cont.no. lttf 40 01 p pid 1209 hp separator p&id
TRANSCRIPT
A1
CHECKEDAMENDMENTS DRAWNREFERENCE DRAWINGS TITLEREF. DWGS NO.REF. DWGS NO. REFERENCE DRAWINGS TITLE DRAWNAMENDMENTS CHECKED
DRAWING NUMBERKOC DRG. No. REV.CONTRACTOR DRG. No. REV.
KOC APPROVALS
CONTRACTOR REVISION
ASHEET - OF -
PROJECT TITLE:
DRAWING TITLE:
PIPING & INSTRUMENTATION DIAGRAM
DATESIGNATURENAMEDESIGNATION - GROUP / TEAM
SHEET - OF -
- -
REV AMENDMENTS (KOC)APPRD. DATECHECKEDDRAWN
(GS)(GS)
A xxxxxxxxxxxxxxxxxx xxxx SN/NK xxxxxx
P.O.Box 46551, Fahaheel-64016, Kuwait.
xxxx
LTTF-40 LONG TERM SOUR WELL TESTING
CONTRACT No. xxxxxxxxxxxFACILITY, NORTH KUWAIT
xxxx
NOTE-23
NOTE-12
NOTE-9
NOTE-32
NOTES3,13,27&38
NOTE-42
NOTE-44
NOTE-44
NOTE-44
NOTE-44NOTE-44
NOTE-43
NOTE-44NOTE-12
NOTE-33
NOTE-33
HOLD NOTE-33
NOTES22 & 44
NOTE-16,17
NOTE
-7
NOTES22 & 44
NOTE-8
NOTE
-45
NOTE
47
NOTE 46
NOTE-48
1003FI
1003FQI
1003FY
1074TI
1070PI1067
PI
1001DPI
1069PIC
1001LI
1069TI
1002FYI
1002FQI
1003LIC
1001ZIC
1001UA
NOTE-32
DESIGN TEMP °C (°F)
OPERATING TEMP °C ( °F)OPERATING PRESSURE BARA ( PSIA)
DIAMETER mm ( inches )
DESIGN PRESSURE BARA ( PSIA)
LIQUID CAPACITY m³ / hr (BPD) : NORMALLENGTH mm ( inches )
MINIMUM MAXIMUM
GAS CAPACITY Sm³ / hr (MMSCFD) : NORMAL
MINIMUM MAXIMUM
MATERIALINSULATIONCODE
: SA516 - GR.60 HIC: NONE: ASME VIII DIV 1
: 73.4 (1065) : 43 to 59.90 (110 to 140)
: -29 to 93 ( -20 to 200)
2 PHASE HP SEPARATORLTTF-40-V-1-01
: 2743.2 (108)
: 86.18 (1250) : 420.7 (63509) : 12192 (480) : 126.21 (19052.7) : 483.8 (73035.35)
: 109928.5 (93) : 32978.55 (27.9) : 126417.78 (106.95)
1:20
0
1:20
0
1:200
1:200
1:200
HP SEPARATOR