A1 CHECKED AMENDMENTS DRAWN REFERENCE DRAWINGS TITLE REF. DWGS NO. REF. DWGS NO. REFERENCE DRAWINGS TITLE DRAWN AMENDMENTS CHECKED DRAWING NUMBER KOC DRG. No. REV. CONTRACTOR DRG. No. REV. KOC APPROVALS CONTRACTOR REVISION A SHEET - OF - PROJECT TITLE: DRAWING TITLE: PIPING & INSTRUMENTATION DIAGRAM DATE SIGNATURE NAME DESIGNATION - GROUP / TEAM SHEET - OF - - - REV AMENDMENTS (KOC) APPRD. DATE CHECKED DRAWN (GS) (GS) A xxxxxxxxxxxxxxxxxx xxxx SN/NK xxxxxx P.O.Box 46551, Fahaheel-64016, Kuwait. xxxx LTTF-40 LONG TERM SOUR WELL TESTING CONTRACT No. xxxxxxxxxxx FACILITY, NORTH KUWAIT xxxx NOTE-23 NOTE-12 NOTE-9 NOTE-32 NOTES 3,13,27&38 NOTE-42 NOTE-44 NOTE-44 NOTE-44 NOTE-44 NOTE-44 NOTE-43 NOTE-44 NOTE-12 NOTE-33 NOTE-33 HOLD NOTE-33 NOTES 22 & 44 NOTE-16,17 NOTE-7 NOTES 22 & 44 NOTE-8 NOTE-45 NOTE 47 NOTE 46 NOTE-48 1003 FI 1003 FQI 1003 FY 1074 TI 1070 PI 1067 PI 1001 DPI 1069 PIC 1001 LI 1069 TI 1002 FYI 1002 FQI 1003 LIC 1001 ZIC 1001 UA NOTE-32 DESIGN TEMP °C (°F) OPERATING TEMP °C ( °F) OPERATING PRESSURE BARA ( PSIA) DIAMETER mm ( inches ) DESIGN PRESSURE BARA ( PSIA) LIQUID CAPACITY m³ / hr (BPD) : NORMAL LENGTH mm ( inches ) MINIMUM MAXIMUM GAS CAPACITY Sm³ / hr (MMSCFD) : NORMAL MINIMUM MAXIMUM MATERIAL INSULATION CODE : SA516 - GR.60 HIC : NONE : ASME VIII DIV 1 : 73.4 (1065) : 43 to 59.90 (110 to 140) : -29 to 93 ( -20 to 200) 2 PHASE HP SEPARATOR LTTF-40-V-1-01 : 2743.2 (108) : 86.18 (1250) : 420.7 (63509) : 12192 (480) : 126.21 (19052.7) : 483.8 (73035.35) : 109928.5 (93) : 32978.55 (27.9) : 126417.78 (106.95) 1:200 1:200 1:200 1:200 1:200 HP SEPARATOR

Upload: sabareesh

Post on 20-Dec-2015

38 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: Cont.no. Lttf 40 01 p Pid 1209 Hp Separator p&Id

A1

CHECKEDAMENDMENTS DRAWNREFERENCE DRAWINGS TITLEREF. DWGS NO.REF. DWGS NO. REFERENCE DRAWINGS TITLE DRAWNAMENDMENTS CHECKED

DRAWING NUMBERKOC DRG. No. REV.CONTRACTOR DRG. No. REV.

KOC APPROVALS

CONTRACTOR REVISION

ASHEET - OF -

PROJECT TITLE:

DRAWING TITLE:

PIPING & INSTRUMENTATION DIAGRAM

DATESIGNATURENAMEDESIGNATION - GROUP / TEAM

SHEET - OF -

- -

REV AMENDMENTS (KOC)APPRD. DATECHECKEDDRAWN

(GS)(GS)

A xxxxxxxxxxxxxxxxxx xxxx SN/NK xxxxxx

P.O.Box 46551, Fahaheel-64016, Kuwait.

xxxx

LTTF-40 LONG TERM SOUR WELL TESTING

CONTRACT No. xxxxxxxxxxxFACILITY, NORTH KUWAIT

xxxx

NOTE-23

NOTE-12

NOTE-9

NOTE-32

NOTES3,13,27&38

NOTE-42

NOTE-44

NOTE-44

NOTE-44

NOTE-44NOTE-44

NOTE-43

NOTE-44NOTE-12

NOTE-33

NOTE-33

HOLD NOTE-33

NOTES22 & 44

NOTE-16,17

NOTE

-7

NOTES22 & 44

NOTE-8

NOTE

-45

NOTE

47

NOTE 46

NOTE-48

1003FI

1003FQI

1003FY

1074TI

1070PI1067

PI

1001DPI

1069PIC

1001LI

1069TI

1002FYI

1002FQI

1003LIC

1001ZIC

1001UA

NOTE-32

DESIGN TEMP °C (°F)

OPERATING TEMP °C ( °F)OPERATING PRESSURE BARA ( PSIA)

DIAMETER mm ( inches )

DESIGN PRESSURE BARA ( PSIA)

LIQUID CAPACITY m³ / hr (BPD) : NORMALLENGTH mm ( inches )

MINIMUM MAXIMUM

GAS CAPACITY Sm³ / hr (MMSCFD) : NORMAL

MINIMUM MAXIMUM

MATERIALINSULATIONCODE

: SA516 - GR.60 HIC: NONE: ASME VIII DIV 1

: 73.4 (1065) : 43 to 59.90 (110 to 140)

: -29 to 93 ( -20 to 200)

2 PHASE HP SEPARATORLTTF-40-V-1-01

: 2743.2 (108)

: 86.18 (1250) : 420.7 (63509) : 12192 (480) : 126.21 (19052.7) : 483.8 (73035.35)

: 109928.5 (93) : 32978.55 (27.9) : 126417.78 (106.95)

1:20

0

1:20

0

1:200

1:200

1:200

HP SEPARATOR