    Sri Lankan Engineering Society - BahrainProudly presents

    Contract Administration

    Foundation Course

    Why Should You Attend?

    The limited time of University / Polytechnic studyprogrammes and the necessity to deliver a vast

    amount of material essential to practice a discipline

    such as Quantity Surveying, Engineering, Architecture

    etc, do not allow for space to teach the

    errors/shortcomings in Standard Forms of Contract

    such as FIDIC, and the incorrect practices in the

    Industry, and therefore there is no choice other than to

    gain such rare knowledge from the industry experts, in

    order to identify the Best Practice.

    For registration, contact [email protected]

    or call Vijitha 39925026 Indika 33410210Wasantha 39172103

    th& 29thNovember 201430AM to 5PM

    Al Manzil Suites Hotel - Juffair

    mited Seats

    How much does it Cost?

    BD 160/- for both days (includi

    course materials, Lunch a

    refreshments)

    All participants successfu

    completing the course will receive

    certificate for 12 CPD hours.

    See the reverse for Course details

    ho is conducting ?e course has been structured and would be conducted by

    of. Indrawansa Samaratunga PhD, DScCS, FAIQS, FIQSSL, FCIArb, FCIOB, FCMI, FASI, FCABEth over 35 years of experience in the Middle Eastartered Surveyor, Chartered Manager, Chartered Construction

    nager,, Chartered Building Engineer, Chartered Quantity Surveyor

    bitrator / Mediator - London Court of International Arbitration

    bitrator / Expert - Dubai International Arbitration Centre, UAE

    nstruction Law & Dispute Resolution Advisory Board member

    the British University in Dubai

    Who Should Attend?Quantity Surveyors who wish to progress from their measuring / valu

    roles to administrate contracts such as dealing with variations and claim

    Final year undergraduates who wish to gain foundation knowledge

    FIDIC contracts and Contract AdministrationEngineers, Architects, Project Managers, Contract Manag

    Commercial Managers, Planners and other construction indu

    professionals who wish to have an introduction into administra

    Variations, Extension of Time & Prolongation Cost Claims, and Pro

    Cost Control etc

    In the future, there would be an Advanced Course for those who

    already practising Contract Administration, but they too are welcom

    brush up their foundation knowledge

    In collaboration with

    Sri Lankan Quantity

    Surveyors-UAE

    andDRSAM FZE

  • 8/10/2019 Contract Administration Course BAH

    2/2

    For registration, contact [email protected]

    or call Vijitha 39925026 Indika 33410210Wasantha 39172103

    1. Introduction to FIDIC Contracts -

    Understanding the terminology in FIDIC.

    People - relationships among various

    parties

    Documents used in different stages of the

    project

    Dates/Timescorrect usage

    Activitiescorrect meaning

    Moneyterminology related to price,

    payments etc. Pre-contract process.

    Project time-line (project process).

    2. Variations Explained

    Project Change Management.

    Understanding Clause 51.

    What can/cannot be instructed as

    variations.

    The Who, When, Which, Why, and How ofVariations.

    Engineers authority to instruct, and

    Contractors obligation to execute

    variations.

    Understanding the 10 Sub-Clauses in the

    Contract under which variations / varied

    work can arise.

    What are variations & what are varied

    work ?

    3. Valuation of Variations

    - Project Cost Management.

    Lump Sum type / Re-measurement type.

    Understanding Clause 52.

    Valuation of Variations

    Varying the rates/prices

    How rates/prices become inapplicable

    Provisional Sums & PC Rates

    4. Extension of Time & Prolongation Costs

    Project Time Management

    Understanding the 22 Sub-Clauses in the

    Contract from which entitlement to EOT

    could be inferred.

    Understanding the 21 Sub-Clauses in the

    Contract from which entitlement to

    prolongation costs could be inferred.

    How to identify the entitlement if contract is

    silent How to reserve the rights to EOT and Cost

    What is Concurrent Delay ?

    What is time-at-large ?

    5. The Claim - How to secure the rights

    Structure of the Claim

    What are Head Office Overheads and how

    are they claimed

    Hudson Formula Loss of productivity

    Calculation of EOT

    Calculation of Prolongation Costs

    6. Drafting the Contract Agreement

    Contract Law Terminology

    8 steps of drafting

    8 requirements of a legally binding contrac

    Definition of a Contract Incorporation of documents

    CONTRACT ADMINISTRATION FOUNDATION COURSE28th& 29thNovember 2014Kingdom of Bahrain

    At the end of each of the above 6 Sessions

    there would be time allocated for Questions

    & Answers, and also more time at the end

    of each day, if required.