S a n d i a N a t i o n a l L a b o r a t o r i e s. February 23, 2011. Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System Final Design Review. Matt Christison, Scot Lewis. Concept of Operations. Pre-SNM (Today). Concept of Operations. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/1.jpg)
Continual Improvements on Preparationfor SNM Experiments on Z
Contamination Control SystemFinal Design Review
Matt Christison, Scot Lewis
February 23, 2011
S a n d i a N a t i o n a l L a b o r a t o r i e s
![Page 2: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/2.jpg)
Concept of Operations
Pre-SNM (Today)
![Page 3: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/3.jpg)
Top Tent main section is installed
SNM Shot hardware is installed
SNM Bottom Lid is installed
(no cap installed)
Concept of Operations
Bottom tent installed
SNM Top Lids installed
![Page 4: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/4.jpg)
Flat Lid installed with tent in place(there are 2 configurations of the lid)
SHOT
Concept of Operations Removable “sunroof” interfaces to lid using Velcro
![Page 5: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/5.jpg)
Top tent completed
Top Air Sample Top Cryo Swipes
Bottom Air Sample
To Blowers
Concept of Operations
Bottom Side Entry and Swipes
![Page 6: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/6.jpg)
To Blowers
Top SNM Lids Removed
Top Area Swipes
Concept of Operations
Modified Top Tent Lid Installed
Survey Results: All Clear
Removable “sunroof” Replaced with Tent Sleeve(swap “sunroof” out on Highbay floor)
![Page 7: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/7.jpg)
To Blowers
Inner Sleeve Installed
Concept of Operations
Modified Top Tent Sleeve Unrolled and Taped to ECC
Survey Results: All Clear
Lifting Bridle Installed
![Page 8: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/8.jpg)
Concept of Operations
Primary is lifted and the underside is swiped
Floor liner is installed under Primary
![Page 9: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/9.jpg)
Survey Results: All Clear
Tent Removal can Commence
Concept of Operations
Tent Lid can be Removed
![Page 10: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/10.jpg)
Primary Bagged, and Removed to Separation Tent OR MBA Cage
Concept of Operations
Tent is designed to work using existing Primary bagout method if desired
![Page 11: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/11.jpg)
Center Section Returned to Pre-Shot Configuration
Concept of Operations
![Page 12: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/12.jpg)
New Pallet is Prepped in Separation Enclosure
ECC + Primary Assembly are hoisted to Separation Enclosure through ceiling
OR
Moved to Pallet, then hand trucked to MBA Cage
Concept of Operations
![Page 13: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/13.jpg)
Ceiling Port is closed (Velcro/Zipper)
ECC Sleeve is placed over Primary
Concept of Operations
*New cross members not shown
![Page 14: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/14.jpg)
(ECC Sleeve)
ECC is removed from UCC
Once UCC is Deemed Clean, Ceiling port is opened for UCC removal
Concept of Operations
UCC/ECC Swipes
*New cross members not shown
![Page 15: Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System](https://reader034.vdocument.in/reader034/viewer/2022051402/56815e43550346895dccb3a9/html5/thumbnails/15.jpg)
Separation Enclosure
Utility Door
Crane Access