    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Item Description Unit Qty Unit Rate Amount

    PRELIMINARIES

    Job Ref : IS 581/12

    Bill No.1 - PRELIMINARIES

    CONTRACT BOQ

    216,000.00CARRIED TO COLLECTION

    Bill No. 1 B1 - 2/52 Preliminaries

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    3/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Item Description Unit Qty Unit Rate Amount

    PRELIMINARIES

    Job Ref : IS 581/12

    Bill No.1 - PRELIMINARIES

    CONTRACT BOQ

    A Scaffolding

    Provide, erect, maintain, dismantle and clear away at

    completion proper and adequate internal and external

    scaffolding as per the requirement of the work

    B Health and Safety

    Provide safety, health and welfare for all work people andshall comply with all local Municpality and Federal

    requirements

    C Protection of existing services and facilities

    Provide adequate protection against any form of damage

    or deterioration for all sections of the works. Provide all

    necessary dust sheets, barriers, guard rai ls, safety signs

    etc., and clear away the same upon completionIncluded

    D Housekeeping

    Clear away rubbish at regular intervals during the

    progress of the work

    E Transportation

    Provide transport facilities to travel from the

    accomodation to the site and back

    F Tests and Samples

    Carry out tests as required to confirm the compliance of

    material and wokmanship as per the DM standards

    -CARRIED TO COLLECTION

    Bill No. 1 B1 - 3/52 Preliminaries

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    4/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Item Description Unit Qty Unit Rate Amount

    PRELIMINARIES

    Job Ref : IS 581/12

    Bill No.1 - PRELIMINARIES

    CONTRACT BOQ

    A Records

    Maintain records of all details and dimensions of the

    works as constructed including progress photographs

    B As built drawings and manuals

    Provide as-built drawings, operation and maintenancemanuals as required upon completion of the works

    Included

    C Cleaning and hand-over

    Prior to handing over of the works, clean all of the area

    executed, ready for occupation

    D Water and electricity

    Supply of clean water and power for consumption duringthe progress of the work

    Excluded(By Client)

    Bill No. 1 B1 - 4/52 Preliminaries

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    5/52

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    6/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Item Description Unit Qty Unit Rate Amount

    PRELIMINARIES

    Job Ref : IS 581/12

    Bill No.1 - PRELIMINARIES

    CONTRACT BOQ

    PRELIMINARIES (Cont'd.)

    Collection

    From Page 1 / 1 216,000.00

    From Page 1 / 2 -

    From Page 1 / 3 -

    216,000.00CARRIED TO GENERAL SUMMARY

    Bill No. 1 B1 - 6/52 Preliminaries

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    7/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Item Description Unit Qty Unit Rate Amount

    ENABLING WORKS

    A Removal of existing wall/partition as per the proposed layout and form

    openings/niches as required

    B Demolition of existing columns/pillars where applicable to suit the new

    layout

    C Removal of existing doors/windows as per the proposed layout

    D Strip out existing floor, skirting, wall and ceiling finishes as required by

    the new layout / finishes schedule

    E Removal of existing internal staircase and void balustrade/railing Item 1.00 48,750.00 48,750.00

    F Removal of the existing internal main staircase marble tread and riser

    G Removal of the existing external balcony balustrade/railing

    H Removal of existing fittings and fixtures (where applicable) such as

    light fittings, sanitary ware & accessories and handover to the Client

    J Cart away all the above debris to Municipality approved dump area

    48,750.00CARRIED TO COLLECTION

    Job Ref : IS 581/12

    Bill No. 2- ENABLING WORKS

    CONTRACT BOQ

    Bill No. 2 B2 - 7/52 Enabling works

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    8/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Item Description Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 2- ENABLING WORKS

    CONTRACT BOQ

    ENABLING WORKS (Cont'd).

    Collection

    From Page 1 / 2 48,750.00

    48,750.00CARRIED TO GENERAL SUMMARY

    Bill No. 2 B2 - 8/52 Enabling works

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    9/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    BUILDERS WORKS

    Builders Works

    A Close the existing niches/openings as required with blockwork -

    B Construction of new thermal insulated and hollow blockwork as per

    the proposed layout

    C Extra over in blockwork/ gypsum to receive new sliding doors

    D Necessary RCC works such as stiffener columns/beams, lintel for

    new openings including projection to elevation at the newly formed

    windows/doors, matching to the existing

    Job Ref : IS 581/12

    Bill No. 3 - BUILDERS WORKS

    CONTRACT BOQ

    Bill No. 3 B3 - 9/52 Builders work

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    10/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 3 - BUILDERS WORKS

    CONTRACT BOQ

    E Cement sand plaster (internal & external) to the new blockwork

    including behind wall finishes of modified bathrooms.

    Item 1.00 72,796.00 72,796.00

    F Make good jambs, corners, edges and the like where openings are

    formed or wall demolished

    G Cement sand screed with self levelling compound to the areas

    where parquet and carpet flooring to be installed

    H Light weight concrete fill above garage to match the finish level of

    the existing storage cum play area

    J Construction of supports for Balcony railing and concrete fill to the

    extended area to the level of existing floor finish (above main

    reception).

    72,796.00CARRIED TO COLLECTION

    Bill No. 3 B3 - 10/52 Builders work

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    11/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 3 - BUILDERS WORKS

    CONTRACT BOQ

    BUILDERS WORKS (Cont'd).

    Thermal insulation works

    Roof Waterproofing

    Composite waterproofing system and insulation on the concrete

    roof slab (New extension area only), with the following items:

    A 150mm thick light weight concrete screed with 50mm minimum

    thickness (density 600 kg/m3) sloped to drains (1%) over a

    bituminous primer layer

    B 4mm thick heavy duty, reinforced with torch applied non-woven

    polyester elastoplastomeric APP bituminous waterproofing

    membrane on approved primer

    C 50mm thick extruded polysterene board insulation

    D Separation layer with non woven polypropylene mesh

    E Cement tiles over cement sand screed

    F Water proofing membrane to skirting Item 1.00 18,229.00 18,229.00

    G Dressing waterproofing membrane around roof drain, vent pipe

    etc.,

    H Extra over for the water proofing works at the joint between theexisting structure and the new extension.

    Wet area waterproofing

    J 2mm thick liquid applied water proofing coatings to the following

    wet areas (2 coats) including 200mm high on the wall, applied

    strictly in accordance with manufacturer's instructions and flood

    water testing upon completion

    Bill No. 3 B3 - 11/52 Builders work

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    12/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 3 - BUILDERS WORKS

    CONTRACT BOQ

    Master bathroom (F.Floor)

    Boy's bathroom (F.Floor)

    Guest bathroom (F.Floor)

    18,229.00CARRIED TO COLLECTION

    Bill No. 3 B3 - 12/52 Builders work

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    13/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 3 - BUILDERS WORKS

    CONTRACT BOQ

    BUILDERS WORKS (Cont'd).

    Collection

    From Page 1 / 3 72,796.00

    From Page 2 / 3 18,229.00

    91,025.00CARRIED TO GENERAL SUMMARY

    Bill No. 3 B3 - 13/52 Builders work

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    14/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    METAL /GLASS WORKS

    Aluminium Doors and Windows

    Powder coated Aluminium window, 24mm thick glazing consisting of 6mm

    thick medium performance reflective glass from outside, 12mm air gap &

    6mm thick clear tempered glass from inside, including sealant and

    ironmongery (all matching to the existing);

    A Sliding Window : Size-4000mm x 2200mm H (GF) No. 2.00 11,088.00 22,176.00

    Library / Study - 01 No.Garage - 01 No.

    B Top Hung Window : Size-4000mm x 2650mm H (GF) No. 3.00 13,356.00 40,068.00

    TV / Living Area - 01 No.

    Main Reception - 01 No.

    Dining Area - 01 No.

    C Sliding Window : Size-4000mm x 2400mm H (FF) No. 4.00 12,096.00 48,384.00

    Boy's Room - 01 No.

    Master Bedroom - 01 No.Guest Room - 01 No.

    Storage cum Play room - 01 No.

    D Sliding Window : Size-4130mm x 2400mm H (FF) No. 1.00 12,488.00 12,488.00

    Master Dressing Room - 01 No.

    E Sliding Window : Size-4300mm x 2400mm H (FF) No. 1.00 13,006.00 13,006.00

    Family Living - 01 No.

    F Sliding Window: Size-1400mm x 2400mm H (FF) No. 2.00 4,234.00 8,468.00

    Storage cum Play room - 02 No.

    Glass block windows

    G Fixed window with glass blocks in white colour, frosted finish No. 1.00 2,801.00 2,801.00

    to Master Bathroom: Size-600mmx1200mm

    Job Ref : IS 581/12

    Bill No. 4- METAL WORKS

    CONTRACT BOQ

    Bill No. 4 B4 - 14/52 Metal works

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    15/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 4- METAL WORKS

    CONTRACT BOQ

    147,391.00CARRIED TO COLLECTION

    Bill No. 4 B4 - 15/52 Metal works

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    16/52

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    17/52

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    18/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    JOINERY WORKS

    Timber Doors- Ground Floor

    A Double leaf pocket sliding door to Entrance lobby Item 1 15,000.00 15,000.00

    (Size: 2500mm x 2250mm)

    B Double leaf pocket sliding door at Main Reception / Dining area (Size:

    1650mm x 2100mm)

    Item 1 9,000.00 9,000.00

    C Frame to opening at Main Reception/TV area (opening size: 2200mm

    x 2200mm)

    Item 1 2,376.00 2,376.00

    D Single leaf pocket sliding door at TV/Living Area (Size: 1500mm x

    2100mm)

    Item 1 8,400.00 8,400.00

    E Single leaf pocket sliding door at Kitchen (Size: 1400mm x 2100mm) Item 1 7,800.00 7,800.00

    F Single leaf hinged door at Dining area (Size: 1000mm x 2100mm) Item 1 4,800.00 4,800.00

    G 20mm thick doors to existing storage cabinet including Iron mongery Item 1 3,600.00 3,600.00

    H Relocation of existing doors (re use existing irongmongery) but

    newarchitrave

    Item 2 1,440.00 2,880.00

    J Frame to opening at Entrance lobby (opening size: 1900mm x2200mm)

    Item 2 2,268.00 4,536.00

    K Frame to opening at Powder room (opening size: 1500mm x 2250mm) Item 1 1,200.00 1,200.00

    L Replace the existing fixed panels of the main entrance door with

    stained glass panels

    Item 1 3,900.00 3,900.00

    Timber Doors- First Floor

    M Single leaf pocket sliding door at Master dressing (Size: 1200mm x

    2200mm)

    Item 1 6,600.00 6,600.00

    N Single leaf hinged door at Master bathroom (Size: 1000mm x

    2100mm)

    Item 1 3,600.00 3,600.00

    P Relocation of existing doors (re use existing irongmongery) but

    newarchitrave

    Item 1 1,440.00 1,440.00

    Ironmongery

    Q Ironmongery comprising of hinges, handle, lockset, door closer,

    sliding rails etc., complete PC Supply rate Dhs. 750/ door

    Item 7 863.00 6,041.00

    81,173.00

    Job Ref : IS 581/12

    CONTRACT BOQ

    CARRIED TO COLLECTION

    Bill No. 5- JOINERY WORKS

    Bill No. 5 B5 - 18/52 Joinery and Glass works

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    19/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    CONTRACT BOQ

    Bill No. 5- JOINERY WORKS

    JOINERY WORKS (Cont'd).

    Fixed Joinery

    Ground Floor

    A Main Reception : Niche (O/A Size 1.15mx2.15m H) Item 2.00 8,525.00 17,050.00

    Marble Cladding : PC Supply Rate Dhs.1800/m2

    B Living Area: TV Cabinet (O/A Size 3.5x.55x2.15m H) Item 1.00 22,110.00 22,110.00

    C Living Area: Console (O/A Size 2.25x.35x.65m H) Item 1.00 7,260.00 7,260.00

    D Living Area: Cabinet (O/A Size 2.55x.8x.85m H) Item 1.00 12,100.00 12,100.00

    E Dining Area: Dining table (O/A Size 3.5x1.75x0.75m H) Item 1.00 19,360.00 19,360.00

    F Library/Study Area: Wall unit (O/A Size 6.5x2.4m H) Item 1.00 42,627.00 42,627.00

    G Library/Study Area: Low cabinet (O/A Size 3x0.6x0.85m H) Item 1.00 14,520.00 14,520.00

    H Powder room: Vanity counter (O/A Size 2.9x0.6m) Item 1.00 14,993.00 14,993.00

    Counter Top Marble : PC Supply Rate Dhs.2500/m

    J Powder room: Vanity mirror (O/A Size 1.5x0.9m) Item 1.00 1,950.00 1,950.00

    K Powder room: Mirror (O/A Size 0.75x0.9m) Item 1.00 390.00 390.00

    First Floor

    L Family Living Area: TV cabinet including wall mounted wooden

    shelves (O/A Size 6716mmx600mmx750mm H)

    Item 1.00 26,620.00 26,620.00

    M Family Living: Storage Bench Item 2.00 5,720.00 11,440.00

    N Master Bedroom: Make-up Console (O/A Size 3.0x0.6x0.75m H) Item 1.00 15,730.00 15,730.00

    P Master Dressing: Chest of drawers cum bench Item 1.00 17,600.00 17,600.00

    Q Master Dressing: Wardrobes including secret door Item 1.00 86,810.00 86,810.00

    R Master Bathroom: Vanity mirror (O/A Size 2.06mx1.10m) Item 1.00 2,600.00 2,600.00

    Bill No. 5 B5 - 19/52 Joinery and Glass works

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    20/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    CONTRACT BOQ

    Bill No. 5- JOINERY WORKS

    S Master Bathroom: Fixed glass window(O/A Size 0.45mx1.30m H)

    Item 2.00 3,250.00 6,500.00

    T Master Bathroom: Vanity counter (O/A Size 3.40mx0.60m) Item 1.00 12,100.00 12,100.00

    Counter Top Marble : PC Supply Rate Dhs.2500/m

    U Master Bathroom: Chest of Drawers & Cabinet Item 1.00 12,925.00 12,925.00

    V Boys Bathroom: Vanity Counter (O/A Size 1.50mx0.6m) Item 1.00 4,950.00 4,950.00

    Counter Top Corian : PC Supply Rate : Dhs. 800/m

    W Boys Bathroom: Vanity mirror (O/A Size 0.80x0.80m) Item 1.00 650.00 650.00

    X Shower bench at bathrooms (master/boy's/guest) Item 3.00 3,575.00 10,725.00

    Y Storage cabinets at extended storage cum play room (O/A Size10.5m) Item 1.00 51,750.00 51,750.00

    412,760.00CARRIED TO COLLECTION

    Bill No. 5 B5 - 20/52 Joinery and Glass works

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    21/52

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    22/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    CONTRACT BOQ

    Bill No. 5- JOINERY WORKS

    69,120.00CARRIED TO COLLECTION

    Bill No. 5 B5 - 22/52 Joinery and Glass works

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    23/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    CONTRACT BOQ

    Bill No. 5- JOINERY WORKS

    JOINERY WORKS (Cont'd).

    Collection

    From Page 1 / 4 81,173.00

    From Page 2 / 4 412,760.00

    From Page 3 / 4 69,120.00

    563,053.00CARRIED TO GENERAL SUMMARY

    Bill No. 5 B5 - 23/52 Joinery and Glass works

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    24/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No.Description of Item Unit Qty Unit Rate Amount

    FINISHES

    FLOOR FINISHES (Internal)

    A Supply and install 600 x 600mm Travertino Classico Marble to the

    areas as per the finishes schedule and approved sample, over and

    including cement sand mortar (Finish Type MBFL-01) PC Supply

    Rate Dhs.415/m2

    m2 466.00 767.00 357,422.00

    B Supply and install 1200mm x 200mm porcelain floor tiles to the

    areas as per the finishes schedule and approved sample, over and

    including cement sand mortar (Finish Type TLFL-01) PC Supply

    Rate Dhs.231/m2

    m2 16.00 356.00 5,696.00

    C Supply and install 600mm x 600mm ceramic floor tiles to the areasas per the finishes schedule and approved sample, over and

    including cement sand mortar (Finish Type TLFL-02) PC Supply

    Rate Dhs.168/m2

    m2 35.00 277.00 9,695.00

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    Bill No. 6 B6 - 24/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    25/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    D Supply and install Parquet wood flooring to the areas as per the

    finishes schedule (Finish Type PQFL-01) PC Rate Supply & Fix

    Dhs.500/m2 (Pending Selection)

    m2 95.40 575.00 54,855.00

    E Supply and install Sicis mosaic flooring to the areas as per thefinishes schedule, over and including cement sand mortar (Finish

    Type MOFL-01) PC Supply Rate Dhs.473/m2 (Pending Selection)

    m2 11.24 798.00 8,969.52

    F Supply and install Sicis mosaic flooring to the areas as per thefinishes schedule, over and including cement sand mortar (Finish

    Type MOCD-02) PC Supply Rate Dhs.473/m2 (Pending Selection)

    m2 3.00 798.00 2,394.00

    G Supply and install 600mm x 600mm marble crystal white finish to

    the areas as per the finishes schedule and approved sample, over

    and including cement sand mortar (Finish Type MBCD-02) PC

    Supply Rate Dhs.473/m2 (Pending Selection)

    m2 4.20 798.00 3,351.60

    Bill No. 6 B6 - 25/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    26/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    442,383.12CARRIED TO COLLECTION

    Bill No. 6 B6 - 26/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    27/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    FINISHES (Cont'd).

    FLOOR FINISHES (Internal) (cont'd..)

    A Supply and install Sicis mosaic flooring to the areas as per the

    finishes schedule, over and including cement sand mortar (Finish

    Type MOCD-03) PC Supply Rate Dhs.855/m2

    m2 1.00 1,333.00 1,333.00

    B Supply and install Sicis mosaic flooring 300mm border to the areas

    as per the finishes schedule, over and including cement sand

    mortar (Finish Type MOCD-04) PC Supply Rate Dhs.855/m2

    m2 2.70 1,333.00 3,599.10

    D Supply and install mosaic tiles flooring to the areas as per the

    finishes schedule, over and including cement sand mortar (FinishType MOCD-05) PC Supply Rate Dhs.467/m2

    m2 2.00 791.00 1,582.00

    Bill No. 6 B6 - 27/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    28/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    E Supply and install carpet flooring to the areas as per the finishes

    schedule, over and including necessary underlay (Finish Type

    CPRG-05) PC Supply Rate Dhs.1097/m2

    m2 12.00 1,284.00 15,408.00

    F Supply and install carpet flooring to the areas as per the finishes

    schedule, over and including necessary underlay (Finish Type

    CPRG-07) PC Supply Rate Dhs.205/m2

    m2 11.70 281.00 3,287.70

    G Supply and install carpet flooring to the areas as per the finishes

    schedule, over and including necessary underlay (Finish Type

    CPRG-08) PC Supply Rate Dhs.205/m2

    m2 10.00 281.00 2,810.00

    H S/S trip between finishes Item 1.00 3,563.00 3,563.00

    31,582.80

    FINISHES (Cont'd).

    CARRIED TO COLLECTION

    Bill No. 6 B6 - 28/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    29/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    SKIRTING FINISHES

    A Supply and install 100mm high Travertino Classico marble skirting

    where the floor finish is Travertino classico marble PC Supply Rate

    Dhs.125/m

    m 195.00 195.00 38,025.00

    B Supply and install 100mm high Timber skirting where the floor finish

    is parquet wood flooring or carpet. PC Supply & Fix Rate

    Dhs.142/m

    m 68.00 163.00 11,084.00

    C Supply and install 100mm high ceramic skirting where the floor

    finish is ceramic tile. PC Supply Rate Dhs.35/m

    m 35.40 65.00 2,301.00

    THRESHOLD

    D Supply and install 30mm thick marble threshold at bathroom doors Item 1.00 LS 6,495.00

    STAIRCASE FINISHES

    ESupply and install Travertino classico marble tread and riser to the

    internal main staircasePC Sum Supply only Dhs.13,500.00

    Item 1.00 19,500.00 19,500.00

    Bill No. 6 B6 - 29/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    30/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    77,405.00

    FINISHES (Cont'd).

    WALL FINISHES (Internal)

    A Supply and install Wall covering to the areas as per the finishesschedule (Finish Type WP-01)PC Supply Rate Dhs.74/m2

    m2 145.00 123.00 17,835.00

    B Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-03) PC Supply Rate Dhs.333/m2

    m2 67.20 448.00 30,105.60

    C Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-04) PC Supply Rate Dhs.59/m2

    m2 45.12 105.00 4,737.60

    CARRIED TO COLLECTION

    Bill No. 6 B6 - 30/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    31/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    D Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-05) PC Supply Rate Dhs.152/m2

    m2 56.64 220.00 12,460.80

    E Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-06) PC Supply Rate Dhs.402/m2

    m2 20.00 534.00 10,680.00

    F Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-08) PC Supply Rate Dhs.92/m2

    m2 48.00 146.00 7,008.00

    G Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-09) PC Supply Rate Dhs.54/m2

    m2 117.10 105.00 12,295.50

    H Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-10)PC Supply Rate Dhs.322/m2

    m2 20.00 474.00 9,480.00

    Bill No. 6 B6 - 31/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    32/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    J Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-11) PC Supply Rate Dhs.50/m2

    m2 84.00 93.00 7,812.00

    K Supply and install Wall covering to the areas as per the finishesschedule (Finish Type WP-12) PC Supply Rate Dhs.40/m2

    m2 96.00 80.00 7,680.00

    120,094.50

    FINISHES (Cont'd).

    WALL FINISHES (Internal) (Cont'd..)

    A Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-13) PC Supply Rate Dhs.100/m2

    (Pending Selection)

    m2 82.32 161.00 13,253.52

    B Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-14)PC Supply Rate Dhs.59/m2

    m2 56.64 105.00 5,947.20

    CARRIED TO COLLECTION

    Bill No. 6 B6 - 32/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    33/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    C Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-15) PC Supply Rate Dhs.59/m2

    m2 33.10 105.00 3,475.50

    D Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-16) PC Supply Rate Dhs.54/m2

    m2 11.10 105.00 1,165.50

    E Supply and install Wall covering to the areas as per the finishesschedule (Finish Type WP-17) PC Supply Rate Dhs.108/m2

    m2 29.04 166.00 4,820.64

    F Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-18)PC Supply Rate Dhs.141/m2

    m2 15.00 207.00 3,105.00

    G Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-19) PC Supply Rate Dhs.40/m2

    m2 12.60 80.00 1,008.00

    Bill No. 6 B6 - 33/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    34/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    H Supply and install Wall covering to the areas as per the finishes

    schedule (Finish Type WP-20) PC Supply Rate Dhs.100/m2

    (Pending Selection)

    m2 11.20 168.00 1,881.60

    J Supply and install ceramic tile 600mm x 600mm to the areas as per

    the finishes schedule (Finish Type TLWL-01) PC Supply Rate

    Dhs.236/m2

    m2 24.34 399.00 9,711.66

    K Supply and install ceramic tile 220mm x 450mm to the areas as per

    the finishes schedule (Finish Type TLWL-02) PC Supply Rate

    Dhs.279/m2

    m2 16.60 453.00 7,519.80

    L Supply and install BBM mosaic tiles to the areas as per the finishes

    schedule (Finish Type MOCD-05) PC Supply Rate Dhs.467/m2

    m2 10.80 827.00 8,931.60

    Bill No. 6 B6 - 34/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    35/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    60,820.02

    FINISHES (Cont'd).

    WALL FINISHES (Internal) (Cont'd..)

    A Supply and install sicis mosaic tiles to the areas as per the finishes

    schedule (Finish Type MOCD-02) PC Supply Rate Dhs.450/m2

    (Pending Selection)

    m2 12.00 834.00 10,008.00

    B Supply and install sicis mosaic tiles to the areas as per the finishesschedule (Finish Type MOCD-03) PC Supply Rate Dhs.898/m2

    m2

    16.00 1,369.00 21,904.00

    C Supply and install sicis mosaic tiles to the areas as per the finishes

    schedule (Finish Type MOCD-04) PC Supply Rate Dhs.898/m2

    m2

    CARRIED TO COLLECTION

    Bill No. 6 B6 - 35/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    36/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    D Supply and install 600 x 600mm marble crystal white finish to the

    areas as per the finishes schedule (Finish Type MBCD-02) PC

    Supply Rate Dhs.1250/m2

    m2 13.36 1,891.00 25,263.76

    E Supply and install Albaster cladding to the areas as per the finishes

    schedule (Finish Type ALCD-01)PC Supply Rate Dhs. 1800/m2

    m2 29.00 3,036.00 88,044.00

    Bill No. 6 B6 - 36/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    37/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    F Supply and install wooden wall; cladding in wenge. PC Supply &

    FixRate Dhs.686/m2

    m2 7.00 891.42 6,240.00

    G Supply and apply matt white colour paint finish to the areas as per

    the finishes schedule

    m2 120.00 18.00 2,160.00

    153,619.76

    FINISHES (Cont'd).

    CEILING FINISHES

    Gypsum false ceiling

    A Supply and install plain gypsum board ceiling with GI hanging

    support, required taping & jointing, cut out for light fittings and A C

    grills, ready to receive paint.

    m2 373.20 99.00 36,947.00

    B - Ditto - 200mm high Bulkhead

    C - Ditto - 300mm high Bulkhead

    D - Ditto - 400mm high Bulkhead

    Item 1.00 66,285.00 66,285.00

    CARRIED TO COLLECTION

    Bill No. 6 B6 - 37/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    38/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    E - Ditto - 50mm x 50mm detail for the LED strip light in TV/Living

    area

    F - Ditto - cove light detail with 100mm high gypsum cornice

    G 100mm high gypsum cornice to perimeter of the room

    H Supply and install 12.5mm thk moisture resistant gypsum board

    ceiling to wet areas with GI Hanging support, required taping and

    jointing, cut out for light fittings, ready to receive paint

    m2 38.00 110.00 4,180.00

    J - Ditto - Bulkhead and cove light detail Item 1.00 8,965.00 8,965.00

    K 150mm x 200mm wooden ceiling beams, finish to match Item 1.00 27,500.00 27,500.00

    existing furniture (Library/Study area)

    143,877.00

    FINISHES (Cont'd).

    Ceiling Paint / Wall Paper Finish

    A Supply & apply to new gypsum false ceiling white colour mattemulsion paint comprising of 3 coats system including one coats

    stucco filler and two coats of acrylic copolymer vinyl emulsion

    finishing coat

    m2 408.00 18.00 7,344.00

    B Supply & apply to existing gypsum false ceiling white colour matt

    emulsion paint comprising of two coats of acrylic copolymer vinyl

    emulsion finishing coat

    m2 235.00 12.00 2,820.00

    CARRIED TO COLLECTION

    Bill No. 6 B6 - 38/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    39/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    C Supply and fix wall paper to ceiling to the areas as per the finishes

    schedule (Finish Type WP-02) PC Supply Rate Dhs.534/m2

    m2 8.14 771.00 6,275.94

    D Supply and fix wall paper to ceiling to the areas as per the finishes

    schedule (Finish Type WP-07) PC Supply Rate Dhs.118/m2

    m2 15.00 182.00 2,730.00

    E Supply and fix wall paper to ceiling to the areas as per the finishesschedule (Finish Type WP-21) N/A

    19,169.94CARRIED TO COLLECTION

    Bill No. 6 B6 - 39/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    40/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    FINISHES (Cont'd).

    EXTERNAL FINISHES

    Floor finish

    A Supply and fix composite floor decking at rear terrace m2 26.20 990.00 25,938.00

    (Type DECK-01). PC Supply & fix Rate Dhs. 861/m2

    B Supply and fix terracotta tiling to the new balcony above garage.

    PC Supply Rate Dhs.50/m2

    m2 26.20 124.00 3,248.80

    Bill No. 6 B6 - 40/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    41/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    29,186.80CARRIED TO COLLECTION

    Bill No. 6 B6 - 41/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    42/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    FINISHES (Cont'd).

    Collection

    From Page 1 / 10 442,383.12

    From Page 2 / 10 31,582.80

    From Page 3 / 10 77,405.00

    From Page 4 / 10 120,094.50

    From Page 5 / 10 60,820.02

    From Page 6 / 10 153,619.76

    From Page 7 / 10 143,877.00

    From Page 8 / 10 19,169.94

    From Page 9 / 10 29,186.80

    Bill No. 6 B6 - 42/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    43/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 6- FINISHES

    CONTRACT BOQ

    1,078,138.94CARRIED TO GENERAL SUMMARY

    Bill No. 6 B6 - 43/52 Finishes

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    44/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    MEP WORKS

    A Modification to AC grill layout and related duct work

    modifications based on new false ceiling layouts.

    B New 2.5 ton AC unit for extension above garage with

    electrical light and socket wiring.

    C Modificatiosn to wiring layout to suit new light locations

    D Supply and install switches shown on drawings.

    E Supply and install power sockets in locations mentioend on

    drawings

    F TV points containment and wiring till roof.

    G DATA points with CAT 6 wiring as shown on drawings.

    H Supply and install floor boxes with necessary containment

    and wirign as shown on drawings.

    1 LS 302,000.00

    J Containment only for audio / sound system.

    K Pulling of client supplied cables for sound system.

    L Modifications to drainage and plumbign services to suit to

    new bathroom and sanitaryware.

    M Fixing of client supplied sanitary ware and lights.

    Builder work

    N Related builder work for above items

    Sanitary ware & Light Fittings

    P Supply of sanitary ware & light fittings Excluded

    302,000.00CARRIED TO COLLECTION

    Job Ref : IS 581/12

    Bill No. 7 - MEP WORKS

    CONTRACT BOQ

    Bill No. 7 B7 - 44/52 M E P Works

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    45/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Sl. No. Description of Item Unit Qty Unit Rate Amount

    Job Ref : IS 581/12

    Bill No. 7 - MEP WORKS

    CONTRACT BOQ

    MEP WORKS (Cont'd).

    Collection

    From Page 1 / 2 302,000.00

    302,000.00CARRIED TO GENERAL SUMMARY

    Bill No. 7 B7 - 45/52 M E P Works

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    46/52

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    47/52

    EXTENSION & RENOVATION WORKS

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    Bill No.

    SUMMARY

    BILL NO. 1 PRELIMINARIES

    BILL NO. 2 ENABLING WORKS

    BILL NO. 3 BUILDERS WORKS

    BILL NO. 4 METAL WORKS

    BILL NO. 5 JOINERY WORKS

    BILL NO. 6 FINISHES

    BILL NO. 7 MEP WORKS

    BILL NO. 8 PROVISIONAL SUM ITEMS

    Sub Total

    Structural Design & DM Submission

    Total Contract Price (AED)

    CONTRACT BOQ

    GENERAL SUMMARY

    Bill Description

    GENERAL SUMMARY / 47

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    48/52

    Amount (AED)

    216,000.00

    48,750.00

    91,025.00

    261,891.00

    563,053.00

    1,078,138.94

    302,000.00

    108,100.00

    2,668,957.94

    37,500.00

    2,706,457.94

    2,706,457.94

    -

    Job Ref : IS 581/12

    GENERAL SUMMARY / 48

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    49/52

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    50/52

    EXTENSION & RENOVATION WORKS Job Ref : IS 581/12

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    COST MONITORING & CONTROL SYSTEM

    Code Description Total amount

    11-00000 SKIRTING FINISHES

    11-11010 Ceramic Skirting 1,239.00

    11-11040 Marble Skirting 24,375.00

    11-11070 Wood Skirting 8,500.00

    11-11135 Skirting fixing materials (Glue, grout, etc.) Included in 10-10280

    11-11140 Skirting-Fixing Charges 5,406.00

    12-00000 WALL FINISHES

    12-12110 Internal paint (Incl. Base Preparation for wall covering area) 10,129.60

    12-12140 Wall Covering 93,974.11

    12-12150 Timber Paneling 4,800.00

    12-12160 Ceramic Tiles 35,756.62

    12-12180 Marble 72,351.68

    12-12225 Wall finishing fixing materials (Grout, glue, stopper, corner, etc. 1,870.40

    12-12240 Timber Sub frame Work ( for Alabaster Dining wall cladding) 10,150.00

    12-12271 Sub Contractor- Marble cladding fixing & Wall covering 36,181.42

    12-12280 Cement For Wall Finishes (Tiles, Granite, Marble, etc.) 1,870.40

    12-12290 Sand for Wall Finishes (Tiles, Granite, Marble, etc.) 935.20

    13-00000 CEILING FINISHES

    13-13010 Gypsum false ceiling 95,187.00

    13-13090 Paint & Wall covering 16,308.79

    13-13100 Timber Ceiling 25,000.00

    14-00000 JOINERY WORKS14-14100 Timber Doors 18,324.00

    14-14120 Timber Sliding Doors 35,100.00

    14-14170 Vanity Counter 23,742.00

    14-14210 Wardrobes 73,726.00

    14-14220 Cabinets & Glassworks 158,062.00

    14-14250 Ironmongery 5,250.00

    14-14312 Other Carpentry & Woodworks 77,320.00

    15-00000 ALUMINUM, METAL & GLASSWORKS

    15-15010 Aluminum Glass Doors & Windows 198,115.00

    16-00000 EXTERNAL WORKS

    16-16130 Pergola 51,840.00

    17-00000 AIRCONDITIONING WORKS Included

    18-00000 PLUMBING & DRAINAGE WORKS

    18-18091 MEP Sub Contractor 206,100.00

    18-18030 MEP Builders woks - Labour & Material 21,207.69

    19-00000 ELECTRICAL WORKS Included

    20-00000 FIRE ALARM & FIREFIGHTING WORK Included

    BUDGET 50 of 52

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    51/52

    EXTENSION & RENOVATION WORKS Job Ref : IS 581/12

    G+1 VILLA ON PLOT NO. W15 AT EMIRATES HILLS, DUBAI

    MR. AMJAD J. HABBAS

    COST MONITORING & CONTROL SYSTEM

    Code Description Total amount

    21-00000 FURNISH FITTINGS & EQUIPMENT N/A

    21-21070 Mirrors 4,161.00

    22-00000 CONVEYING SYSTEM N/A

    23-00000 SPECIAL ITEMS N/A

    24-00000 PROVISIONAL SUM ITEMS

    24-00002 Structural Steel Works - Closing of existing first floor void including civil

    works 15,000.00

    24-00002 Structural steel work- Extension area including civil works 49,000.00

    24-00002 Re-alignment of the existing external main entrance steps 5,000.00

    24-00002 External Wall Paint 25,000.00

    TOTAL BUDGET:- 2,127,989.57

    BUDGET 51 of 52

  • 8/13/2019 Contract BOQ- W15_EH 17.07.2012 Cost Code

    52/52

    Tender For :

    Gen Manager: Tender No : TS 581/12

    Building CostsTender B/A B/A Offered Totals

    Cost Add Deduct Discount

    % Sum

    Material 1,641,682 0 0 0 0.00 0 1,641,682 61.51

    Labour Incl 0 0 0 0.00 0 0 -

    Sub-contract Incl 0 0 0 0.00 0 0 -

    Direct Plant / Tools Incl 0 0 0 0.00 0 0 -

    Prime cost rates Incl 0 0 0 0.00 0 0 -

    M E P 212,308 0 0 0 0.00 0 212,308 7.95

    Durables Incl 0 0 0 0 0 -

    1,853,990 Sub Total 1,853,990 69.46Contingency / Risk 0% % 0 -

    1,853,990 1,853,990 69.46

    On CostsTender B/A B/A Totals

    Cost Add Deduct

    180,000 0 0 180,000 6.74

    Agency Fees 0 -

    Design & Consultancy fee 0 -

    On Costs Total = 180,000 180,000 6.74TOTAL BUILDING COSTS AND ON COSTS 2,033,990 76.21ContributionContribution Avg. (as % of Total Building Costs & On Costs) 26% % 526,868 19.74

    -

    526,868 526,868 19.74

    AbnormalsTotals

    % Sum

    Nett Nominated Sub-contract 0 + 0 0 -

    Nominated Sub-contractors 0 + 0 0 -

    Nominated Suppliers 0 + 0 0 -

    Provisional Sums 94,000 + 15.00 14,100 108,100 4.05

    Dayworks 0 + 0 0 -

    frayland Provisional Sums 0 + 0.00 0 0 -

    Clients Contingency + 0 0 -

    Fixed Price Allowance for MEP + 0.00 0 0 -

    Sub Total 108,100 108,100 4.05

    Adjustment to the BOQ -

    TOTAL TO FORM OF TENDER 2,668,958 100.00Executive Summary

    Gross Nett

    Added Margin 14,100 0.53% 0.663% Floor Area = Sqft

    Anticipated Margin 526,868 19.74% 24.759% Cost Per Sqft 2 = Per Sqft

    Overall Margin 540,968 20.27 25.422% Programme 22 Weeks

    TENDER SUMMARY SHEET

    EXTENSION & RENOVATION WORKS G+1 VILLA ON PLOT NO. 15 AT EMIRATES HILLS,

    DUBAI MR. AMJAD J. HABBAS

    Colin Veitch Traditional

    =

    Buying

    Discount

    Prelims (Including 5%

    contingency)

    Added Margin

    =

    =

    =

    =

    =

    =

    =