CONTRACT ADMINISTRATION FOR CONSTRUCTION & ENGINEERING CONTRACTS

TRANSCRIPT

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    1/169

    IEM TRAINING CENTRE SDN. BHD.

    TWO DAY INTENSIVE COURSE ON

    CONTRACT ADMINISTRATION FOR

    CONSTRUCTION & ENGINEERING

    CONTRACTS

    Presented by: IR. HARBANS SINGH K.S.

    B.E. (Mech) SPORE, LLB (Hons) London

    CLP, DipICArb, C. Eng, PE.

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    2/169

    HSKS

    ABOUT THE COURSE PRESENTER

    Ir. Harbans Singh K.S.

    B.E. (Mech) Spore, LLB (Hons) London,

    CLP, DipICArb, P.E.,

    C. Eng., MIEM, MIMechE,MIHEEM, MASHRAE, MCIArb, MMIArb.

    Ir. Harbans Singh K.S. is a Professional and Chartered Engineer, Arbitrator,

    Adjudicator, Mediator, Advocate & Solicitor (non-practising). He commenced his

    career in Malaysia before working in Germany and then locally in various professional

    capacities. He is presently domiciled in Malaysia where he is active in construction

    law and dispute resolution. Ir. Harbans is the recipient of IEMs Tan Sri Hj. Yusoff

    Prize (2001), the Cedric Barclay and the Chartered Institute of Arbitrators Awards for

    the Diploma in International Commercial Arbitration Examination (Oxford 2003). He

    is also the author of a series of four books entitled Engineering & ConstructionContracts Management, coauthor of the book The PAM 2006 Standard Form of

    Building Contract, contributor to the Malaysian Standard Forms & Precedents:

    Construction & Engineering Contracts, The Ingenieur and the Malayan Law

    Journal.

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    3/169

    HSKS

    CONTRACT ADMINISTRATION FORCONSTRUCTION/ ENGINEERING CONTRACTS

    DAY 1 - PROGRAMME

    8.30 a.m. - 9.00 a.m. : Registration

    9.00 a.m. - 10.30 a.m. : Session 1

    10.30a.m. - 10.45a.m. : Tea/Coffee Break

    10.45 a.m. - 12.30 noon : Session 2

    12.30 noon - 1.00 p.m. : Q & A Session

    1.00 p.m. - 2.00 p.m. : Lunch Break

    2.00 p.m. - 3.15 p.m. : Session 3

    3.15 p.m. - 3.30 p.m. : Tea/Coffee Break

    3.30 p.m. - 4.45 p.m. : Session 4

    4.45 p.m. - 5.00 p.m. : Q & A Session

    5.00 p.m. : End of Day 1

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    4/169

    HSKS

    CONTRACT ADMINISTRATION FORCONSTRUCTION/ ENGINEERING CONTRACTS

    DAY 2 - PROGRAMME

    9.00 a.m. - 10.30 a.m. : Session 1

    10.30a.m. - 10.45a.m. : Tea/Coffee Break

    10.45 a.m. - 12.30 noon : Session 2

    12.30 noon - 1.00 p.m. : Q & A Session

    1.00 p.m. - 2.00 p.m. : Lunch Break

    2.00 p.m. - 3.15 p.m. : Session 3

    3.15 p.m. - 3.30 p.m. : Tea/Coffee Break

    3.30 p.m. - 4.45 p.m. : Session 4

    4.45 p.m. - 5.00 p.m. : Q & A Session

    5.00 p.m. : End of Course

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    5/169

    CONTENTS

    HSKS

    1.0 CONSTRUCTION/ENGINEERING CONTRACTS: INTRODUCTION

    2.0 COMMENCEMENT OF CONTRACT AT SITE

    3.0 MONITORING OF WORK PROGRESS

    4.0 SUPERVISION OF WORKS/CONTRACT ADMINISTRATION

    5.0 PAYMENTS/COMMERCIAL MATTERS

    6.0 VARIATIONS/CHANGES

    7.0 DELAY AND EXTENSION OF TIME

    8.0 NON-COMPLETION AND DAMAGES

    9.0 COMPLETION AND HANDING OVER

    10.0 DEFECTS

    11.0 POST COMPLETION AND FINAL ACCOUNT

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    6/169

    HSKS

    CONSTRUCTION/

    ENGINEERING CONTRACTS:INTRODUCTION

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    7/169

    HSKS

    1.0 CONSTRUCTION/ENGINEERING CONTRACTS: INTRODUCTION

    TYPES OF CONTRACTSTYPES OF CONTRACTSTYPES OF CONTRACTSTYPES OF CONTRACTS

    1. GENERAL CONTRACTS

    2. ENGINEERING/CONSTRUCTION CONTRACTS

    TYPES OF BUILDING CONTRACTSTYPES OF BUILDING CONTRACTSTYPES OF BUILDING CONTRACTSTYPES OF BUILDING CONTRACTS

    COMMON CONTRACT PROCUREMENT METHODSCOMMON CONTRACT PROCUREMENT METHODSCOMMON CONTRACT PROCUREMENT METHODSCOMMON CONTRACT PROCUREMENT METHODS

    1. TRADITIONAL GENERAL CONTRACTS

    2. MANAGEMENT TYPES

    3. PACKAGE DEAL TYPES

    4. MISCELLANEOUS METHODS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    8/169

    HSKS

    BASIC CONTRACT PRINCIPLESBASIC CONTRACT PRINCIPLESBASIC CONTRACT PRINCIPLESBASIC CONTRACT PRINCIPLES

    1. CONTRACT DEFINITIONS

    2. ELEMENTS OF CONTRACT

    3. STANDARD FORMS OF CONTRACT

    4. BREACH OF CONTRACT: REMEDIES

    MISCELLANEOUS ISSUESMISCELLANEOUS ISSUESMISCELLANEOUS ISSUESMISCELLANEOUS ISSUES

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    9/169

    HSKS

    FIG. 1-1: GENERAL CONTRACTS - TYPES

    SIMPLE

    CONTRACTSSPECIALITYCONTRACTS

    (DEED)

    MATERIAL& LABOUR

    CONTRACTS

    SUB-SUBCONTRACTS

    INDEPENDENTCONTRACTS

    MATERIAL SUPPLYCONTRACT

    LABOURCONTRACT

    COLLATERALCONTRACTS

    ORAL

    CONTRACTS

    EXPRESSCONTRACTS

    EMPLOYMENTCONTRACTS

    MAIN CONTRACTS

    SUB-CONTRACTS

    GENERAL

    CONTRACTS:

    TYPES

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    10/169

    HSKS

    ENGINEERING/CONSTRUCTION

    CONTRACTS:

    TYPES

    FIG. 1-2 : ENGINEERING/CONSTRUCTION CONTRACTS - TYPES

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    11/169

    HSKS

    FIG. 1-3 : TYPES OF CONTRACTS BASED ON PRICING MECHANISM

    TYPE OF CONTRACT

    LUMP SUMCONTRACTS

    LUMP SUMCONTRACTS

    COSTREIMBURSEMENT

    CONTRACTS

    COSTREIMBURSEMENT

    CONTRACTS

    LUMP SUM WITHPLAN AND

    SPECIFICATION

    LUMP SUM WITHPLAN AND

    SPECIFICATION

    LUMP SUM WITHBILLS

    OF QUANTITIES

    LUMP SUM WITHBILLS

    OF QUANTITIES

    COST PLUSFIXED FEE

    COST PLUSFIXED FEE

    COST PLUSPERCENTAGE

    COST PLUSPERCENTAGE

    COST PLUSFLUCTUATING FEE

    COST PLUSFLUCTUATING FEE

    TARGET COSTTARGET COST VALUE COSTVALUE COST

    MESUREMENTCONTRACTS

    MESUREMENTCONTRACTS

    BASED ONAPPROXIMATE

    QUANTITIES

    BASED ONAPPROXIMATE

    QUANTITIES

    BASED ON ASCHEDULE

    BASED ON ASCHEDULE

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    12/169

    HSKS

    TRADITIONALTRADITIONALTRADITIONALTRADITIONALGENERALGENERALGENERALGENERALCONTRACTTINGCONTRACTTINGCONTRACTTINGCONTRACTTING

    TRADITIONALTRADITIONALTRADITIONALTRADITIONALGENERALGENERALGENERALGENERALCONTRACTTINGCONTRACTTINGCONTRACTTINGCONTRACTTING

    MANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENTTYPETYPETYPETYPE

    MANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENTTYPETYPETYPETYPE

    TURNKEYTURNKEYTURNKEYTURNKEYTURNKEYTURNKEYTURNKEYTURNKEYENGINEERING, PROCUREMENT,ENGINEERING, PROCUREMENT,ENGINEERING, PROCUREMENT,ENGINEERING, PROCUREMENT,CONSTRUCTION & COMMISSIONINGCONSTRUCTION & COMMISSIONINGCONSTRUCTION & COMMISSIONINGCONSTRUCTION & COMMISSIONING

    ENGINEERING, PROCUREMENT,ENGINEERING, PROCUREMENT,ENGINEERING, PROCUREMENT,ENGINEERING, PROCUREMENT,CONSTRUCTION & COMMISSIONINGCONSTRUCTION & COMMISSIONINGCONSTRUCTION & COMMISSIONINGCONSTRUCTION & COMMISSIONING

    DESIGN & BUILD/DESIGN & BUILD/DESIGN & BUILD/DESIGN & BUILD/DESIGN & CONSTRUCTDESIGN & CONSTRUCTDESIGN & CONSTRUCTDESIGN & CONSTRUCT

    DESIGN & BUILD/DESIGN & BUILD/DESIGN & BUILD/DESIGN & BUILD/DESIGN & CONSTRUCTDESIGN & CONSTRUCTDESIGN & CONSTRUCTDESIGN & CONSTRUCT

    FASTFASTFASTFASTTRACKINGTRACKINGTRACKINGTRACKING

    FASTFASTFASTFASTTRACKINGTRACKINGTRACKINGTRACKING

    CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONMANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENT

    CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONMANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENT

    MANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENTCONTRACTINGCONTRACTINGCONTRACTINGCONTRACTING

    MANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENTCONTRACTINGCONTRACTINGCONTRACTINGCONTRACTING

    MISCELLANEOUSMISCELLANEOUSMISCELLANEOUSMISCELLANEOUSMETHODSMETHODSMETHODSMETHODS

    MISCELLANEOUSMISCELLANEOUSMISCELLANEOUSMISCELLANEOUSMETHODSMETHODSMETHODSMETHODS

    PACKAGEPACKAGEPACKAGEPACKAGEDEAL TYPEDEAL TYPEDEAL TYPEDEAL TYPEPACKAGEPACKAGEPACKAGEPACKAGE

    DEAL TYPEDEAL TYPEDEAL TYPEDEAL TYPE

    BUILD, OPERATEBUILD, OPERATEBUILD, OPERATEBUILD, OPERATE& TRANSFER& TRANSFER& TRANSFER& TRANSFER

    BUILD, OPERATEBUILD, OPERATEBUILD, OPERATEBUILD, OPERATE& TRANSFER& TRANSFER& TRANSFER& TRANSFER PARTNERINGPARTNERINGPARTNERINGPARTNERING

    PARTNERINGPARTNERINGPARTNERINGPARTNERING

    COMMON CONTRACT PROCUREMENT METHODS

    FIG. 1-4 : COMMON CONTRACT PROCUREMENT METHODS IN USE

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    13/169

    HSKS

    1985198519851985 1990199019901990 1995199519951995 2000200020002000

    1.0 TRADITIONAL GENERAL 95% 76% 31% 20%CONTRACTING

    2.0 MANAGEMENT 2% 3% 2% 1%CONTRACTING

    3.0 CONSTRUCTION 1% 3% 9% 10%MANAGEMENT

    4.0 PACKAGE DEAL TYPE 2% 15% 52% 60%

    5.0 BUILD, OPERATE AND - 2% 5% 8%TRANSFER

    6.0 OTHER - 1% 1% 1%MISCELLANEOUS

    FIG. 1-5 : COMPARISON OF COMMON CONTRACT PROCUREMENT METHODS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    14/169

    HSKS

    EMPLOYEREMPLOYEREMPLOYEREMPLOYER

    PROFESSIONALPROFESSIONALPROFESSIONALPROFESSIONALTEAMTEAMTEAMTEAM ---- DESIGN ANDDESIGN ANDDESIGN ANDDESIGN ANDCONTRACT ADMINISTRATIONCONTRACT ADMINISTRATIONCONTRACT ADMINISTRATIONCONTRACT ADMINISTRATION

    PROFESSIONALPROFESSIONALPROFESSIONALPROFESSIONALTEAMTEAMTEAMTEAM ---- DESIGN ANDDESIGN ANDDESIGN ANDDESIGN ANDCONTRACT ADMINISTRATIONCONTRACT ADMINISTRATIONCONTRACT ADMINISTRATIONCONTRACT ADMINISTRATION

    SUBSUBSUBSUB----SUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERSSUBSUBSUBSUB----SUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERS

    MAIN CONTRACTORMAIN CONTRACTORMAIN CONTRACTORMAIN CONTRACTOR(MC)(MC)(MC)(MC)

    MAIN CONTRACTORMAIN CONTRACTORMAIN CONTRACTORMAIN CONTRACTOR(MC)(MC)(MC)(MC)

    SUBSUBSUBSUB----SUBSUBSUBSUBCONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    SUBSUBSUBSUB----SUBSUBSUBSUBCONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    1. Architect2. Engineers - C&S, M&E3. Quantity Surveyor4. Other Specialist

    SUBSUBSUBSUB----SUBSUBSUBSUBCONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    SUBSUBSUBSUB----SUBSUBSUBSUBCONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS SUBSUBSUBSUB----SUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERSSUBSUBSUBSUB----SUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERS

    NOMINATED SUPLLIERNOMINATED SUPLLIERNOMINATED SUPLLIERNOMINATED SUPLLIER(NS)(NS)(NS)(NS)

    NOMINATED SUPLLIERNOMINATED SUPLLIERNOMINATED SUPLLIERNOMINATED SUPLLIER(NS)(NS)(NS)(NS)

    DOMESTIC SUPPLIERDOMESTIC SUPPLIERDOMESTIC SUPPLIERDOMESTIC SUPPLIER(DS)(DS)(DS)(DS)

    DOMESTIC SUPPLIERDOMESTIC SUPPLIERDOMESTIC SUPPLIERDOMESTIC SUPPLIER(DS)(DS)(DS)(DS)

    Key_______ : Contractual Link_ _ _ _ _ : Responsibility

    FIG. 1-6: TRADITIONAL GENERAL CONTRACTING (TGC) CONTRACTUAL RELATIONSHIPS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    15/169

    HSKS

    EMPLOYEREMPLOYEREMPLOYEREMPLOYER PROFESSIONALPROFESSIONALPROFESSIONALPROFESSIONALADVISORSADVISORSADVISORSADVISORS

    PROFESSIONALPROFESSIONALPROFESSIONALPROFESSIONALADVISORSADVISORSADVISORSADVISORS

    SUBSUBSUBSUB----SUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERSSUBSUBSUBSUB----SUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERS

    D & C CONTRACTORD & C CONTRACTORD & C CONTRACTORD & C CONTRACTORD & C CONTRACTORD & C CONTRACTORD & C CONTRACTORD & C CONTRACTOR

    SUBSUBSUBSUB----SUBSUBSUBSUBCONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    SUBSUBSUBSUB----SUBSUBSUBSUBCONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    1. Architect

    2. Engineers - C&S, M&E3. Quantity Surveyor4. Other Specialist

    SUBSUBSUBSUB----SUBSUBSUBSUBCONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    SUBSUBSUBSUB----SUBSUBSUBSUBCONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS SUBSUBSUBSUB----SUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERSSUBSUBSUBSUB----SUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERSSUB SUPPLIERS

    SUBSUBSUBSUB----SUPPLIERSUPPLIERSUPPLIERSUPPLIER

    SUBSUBSUBSUB----

    SUPPLIERSUPPLIERSUPPLIERSUPPLIERSUBSUBSUBSUB----

    CONTRACTORCONTRACTORCONTRACTORCONTRACTOR

    SUBSUBSUBSUB----

    CONTRACTORCONTRACTORCONTRACTORCONTRACTORPROFESSIONALPROFESSIONALPROFESSIONALPROFESSIONAL

    TEAMTEAMTEAMTEAM

    PROFESSIONALPROFESSIONALPROFESSIONALPROFESSIONAL

    TEAMTEAMTEAMTEAM

    1. Architect2. Engineers - C&S, M&E3. Quantity Surveyor4. Other Specialist

    1. Setting up EmployersRequirements

    2. Auditing role during

    construction

    1. Detailed Design2. Construction supervision

    Key_______ : Contractual Link_ _ _ _ _ : Responsibility

    FIG. 1-7: TURNKEY CONTRACTS/DESIGN & CONSTRUCT (D&C) - CONTRACTUAL

    RELATIONSHIPS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    16/169

    HSKS

    EMPLOYEREMPLOYEREMPLOYEREMPLOYER

    PROFESSIONAL TEAMPROFESSIONAL TEAMPROFESSIONAL TEAMPROFESSIONAL TEAMPROFESSIONAL TEAMPROFESSIONAL TEAMPROFESSIONAL TEAMPROFESSIONAL TEAM

    TRADETRADETRADETRADECONTRACTORCONTRACTORCONTRACTORCONTRACTOR

    TRADETRADETRADETRADECONTRACTORCONTRACTORCONTRACTORCONTRACTOR

    MANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENTCONTRACTORCONTRACTORCONTRACTORCONTRACTOR

    (MC)(MC)(MC)(MC)

    MANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENTCONTRACTORCONTRACTORCONTRACTORCONTRACTOR

    (MC)(MC)(MC)(MC)

    TRADETRADETRADETRADECONTRACTORCONTRACTORCONTRACTORCONTRACTOR

    TRADETRADETRADETRADECONTRACTORCONTRACTORCONTRACTORCONTRACTOR

    1. Architect

    2. Engineers - C&S, M&E3. Quantity Surveyor4. Other Specialist

    TRADETRADETRADETRADECONTRACTORCONTRACTORCONTRACTORCONTRACTOR

    TRADETRADETRADETRADECONTRACTORCONTRACTORCONTRACTORCONTRACTOR

    Key

    _______ : Contractual Link_ _ _ _ _ : Responsibility

    FIG. 1-8: MANAGEMENT CONTRACTING (MC) - CONTRACTUAL RELATIONSHIPS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    17/169

    HSKS

    EMPLOYEREMPLOYEREMPLOYEREMPLOYER

    PROFESSIONALPROFESSIONALPROFESSIONALPROFESSIONALTEAMTEAMTEAMTEAM

    PROFESSIONALPROFESSIONALPROFESSIONALPROFESSIONALTEAMTEAMTEAMTEAM

    TRADETRADETRADETRADECONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    TRADETRADETRADETRADECONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONMANAGER (CM)MANAGER (CM)MANAGER (CM)MANAGER (CM)

    CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONMANAGER (CM)MANAGER (CM)MANAGER (CM)MANAGER (CM)

    TRADETRADETRADETRADECONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    TRADETRADETRADETRADECONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    1. Architect2. Engineers - C&S, M&E3. Quantity Surveyor4. Other Specialist

    Key

    _______ : Contractual Link_ _ _ _ _ : Responsibility

    FIG. 1-9: CONSTRUCTION MANAGEMENT (CM) - CONTRACTUAL RELATIONSHIPS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    18/169

    HSKS

    * CONTRACT - DEFINATIONS

    1.01.01.01.0 PER ANSONPER ANSONPER ANSONPER ANSON

    * Legally binding agreement

    * Between two or more parties

    * By which rights are acquired by one or more* To acts or forbearances on the part of the other or others

    2.02.02.02.0 PER SECTION 2(h) MALAYSIAN CONTRACTS ACT 1950 (REV. 1974)PER SECTION 2(h) MALAYSIAN CONTRACTS ACT 1950 (REV. 1974)PER SECTION 2(h) MALAYSIAN CONTRACTS ACT 1950 (REV. 1974)PER SECTION 2(h) MALAYSIAN CONTRACTS ACT 1950 (REV. 1974)

    * An agreement

    * Enforceable by Law

    ** CONTRACT - BASIC ELEMENTS

    CLEAR + UNQUALIFIED + CONSIDERATION = CONTRACCLEAR + UNQUALIFIED + CONSIDERATION = CONTRACCLEAR + UNQUALIFIED + CONSIDERATION = CONTRACCLEAR + UNQUALIFIED + CONSIDERATION = CONTRACTTTTOFFEROFFEROFFEROFFER ACCEPTANCEACCEPTANCEACCEPTANCEACCEPTANCE (LEGAL(LEGAL(LEGAL(LEGAL

    AGREEMENT)AGREEMENT)AGREEMENT)AGREEMENT)

    FIG. 1-10: CONTRACT DEFINITIONS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    19/169

    HSKS

    INTENTION TO CREATELEGAL RELATIONS

    CERTAINTY OF TERMS

    LEGAL CAPACITY TOCONTRACT

    FREE CONSENT

    LAWFUL OBJECT ANDCONSIDERATION

    PHYSICAL/LEGALPOSSIBILITY

    FIG. 1-11: ELEMENTS OF A VALID/ENFORCEABLE AGREEMENT

    +

    +

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    20/169

    HSKS

    FIG. 1-12 : STANDARD FORMS OF CONTRACT (PART I)

    STANDARDFORMS OF

    CONTRACT

    DISADVANTAGES

    DEFINITION/MEANING

    MAIN TYPES

    ADVANTAGES

    CHARACTERISTICS

    PURPOSE

    TYPES

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    21/169

    HSKS

    GOVERNMENT/GOVERNMENT/GOVERNMENT/GOVERNMENT/PUBLIC SECTORPUBLIC SECTORPUBLIC SECTORPUBLIC SECTOR

    GOVERNMENT/GOVERNMENT/GOVERNMENT/GOVERNMENT/PUBLIC SECTORPUBLIC SECTORPUBLIC SECTORPUBLIC SECTOR

    STANDARD FORMS OF CONTRACT

    PRIVATE SECTORPRIVATE SECTORPRIVATE SECTORPRIVATE SECTORPRIVATE SECTORPRIVATE SECTORPRIVATE SECTORPRIVATE SECTORINTERNATIONALINTERNATIONALINTERNATIONALINTERNATIONAL

    CONTRACTSCONTRACTSCONTRACTSCONTRACTS

    INTERNATIONALINTERNATIONALINTERNATIONALINTERNATIONALCONTRACTSCONTRACTSCONTRACTSCONTRACTS

    BUILDING WORKSBUILDING WORKS

    JKR / PWDJKR / PWD MISCELLANEOUSMISCELLANEOUS

    1. FIDIC Conditions

    2. ICE Conditions

    3. IEEE Conditions

    4. IMechE Conditions

    5. JCT Conditions

    CIVIL ENGINEERINGWORKS

    CIVIL ENGINEERINGWORKS

    M & E WORKSM & E WORKS

    FIG. 1-13: STANDARD FORMS OF CONTRACT (PART II)

    203 (Rev. 1/2010) - withoutquantities

    203A (Rev. 1/2010) - with

    quantities

    203N (Rev. 1/2010) - For NSC

    203P (Rev. 1/2010) - ForNominated Suppliers

    PWD Form DB (2007 Edn.)For Design & Build Contracts

    CIDB Form for:

    - Building Contracts 2000 Edn.- Form CIDB.B (NSC/2002)

    Modified JKR/PWD Forms e.g.LPK, MHA, etc.

    IEM Conditions

    - IEM.CE 2011- IEM.CES 1/90

    PAM Contract 2006(with quantities)

    PAM Contract 2006(without quantities)

    PAM Sub-Contract 2006

    IEM Conditions

    - IEM.ME 1/94

    TNB Conditions, etc.

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    22/169

    HSKS

    COMMENCEMENT OF

    CONTRACT AT SITE

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    23/169

    2.0 COMMENCEMENT OF CONTRACT AT SITE

    APPROACHES IN:APPROACHES IN:APPROACHES IN:APPROACHES IN:

    1. TRADITIONAL GENERAL CONTRACTS2. DESIGN & BUILD / TURNKEY CONTRACTS

    FORMALITIES:FORMALITIES:FORMALITIES:FORMALITIES:

    1. CONDITIONS PRECEDENT2. INSURANCES, PERFORMANCE BONDS, ETC.

    SITE POSSESSION : MEANING AND EFFECTSITE POSSESSION : MEANING AND EFFECTSITE POSSESSION : MEANING AND EFFECTSITE POSSESSION : MEANING AND EFFECT

    SUBMITTALS :SUBMITTALS :SUBMITTALS :SUBMITTALS :1. CONSTRUCTION DRAWINGS2. SHOP DRAWINGS3. SAMPLES4. QA AND QC DOCUMENTS5. HEALTH AND SAFETY DOCUMENTS

    6. METHOD STATEMENTS TEMPORARY WORKSTEMPORARY WORKSTEMPORARY WORKSTEMPORARY WORKS

    ISSUES FOR ATTENDANCE OF NOMINATED SUBISSUES FOR ATTENDANCE OF NOMINATED SUBISSUES FOR ATTENDANCE OF NOMINATED SUBISSUES FOR ATTENDANCE OF NOMINATED SUB----CONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    MISCELLANEOUS ISSUESMISCELLANEOUS ISSUESMISCELLANEOUS ISSUESMISCELLANEOUS ISSUES

    HSKS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    24/169

    RELEVANT CASESRELEVANT CASESRELEVANT CASESRELEVANT CASES

    1. THE RADIO & GENERAL TRADING CO. SDN. BHD. V WYASS & FREYTAG (M)SDN. BHD. [1998] 1 MLJ 346

    2. LEC CONTRACTORS (M) SDN. BHD. V CASTLE INN SDN. BHD. & ANOR[2000]3 MLJ 339

    3. KLEINWORT BENSON LTD. V MALAYSIA MINING CORP. BHD [1989] 1 WLR 379

    4. NANYANG INSURANCE CO. LTD. V SALBIAH & ANOR[1967] 1 MLJ 94

    5. SURREY HEALTH BOROUGH COUNCIL V LOVELL CONSTRUCTION[1988] 42 BLR 25

    6. FREEMAN V HENSLER[1981] 20 BLR 78

    7. TAN HOCK CHAN V KHO TECK SENG[1980] 1 MLJ 308

    8. PUTRA PERDANA CONSTRUCTION SDN. BHD. V AMI INSURANCE BHD

    & ORS[2005] 2 MLJ 123 HC

    9. YIP SHOU SHAN V SIN HEAP LEE MARUBENI SDN. BHD. [2002] 5 MLJ43, HC`

    HSKS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    25/169

    FIG. 2-1 : COMMENCEMENT - COMMON LABELS

    HSKS

    COMMENCEMENTOF CONTRACT

    PERIOD

    COMMENCEMENTOF CONTRACT

    TAKING OVER OFTHE SITE

    SITE POSSESSION

    COMMENCEMENTOF WORKS

    COMMENCEMENTOF OPERATIONS

    ON SITE

    COMMENCEMENT:

    COMMON LABELS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    26/169

    FIG. 2-2: PROTECTION AGAINST CONTRACTORS FAILURES COMMON MECHANISMS

    HSKS

    PARENT COMPANYGUARANTEE

    LETTER OF AWARENESS

    INSURANCE PERFORMANCE BOND

    STANDBY LETTEROF CREDIT

    LETTER OF COMFORT

    PROTECTION AGAINSTCONTRACTORS FAILURES:

    COMMON MECHANISMS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    27/169

    FIG. 2-3 : PROTECTION AGAINST CONTRACTORS FAILURES AN OVERVIEW (PART I)

    HSKS

    PURPOSE

    PROTECTION AGAINST CONTRACTORS FAILURES: AN OVERVIEW (PART I)

    COMMON MECHANISMS/INSTRUMENTS: TYPES

    PARENT COMPANYGUARANTEES

    USENATUREPROCEDURAL

    REQUIREMENTS

    Preliminary review

    Check for legal compliance

    Check for compliance withformalities

    Contractual performance ofCompany within a corporategroup is underwritten by other

    members of group

    E.g. Subsidiary and HoldingCompany

    For commercial andadministrative convenience

    Owing to requirements ofapplicable law e.g. companylaw, etc.

    Risk transferring contracts

    Enable recovery of compensationupon contractors default/failureunder the contract

    Parent Company Guarantees

    Performance Bonds

    Miscellaneous Types:

    1. Letters of Comfort2. Standby Letters of Credit3. Insurances

    Contd.

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    28/169

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    29/169

    FIG. 2-5 : CONTRACTORS INSURANCE POLICIES COMMON TYPES HSKS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    30/169

    FIG. 2-6 : INSURANCES AN OVERVIEW (PART I) HSKS

    PURPOSES

    INSURANCES: AN OVERVIEW (PART I)

    DEFINITION TYPES

    CATEGORY IICATEGORISATION PRINICPAL TYPES

    Contractor: Common Types

    Employer: Common Types

    Occupier: Common Types

    Management Corporation:Common Types

    Two Main Categorization:

    1. Liability based2. Loss based

    Difference: basis ofcompensation

    Risk allocation mechanisms

    Means of seeking compensationfollowing default/failure

    Per Robinson and Lavers

    Voluntary assumption ofspecified risk in return for anagreed payment

    CATEGORY I

    Liability based

    Indemnification of insuredagainst damages payable to3rd party

    Examples:

    1. 3rd Party LiabilityInsurance

    2. WorkmensCompensation

    3. Professional IndemnityInsurance

    Loss based

    Compensate insured forloss/damage directlyincurred by insured

    Examples:

    1. Contractors All RiskPolicy

    2. Erection All RiskPolicy

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    31/169

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    32/169

    HSKS

    FIG. 2-8 : SITE POSSESSION AN OVERVIEW

    PROVISIONSPROVISIONSPROVISIONSPROVISIONSFORFORFORFOR

    SITE POSSESSION: AN OVERVIEW

    EXCEPTIONSEXCEPTIONSEXCEPTIONSEXCEPTIONSTO GENERALTO GENERALTO GENERALTO GENERAL

    PRINCIPLEPRINCIPLEPRINCIPLEPRINCIPLE

    MEANINGMEANINGMEANINGMEANING DEGREEDEGREEDEGREEDEGREE POSTPONEMENTPOSTPONEMENTPOSTPONEMENTPOSTPONEMENTFAILURE TO GIVEFAILURE TO GIVEFAILURE TO GIVEFAILURE TO GIVE

    POSSESSIONPOSSESSIONPOSSESSIONPOSSESSION

    In Letter ofAcceptance

    Or in Contract

    LATEST LEGALLATEST LEGALLATEST LEGALLATEST LEGALPOSITIONPOSITIONPOSITIONPOSITION

    POSSESSIONPOSSESSIONPOSSESSIONPOSSESSIONON PIECEMEALON PIECEMEALON PIECEMEALON PIECEMEAL

    BASIS?BASIS?BASIS?BASIS?

    No

    GENERALGENERALGENERALGENERALPRINCIPLEPRINCIPLEPRINCIPLEPRINCIPLE

    EXPRESSEXPRESSEXPRESSEXPRESS IMPLIEDIMPLIEDIMPLIEDIMPLIED

    If not expressed, byLaw

    Freeman & SonvHensler

    Licence revocable byEmployer at any time

    Licence to be free fromany encumbrances

    Contractor entitled toSole/exclusivepossession

    Express Stipulations

    Case Law

    Sufficient degreeof possession/access

    To execute workunimpeded

    To be able toperform work

    Express contractstipulations permittingpostponement

    GENERALGENERALGENERALGENERALLEGAL POSITIONLEGAL POSITIONLEGAL POSITIONLEGAL POSITION

    EXCEPTIONSEXCEPTIONSEXCEPTIONSEXCEPTIONS

    GENERALGENERALGENERALGENERALLEGAL POSITIONLEGAL POSITIONLEGAL POSITIONLEGAL POSITION

    EFFECTEFFECTEFFECTEFFECT

    Breach of Contract Entitles Contractor to

    rescind Contract.

    Contractor entitled toloss occasioned

    Contractor entitled toEOT if expresslypermittedcontractually

    Otherwise, LADcannot be imposed

    General Position: No Exceptions:

    a) Expressstipulations tocontrary

    b) Where CommonLaw applies

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    33/169

    TIMING

    SITE POSSESSION MEETINGS

    EXPLANATIONOF CONTRACT

    REQUIREMENTS

    PURPOSEMATTERS

    DEALT MINUTESPARTICIPANTS

    On Date of Commencementof Contract /

    Date of Site Possession

    INTRODUCTIONOF PROJECT

    MEMBERS

    HANDOVEROF VARIOUSDOCUMENTS

    1. All Project TeamMember

    LETTER OFDELEGATIONOF POWERS

    SET OUTPROCEDURES

    COVERING

    COPY OFCONTRACT

    DOCUMENTS

    PRICED COPYOF B.Q.

    SET OFCONSTRUCTION

    DRAWINGS

    To officially handoverPossession of Site tothe Contractor

    DISTRIBUTION/CIRCULATION

    WHOPREPARES ?

    Document Submittals andApprovals

    Sample Submittals andApprovals

    Inspection of Work

    Interim Valuations

    Claim Procedures

    Contract Administrator To all parties

    FIG. 2-9 : SITE POSSESSION MEETINGS

    HSKS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    34/169

    HSKS

    WORK PROGRAMME

    WORKS UNDER CONTRACT:TYPICAL SUBMITTALS BY

    CONTRACTOR

    HEALTH AND SAFETYDOCUMENTS

    DESIGN AND CALCULATIONSFOR WORKS UNDER P.C.

    SUM, PACKAGE DEAL TYPECONTRACTS, ETC.

    DRAWINGS I.E. SHOP,FABRICATION, SETTING

    OUT, ETC.

    MISCELLANOUESREPORTS

    AND DOCUMENTS METHOD STATEMENTS

    DESIGN ANDCALCULATIONS FOR

    TEMPORARY WORKS

    QA/QC DOCUMENTS

    FIG. 2-10: WORKS UNDER CONTRACT TYPICAL SUBMITTALS BY CONTRACTOR

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    35/169

    HSKS

    MONITORING OF

    WORK PROGRESS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    36/169

    3.0 MONITORING OF WORK PROGRESS

    PROGRAMMING OF WORKSPROGRAMMING OF WORKSPROGRAMMING OF WORKSPROGRAMMING OF WORKS

    PARTIES RESPONSIBLE:PARTIES RESPONSIBLE:PARTIES RESPONSIBLE:PARTIES RESPONSIBLE:

    1. EMPLOYER2. MAIN CONTRACTOR3. CONTRACT ADMINISTRATOR

    PROGRESS REPORTSPROGRESS REPORTSPROGRESS REPORTSPROGRESS REPORTS

    SITE RECORDSSITE RECORDSSITE RECORDSSITE RECORDS

    MEETINGS:MEETINGS:MEETINGS:MEETINGS:

    1. SITE POSSESSION2. PROGRESS/SITE3. NSC COORDINATION4. AD-HOC

    MISCELLANEOUS ISSUESMISCELLANEOUS ISSUESMISCELLANEOUS ISSUESMISCELLANEOUS ISSUES

    HSKS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    37/169

    RELEVANT CASESRELEVANT CASESRELEVANT CASESRELEVANT CASES

    1. GLENLION CONSTRUCTION LTD. V THE GUINESS TRUST [1987] 39 BLR 89

    2. YORKSHIRE WATER AUTHORITY V SIR ALFRED MCALPINE & SON(NORTHERN) LTD. [1986] 32 BLR 114

    3. GREATER LONDON COUNCIL V CLEVELAND BRIDGE & ENGINEERING CO.LTD. [1986] 8 Con LR 30

    4. KITSONS SHEET METAL LTD. V MATTHEW HALL MECHANICAL &ELECTRICAL ENGINEERS LTD. [1989] 47 BLR 82

    5. WEST FAULKNER ASSOCIATES V LONDON BOROUGH OF NEWHAM [1994]71 BLR 1

    6. EQUITABLE DEBENTURES ASSETS CORP. LTD. V MORGAN BRANCH

    ROBERTS & ORS[1984] 2-CLD-10-01

    HSKS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    38/169

    FIG. 3-1 : WORK PROGRAMME - TYPICAL FORMS

    HSKS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    39/169

    HSKS

    PRINCIPAL ACTIVITIES

    IDENTIFICATION OFCRITICAL ACTIVITIESAND CRITICAL PATH

    IMPORTANTMILESTONES FOR

    EMPLOYER TO MEET SEQUENCE OFACTIVITIES

    IMPORTANTMILESTONES FOR

    CONTRACTOR TO MEET

    TIMING OF ACTIVITIES

    WORK PROGRAMME:PRINCIPAL CONTENTS

    FIG. 3-2 : WORK PROGRAMME PRINCIPAL CONTENTS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    40/169

    HSKS

    FIG. 3-3 : WORK PROGRAMME AN OVERVIEW

    RESPONSIBILITYRESPONSIBILITYRESPONSIBILITYRESPONSIBILITY

    WORK PROGRAMME: AN OVERVIEW

    OPTIONS ONOPTIONS ONOPTIONS ONOPTIONS ONSUBMISSIONSUBMISSIONSUBMISSIONSUBMISSION

    METHOD OFMETHOD OFMETHOD OFMETHOD OFWORKINGWORKINGWORKINGWORKING

    SEQUENCE OFSEQUENCE OFSEQUENCE OFSEQUENCE OFWORKINGWORKINGWORKINGWORKING

    MEANINGMEANINGMEANINGMEANING FORMFORMFORMFORM CONTENTSCONTENTSCONTENTSCONTENTS PURPOSEPURPOSEPURPOSEPURPOSE PART OFPART OFPART OFPART OFCONTRACT?CONTRACT?CONTRACT?CONTRACT?

    ALTERATION/ALTERATION/ALTERATION/ALTERATION/REVISIONREVISIONREVISIONREVISION

    Express Provisions

    By Implication

    Sequence andTiming of Activities

    Critical Milestones

    FOR CONTRACTFOR CONTRACTFOR CONTRACTFOR CONTRACTADMINISTRATORADMINISTRATORADMINISTRATORADMINISTRATOR

    FORFORFORFORCONTRACTORCONTRACTORCONTRACTORCONTRACTOR

    Approval Rejection Withholding of

    Approval

    SUBMITTED AFTERSUBMITTED AFTERSUBMITTED AFTERSUBMITTED AFTERTENDER AWARDTENDER AWARDTENDER AWARDTENDER AWARD

    PART OF TENDERPART OF TENDERPART OF TENDERPART OF TENDERSUBMISSION?SUBMISSION?SUBMISSION?SUBMISSION?

    GeneralPolicies

    Mode ofAlternatives /Revision

    Effect ofAlternatives/Revision

    BARBARBARBARCHARTSCHARTSCHARTSCHARTS

    CRITICAL PATHCRITICAL PATHCRITICAL PATHCRITICAL PATHANALYSISANALYSISANALYSISANALYSIS

    PERTPERTPERTPERT

    PRIMIVERA/PRIMIVERA/PRIMIVERA/PRIMIVERA/MICROSOFTMICROSOFTMICROSOFTMICROSOFTPROJECTPROJECTPROJECTPROJECT

    MISCELLANEOUSMISCELLANEOUSMISCELLANEOUSMISCELLANEOUS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    41/169

    FIG. 3-4 : PROGRESS MONITORING EMPLOYERS PURPOSES

    HSKS

    TO LEVY CONTROL OVERPROGRESS OF THE WORKS

    TO TAKE NECESSARYREMEDIAL MEASURES IF

    DELAY OCCURS OR IFEMPLOYER IS AT FAULT

    MISCELLANEOUSPURPOSES

    TO ENSURE CONTRACTIS COMPLETEDACCORDING TO

    SCHEDULE

    TO PLAN ANDSTREAMLINE FINANCIAL

    ARRANGEMENTSTO OBVIATE DEFAULT

    TO WARN CONTRACTORTO TAKE REMEDIAL

    MEASURES IN CASEDELAY OCCURS

    PROGRESS MONITORING:EMPLOYERS PURPOSES

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    42/169

    HSKSFIG. 3-5 : PROGRESS MONITORING AN OVERVIEW

    DURATIONDURATIONDURATIONDURATION

    PROGRESS MONITORING: AN OVERVIEW

    SITE PROGRESSSITE PROGRESSSITE PROGRESSSITE PROGRESSMEETINGSMEETINGSMEETINGSMEETINGS

    PURPOSEPURPOSEPURPOSEPURPOSE METHODSMETHODSMETHODSMETHODS BASISBASISBASISBASIS

    FREQUENCY/FREQUENCY/FREQUENCY/FREQUENCY/NATURE OFNATURE OFNATURE OFNATURE OF

    CHECKSCHECKSCHECKSCHECKS

    SUBSUBSUBSUB----CONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    MEETINGMEETINGMEETINGMEETING

    COORDINATION/COORDINATION/COORDINATION/COORDINATION/PROJECTPROJECTPROJECTPROJECT

    MANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENTMEETINGSMEETINGSMEETINGSMEETINGS

    DURATIONDURATIONDURATIONDURATION

    SITESITESITESITEDIARYDIARYDIARYDIARY

    OFFICIAL WORKOFFICIAL WORKOFFICIAL WORKOFFICIAL WORKRECORDSRECORDSRECORDSRECORDS

    OFFICIALOFFICIALOFFICIALOFFICIALPROGRESSPROGRESSPROGRESSPROGRESSREPORTSREPORTSREPORTSREPORTS

    PROGRESSPROGRESSPROGRESSPROGRESSMEETINGSMEETINGSMEETINGSMEETINGS

    SITESITESITESITERECORDSRECORDSRECORDSRECORDS

    SITESITESITESITEPOSSESSIONPOSSESSIONPOSSESSIONPOSSESSION

    MEETINGSMEETINGSMEETINGSMEETINGS

    ADADADAD----HOCHOCHOCHOCMEETINGSMEETINGSMEETINGSMEETINGS

    PURPOSEPURPOSEPURPOSEPURPOSE METHODSMETHODSMETHODSMETHODS EVIDENTIAL VALUEEVIDENTIAL VALUEEVIDENTIAL VALUEEVIDENTIAL VALUE

    PARTIESPARTIESPARTIESPARTIESRESPONSIBLERESPONSIBLERESPONSIBLERESPONSIBLE

    From SitePossession

    To Issue of FinalCertificate

    Normally up toPractical Completiononly

    Use of ContractorsWork Programme

    Primary Purposes Secondary Purposes

    Employer/ contractadministrator

    Contractor

    On regular basis Normally monthly

    Maybe

    i. Weeklyii. Fortnightlyiii. Quarterly, etc.

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    43/169

    FIG. 3-6 : POST CONTRACT AWARD STAGE PRINCIPAL TYPES OF MEETINGS

    HSKS

    POST CONTRACTAWARD STAGE:

    PRINCIPAL TYPESOF MEETINGS

    SITE POSSESSIONMEETINGS

    MISCELLANEOUSMEETINGS

    SUB-CONTRACTORSMEETINGS

    COORDINATION/PROJECT

    MANAGEMENTMEETINGS

    SITE PROGRESSMEETINGS

    AD-HOCMEETINGS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    44/169

    FIG. 3-7 : SITE PROGRESS MEETINGS AN OVERVIEW

    HSKS

    TIMING

    SITE PROGRESS MEETINGS: AN OVERVIEW

    ENABLEENABLEENABLEENABLECONTRACTOR TOCONTRACTOR TOCONTRACTOR TOCONTRACTOR TO

    PURPOSE ISSUES/MATTERS DEALT MINUTES

    PARTICIPANTS

    PERMIT WORKPERMIT WORKPERMIT WORKPERMIT WORKPROGRESS TOPROGRESS TOPROGRESS TOPROGRESS TO

    MISCELLANEOUSMISCELLANEOUSMISCELLANEOUSMISCELLANEOUS

    S.O./ ContractAdministrator

    DISTRIBUTION/DISTRIBUTION/DISTRIBUTION/DISTRIBUTION/CIRCULATIONCIRCULATIONCIRCULATIONCIRCULATION

    WHOWHOWHOWHOPREPARES?PREPARES?PREPARES?PREPARES?

    Officially presentprogress report

    Present problemsencountered

    Be reviewed onregular basis

    Identify areas andcauses of delay

    Enable Employer/ C.A. toredress delay caused byhim/them

    Keep track of financialprogress/allocation

    CONTRACTCONTRACTCONTRACTCONTRACTADMINISTRATORADMINISTRATORADMINISTRATORADMINISTRATOR

    MAINMAINMAINMAINCONTRACTORCONTRACTORCONTRACTORCONTRACTOR

    CONSULTANTSCONSULTANTSCONSULTANTSCONSULTANTS NSCsNSCsNSCsNSCs EMPLOYEREMPLOYEREMPLOYEREMPLOYER

    Chairs Meeting

    Main participant

    Observers Only

    Participants if contractadministrator's assistants/representatives

    By invitation only Observer only

    To all parties/attendees

    Main participant

    ONLY SITE ISSUESONLY SITE ISSUESONLY SITE ISSUESONLY SITE ISSUES FINANCIAL ISSUESFINANCIAL ISSUESFINANCIAL ISSUESFINANCIAL ISSUES3333RDRDRDRD PARTYPARTYPARTYPARTY

    ISSUES AFFECTINGISSUES AFFECTINGISSUES AFFECTINGISSUES AFFECTINGCONTRACTCONTRACTCONTRACTCONTRACT

    MISCELLANEOUSMISCELLANEOUSMISCELLANEOUSMISCELLANEOUSISSUESISSUESISSUESISSUES

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    45/169

    FIG. 3-8 : SUB-CONTRACTORS MEETINGS AN OVERVIEW

    HSKS

    TIMING

    SUB-CONTRACTORS MEETINGS: AN OVERVIEW

    TO ENABLE SUBTO ENABLE SUBTO ENABLE SUBTO ENABLE SUB----CONTRACTOR TOCONTRACTOR TOCONTRACTOR TOCONTRACTOR TO

    PURPOSE ISSUES/MATTERS DEALT

    MINUTES

    TO PERMITTO PERMITTO PERMITTO PERMITCONTRACTOR TOCONTRACTOR TOCONTRACTOR TOCONTRACTOR TO

    MainContractor

    DISTRIBUTION/DISTRIBUTION/DISTRIBUTION/DISTRIBUTION/CIRCULATIONCIRCULATIONCIRCULATIONCIRCULATION

    WHOWHOWHOWHOPREPARES?PREPARES?PREPARES?PREPARES?

    Officially presentprogress report toContractor

    Present problemsencountered

    Review NSCs progress,areas of delay, etc.

    Identify and sortcoordination problems

    CONTRACTORCONTRACTORCONTRACTORCONTRACTOR(MAIN)(MAIN)(MAIN)(MAIN)

    NOMINATEDNOMINATEDNOMINATEDNOMINATEDSUBSUBSUBSUB----

    CONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    DOMESTICDOMESTICDOMESTICDOMESTICSUBSUBSUBSUB----

    CONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    OTHERSOTHERSOTHERSOTHERS(BY(BY(BY(BY

    INVITATIONINVITATIONINVITATIONINVITATION))))

    Chairs Meeting Employer

    Third Parties

    ContractAdministrator

    To all parties/attendees

    PARTICIPANTS

    Usually monthly priorto site meetings

    If necessary morefrequently

    COORDINATIONCOORDINATIONCOORDINATIONCOORDINATIONMATTERSMATTERSMATTERSMATTERS

    SITE PROBLEMSSITE PROBLEMSSITE PROBLEMSSITE PROBLEMS FINANCIAL ISSUESFINANCIAL ISSUESFINANCIAL ISSUESFINANCIAL ISSUES 3333RDRDRDRD PARTY ISSUESPARTY ISSUESPARTY ISSUESPARTY ISSUES MISCELLANEOUSMISCELLANEOUSMISCELLANEOUSMISCELLANEOUS

    ISSUESISSUESISSUESISSUES

    Design

    Site Work

    Possession

    Access

    Security

    Payments

    V.O.s

    Claims

    Authorities

    Utilities Providers

    Others

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    46/169

    FIG. 3-9 : AD-HOC MEETINGS AN OVERVIEW

    HSKS

    AD-HOC MEETINGS: AN OVERVIEW

    AS AND WHENAS AND WHENAS AND WHENAS AND WHENNECESSARY FROMNECESSARY FROMNECESSARY FROMNECESSARY FROM

    TIME TO TIMETIME TO TIMETIME TO TIMETIME TO TIME

    TIMINGTIMINGTIMINGTIMING PURPOSEPURPOSEPURPOSEPURPOSE

    USUALLYUSUALLYUSUALLYUSUALLYDICTATED BYDICTATED BYDICTATED BYDICTATED BY

    CIRCUMSTANCESCIRCUMSTANCESCIRCUMSTANCESCIRCUMSTANCES

    TO DISCUSSTO DISCUSSTO DISCUSSTO DISCUSSSPECIFIC ISSUES /SPECIFIC ISSUES /SPECIFIC ISSUES /SPECIFIC ISSUES /

    MATTERSMATTERSMATTERSMATTERS

    EMERGENCYEMERGENCYEMERGENCYEMERGENCYISSUESISSUESISSUESISSUES

    FINANCIALFINANCIALFINANCIALFINANCIALISSUESISSUESISSUESISSUES

    TECHNICALTECHNICALTECHNICALTECHNICALISSUESISSUESISSUESISSUES

    ADMINISTRATIVEADMINISTRATIVEADMINISTRATIVEADMINISTRATIVEMATTERSMATTERSMATTERSMATTERS

    Site Issues

    Design/ Work Issues

    3rd Party Issues

    Training

    Maintenance

    As-Built Records

    Payments

    V.O.s

    Claims

    Design

    Construction/Installation

    Testing andCommissioning

    Defects

    CONVENORSCONVENORSCONVENORSCONVENORS(AS APPLICABLE)(AS APPLICABLE)(AS APPLICABLE)(AS APPLICABLE)

    The Employer

    The Contract Administrator

    The Contractor

    The Sub-Contractors

    MISCELLANEOUSMISCELLANEOUSMISCELLANEOUSMISCELLANEOUSISSUESISSUESISSUESISSUES

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    47/169

    FIG. 3-10 : SITE RECORDS AN OVERVIEW

    HSKS

    DURATIONDURATIONDURATIONDURATION

    SITE RECORDS: AN OVERVIEW

    PURPOSEPURPOSEPURPOSEPURPOSE METHODSMETHODSMETHODSMETHODS EVIDENTIAL VALUEEVIDENTIAL VALUEEVIDENTIAL VALUEEVIDENTIAL VALUE

    From Date of Commencement /Site Possession to

    Completion of works

    Normally up to PracticalCompletion only

    OFFICIALOFFICIALOFFICIALOFFICIALPROGRESSPROGRESSPROGRESSPROGRESS

    REPORTREPORTREPORTREPORT

    OFFICIAL WORKOFFICIAL WORKOFFICIAL WORKOFFICIAL WORKRECORDSRECORDSRECORDSRECORDS

    Contractors Scope

    NSCs/DSCs Scope

    Extension of Time

    Additional Work

    Direct loss and/orexpense

    Miscellaneous matters

    REVIEW WORKREVIEW WORKREVIEW WORKREVIEW WORKPROGRESSPROGRESSPROGRESSPROGRESS

    EVALUATEEVALUATEEVALUATEEVALUATECONTRACTORCONTRACTORCONTRACTORCONTRACTORSSSS

    CLAIMS TOCLAIMS TOCLAIMS TOCLAIMS TO

    PERMITPERMITPERMITPERMITDECISION MAKINGDECISION MAKINGDECISION MAKINGDECISION MAKING

    PROVIDE NECESSARYPROVIDE NECESSARYPROVIDE NECESSARYPROVIDE NECESSARYINFORMATION/ EVIDENCEINFORMATION/ EVIDENCEINFORMATION/ EVIDENCEINFORMATION/ EVIDENCE

    TOTOTOTOSITE DIARYSITE DIARYSITE DIARYSITE DIARY

    DULY SIGNED/DULY SIGNED/DULY SIGNED/DULY SIGNED/ENDORSED RECORDSENDORSED RECORDSENDORSED RECORDSENDORSED RECORDS

    ACKNOWLEDGEMENTACKNOWLEDGEMENTACKNOWLEDGEMENTACKNOWLEDGEMENTOF RECEIPT RECORDSOF RECEIPT RECORDSOF RECEIPT RECORDSOF RECEIPT RECORDS

    Best evidential value

    Some evidential value

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    48/169

    FIG. 3-11 : OFFICIAL WORK RECORDS AN OVERVIEW

    HSKS

    TIMING OFTIMING OFTIMING OFTIMING OFSUBMISSIONSUBMISSIONSUBMISSIONSUBMISSION

    OFFICIAL WORK RECORDS: AN OVERVIEW

    RECORD OFRECORD OFRECORD OFRECORD OFSITE INFORMATIONSITE INFORMATIONSITE INFORMATIONSITE INFORMATION

    PURPOSEPURPOSEPURPOSEPURPOSE CONTENTSCONTENTSCONTENTSCONTENTS PROCEDURALPROCEDURALPROCEDURALPROCEDURALMATTERSMATTERSMATTERSMATTERS

    FOR CONTRACTFOR CONTRACTFOR CONTRACTFOR CONTRACTADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATION

    SIGNING ORSIGNING ORSIGNING ORSIGNING ORENDORSEMENTENDORSEMENTENDORSEMENTENDORSEMENT

    TIME OFTIME OFTIME OFTIME OFENTRYENTRYENTRYENTRY

    FOR BASISFOR BASISFOR BASISFOR BASISOF OFFICIALOF OFFICIALOF OFFICIALOF OFFICIAL

    PROGRESS REPORTPROGRESS REPORTPROGRESS REPORTPROGRESS REPORT

    Planned

    Undertaken

    SAFESAFESAFESAFEKEEPINGKEEPINGKEEPINGKEEPING

    DAILYDAILYDAILYDAILY WEEKLYWEEKLYWEEKLYWEEKLY FORTNIGHTLYFORTNIGHTLYFORTNIGHTLYFORTNIGHTLYUSE OFUSE OFUSE OFUSE OF

    DESIGNATEDDESIGNATEDDESIGNATEDDESIGNATEDSTAFF FORSTAFF FORSTAFF FORSTAFF FOR

    SITE WORK/SITE WORK/SITE WORK/SITE WORK/ACTIVITIESACTIVITIESACTIVITIESACTIVITIES

    RECORDRECORDRECORDRECORDOF WORKERSOF WORKERSOF WORKERSOF WORKERS

    RECORD OFRECORD OFRECORD OFRECORD OFPLANT/MACHINERPLANT/MACHINERPLANT/MACHINERPLANT/MACHINER

    YYYY

    WEATHERWEATHERWEATHERWEATHERCONDITIONSCONDITIONSCONDITIONSCONDITIONS

    PROBLEMSPROBLEMSPROBLEMSPROBLEMSENCOUNTEREDENCOUNTEREDENCOUNTEREDENCOUNTERED

    INSTRUCTIONSINSTRUCTIONSINSTRUCTIONSINSTRUCTIONS MISCELLANEOUSMISCELLANEOUSMISCELLANEOUSMISCELLANEOUS

    Skilled

    Unskilled

    Design

    Site

    Coordination

    Due to 3rd Parties

    Received

    Carried Out

    Outstanding

    Site/ FactoryVisits

    Inspections

    Preparing

    Maintaining

    Submitting

    Daily

    By authorizedPerson(s)

    S.O/ ContractAdministrator

    On site

    By S.O./Contractadministrator

    Up to lapse ofperiod oflimitation

    Affecting work

    Delaying siteoperations

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    49/169

    FIG. 3-12 : SITE DIARY AN OVERVIEW

    HSKS

    NATURENATURENATURENATURE

    SITE DIARY: AN OVERVIEW

    CONTENTSCONTENTSCONTENTSCONTENTS PROCEDURALPROCEDURALPROCEDURALPROCEDURALMATTERSMATTERSMATTERSMATTERS

    Undertaken

    PRESENTATIONPRESENTATIONPRESENTATIONPRESENTATIONON REQUEST/ON REQUEST/ON REQUEST/ON REQUEST/

    DEMANDDEMANDDEMANDDEMAND

    CHECKING /CHECKING /CHECKING /CHECKING /ENDORSEMENTENDORSEMENTENDORSEMENTENDORSEMENT

    SAFE KEEPING/SAFE KEEPING/SAFE KEEPING/SAFE KEEPING/CUSTODYCUSTODYCUSTODYCUSTODY

    ENTRIES ONENTRIES ONENTRIES ONENTRIES ONDAILY BASISDAILY BASISDAILY BASISDAILY BASIS

    SITE WORK/SITE WORK/SITE WORK/SITE WORK/ACTIVITIESACTIVITIESACTIVITIESACTIVITIES

    PROBLEMSPROBLEMSPROBLEMSPROBLEMSENCOUNTEREDENCOUNTEREDENCOUNTEREDENCOUNTERED

    INSTRUCTIONSINSTRUCTIONSINSTRUCTIONSINSTRUCTIONS RECORD OFRECORD OFRECORD OFRECORD OF MISCELLANEOUSMISCELLANEOUSMISCELLANEOUSMISCELLANEOUS ATTACHMENTSATTACHMENTSATTACHMENTSATTACHMENTS

    As to Site Work

    Coordination

    Site/ factory visits

    Weather conditions

    Disruption to siteactivities

    As-Built sketches,drawings, diagrams,etc.

    As-erected/ As-Installed Work/ plant,etc.

    By EmployersRepresentative/

    Designatedperson

    Accuracy ofentries

    By S.O./ contractadministrator

    Up to lapse ofperiod oflimitation

    Preferably kept byeach and every sitepersonnel

    Personal record of siteactivities

    Otherwise bydesignated sitesupervision teammember

    Issued to Contractors

    Carried out byContractor

    Contractorsdefaults/omissions

    DURATIONDURATIONDURATIONDURATION

    From commencement ofwork on site untilcompletion

    If necessary until the endof the contract

    By designatedperson

    By Employer/S.O./ any

    interested party

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    50/169

    HSKS

    SUPERVISION OF WORKS/

    CONTRACT ADMINISTRATION

    4 0 SUPERVISION OF WORKS/CONTRACT ADMINISTRATION

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    51/169

    HSKS

    4.0 SUPERVISION OF WORKS/CONTRACT ADMINISTRATION

    1.01.01.01.0 CONTRACT ADMINISTRATIONCONTRACT ADMINISTRATIONCONTRACT ADMINISTRATIONCONTRACT ADMINISTRATION

    PURPOSE

    DESIGNATION

    ROLES SOURCES OF DUTIES AND POWERS

    REPRESENTATIVE/ASSISTANTS

    PRINCIPAL DUTIES

    LIABILITY

    2.02.02.02.0 SUPERVISIONSUPERVISIONSUPERVISIONSUPERVISION

    FORMS

    DURATION

    LEVEL

    LIABILITIES

    3.03.03.03.0 DISCUSSION OF CASE LAWDISCUSSION OF CASE LAWDISCUSSION OF CASE LAWDISCUSSION OF CASE LAW

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    52/169

    HSKS

    CONTRACTADMINISTRATION:

    PRIMARY PURPOSES

    FIG. 4-1 : CONTRACT ADMINISTRATION PRIMARY PURPOSES

    ENSURE THAT CONTRACTORFULFILLS HIS OBLIGATIONS

    UNDER THE CONTRACT

    ENSURE THAT EMPLOYERSPOSITION ADEQUATELY

    PROTECTED AGAINST VARIOUSCLAIMS

    ENSURE WORKS

    SATISFACTORILYCOMPLETED WITHINORIGINAL CONTRACT PERIOD

    AND PRICE

    ENSURE THAT EMPLOYERFULFILLS HIS OBLIGATIONS

    UNDER THE CONTRACT

    ENSURE THAT NEEDS/OBLIGATIONS OF CONTRACT

    ADMINISTRATOR UNDERCONTRACT/STATUTE

    ADEQUATELY FULFILLED

    ENSURE THAT EMPLOYERFULFILS HIS

    STATUTORY/LOCALAUTHORITY REQUIREMENTS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    53/169

    FIG. 4-2 : CONTRACT ADMINISTRATORS COMMON DESIGNATIONS

    HSKS

    CONTRACTADMINISTRATORS:

    COMMONDESIGNATIONS

    SUPERINTENDINGOFFICER/ S.O.

    CONSTRUCTIONMANAGER

    EMPLOYERSREPRESENTATIVE ENGINEER

    ARCHITECTPROJECT DIRECTOR

    AS TO

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    54/169

    HSKS

    CONTRACTADMINISTRATOR:RANGE OF ROLES

    PERFORMED

    WITH EXPRESSAUTHORITY

    AS AN AGENTOF THE EMPLOYER

    AS AN ADVISORTO THE EMPLOYER

    AS AN INDEPENDENTCONTRACTOR

    AS AN INDEPENDENT/IMPARTIAL

    ADJUDICATOR

    WITH IMPLIED/OSTENSIBLEAUTHORITY

    WHERE SUCHWORK

    IS REQUIREDPOST-

    CONTRACT

    FOR MAINLY

    DESIGN/DETAILING

    WORK

    AS TO MATTERSOF COST

    AS TO OTHERMATTERS

    RIGHTS/ DUTIES UNDERTHE CONTRACT

    AS TO DISPUTE

    RESOLUTIONAS TO

    CERTIFICATION

    FIG. 4-3 : CONTRACT ADMINISTRATOR RANGE OF ROLES PERFORMED

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    55/169

    HSKS

    CONTRACT ADMINISTRATOR: SOURCES OF DUTIES AND POWERS

    TERMS OFREFERENCE OFAPPOINTMENT

    IN-HOUSE EMPLOYEE EXTERNAL BODY/PERSON

    CONDITIONSOF CONTRACT

    BEINGADMINISTERED

    CONDITIONSOF

    ENGAGEMENT/SERVICES

    AGREEMENT

    CONDITIONS OFCONTRACT

    BEINGADMINISTERED

    FIG. 4-4 : CONTRACT ADMINISTRATOR SOURCES OF DUTIES AND POWERS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    56/169

    HSKS

    FIG. 4-5 : CONTRACT ADMINISTRATORS REPRESENTATIVES/ASSISTANTS - TYPICALEXAMPLES

    CONTRACT ADMINISTRATORSREPRESENTATIVES/ ASSISTANTS:

    TYPICAL EXAMPLES

    ARCHITECT

    ELECTRICAL ENGINEER

    PROJECT MANAGER STRUCTURAL ENGINEER

    SPECIALISTCONSULTANT CIVIL ENGINEER

    QUANTITY SURVEYOR MECHANICAL ENGINEER

    PROGRESS MONITORINGOVERALL SUPERVISION

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    57/169

    HSKS

    FIG. 4-6: CONTRACT ADMINISTRATORS PRINCIPAL DUTIES FOR TRADITIONAL GENERALCONTRACTS

    CONTRACT ADMINISTRATORS PRINCIPAL DUTIES FORTRADITIONAL GENERAL CONTRACTS

    OVERSEEING TRAINING OF EMPLOYERSO & M PERSONNEL

    ADVISING EMPLOYER

    ORDERING VARIATIONS

    PARTICIPATING IN PREPARATION OF MIGRATION/FACILITIES MANAGEMENT PLANS CLOSING-OFF CONTRACT

    PARTICIPATING IN TESTING AND COMMISSIONING

    ISSUING INFORMATION,DRAWINGS, DETAILS, ETC.

    ADMINISTRATION OF PAYMENTS

    GRANTING APPROVALS, CONSENTS, ETC.

    NOMINATING SUB-CONTRACTORS, ETC.

    ISSUING RELEVANT INSTRUCTIONS

    INSPECTIONS OF WORKS

    MONITORING

    RECTIFICATION OF DEFECTS

    OVERSEEING COMPLETION &HANDING OVER OF WORKS

    PREPARING FINAL ACCOUNT

    CHECKING AND APPROVING O & M MANUALS &AS-BUILT DRAWINGS

    ISSUING NECESSARY REPORTS

    MONITORING SERVICING AND MAINTENANCE

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    58/169

    HSKS

    FIG. 4-7 : FORMS OF SUPERVISION COMMON LABELS

    FORMS OF SUPERVISION:COMMON LABELS

    FULL-TIME SUPERVISION

    PART-TIME SUPERVISION

    NOMINAL SUPERVISION STANDINGSUPERVISION

    PERIODIC SUPERVISION CONSTANT SUPERVISION

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    59/169

    FIG. 4-8 : SUPERVISION/INSPECTIONS OVERVIEW (PART I)

    HSKS

    TYPICALTYPICALTYPICALTYPICALCLAUSES INCLAUSES INCLAUSES INCLAUSES IN

    AGREEMENTSAGREEMENTSAGREEMENTSAGREEMENTS

    TYPICALTYPICALTYPICALTYPICALCLAUSES INCLAUSES INCLAUSES INCLAUSES IN

    AGREEMENTSAGREEMENTSAGREEMENTSAGREEMENTS

    SUPERVISION/INSPECTIONS: OVERVIEW (PART I)

    NATURENATURENATURENATUREAND MEANINGAND MEANINGAND MEANINGAND MEANING

    NATURENATURENATURENATUREAND MEANINGAND MEANINGAND MEANINGAND MEANING

    PURPOSESPURPOSESPURPOSESPURPOSESPURPOSESPURPOSESPURPOSESPURPOSESTYPICALTYPICALTYPICALTYPICAL

    PROVISIONS INPROVISIONS INPROVISIONS INPROVISIONS INBYBYBYBY----LAWSLAWSLAWSLAWS

    TYPICALTYPICALTYPICALTYPICALPROVISIONS INPROVISIONS INPROVISIONS INPROVISIONS IN

    BYBYBYBY----LAWSLAWSLAWSLAWS

    Terms used synonymously

    See Newey Js definition

    Distinction: Inspection imposes alesser duty: William Tompkinsonv St. Michael in the Hamlet.

    In absence of express provisionsto contrary courts imply a duty ofsupervision:Alexander Corfield vDavid Grant.

    Malaysia: Statutory provisions

    necessitate supervision

    Building (Federal Territory ofKuala Lumpur) By-Laws 1985:

    1. By-Law 6: Supervision of

    Works

    2. By-Law 23(1): Certificate ForOccupation

    By-Law 5(1) City of KualaLumpur (Earthworks) By-Laws1975

    Engineers Agreement:

    1. Clause 8.1 and 8.7 BEMForm (1999)

    Architects Agreement

    1. Clause 5(4)(iv) Part II:Architects (Scale ofMinimum Fees)(Amendment) Rules 1992

    2. Clause 9 Conditions ofEngagement of Architect

    See Keatings definition inBuilding Contracts

    Three fold purpose:

    1. To ensure contractorcarries out work inaccordance with contract.

    2. To enable contractadministrator to dischargehis obligations to employer.

    3. To enable contract

    administrator to meet hisstatutory obligations

    SUPERVISION/INSPECTIONS OVERVIEW (PART II)

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    60/169

    FIG. 4-9 : SUPERVISION/INSPECTIONS OVERVIEW (PART II)

    HSKS

    DURATIONDURATIONDURATIONDURATIONDURATIONDURATIONDURATIONDURATION

    SUPERVISION/INSPECTIONS: OVERVIEW (PART II)

    RESIDENTRESIDENTRESIDENTRESIDENTSITE STAFFSITE STAFFSITE STAFFSITE STAFFRESIDENTRESIDENTRESIDENTRESIDENT

    SITE STAFFSITE STAFFSITE STAFFSITE STAFF LIABILITIESLIABILITIESLIABILITIESLIABILITIESLIABILITIESLIABILITIESLIABILITIESLIABILITIES

    LEVEL OFLEVEL OFLEVEL OFLEVEL OFSUPERVISIONSUPERVISIONSUPERVISIONSUPERVISION

    REQUIREDREQUIREDREQUIREDREQUIRED

    LEVEL OFLEVEL OFLEVEL OFLEVEL OFSUPERVISIONSUPERVISIONSUPERVISIONSUPERVISION

    REQUIREDREQUIREDREQUIREDREQUIRED

    Necessity for Resident SiteStaff (RSS)

    Typical examples:

    1. Resident architect/engineer2. Clerk-of-works.3. Other relevant staff

    Engagement:

    1. By employer; or2. By contract administrator

    Powers and duties determinedby engineering/constructioncontract being administeredand/or letter of delegation ofpower.

    Responsibilities of:

    1. RSS2. Contract Administrator

    Determined by:1. Conditions of engagement

    2. Applicable statutoryprovisions e.g. By-Laws

    Prevailing Forms:

    1. Category I: Full-time/Standing/ Constantsupervision

    2. Category II: Part-Time/Periodic Supervision

    3. Category III: NominalSupervision

    Legal Position:

    1. Must be reasonable forworks involved

    2. Must be sufficient to checkthe important elements

    3. Adequate to meet statutoryrequirements

    4. Sufficient to meetobligations of engagement

    Determining factors:1. Nature of works under

    contract

    2. Conditions of engagement

    Normal periods:

    1. Up to issue of PracticalCompletion; or

    2. Up to application of certificate

    for occupation; or3. Up to issue of Certificate of

    Making Good Defects

    Common practice is up to issue ofCertificate of Making GoodDefects

    Primary responsibility forsupervision: contractors.See East Ham Corp. vBernard Sunley.

    Heads of liabilities of contractadministrator for defaults/breaches:

    1. Contractual2. In tort3. Statutory

    Position of contractadministrators who areprofessional engineers,architects, etc.

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    61/169

    FIG. 4-10 : CONTRACT ADMINISTRATORS LIABILITIES AN OVERVIEW (PART I)

    HSKS

    HEADS OF LIABILITIESHEADS OF LIABILITIESHEADS OF LIABILITIESHEADS OF LIABILITIESHEADS OF LIABILITIESHEADS OF LIABILITIESHEADS OF LIABILITIESHEADS OF LIABILITIES

    CONTRACT ADMINISTRATORS LIABILITIES: AN OVERVIEW (PART I)

    LEGAL KNOWLEDGELEGAL KNOWLEDGELEGAL KNOWLEDGELEGAL KNOWLEDGEAND PERSONAL DUTYAND PERSONAL DUTYAND PERSONAL DUTYAND PERSONAL DUTYLEGAL KNOWLEDGELEGAL KNOWLEDGELEGAL KNOWLEDGELEGAL KNOWLEDGE

    AND PERSONAL DUTYAND PERSONAL DUTYAND PERSONAL DUTYAND PERSONAL DUTY

    STANDARD OF CARESTANDARD OF CARESTANDARD OF CARESTANDARD OF CARESTANDARD OF CARESTANDARD OF CARESTANDARD OF CARESTANDARD OF CAREGENERAL POSITIONGENERAL POSITIONGENERAL POSITIONGENERAL POSITIONGENERAL POSITIONGENERAL POSITIONGENERAL POSITIONGENERAL POSITION

    General position: Required to haveknowledge of all legal mattersrelating to work being undertaken

    Nature of matters.

    Consequences of failure

    Duty is personal and non-delegable

    Action by employer under termsof contract of engagement

    If no express terms, implied bylaw

    Contract of engagement:

    1. Standard forms, or2. Bespoke Forms

    Three main categories:1. Contractual2. Tortious3. Statutory

    Characteristics:

    1. Not distinct/mutually exclusive

    2. Concurrent/complementary

    3. Choice of option on aggrieved part

    CONTRACTUALCONTRACTUALCONTRACTUALCONTRACTUALLIABILITYLIABILITYLIABILITYLIABILITY

    CONTRACTUALCONTRACTUALCONTRACTUALCONTRACTUALLIABILITYLIABILITYLIABILITYLIABILITY

    Prove no validexpress/implied contractof engagement

    If there is such validcontract prove:

    1. Contract didnt imposeparticular duty breachof which claimed, or

    2. Service actuallyrendered was of thestandard reasonablyexpected under thecircumstances

    EFFECT OF BREACHEFFECT OF BREACHEFFECT OF BREACHEFFECT OF BREACHEFFECT OF BREACHEFFECT OF BREACHEFFECT OF BREACHEFFECT OF BREACH

    Two options available toemployer:

    1. Rescind contract and sue for

    damages; or2. Affirm contract and sue for

    damages

    Right of election of optionbelongs to employer

    Duty of care owed to employer

    Usually to use reasonable skilland care

    Duty and standard of care either:

    1. Expressed in contract ofengagement, or

    2. Implied by law

    DEFENCESDEFENCESDEFENCESDEFENCESDEFENCESDEFENCESDEFENCESDEFENCES

    CONTRACT ADMINISTRATORS LIABILITIES: AN OVERVIEW (PART II)

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    62/169

    FIG. 4-11 : CONTRACT ADMINISTRATORS LIABILITIES AN OVERVIEW (PART II)

    HSKS

    TORTIOUS LIABILITYTORTIOUS LIABILITYTORTIOUS LIABILITYTORTIOUS LIABILITY

    REASONABLEREASONABLEREASONABLEREASONABLESKILL & CARESKILL & CARESKILL & CARESKILL & CAREDEFINITIONDEFINITIONDEFINITIONDEFINITION

    BASICBASICBASICBASICELEMENTSELEMENTSELEMENTSELEMENTS

    STANDARDSTANDARDSTANDARDSTANDARD

    OF CAREOF CAREOF CAREOF CARE

    ESTABLISHINGESTABLISHINGESTABLISHINGESTABLISHINGLIABILITYLIABILITYLIABILITYLIABILITY DEFENCESDEFENCESDEFENCESDEFENCES

    LIABILITY TOLIABILITY TOLIABILITY TOLIABILITY TO3333RDRDRDRD PARTIESPARTIESPARTIESPARTIES

    Laid down inDonoghue vStevenson

    Neighbourhoodprinciple

    Important elements:

    1. Causation2. Forseeability

    D owed P duty ofcare

    D breached this duty

    Consequence: Psufferedloss/damage

    Loss/damagesuffered not remote

    CONTRACT ADMINISTRATOR S LIABILITIES: AN OVERVIEW (PART II)

    Duty of care in tort of negligence concurrentwith contractual duty: Brown v Boorman

    Common Forms:

    1. Acts/omissions2. Mis-statements

    GENERAL POSITIONGENERAL POSITIONGENERAL POSITIONGENERAL POSITION NEGLIGENCENEGLIGENCENEGLIGENCENEGLIGENCE

    Application of theBolam Test

    Use of ReasonableMan test

    Use by MalaysianCourts

    2 Categories:

    1. Reasonableskill & care

    2. Fitness forpurpose

    Criterion: Objective

    Less onerous

    Use of standardsprevailing at time ofdefault

    Proscribe use ofhindsight

    See Eckersly vBinnie & Partners

    Per Hunter vHenley

    1. There is a usualand normalpractice

    2. D did not adoptthe practice

    3. Practice

    adopted by Dwould not beadopted byanotherreasonable D

    Need to satisfy all 3element on balanceof probabilities

    Only 3 types:

    1. Deny existence ofduty of care

    2. Prove claim madenot of typecurrentlyrecognized

    3. Show service

    rendered meetsBolam Test

    No immunity to suit:Sutcliffe v Thackrah

    Situation per PureEconomic Loss

    No liability tocontractor

    Possibleexceptions:See Para 5.9B5.

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    63/169

    FIG. 4-12 : CONTRACT ADMINISTRATORS LIABILITIES AN OVERVIEW (PART III)

    HSKS

    STATUTORY LIABILITYSTATUTORY LIABILITYSTATUTORY LIABILITYSTATUTORY LIABILITYSTATUTORY LIABILITYSTATUTORY LIABILITYSTATUTORY LIABILITYSTATUTORY LIABILITY

    For professional contractadministrator

    Under specific Acts ofParliament

    Possible sanctions:1. Fine2. Suspension3. Cancellation of

    registration

    Liability under various By-Laws e.g. UBBL, etc.

    Penalties/sanctions stipulatedin the By-Laws

    PROFESSIONALPROFESSIONALPROFESSIONALPROFESSIONALLIABILITYLIABILITYLIABILITYLIABILITY

    PROFESSIONALPROFESSIONALPROFESSIONALPROFESSIONALLIABILITYLIABILITYLIABILITYLIABILITY

    CONTRACT ADMINISTRATORS LIABILITIES: AN OVERVIEW (PART III)

    Various Acts of Parliamentapplicable

    Principal example: S71 Street,Drainage & Building Act 1974

    Penalty for mis-supervision, etc.

    GENERAL POSITIONGENERAL POSITIONGENERAL POSITIONGENERAL POSITIONGENERAL POSITIONGENERAL POSITIONGENERAL POSITIONGENERAL POSITION DIRECTDIRECTDIRECTDIRECTSTATUTORY LIABILITYSTATUTORY LIABILITYSTATUTORY LIABILITYSTATUTORY LIABILITY

    DIRECTDIRECTDIRECTDIRECTSTATUTORY LIABILITYSTATUTORY LIABILITYSTATUTORY LIABILITYSTATUTORY LIABILITY

    In addition to Contractual andTortious Liability

    Various sub-heads:

    1. Direct statutory liability2. Under delegated legislation3. Professional liability

    LIABILITIES UNDERLIABILITIES UNDERLIABILITIES UNDERLIABILITIES UNDERDELEGATEDDELEGATEDDELEGATEDDELEGATED

    LEGISLATIONLEGISLATIONLEGISLATIONLEGISLATION

    LIABILITIES UNDERLIABILITIES UNDERLIABILITIES UNDERLIABILITIES UNDERDELEGATEDDELEGATEDDELEGATEDDELEGATED

    LEGISLATIONLEGISLATIONLEGISLATIONLEGISLATION

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    64/169

    HSKS

    PAYMENTS/

    COMMERCIAL MATTERS

    5.0 PAYMENTS/COMMERCIAL MATTERS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    65/169

    LEGAL OBLIGATION OF EMPLOYERLEGAL OBLIGATION OF EMPLOYERLEGAL OBLIGATION OF EMPLOYERLEGAL OBLIGATION OF EMPLOYER

    PAYMENT TO MAIN CONTRACTOR/TURNKEY CONTRACTORPAYMENT TO MAIN CONTRACTOR/TURNKEY CONTRACTORPAYMENT TO MAIN CONTRACTOR/TURNKEY CONTRACTORPAYMENT TO MAIN CONTRACTOR/TURNKEY CONTRACTOR

    PAYMENT TO SUBPAYMENT TO SUBPAYMENT TO SUBPAYMENT TO SUB----CONTRACTORSCONTRACTORSCONTRACTORSCONTRACTORS

    BACK TO BACKBACK TO BACKBACK TO BACKBACK TO BACK PAYMENTSPAYMENTSPAYMENTSPAYMENTS

    BREACHES IN PAYMENT OBLIGATIONSBREACHES IN PAYMENT OBLIGATIONSBREACHES IN PAYMENT OBLIGATIONSBREACHES IN PAYMENT OBLIGATIONS

    RELEVANT CASESRELEVANT CASESRELEVANT CASESRELEVANT CASES

    SUTCLIFFE V THACKRAH[1974] 1 ALL ER 319

    * CROUDACE LTD. V THE LONDON BOROUGH OF LAMBETH[1986] 33 BLR 20

    * GUNUNG BAYU SDN. BHD. V SYARIKAT PEMBINAAN PERLIS SDN. BHD. [1987] 2 MLJ 332

    * HAJI ABU KASSIM V TEGAP CONSTRUCTION SDN. BHD. [1981] 2 MLJ 149

    * KAH SENG CONSTRUCTION SDN. BHD. V SELSIN DEVELOPMENT SDN. BHD. [1997] 1 CLJ

    SUPP 448

    * YONG MOK HIN V UNITED MALAY STATES SUGAR INDUSTRIES LTD. [1966] 2 MLJ 286

    * JALLCON (M) SDN. BHD. V NIKKON METAL (M) SDN. BHD. (No. 2) [2001] 5 MLJ 716, HC.

    HSKS

    PROCEDURES AND CONDITIONSPRECEDENT

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    66/169

    HSKS

    PAYMENT: ASPECTS OF CONTRACTORSENTITLEMENTS/EMPLOYERS OBLIGATIONS

    TIMING ENFORCEMENT/HONOURING

    PRECEDENT

    QUANTUM/AMOUNT SET-OFF/DEDUCTIONS

    FIG. 5-1: PAYMENTS ASPECTS OF CONTRACTORS ENTITLEMENT/EMPLOYERS OLIGATIONS

    TIMING OF PAYMENT TO CONTRACTOR PRINCIPAL SCHEMES/SCHEDULES

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    67/169

    HSKS

    FIG. 5-2 : TIMING OF PAYMENT TO CONTRACTOR PRINCIPAL SCHEMES/SCHEDULES

    PERIODIC SCHEDULEPERIODIC SCHEDULEPERIODIC SCHEDULEPERIODIC SCHEDULEDURING CURRENCYDURING CURRENCYDURING CURRENCYDURING CURRENCYOF THE CONTRACTOF THE CONTRACTOF THE CONTRACTOF THE CONTRACT

    TIMING OF PAYMENT TO CONTRACTOR: PRINCIPAL SCHEMES/SCHEDULES

    STAGES/MILESTONESTAGES/MILESTONESTAGES/MILESTONESTAGES/MILESTONEPAYMENTPAYMENTPAYMENTPAYMENT

    ADVANCE PAYMENTADVANCE PAYMENTADVANCE PAYMENTADVANCE PAYMENT

    PERIODIC SCHEDULEPERIODIC SCHEDULEPERIODIC SCHEDULEPERIODIC SCHEDULEAFTER COMPLETION/AFTER COMPLETION/AFTER COMPLETION/AFTER COMPLETION/END OF CONTRACTEND OF CONTRACTEND OF CONTRACTEND OF CONTRACT

    AFTER COMPLETION/AFTER COMPLETION/AFTER COMPLETION/AFTER COMPLETION/END OF CONTRACTEND OF CONTRACTEND OF CONTRACTEND OF CONTRACT

    AFTER ISSUE OFAFTER ISSUE OFAFTER ISSUE OFAFTER ISSUE OFFINAL CERTIFICATEFINAL CERTIFICATEFINAL CERTIFICATEFINAL CERTIFICATE

    AFTERAFTERAFTERAFTERISSUE OF CPCISSUE OF CPCISSUE OF CPCISSUE OF CPC

    FINANCIALFINANCIALFINANCIALFINANCIALPHYSICAL WORKSPHYSICAL WORKSPHYSICAL WORKSPHYSICAL WORKS

    OF WHOLEOF WHOLEOF WHOLEOF WHOLECONTRACT SUMCONTRACT SUMCONTRACT SUMCONTRACT SUM

    OF PART OFOF PART OFOF PART OFOF PART OFCONTRACT SUMCONTRACT SUMCONTRACT SUMCONTRACT SUM

    AFTER ISSUEAFTER ISSUEAFTER ISSUEAFTER ISSUEOF CPCOF CPCOF CPCOF CPC

    AFTER ISSUE OFAFTER ISSUE OFAFTER ISSUE OFAFTER ISSUE OFFINAL CERTIFICATEFINAL CERTIFICATEFINAL CERTIFICATEFINAL CERTIFICATE

    MISCELLANEOUS/MISCELLANEOUS/MISCELLANEOUS/MISCELLANEOUS/METHODSMETHODSMETHODSMETHODS

    START

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    68/169

    Are they includedin the Project ProceduresManual?

    No

    Contract administrator to issueformal record of issues agreed

    upon by all relevant parties

    A

    Yes

    Contract administrator toresolve all preliminary issues

    Have these beensorted- out following award of

    contract?

    Yes

    Yes

    Have thesebeen formalized by all the

    parties?

    No

    No

    Are the preliminarymatters expressly stipulated

    in the contract?

    Yes

    No

    All relevant partiesto take necessary steps to

    implement issues

    Contract administratorto take necessaryaction forthwith

    FIG. 5-3: FLOWCHART ON GENERAL PROCEDURE FOR PROCESSING OF PAYMENTS (PART I)

    HSKS

    A

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    69/169

    Has heexecuted any physicalwork?

    Yes

    C

    No

    Establish if the contractorhas fulfilled his firstpre-condition to payment

    Contract administratornot obliged to initiatethe progress payment

    Has hedelivered materials to

    site?

    Yes

    Yes

    Does the contractcontain an express termthereto?

    No

    Has the contractorcommenced with the work

    under the contract?No

    Yes

    Prima facie, contractormay be entitled to payment

    Establish if it is necessaryfor the contractor to apply for

    the required payment

    Contractor notentitled to any

    payment

    D

    No

    B

    FIG. 5-4: FLOWCHART ON GENERAL PROCEDURE FOR PROCESSING OF PAYMENTS (PART II)

    HSKS

    DCB

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    70/169

    GE F

    Has themethod for valuation been

    confirmed?

    Yes

    Have theparties involved been

    identified?

    Yes

    Yes

    Have therelevant pre-conditions beenfulfilled?

    Yes

    Contract administrator to proceedwith the next stage i.e. valuation

    Has thedate of valuation been

    reached?

    Yes

    Is it mandatory?

    No Contractor maynot be entitled topayment untilhe satisfies

    pre-conditions

    Hascontractor complied with

    requirements?

    Yes

    No

    Contractor notobliged to apply

    NoDeficiencies/omissionsto be addressed

    forthwith to enableprocess to continue

    Contract administratorobliged to initiate

    process on his ownvolition

    No

    No Prima facie, valuation

    may not be initiateduntil achievementof necessaryrequirements

    No

    FIG. 5-5: FLOWCHART ON GENERAL PROCEDURE FOR PROCESSING OF PAYMENTS (PART III)

    HSKS

    F GE

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    71/169

    IH KJ

    Valuation of works to be carried

    out jointly by the relevant parties

    Valuers to prepare a valuation report

    Does thecontractor agree with the valuation?

    Does he officiallyregister his protest with

    valuers?

    Do the valuersconsider the objections

    protest?

    Do theyagree with the

    objections?

    Valuers may revise/amendthe valuation as necessary

    Valuers to endorse/sign offthe valuation report prepared

    Does hesign off the

    valuation report?

    Valuation deemed to havebeen accepted by the

    contractor

    Contractor may protest tothe certifier if necessary

    Does theContractor

    protest to thecertifier?

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    No

    No

    No

    No

    No

    No

    FIG. 5-6: FLOWCHART ON GENERAL PROCEDURE FOR PROCESSING OF PAYMENTS (PART IV)

    HSKS

    KJH I

    V l ti t t th ith

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    72/169

    M ON

    L

    Valuation report together withall other necessary documents to

    be submitted to the certifier

    Certifier to carry out preliminary reviews

    Is the valuationreport complete, sufficient and

    accurate?

    Has thecontractor any valid grounds

    for objecting?

    Certifier not to considerobjections any further

    Is the datefor certification

    imminent?

    Has the stipulatedminimum value of work been exceeded?

    Certifier to proceed with thenecessary certification procedures

    Certifier to takeobjections into

    consideration beforeundertaking certification

    Certifier may exercisehis discretion in

    undertaking certification

    Should inhis discretion a

    certificate beissued?

    Certifier to clarify/discuss deficiencies/omissions with the

    valuers

    Deficiencies/omissions maycompromise the

    certification

    Certifier has no discretion tocarry out certification

    Yes

    Yes

    Yes

    Yes

    Yes

    No

    No

    NoNo

    No

    FIG. 5-7: FLOWCHART ON GENERAL PROCEDURE FOR PROCESSING OF PAYMENTS(PART V)

    HSKS

    OM L N

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    73/169

    SP TQ

    -

    R

    Is the 1st Interim Certificate due?

    Have allthe stipulated pre-conditions been met?

    Is thesubsequent Interim Certificate

    due?

    Have allthe relevant pre-conditions been met?

    Certifier to proceed withpreparation of Interim Certificate

    Is there astandard form of certificate prescribed?

    Has a bespoke form been generated?

    Certifier to develop an ad hoc formmeeting the necessary criteria/contents

    requirements

    Utilize the formunless foundnot suitable

    Prima facie,certificate cannot

    be issued

    Use thestandard formas prescribed

    No

    No

    No

    No

    No

    No

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    FIG. 5-8: FLOWCHART ON GENERAL PROCEDURE FOR PROCESSING OF PAYMENTS (PART VI)

    HSKS

    TRP SQ

    Certifier to fill in all details

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    74/169

    XU V W

    Certifier to fill in all detailscompletely, sufficiently and

    correctly in certificate

    Are thereany NSCs/Nominated

    Suppliers?

    Arethere any official

    assignees?

    Areall procedural requirements met?

    Are

    all formal requirementsmet?

    Is the signatory anauthorized person under the

    contract?

    Have all therelevant checks for errors,etc. been undertaken?

    Certificate may bechallenged as invalid and

    unenforceable, if andwhen issued

    Amount certifiedfor such partiesto be indicated

    separately in certificate

    Deficiencies/ errors maycompromise validity ofcertificate

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    No

    No

    No

    No

    No

    No

    FIG. 5-9: FLOWCHART ON GENERAL PROCEDURE FOR PROCESSING OF PAYMENTS (PART VII)

    HSKS

    XVU W

    C d i i CA to rectify

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    75/169

    ABY AAZ

    Contract administrator to

    issue relevant certificate

    Is there acertification period stipulated

    in the contract?

    Is certificateissued within the said

    period?

    Is the recipientof the original copy

    stipulated?

    Is the certificateissued to the stipulated

    person?

    Are copiesissued to the relevant

    parties?

    Is the serviceof certificate formally

    evidenced?

    Prima facie, employer maybe in breach of contract.

    Contractor may takeappropriate action for

    employers breach

    Contractor tobe furnished with

    original copy

    CA to rectifydeficiencies/errors

    as soon as possible

    Certificate to be issuedwithin a reasonable timeof application/ valuation

    Default in service mayconstitute a breach of

    contract on employers part.To be corrected/ rectifiedforthwith

    Relevant parties have aright to demand the

    necessary copies fromcontract administrator

    No

    No

    No

    No

    No

    No

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    FIG. 5-10: FLOWCHART ON GENERAL PROCEDURE FOR PROCESSING OF PAYMENTS (PART VIII)

    HSKS

    ABAAY Z

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    76/169

    -

    AFAC AEAD

    Establish the specific post-

    certification requirements

    Do therecipients formally

    acknowledge receipt ofdocument?

    Is presentationof certificate stipulated in the

    contract?

    Is there aperiod stipulated for the

    presentation?

    Is presentationformally effected within this

    period?

    Does employerformally acknowledges receipt

    of the certificate fromcontractor?

    Employer to reviewcertificate for validity

    Contractormay present

    certificate withina reasonable

    period of receipt

    Omission toacknowledge may

    lead to future evidentialproblems

    Contract administrator

    to procure saidacknowledgements assoon as possible

    Delay may postponeemployers obligation to

    honour certificate

    Omission to acknowledge maylead to future evidential

    problems and may affect thehonouring of certificate

    Contractor to procuresaid acknowledgement

    as soon as possible

    No

    No

    No

    No

    No

    Yes

    Yes

    Yes

    Yes

    Yes

    FIG. 5-11: FLOWCHART ON GENERAL PROCEDURE FOR PROCESSING OF PAYMENTS (PART IX)

    HSKS

    AFAEAC AD

    Are Employer may challenge

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    77/169

    -

    -

    there grounds forchallenging validity of

    certificate?

    Employer to proceed with honouringcertificate issued/ presented (as

    applicable)

    Are there anyset-offs/deductions to be

    made?

    Are theseexpressly permitted by the

    contract?

    Has the

    amount certified less the set-offs/ deduction beenestablished?

    Has the finalsum due been paid to the

    contractor?

    Has this been done in thestipulated honouring

    period?

    STOP

    Employer mustpay amountas certified

    to the contractor

    Employer to determine amount

    due before the stipulatedhonouring period lapses

    Employer may challengecertificate and refuse to

    honour it citing therelevant grounds

    Employer culpableof breach of contract.

    Contractor to takeappropriate action.

    No

    No

    No

    No

    No

    No

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    FIG. 5-12: FLOWCHART ON GENERAL PROCEDURE FOR PROCESSING OF PAYMENTS (PART X)

    HSKS

    RECOVERY OF THE UNPAIDAMOUNT

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    78/169

    HSKS

    DEFAULT IN PAYMENT:TYPICAL CONTRACTUAL

    REMEDIES

    FIG. 5-13 : DEFAULT IN PAYMENT - TYPICAL CONTRACTUAL REMEDIES

    RIGHT TO SUSPEND WORK

    MISCELLANEOUSREMEDIES

    INTEREST ON THEUNPAID AMOUNT

    RIGHT TO DETERMINEEMPLOYMENT UNDER

    CONTRACT

    RIGHT TO REDUCE RATEOF EXECUTING WORK

    CERTIFICATE WRONG ON ITS FACE

    CERTIFICATE FUNDAMENTALLY INACCURATE

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    79/169

    INTERIM CERTIFICATES:TYPICAL CHALLENGES

    CERTIFICATE FUNDAMENTALLY INACCURATE

    CERTIFICATE NOT IN CORRECT FORM

    CERTIFICATE ISSUED BY UNAUTHORISED PERSON

    CERTIFICATE ISSUED IN UNAUTHORISED MANNER

    CERTIFICATE ISSUED OUT OF TIME

    CERTIFIER ACTING ULTRA VIRES

    CERTIFIER IMPROPERLY PRESSURIZED/INFLUENCED

    CERTIFICATE SUBJECT TO FRAUD/COLLUSION

    FRAUD, DISHONESTY/FRAUDULENT CONCEALMENT BY CONTRACTOR

    MISCELLANEOUS CHALLENGES

    FIG. 5-14: INTERIM CERTIFICATES TYPICAL CHALLENGES

    HSKS

    DIRECT PAYMENT BY THEEMPLOYER

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    80/169

    HSKS

    PAYMENT TO SUB-CONTRACTORS:PRINCIPAL METHODS

    PAYMENT UPON CERTIFICATION CONTINGENT PAYMENT

    FIG. 5-15 : PAYMENT TO SUB-CONTRACTORS PRINICPAL METHODS

    -

    START

    Sub-Contractor (SC) forwards details of amount SC to make fresh submission in the

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    81/169

    A

    -

    claimed to Main Contractor (MC) officially

    Is it withinthe prescribed time

    limits?

    MC to includeSCs details in his claim

    MC to submit consolidated claimto the Contract Administrator (CA)

    CA to carry out the necessary valuation

    CA to issue interimpayment certificate to MC

    Employer to pay certified amount toMC within the Honouring Period

    Establish if there is aContingent Payment Type IIclause in the sub-contract

    next application

    Does theMC accept thesubmission?

    YesYes

    No

    No

    FIG. 5-16: FLOWCHART ON GENERAL PROCEDURE FOR TYPE II CONTINGENT PAYMENT (PART I)

    HSKS

    A

    Is there No

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    82/169

    STOP

    such a clause in thecontract?

    Is theperiod for payment

    stated?

    Does the MCpay the SC within thesaid period?

    SC to pursue the remediesavailable under the contract

    Are thereany contractual remediesavailable?

    Is therean arbitrationagreement?

    SC to pursue his commonlaw remedies if necessary

    MC may pay SC withina reasonable time of receipt of

    monies from the Employer

    SC to initiate the contractualremedies as applicable

    SC to initiate the Arbitrationprocess if necessary

    Yes

    Yes

    Yes

    Yes

    Yes

    No

    No

    No

    No

    No

    FIG. 5-17: FLOWCHART ON GENERAL PROCEDURE FOR TYPE II CONTINGENT PAYMENTS(PART II)

    HSKS

    PAYMENT IN PACKAGE DEAL TYPES OF CONTRACTS: AN OVERVIEW

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    83/169

    HSKS

    CONTRACT SUMANALYSIS

    CONTRACT SUMANALYSIS

    QUANTITIESQUANTITIES MEASUREMENTMEASUREMENT

    For Tender Analysis

    For Interim Payment

    Valuation ofChanges/

    Provisional Sums

    For any PriceAdjustment

    SITUATIONSWHERE USED

    SITUATIONSWHERE USED ACCURACYACCURACY

    PURPOSEPURPOSE DRAFTINGDRAFTING

    Normally byContractor

    Samples may begiven by Employer

    in EmployersRequirements

    ERRORS/OMISSIONS

    ERRORS/OMISSIONS PREPARATIONPREPARATION

    Contractor responsible

    If Employer prepares,risk for errors/omissionsnormally passed on toContractor

    EXPRESSPROVISIONS

    EXPRESSPROVISIONS

    STRUCTURESTRUCTURE

    Given in some Formse.g. JCT 98, PWDForm DB/T, etc.

    Required for:

    1. Overall Works2. Sections or

    Phases

    GENERALPOSITION

    GENERALPOSITION

    Effect ofmeasurementexpresslystipulated in

    some forms Mostly deals with

    patent errors

    As based onLump Sum anddue to nature ofcontract

    No requirementfor measurement

    Changes/V.O.s

    UnforeseenConditions

    Included in mostStandard Forms

    E.g. Clause 55(1) ICE,Clause 13.1(d) FIDIC, etc.

    Risk on Contractor

    E.g. Clause 55(2) ICEForm

    GENERALPOSITION

    GENERALPOSITION

    Whenever used, effectnot similar to TGC

    Are deemed to be onlyestimates

    FIG. 5-18 : PAYMENT IN PACKAGE DEAL TYPES OF CONTRACTS: AN OVERVIEW

    FINAL AMOUNT TO WHICHCONTRACTOR ENTITLED TO UNDER

    THE CONTRACT

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    84/169

    HSKS

    FINAL ACCOUNT: PRINCIPAL CONTENTS

    FINAL ADJUSTMENTS TOTHE CONTRACT SUM

    FINAL AMOUNT (SET OFFS/DEDUCTIONS) TO WHICH

    EMPLOYER ENTITLED TO UNDERTHE CONTRACT

    FIG. 5-19 : FINAL ACCOUNT PRINCIPAL CONTENTS

    APPROVED VARIATIONSTO THE CONTRACT

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    85/169

    HSKS

    ADJUSTMENT TO THECONTRACT SUM: TYPICAL

    HEADS/ITEMS

    REMEASUREMENT OFPROVISIONALITEMS/WORK

    ADJUSTMENT FOR PRICEFLUCTUATION, ETC.

    PERMITTED COSTS FORTESTING, OPENING UP OF

    WORK, ETC.

    MISCELLANEOUSADJUSTMENTS APPROVED

    CONTRACTORS CLAIMS

    ADJUSTMENT FOR P.C.SUMS/ PROVISIONAL

    SUMS

    FEES AND CHARGES FORPERMANENT

    CONNECTIONS

    FIG. 5-20 : ADJUSTMENT TO THE CONTRACT SUM TYPICAL HEADS/ITEMS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    86/169

    HSKS

    VARIATIONS/CHANGES

    6.0 VARIATIONS/CHANGES

    WHAT CONSTITUTESWHAT CONSTITUTESWHAT CONSTITUTESWHAT CONSTITUTES VARIATIONS/CHANGESVARIATIONS/CHANGESVARIATIONS/CHANGESVARIATIONS/CHANGES

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    87/169

    WHAT CONSTITUTESWHAT CONSTITUTESWHAT CONSTITUTESWHAT CONSTITUTES VARIATIONS/CHANGESVARIATIONS/CHANGESVARIATIONS/CHANGESVARIATIONS/CHANGES

    ISSUES AS TO VALIDITYISSUES AS TO VALIDITYISSUES AS TO VALIDITYISSUES AS TO VALIDITY

    PROBLEMS WITH VARIATIONSPROBLEMS WITH VARIATIONSPROBLEMS WITH VARIATIONSPROBLEMS WITH VARIATIONS

    INVALID VARIATION ORDERS AND EFFECTSINVALID VARIATION ORDERS AND EFFECTSINVALID VARIATION ORDERS AND EFFECTSINVALID VARIATION ORDERS AND EFFECTS

    LIMITATIONS OF VARIATIONSLIMITATIONS OF VARIATIONSLIMITATIONS OF VARIATIONSLIMITATIONS OF VARIATIONS

    RELEVANT CASESRELEVANT CASESRELEVANT CASESRELEVANT CASES

    * SHARPE V SAN PAULO RAILWAY[1873] L.R. 8 CH. APP. 597

    * RE CHITTICK & TAYLOR[1954] 12 WWR 653

    * MITSUI CONSTRUCTION CO. LTD. V A.G. OF HONG KONG[1986] 33 BLR 1

    * CARR V JA BERRIMAN PTY LTD. [1953] 27 A.L.J.R. 273

    * COMMISSIONER FOR MAIN ROADS V REED & STUART PTY LTD. & ANOR[1974] A.L.J.R.461

    * SIR LINDSAY PARKINSON & CO. LTD. V COMMISSIONERS OF HIS MAJESTYS WORKSAND PUBLIC BUILDINGS[1950] 1 ALL ER 2008

    * ANTARA ELEKTRIK SDN. BHD. V BELL & ORDER BHD[2002] 3 MLJ 321, HC.

    HSKS

    VARIATIONS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    88/169

    HSKS

    FIG. 6-1: VARIATIONS: OVERVIEW

    TYPESFACTORS DETERMINING

    A VALID V.O.

    OMISSIONADDITION

    FORMALITIES

    ISSUE BYDESIGNATED

    OFFICER

    PROCEDURALREQUIREMENTS

    EXPRESS CONTRACTCONDITIONSAPPLICABLE

    HYBRID

    LEGAL NATURE OFPROPOSED CHANGE

    APPLICABLECOMMON

    LAW RULES

    CHANGE TO BE IN RELATIONTO SCOPE OF THE WORK

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    89/169

    HSKS

    CHANGES/VARIATIONS: BASIC ELEMENTS

    A CHANGE BEING EFFECTED

    SCOPE OF WORK BEINGCHANGED MUST BE AS

    EXPRESSLY OR IMPLIEDLY

    CONTAINED IN CONTRACTDOCUMENTS

    FIG. 6-2 : CHANGES/VARIATIONS BASIC ELEMENTS

    INCREASE/DECREASE

    QUANTITY OF

    WORK

    OMIT

    WORK

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    90/169

    FIG. 6-3: VARIATIONS - TYPICAL EXAMPLES

    HSKS

    WORK WORK

    CHANGEDIMENSIONS OF

    WORK

    CHANGESEQUENCE OF

    WORK

    CHANGECHARACTER OF

    WORK

    CHANGEKIND OF WORK

    CHANGE POSITIONOF WORK

    CHANGE TIMINGOF WORK

    ACTIVITIES

    EXECUTEADDITIONAL WORK

    OF ANY KIND

    VARIATIONS:VARIATIONS:VARIATIONS:VARIATIONS:TYPICALTYPICALTYPICALTYPICAL

    EXAMPLESEXAMPLESEXAMPLESEXAMPLES

    CHANGE QUALITYOF WORK

    CHANGE LEVELSOF WORK

    ADDITIONS HYBRID

    OMISSIONS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    91/169

    ACCORDING TO IDENTITY

    OF INITIATOR OF CHANGE

    ACCORDING TO

    CONSEQUENCES/EFFECTOF THE CHANGE

    ACCORDING TO NATUREOF THE CHANGE

    EMPLOYERCONTRACT

    ADMINISTRATORFINANCIAL

    CONSIDERATIONSCOMBINATION

    OF BOTH

    TIME IMPLICATIONS

    CONTRACTOR NSC

    FIG. 6-4: TYPES OF VARIATIONS MAIN METHODS OF CLASSIFICATION

    HSKS

    TYPES OF VARIATIONS:

    MAIN METHODS OF CLASSIFICATION

    CHANGES INEMPLOYERS

    REQUIREMENTS

    DEFECTIVE

    DRAWINGS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    92/169

    HSKS

    REQUIREMENTS DRAWINGS

    WRONG/NEGLIGENT ADVICEFROM CONTRACTADMINISTRATOR

    MAL-ADMINISTRATION

    OF CONTRACT

    DEFECTIVESPECIFICATIONS

    CHANGES DUE

    TO STATUTORY/LEGISLATIVE

    CHANGES

    INTEFERENCEBY EMPLOYER

    ITEMS

    CONSTITUTINGVARIATIONS

    DEFECTIVECONTRACT

    DOCUMENTS

    DIFFERENCESBETWEEN BILLED

    AND ACTUALQUANTITIES

    FIG. 6-5: ITEMS CONSTITUTING VARIATIONS

    WHAT CONSTITUTES VARIATION WORKS

  • 5/20/2018 Contract Administration for Construction & Engineering Contracts - 1

    93/169

    HSKS

    LEGAL POSITIONLEGAL POSITIONLEGAL POSITIONLEGAL POSITIONLEGAL POSITIONLEGAL POSITIONLEGAL POSITIONLEGAL POSITIONCONTRACTS BASED ONCONTRACTS BASED ONCONTRACTS BASED ONCONTRACTS BASED ON

    DRAWINGSDRAWINGSDRAWINGSDRAWINGSAND SPECIFICATIONSAND SPECIFICATIONSAND SPECIFICATIONSAND SPECIFICATIONS

    CONTRACTS BASED ONCONTRACTS BASED ONCONTRACTS BASED ONCONTRACTS BASED ONDRAWINGSDRAWINGSDRAWINGSDRAWINGS

    AND SPECIFICATIONSAND SPECIFICATIONSAND SPECIFICATIONSAND SPECIFICATIONS

    VARIATION TESTVARIATION TESTVARIATION TESTVARIATION TEST

    PER RE:PER RE:PER RE:PER RE:CHITTICK & TAYLOR

    VARIATION TESTVARIATION TESTVARIATION TESTVARIATION TESTPER RE:PER RE:PER RE:PER RE:

    CHITTICK & TAYLOR