    400

    2,40

    060

    02,

    050

    D06 D05

    D45D46

    FFL39.300

    FFL42.300

    CFC1

    DBC1

    BW3 BW3

    CFC1

    DBC1

    3 2 1

    SC1

    Bal 2

    Bal 1

    BRS3

    RS1 5°Slope

    Awn

    SC1

    CFC1 Horizontal SheetJoin across entirelength of wall to line upwith door head

    CFC1 VerticalSheet Joins Dashed

    BPBP

    Awn

    RRV

    FSC

    BW2

    Bal 1

    Bal2

    3,00

    02,

    050

    2,40

    060

    0

    W11 W10W01

    D42

    W56

    FFL 39.300

    FFL 42.300

    CFC1

    BV1

    DBC1

    BW2

    DBC1

    BV1

    1 2 3RS1 5°Slope

    Bal3

    BRS3

    RS1 5°Slope

    BP1

    RRV

    CFC1 VerticalSheet JoinsDashed

    RRV

    FSC FSC

    DP

    GU DP

    GUDP

    behind

    SC1

    Awn

    Awn

    3,00

    02,

    400

    2,40

    060

    02,

    050

    D01

    W04

    W50W48

    D49

    W49

    W03 D04 W02

    FFL39.300

    FFL42.300

    CFC1

    BV1

    DBC1

    BW2

    BW2

    BW2

    A B

    RS1 5°Slope

    SC1

    RS1 5°Slope

    BW3Upstand

    Bal4

    BRS1

    BP1

    HR

    BP1

    RRV

    CFC1 Vertical SheetJoins Dashed

    RRV

    AwnAwn

    AwnAwn

    SC1

    SC1 Bal3

    DP Stair 1

    DP

    GUGU

    SC1

    GU

    D-01A06.01

    D-02A06.01

    D-03A06.01

    D-04A06.01

    D-05A06.01

    D-06A06.01

    D-14A06.01

    D-15A06.01

    D-35A06.02

    D-28A06.02

    3,00

    02,

    400

    2,40

    060

    02,

    050

    1,02

    0

    670

    D01W07D05

    D03

    D45

    D43D44

    D49

    D02

    FFL39.300

    FFL42.300

    Unit 27 Bed

    Unit 25MeetingRoom

    Bath

    PB3

    PB3 PB1

    PB1

    PBWA

    PBWA

    BW2

    BW2

    BW2

    BW2Bath/Ldry

    CPD

    CPD

    A BF

    TS1

    RS1 5°Slope

    Bal1BW3

    Upstand

    RRV

    BW2

    Stair 1

    Conc1

    RS1

    RS1 5°Slope

    Bal3

    Note: Min.2100mmhigh atPitchingPoint

    Note: Min.2400mm high at

    Pitching Point

    HR

    DP

    GU

    DBC1

    BV1DP

    GU

    DBC1

    TS2

    TS2

    Bal3HR

    TS2

    TS2

    RRV

    PB1

    CPD

    SB Bal3

    TS1

    D-07A06.01

    D-08A06.013

    ,000

    2,40

    02,

    400

    600

    2,05

    0

    W11W11

    W07

    W10

    W04

    W53

    D42W56

    W50

    FFL 39.300

    FFL 42.300

    Unit 28 Unit 27

    Unit 26Office

    Unit 25Office

    Awn

    Awn

    PB1

    PB2

    SBSB

    PB1

    PB2

    PB1

    SB

    PB1

    3 2 1

    BP1

    RS1 5°Slope

    TS1

    BRS3

    DBC1

    TS1

    RRVRS1 5°

    Slope

    DBC1

    BV1BV1

    Awn

    AC

    FSCFSC

    BW1

    PB3

    Awn

    D-09A06.01

    3,00

    02,

    400

    2,40

    060

    02,

    050

    1,02

    0

    670

    D01

    W10

    D06D03

    D46D48 D47

    FFL39.300

    FFL42.300

    Unit 28BedBath/Ldry

    Unit 26Office

    Awn

    AwnPBWA PB1

    PB3

    PB3 PB1

    BW2

    BW2

    BW2

    BW3 BW3

    CPD

    PB1

    B A

    RS1 5°Slope

    RRV

    Bal2

    Bal1

    BW3Upstand

    BRS1

    BP1

    CD

    SC1

    BRS1

    RRVNote: Min.2400mm high atPitching Point

    FSC

    CDBP1

    Bal2Bal1

    GU

    DP

    DBC1

    BV1

    GU

    DBC1

    TS1

    DP

    WMUnderBench

    D-10A06.01

    3,00

    02,

    400

    2,40

    060

    02,

    050

    W11W10

    D03

    W01

    D42

    D44

    W56

    W49

    D04

    FFL39.300

    FFL42.300

    Awn

    Unit 28Bed

    Unit 27Bed

    Unit 26Office

    MeetingRoom

    Awn

    PB1 PB1 PB1 PB1

    PB1PB1

    PB2PB2

    PB1

    3 2 1

    RS1 5°Slope

    RS1 5°Slope

    DBC1

    BRS3

    BP1

    TS1

    BV1

    DBC1

    BW1

    BV1

    TS2

    TS2

    TS2

    Awn

    TS1

    AwnPB3

    CPD

    PB1

    2500

    H PB

    2500H PB 250

    0H P

    B2

    2500H PB2

    2500H PB2

    2800H P1

    2800H P1

    Awn

    Aw

    nA

    wn

    Aw

    nA

    wn

    Rob

    e

    MeetingRoom

    Unit 26Office

    Unit 25Office

    Terrace

    Bath

    TerraceKtnJoinery

    2400HPB

    BHD

    AC

    AC

    AC

    2400HPB2 BHD

    Undersideof Balcony

    Undersideof Balcony

    RakingPB25°

    Raking PB25°

    RakingPB25°

    RakingPB25°

    RakingCFC2

    RakingCFC2

    RakingPB25°

    Raking PB25°

    Awn

    Aw

    nA

    wn

    Aw

    nA

    wn

    Rob

    e

    Rob

    e

    Balcony

    Unit 28

    Unit 27

    Balcony

    Bed

    Bath / Ldry

    Bed

    Bath / Ldry

    2400HPB2 BHD

    2400HPB2 BHD

    KtnJoinery

    2400HPB2 BHD

    KtnJoinery

    2400HPB2 BHD

    Undersideof Roof

    RRVVent

    RRVVent

    Building 1 - Ground Floor Plan1:100

    Building 1 - First Floor Plan1:100

    Building 1 - East Elevation1:100A03.01

    Building 1 - North Elevation1:100A03.01

    Building 1 - South Elevation1:100A03.01

    Building 1 - West Elevation1:100A03.01

    Building 1 - Section A1:100A03.01

    Building 1 - Section B1:100A03.01

    Building 1 - Section C1:100A03.01

    Building 1 - Section D1:100A03.01

    Building 1 - Ground Floor RCP1:100

    Building 1 - First Floor RCP1:100

    A 26.09.17 Preliminary Issue to ConsultantsB 28.09.17 Preliminary 60% DD Issue to Consultants.

    G

    06.10.17 60% Design Development Issue to Client. A/C units shown on RCP. Plumbing stack moved to cupboard. Grid lines shown on elevations and sections.C

    NE DHPW Feedback DD Issue to Consultants - Comcork flooring changed to Vinyl. PWD vanity drawers reduced in depth. 100mm gap added betweenBW3 upstand and BW2 party wall to allow drainage to east balconies.

    10.11.1719.10.17 Preliminary issue to Electrical & Mechanical Consultants.D

    Preliminary 100% DD Issue to Consultants - References updated. Down pipes noted. All Bathrooms re-arranged to include a separate Laundry tub.Door & Window numbers updated. Joinery numbers updated.

    A02.01

    A02.01 A02.04

    A02.04

    F 01.12.17

    15.12.17 100% DD Issue to Client - Contract Documentation.G

  • Rev Date Description Drawing TitleProject

    Revision

    Drawing No.

    Project No.Notes

    CD.A03.02

    1709

    Date

    17 - 21 Garfield Road,Woodridge Qld 4114

    December 2017

    Department of Housing &Public WorksHHS HPW 2017 - 006

    Logan Youth Foyer Building 2 Plans,Sections & Elevations

    07 5

    471

    0340

    07 5

    471

    0343

    0418

    876

    394

    0412

    127

    904

    info

    @ba

    rkde

    sign

    .com

    .au

    ww

    w.b

    arkd

    esig

    n.co

    m.a

    u

    Tel

    epho

    neF

    acsi

    mile

    Ste

    ve G

    uthr

    ieLi

    ndy

    Atk

    inE

    mai

    lW

    eb

    Bar

    k D

    esig

    n A

    rchi

    tect

    s

    Que

    ensl

    and

    A

    ustr

    alia

    456

    7P

    O B

    ox 1

    355

    Noo

    sa H

    eadsUse figured dimensions

    in preference to scale. Alldimensions to be varifiedand checked on site.These designs,drawings,specifications and thecopyright thereof are theproperty of Bark DesignPty Ltd and must not beused, retained or copiedwithout the writtenauthority of Bark DesignPty Ltd. 3668 (SG)3664 (LA)

    Registration No.Architects

    RAIA Member 28409

    Scale 1:100 @ A1

    Contract Documentation - Not for Construction

    Approved By: LA, SG

    Drawn By: MR

    40.33

    W21

    W23

    W22

    W19W20

    D16

    D07

    W14

    W13

    W12

    W15

    D11

    W17

    W18

    W16

    D12

    D10

    D08

    D09

    D15

    D13

    D14

    D-30A07.01

    C/OV

    +39,800

    +39,230

    +39,230

    +39,230

    C/OV

    C/OV

    F

    F

    FBedVF1

    BathVF1

    Unit 3051m2

    FFL 39.230VF1

    Unit 2951m2

    FFL 39.230VF1

    AwnAbove

    Balcony Above

    Balcony Above

    BathVF1

    TerraceFFL 39.230

    Aw

    n A

    bove

    P

    BedVF1

    TerraceFFL 39.230

    Refer to LandscapeDocumentation for

    Terrace PavingLayout

    Refer to LandscapeDocumentation for

    Terrace PavingLayout

    Note: VF1 tocontinue under

    Ktn Joinery.

    Refer to A10.02& A10.03 for

    Stair andWalkway 2 & 3Documentation.

    P

    WM

    WM

    P S

    SS

    SS

    S

    SHR

    SHR

    4 5 6

    F F

    G G

    D-29A07.01

    4,925 4,995

    12,2

    202,

    900

    10,0

    001,

    100

    350

    750

    280

    1,81

    01,

    150

    2,65

    01,

    180

    2,65

    028

    02,

    550

    350

    280

    2,10

    011

    03,

    400

    110

    3,72

    028

    0

    2302301,8102,7351904,7752302309,740230600

    280 3,335 110 1,200350

    1,200 110 3,335 280

    4,18

    0

    600 10,200 600

    230 1,445 2,170 230 85080 190 80

    850 230 2,170 1,445 230280 4,645 350 4,645 280

    6004,045

    12,8

    0035

    075

    028

    02,

    650

    1,18

    02,

    650

    3,24

    01,

    350

    350

    4,40

    028

    03,

    720

    110

    3,40

    011

    02,

    100

    280

    600

    1,30

    02,

    100

    3,12

    060

    02,

    100

    1,30

    092

    011

    01,

    070

    2,5751106501101106501102,575

    920

    110

    1,07

    011

    0

    HWUUnderSink

    HWUUnder Sink

    Cpd J2

    Ktn J2

    WC

    Bth J2

    Bth J2

    Cpd J2

    Ktn J2

    BW2

    BW1

    SB

    PlumbingStack

    within Cpd

    PlumbingStack withinCpd

    BP1

    BRS3

    DBC1

    BW2

    BP1

    BRS1

    BRS3

    BP1

    BRS3

    BP1

    1 in 33 fallto landingaway fromentry door.

    DSB DP

    DP DP

    RHAboveSB

    RHAbove

    WC

    SM

    SM

    SHSC

    SHSC

    DP

    CD

    CD

    AA03.02

    AA03.02

    CA03.02

    CA03.02

    BA03.02

    BA03.02

    DA03.02

    DA03.02

    SouthA03.02

    WestA03.02

    NorthA03.02

    EastA03.02

    D57

    W60D53

    W61 D54

    D55

    D56

    D-33A07.01

    1,12

    02,

    100

    +42,230

    +42,230

    C/OV

    W68

    W67

    D51

    D52

    W63

    F

    F

    F

    C/OV

    C/OV

    W66

    W65 W64

    W59

    W62

    W57

    W58

    4 5 6

    F F

    G G

    Balcony12.9m2

    FFL 42.210Conc1

    Unit 3251m2

    FFL 42.230VF1

    Unit 3151m2

    FFL 42.230VF1

    20mmStep

    20mmStep

    Balcony11.9m2

    FFL 42.210Conc1

    BedVF1

    Bath / LdryVF1

    BedVF1

    Bath / LdryVF1

    Aw

    n A

    bove

    Aw

    n A

    bove

    Refer to A10.02& A10.03 for

    Stair andWalkway 2 & 3Documentation.

    Note: VF1 tocontinue under

    Ktn Joinery.

    P

    P

    WM

    WM

    S S

    S

    S

    SS

    SHR

    SHR

    RRVAbove

    RRVAbove

    D50

    W55

    D-34A07.01

    12,2

    20

    4,925 4,99590010,200900

    600 230 1,445 2,170 230 85080 190 70

    860 230 2,170 1,445 230 600260 4,665 350 4,665 260

    2603,5551101,000350

    1,0001103,555260

    2,90

    010

    ,000

    1,10

    035

    075

    034

    01,

    810

    680

    2,65

    01,

    600

    2,65

    027

    02,

    550

    350

    2,15

    011

    03,

    220

    110

    4,29

    411

    62,

    000

    3,69

    460

    01,

    120

    2,10

    0

    350

    750

    270

    2,65

    01,

    600

    2,65

    02,

    830

    116

    4,29

    411

    03,

    220

    110

    1,89

    026

    060

    04,

    400

    3,69

    460

    0

    2301,8101,65585023019080

    9203,7758301,6551,00090030 1,000

    100

    AA03.02

    AA03.02

    CA03.02

    CA03.02

    BA03.02

    BA03.02

    DA03.02

    DA03.02

    SouthA03.02

    WestA03.02

    NorthA03.02

    EastA03.02

    HWUUnder Sink

    HWUUnder Sink

    Ktn J3

    SB

    RHAbove

    Cpd J2

    WCBth J3

    Cpd J2

    Ktn J3 SB

    RHAbove

    WCBth J3

    BW2

    BW1

    BP1

    DBC1

    BW2

    Bal1

    Bal2

    Bal1

    Bal2

    BW3 Up stand

    BW3Upstand

    BP1

    BRS1CD

    BRS3

    BP1

    BRS3

    BP1

    BRS3

    Bal4

    100mm gap inBW3 fordrainage.

    SC1

    SC1

    SC1

    SC1

    SC1

    SC1

    DP DP

    DP DP

    SM

    SM

    CD

    3,00

    02,

    400

    600

    2,05

    02,

    400

    W62

    W63

    W17W18

    FFL39.230

    FFL42.230

    CFC1

    DBC1

    BV1

    BW2

    BW3BW3

    BW2

    Stair 2

    G FK

    CFC1 SheetJoins Dashed

    RS1 5°Slope

    Bal 2

    BW3Upstand

    Bal1

    SC1

    RS1 5°Slope

    BP1

    BP1

    RRV

    BRS3 BRS1

    Bal 2

    Bal1

    RRV

    FSC

    AwnAwn

    Awn

    HR

    Bal3

    BP1

    BRS1

    Bal3

    SC1

    HR

    3,00

    02,

    400

    2,40

    060

    02,

    050

    W16 W15

    D53D54

    D12 D11

    FFL39.230

    FFL42.230

    CFC1

    DBC1

    BW3 BW3

    CFC1

    DBC1

    6 5 4CFC1 VerticalSheet Joins Dashed

    SC1

    Bal 2

    Bal 1

    RS1 5°Slope

    Awn

    SC1

    CFC1 Horizontal SheetJoin across entire

    length of wall to line upwith door head

    BP

    BP

    Awn

    RRV

    FSC

    BW2

    Bal 1

    Bal2

    Awn

    Awn

    Bal3HR

    3,00

    02,

    050

    2,40

    060

    0

    D50 W65

    W19

    W64

    W20D07

    FFL39.230

    FFL42.230

    CFC1

    BV1

    DBC1

    DBC1

    BV1

    DBC1

    CFC1

    4 5 6RS1 5°Slope

    RS1 5°Slope

    BP1

    RRVRRV

    FSC FSC

    DP

    GU DP

    GU

    DP

    Awn

    BW2

    HR

    Awn

    Awn

    DPSCR1

    BRS3

    Awn

    Awn

    3,00

    02,

    400

    2,40

    060

    02,

    050 W59

    D57W58

    W57

    D16W14

    W13W12

    FFL39.230

    FFL42.230

    CFC1

    BV1

    DBC1

    BW2

    BW2

    BW2

    F K G

    CFC1 Vertical SheetJoins Dashed

    RS1 5°Slope

    SC1

    RS1 5°Slope

    BW3Upstand

    Bal4

    BRS1

    BP1

    BP1

    RRV RRV

    AwnAwn

    AwnAwn

    DP

    GUGU

    SC1

    SCR1

    BRS3

    GUDP

    G

    3,00

    02,

    400

    2,40

    060

    02,

    050

    1,02

    0

    670

    D11

    W59W57

    W58

    W14W13

    W12

    FFL39.230

    FFL42.230

    Unit 29Living

    Unit 31LivingBed

    Bath/Ldry

    Bath/Ldry

    PB1

    PBWA PB1

    PB1

    LWA

    LWA

    BedPBWA

    F

    RS1 5°Slope

    RS1

    Bal1

    BW3Upstand

    CD

    Bal2

    SC1

    BRS3

    Note: Pitching Pointdictated by CoveredWalkway 2 PitchingPoint.

    BP

    DBC1DP

    BV1

    GU CD

    BP1

    BRS1

    TS2PB1

    CPD

    SB

    C/OV

    TS2SHSC

    SHSC

    TS1

    D53

    3,00

    02,

    400

    2,40

    060

    02,

    050

    W62

    D50W65

    W20 D07

    W17

    FFL39.230

    FFL42.230

    Unit 29Unit 30

    Unit 31Unit 32

    PB1

    PB2

    PB1

    PB2

    SB SB

    PB1

    SCR1

    SBSB

    PB1

    CPD

    PB1 PB1CPD

    PB1

    CPD

    PB1

    CPD

    PB1

    CPD

    6 5 4

    RS1 5°Slope

    TS1

    DBC1

    RRVRS1 5°

    Slope

    SC1

    Bal3

    Awn

    Awn

    AwnAwn

    BW2

    HR

    RS1 5°Slope

    Stair 2

    Bal3

    3,00

    02,

    400

    2,40

    060

    02,

    050

    1,02

    0

    670

    D54

    D12

    D55D56

    D15 D13

    FFL39.230

    FFL42.230

    Unit 30

    Unit 32BedBath/Ldry

    Bath

    PB1

    BW2

    PBWA

    BW2

    BW2

    PB3

    PB3PBWA

    BW3 BW3

    CPD

    Bed

    CPDPB1MR

    G F

    RS1 5°Slope

    RRV

    Bal2

    Bal1

    BW3Upstand

    BRS1

    BP1CD

    SC1

    SC1

    Awn

    Awn

    Note: Min.2100mm high

    at PitchingPoint

    SCR1

    GU