container ship construction. objectives explain the container carrying vessel construction explain...
TRANSCRIPT
Container Ship Container Ship ConstructionConstruction
ObjectivesObjectives
►Explain the container carrying vessel Explain the container carrying vessel constructionconstruction
►Name and identify the basic Name and identify the basic constructional features of a cargo constructional features of a cargo vesselvessel
►Explain the dimensions of vessels Explain the dimensions of vessels and their useand their use
► Identify the five main types of Identify the five main types of container vesselscontainer vessels
Why learning about Why learning about container ship container ship constructionconstruction
►11 To plan loading and To plan loading and dischargedischarge
►22 To know the working To know the working environmentenvironment
►33 To ensure safety and To ensure safety and securitysecurity
Construction Knowledge for Construction Knowledge for PlanningPlanning
►For berth allocationFor berth allocation
►For resource allocationFor resource allocation
►For schedulingFor scheduling
►For estimating performanceFor estimating performance
Knowing the Work Knowing the Work EnvironmentEnvironment
►Where are the work locations?Where are the work locations?►How are the work locations to be How are the work locations to be
reached?reached?►What work will be required?What work will be required?►How will the containers be handled?How will the containers be handled?►What gear, clothing and equipment What gear, clothing and equipment
will be needed ?will be needed ?
Ship Construction and SafetyShip Construction and Safety
►What safety precautions might be What safety precautions might be neededneeded
►What emergency procedures should What emergency procedures should be preparedbe prepared
►Where are emergency gear and Where are emergency gear and equipment keptequipment kept
►Which are the safe emergency escape Which are the safe emergency escape routesroutes
Panama Canal Panama Canal
Maximum SizeMaximum Size
32.26 meter32.26 meter
Plimsol merkPlimsol merk
Dead WeightDead Weight
Total weight that can be Total weight that can be carriedcarried
in tonnesin tonnes
Gross TonnageGross Tonnage
Total volume of all enclosed Total volume of all enclosed spaces in tonnesspaces in tonnes
Net TonnageNet Tonnage
Total volume of cargo spacesTotal volume of cargo spaces
in tonnesin tonnes
Container Carrying Container Carrying CapacityCapacity
In twenty feet equivalents In twenty feet equivalents unitsunits
TEUTEU
Size, Type and Design Size, Type and Design SelectionSelection
►Traffic volumeTraffic volume►Container / Bulk / General cargo / mixed / Container / Bulk / General cargo / mixed /
CarCar►Port equipment and technologyPort equipment and technology►Water depthWater depth►Channel widthChannel width►Berth LengthBerth Length►Air draftAir draft
Stowage Ro-Ro OperationsStowage Ro-Ro Operations► ProblemsProblems
Limited stacking Limited stacking heightheight
Labour- intensiveLabour- intensive Safety risksSafety risks Range of Range of
equipment equipment neededneeded
Space utilization Space utilization not highnot high
► BenefitsBenefits Cargo can be pre-Cargo can be pre-
laded onto laded onto cassettes/flatrackscassettes/flatracks
Can handle Can handle vehicles quicklyvehicles quickly
Heavy lifts and Heavy lifts and awkward loads are awkward loads are easily easily accommodatedaccommodated
Vessels can be Vessels can be handled at berths handled at berths and terminals and terminals without craneswithout cranes