CONTRACTOR SAFETY MANUAL

Health and Safety Procedure HS-MAN-001

Subject: Contractor Safety Manual

TRIM #: D-20-049035 Version #: 1.0

Review date: 01/06/2021 Status: Published

Document Owner: Manager Corporate Compliance & Safety

Uncontrolled if printed. For the most current document refer to TRIM

Page 2: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

CONTENTS

1. PURPOSE & OBJECTIVE ........................................................................................................................................................................ 1

2. GENERAL SAFETY REQUIREMENTS ............................................................................................................................................... 1

OSH Works Planning Meeting ............................................................................................................................................. 1

Incident Notification and Investigation ......................................................................................................................... 1

Safety Management Plan ....................................................................................................................................................... 2

Risk Register .................................................................................................................................................................................... 2

High Risk Activities (HRA) ....................................................................................................................................................... 2

Safe Work Method Statement (SWMS) .......................................................................................................................... 3

City Contractor Induction ...................................................................................................................................................... 3

Site Specific Induction ............................................................................................................................................................. 3

Competency and Qualifications ........................................................................................................................................ 3

Sub-Contractors – Management and Control .......................................................................................................... 3

Safety Meetings ............................................................................................................................................................................ 4

Compliance with Directions from the City .................................................................................................................. 4

Inspections and Spot Checks............................................................................................................................................... 4

First Aid .............................................................................................................................................................................................. 4

Worksite Security ......................................................................................................................................................................... 4

Site Access ....................................................................................................................................................................................... 5

Site Deliveries ................................................................................................................................................................................ 5

Signage.............................................................................................................................................................................................. 5

PPE Requirements ...................................................................................................................................................................... 5

Drug and Alcohol Management........................................................................................................................................ 5

Smoking in Designated Areas Only ................................................................................................................................. 6

General Plant and Equipment ............................................................................................................................................. 6

Electrical Safety ............................................................................................................................................................................. 6

Crane Operation .......................................................................................................................................................................... 6

Road Closures and Traffic Management Plans.......................................................................................................... 6

Excavation and Location of Buried Services ............................................................................................................... 7

Confined Spaces .......................................................................................................................................................................... 7

Handover .......................................................................................................................................................................................... 7

3. SAFETY REQUIREMENTS ...................................................................................................................................................................... 7

Introduction.................................................................................................................................................................................... 7

Emergency Response Planning Arrangements ....................................................................................................... 8

Emergency Reporting Requirements ............................................................................................................................. 8

Fire Safety ......................................................................................................................................................................................... 8

Page 3: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

Fire Extinguishers, Hose Reels and other Fire Safety Equipment ....................................................... 8

Noise ................................................................................................................................................................................................... 8

Hazardous Substances & Fumes ........................................................................................................................................ 9

Dust and Vibration ..................................................................................................................................................................... 9

Hot Work........................................................................................................................................................................................... 9

Working at Heights .................................................................................................................................................................... 9

Scaffolding....................................................................................................................................................................................... 9

Falling Objects ........................................................................................................................................................................... 10

Ladders ........................................................................................................................................................................................... 10

Asbestos ......................................................................................................................................................................................... 10

House Keeping .......................................................................................................................................................................... 11

4. High Risk Activities (HRA) ................................................................................................................................................................ 11

Confined Space Entry Permitting and Safety Rules ............................................................................................ 11

Purpose ............................................................................................................................................................................... 11

Scope ................................................................................................................................................................................... 11

OSH Works Planning Meeting .............................................................................................................................. 11

Supporting Documentation .................................................................................................................................. 12

Review of Supporting Documentation ........................................................................................................... 12

Site Inspection ................................................................................................................................................................ 12

Issue Permit ...................................................................................................................................................................... 12

Monitoring ........................................................................................................................................................................ 12

Completion of Work ................................................................................................................................................... 12

Permit Cancellation ..................................................................................................................................................... 12

Confined Space Entry Safety Rules .................................................................................................................... 12

Crane Operations Process and Safety Rules ............................................................................................................ 13

Purpose ............................................................................................................................................................................... 13

Scope ................................................................................................................................................................................... 13

OSH Works Planning Meeting .............................................................................................................................. 13

Supporting Documentation .................................................................................................................................. 13

Review of Supporting Documentation ........................................................................................................... 14

Lift Plans/Study .............................................................................................................................................................. 14

Lifting Gear ....................................................................................................................................................................... 14

Lifting People (Personnel Cages/Work Boxes) ............................................................................................ 15

Exclusion/Crash Zones and Falling Objects ................................................................................................. 15

Multiple Crane Lifts ...................................................................................................................................................... 15

Pick and Carry.................................................................................................................................................................. 15

Page 4: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

Vehicle Loading Cranes ............................................................................................................................................ 16

Crane Operation Safety Rules ............................................................................................................................... 16

Demolition Process and Safety Rules .......................................................................................................................... 16

Purpose ............................................................................................................................................................................... 16

Scope ................................................................................................................................................................................... 17

OSH Works Planning Meeting .............................................................................................................................. 17

Non-Structural Demolition ..................................................................................................................................... 17

Structural Demolition ................................................................................................................................................. 17

Supporting Documentation .................................................................................................................................. 17

Non-Structural Demolition ..................................................................................................................................... 17

Structural Demolition ................................................................................................................................................. 18

Review of Supporting Documentation ........................................................................................................... 18

Site Inspection ................................................................................................................................................................ 18

Monitoring ........................................................................................................................................................................ 18

Engineer’s Reports ....................................................................................................................................................... 18

Services Within Ceilings, Walls and Floors ..................................................................................................... 18

Asbestos ............................................................................................................................................................................. 18

Public Safety..................................................................................................................................................................... 19

Demolition Works Safety Rules ............................................................................................................................ 19

Excavation Permitting Process and Safety Rules .................................................................................................. 19

Purpose ............................................................................................................................................................................... 19

Scope ................................................................................................................................................................................... 19

OSH Works Planning Meeting .............................................................................................................................. 19

HRA Excavation Permit Request .......................................................................................................................... 20

Supporting Documentation .................................................................................................................................. 20

Excavation Supporting Documentation ........................................................................................................ 20

Review of Supporting Documentation ........................................................................................................... 20

Site Inspection ................................................................................................................................................................ 20

Issue Permit ...................................................................................................................................................................... 20

Monitoring ........................................................................................................................................................................ 20

Completion of Work ................................................................................................................................................... 21

Permit Cancellation ..................................................................................................................................................... 21

Excavation Planning .................................................................................................................................................... 21

SWMS ................................................................................................................................................................................... 21

Accurate location of Services on the site ....................................................................................................... 21

Step 1 – Service Data Identification .................................................................................................................. 21

Page 5: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

Step 2 – Excavation Site Identification ............................................................................................................ 21

Step 3 – Service Location and Marking Requirements ......................................................................... 21

Step 4 – Excavation Perimeter Scan .................................................................................................................. 21

Step 5 –Marker Currency .......................................................................................................................................... 22

Service Crossing Excavation ................................................................................................................................... 22

Service Parallel to Excavation ................................................................................................................................ 22

Excavation Safety .......................................................................................................................................................... 22

Environmental and Heritage Clearance .......................................................................................................... 22

Excavation Safety Rules ............................................................................................................................................. 23

Hot Works Permitting Process and Safety Rules ................................................................................................... 23

Purpose ............................................................................................................................................................................... 23

Scope ................................................................................................................................................................................... 23

OSH Works Planning Meeting .............................................................................................................................. 23

Hot Works Permit Request ...................................................................................................................................... 23

Supporting Documentation .................................................................................................................................. 24

Review of Supporting Documentation ........................................................................................................... 24

Site Inspection ................................................................................................................................................................ 24

Issue Permit ...................................................................................................................................................................... 24

Monitoring ........................................................................................................................................................................ 24

Completion of Work ................................................................................................................................................... 24

Permit Cancellation ..................................................................................................................................................... 24

Fire Fighting Equipment and Fire Watch ....................................................................................................... 24

Hot Work Protection Measures and Designated Hot Work Zones ................................................ 25

Gas Cutting / Gas Cylinders .................................................................................................................................... 25

Hot Works Safety Rules .............................................................................................................................................. 25

Working at Heights Process and Safety Rules ........................................................................................................ 26

Purpose ............................................................................................................................................................................... 26

Scope ................................................................................................................................................................................... 26

OSH Works Planning Meeting .............................................................................................................................. 26

Supporting Documentation .................................................................................................................................. 26

Review of Supporting Documentation ........................................................................................................... 27

Monitoring ........................................................................................................................................................................ 27

Ladders ................................................................................................................................................................................ 27

Elevated Working Platforms ................................................................................................................................... 27

Working at Heights Safety Rules ......................................................................................................................... 27

Energy Isolation and Control Activity .......................................................................................................................... 28

Page 6: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

Purpose ............................................................................................................................................................................... 28

Scope ................................................................................................................................................................................... 28

OSH Works Planning Meeting .............................................................................................................................. 28

REQUEST – Energy Isolation ................................................................................................................................... 28

Supporting Documentation .................................................................................................................................. 28

Review of Supporting Documentation ........................................................................................................... 28

Site Inspection ................................................................................................................................................................ 28

Issue Work Authorisation - Lock Out Tag Out (LOTO)............................................................................ 29

LOTO Duration ............................................................................................................................................................... 29

Monitoring and Enforcement ............................................................................................................................... 29

Re-Energisation on Works Completion ........................................................................................................... 29

Hazardous Substances .............................................................................................................................................. 29

Out of Service Tags ...................................................................................................................................................... 30

Emergency Response Planning ...................................................................................................................................... 30

Purpose ............................................................................................................................................................................... 30

Underpinning Principles of Emergency Response .................................................................................. 31

Communicating Incidents ...................................................................................................................................... 31

5. APPENDIX ................................................................................................................................................................................................. 32

6. DOCUMENT CONTROL ..................................................................................................................................................................... 36

Page 7: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

1 | P a g e

1. PURPOSE & OBJECTIVE The Contractor Safety Manual (this Manual) provides information to Contractors about specific requirements that may apply when undertaking Works under Contract at the City of Greater Geraldton (The City) Sites. The Manual also outlines the general and minimum requirements which apply to the works.

The Contractor must, so far as is reasonably practicable, consult, co-operate and co-ordinate with the City, any activities which may impact services, operations, infrastructure or the public:

to achieve effective co-ordination of activities to ensure health and safety risk management and to enable the City and the Contractor and other relevant parties to comply with their respective

obligations under all relevant Safety Legislation.

The Contractor is responsible for ensuring this Manual is fully implemented whilst undertaking works on City Sites.

2. GENERAL SAFETY REQUIREMENTS

This section outlines the City’s general safety requirements for works carried out at all City sites. These requirements must be implemented as a minimum standard.

OSH Works Planning Meeting

A central element of Contractor consultation is the joint City / Contractor OSH Works Planning Meeting, which must be completed prior to any works commencing.

The OSH Works Planning Meeting ensures clarity and alignment between the City and the Contractor in relation to how High Risk Activities (HRA) and Energy Isolation will be controlled (i.e. The City or Contractor permitting processes).

The City Representative will initiate and facilitate the OSH Works Planning Meeting. The meeting structure will be dependent on the scope and complexity of the works.

The meeting is held to:

review the scope of works identify hazards and agree on appropriate controls (i.e. HRA’s/Energy Isolation Activity within scope

and the circumstances for each permit type that dictate whether the City’s or the Contractor’s permitting processes will be followed)

explain the City’s hazard and incident reporting requirements.

Incident Notification and Investigation

The Contractor is required to report incidents and injuries which occur on the work site to the City Representative immediately and to carry out incident investigations as agreed in the OSH Works Planning Meeting. The Contractor must provide the City Representative with an initial incident investigation report and supporting documents within 48 hours of the incident.

The Contractor must also submit a – Contractor Monthly Safety Performance Report for all works carried out for the City.

Page 8: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

2 | P a g e

Safety Management Plan

The Contractor must submit a site-specific Safety Management Plan to the City Representative for review and acknowledgement by the City prior to the commencement of any works over $250,000 or as agreed with the City Representative.

The Contractor must ensure the Safety Management Plan is up-to-date and relevant to the changes in the working environment.

It is not acceptable to utilise generic documentation.

The Safety Management Plan must include, but not limited to:

Requirements of this Manual. Compliance with the City’s occupational safety and health requirements. Ensuring the health and safety of workers and other members of the public visiting or accessing the

site. Occupational safety and health induction processes, procedures and management. Minimum site safety rules, standards and policies (including in respect of drugs and alcohol,

smoking and bullying on site). Occupational safety and health project risk assessment. Site-specific hazards and control measures. Workforce consultation, health and safety representatives and workgroup structures and

procedures. Medical and first aid facilities and management. Procedures for:

o On-Site promotion of health and safety risk management

o Issue resolution

o Workforce behaviour standards and response to misconduct

o Drugs and alcohol management

o Rehabilitation and return to work

o Reviews and auditing

o Reporting

Risk Register

The Contractor must submit a site-specific Risk Register to the City Representative for review and acknowledgement by the City prior to the commencement of any works.

The Contractor must ensure the Risk Register is maintained up-to-date relevant to the changes to the working environment.

It is not sufficient to utilise generic documentation.

High Risk Activities (HRA)

The purpose of the City’s HRA Authorisation and Control System is to ensure that proper consideration is given to the construction, health, safety and operational risks arising from HRAs at any City sites. This system covers:

Page 9: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

3 | P a g e

Confined Space Entry Crane Operations Excavations Hot Works Penetrations Working at Heights

HRA that are applicable to the project will be determined at the OSH Works Planning Meeting.

All HRA requests must be made through the OSH department and will be organised by the City Representative at the OSH Works Planning Meeting

Safe Work Method Statement (SWMS)

The Contractor and its sub-Contractor must:

develop SWMS for all High Risk Construction work as defined under Part 3, Division 12 section 3.137 of the Occupation Safety and Health Regulations 1996

ensure the SWMS are appropriate for the works submit SWMS for any HRAs identified for review by the City Representative ensure all sub-contractors develop SWMS to an appropriate standard.

NOTE: It is important that each SWMS reflects the works to be carried out and the hazards associated with each specific task. It is not acceptable to utilise generic SWMS for any HRA.

City Contractor Induction

Anyone who undertakes works at any City worksite must complete the Contractor Induction prior to commencing work.

Site Specific Induction

Contractors are required to provide a site-specific induction to their employees and sub- Contractors prior to them commencing works.

Competency and Qualifications

The Contractor must ensure that all personnel who are engaged to perform the works:

have undertaken the appropriate training hold all relevant and valid licences necessary (including high risk work licences) are verified competent to perform work or operate plant or equipment required for the works.

Sub-Contractors – Management and Control

The Contractor must ensure that all sub-contractors engaged to carry out work on their behalf always identify and exercise all necessary precautions for the health and safety of all persons including their employees, all Subcontractor’s employees, the City’s employees, and members of the public who may be affected by the works being performed.

The Contractor must, ensure that its sub-contractors:

obtain and consider information on the requirements for safe use of and the risk to health and safety of all persons, from plant or substances supplied or used for carrying out any work

Page 10: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

4 | P a g e

as far as reasonably practicable, supply those persons using or exposed to such plant or substances with adequate health and safety information concerning the plant or substances

ensure that any such plant or substances are safe when properly used or stored undertake any City training modules required to complete their works does not complete works they are not authorised by the City to undertake (Noting the Contractor

cannot extend their approved authority to their Sub-Contractor) complete the Contractor Induction prior to commencing work.

The Contractor must convey all relevant safety requirements as described in this manual to its sub-contractors and ensure that they are fully understood and complied with.

The Contractor must ensure that its sub-contractors:

are directly supervised by the Contractor at all times whilst on the City worksite exercise due skill, care and diligence in the execution and completion of their work consult, co-operate and co-ordinate activities with the contractor, separate contractors and other

sub-contractors to achieve compliance with Safety Legislation.

Safety Meetings

The Contractor and the City Representative (and whomever they deem necessary to attend) must ensure ongoing meetings for the purpose of consultation on Health and Safety matters are undertaken. These meeting may form part of other meetings, however the meetings must be documented and distributed to the City Representative.

Compliance with Directions from the City

The Contractor must comply with any reasonable direction from the City Representative, and OSH Advisors.

Inspections and Spot Checks

In line with the City’s OSH Management System, Contractors are subject to Inspections and Spot Checks carried out by the City Representative and/or an OSH Advisor.

A Spot Check will be undertaken by a City OSH Advisor as deemed necessary.

The Contractor must allow the City to inspect any part of the works including the Contractor’s offices, Plant and Equipment, and make available to the City representative any related documents and records relevant to the works.

The City has the right to request an audit, inspection and any information relating to the Contractor’s compliance with all OSH, Security, Environmental legislation and any City Procedures.

First Aid

It is the Contractor’s responsibility to provide First Aid facilities and services in accordance with OSH Regulation 1996 and the Code of Practice – First Aid Facilities and Services.

Worksite Security

It is the Contractor’s responsibility to ensure the security of their works area and ensure no unauthorised access by members of the public.

The Contractor must ensure that worksites controlled with fencing panels:

Page 11: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

5 | P a g e

remain locked and secure at all times are maintained in good order and condition are safe, and do not interrupt access to paths of travel or facilities for the public and building

occupants remain lit where required do not constitute a safety hazard to normal operations (e.g. tripping hazard, hazardous line of sight

interruption, etc).

Site Access

The Contractor must:

ensure that all public pavements and/or roadways in the vicinity of the site are in a clean, tidy and safe condition and that pedestrian and/or vehicular traffic is not interrupted

provide temporary directional signs and barricades necessary for the safety and convenience of pedestrians and/or vehicular traffic.

provide access at all times to the site to other Contractors or individuals approved by the City Representative

ensure that access for their personnel throughout the various parts of the site, as far as is reasonably practicable, avoids interference with members of the public or with existing tenancy areas where trading is continuing.

NOTE: The City Representative may direct the Contractor to modify or provide additional signs and barricades if considered necessary.

Site Deliveries

Prior to the commencement of any works, a site access and delivery route plan must be developed by the Contractor and submitted to the City Representative for approval.

Signage

All signage must be securely fastened to withstand strong winds, and not become or create a hazard.

PPE Requirements

The Contractor must provide PPE that is appropriate to the nature of the work it is performing and that has been identified through risk management processes or is compliant with relevant OSH legislation.

The Contractor must ensure at least the City’s minimum requirements for PPE are met as detailed below:

High visibility clothing - full length trousers and long sleeve shirt Safety Boots - fitted with full toe cap protection Safety Glasses - must be worn at all times on a construction site Head Protection – if detailed in the SWMS or JHA Hearing protection – As required/signed All PPE must meet Australian /New Zealand Standards.

Drug and Alcohol Management

Contractors are required to:

Page 12: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

6 | P a g e

conduct pre-deployment drug and alcohol testing prior to works commencing (for all OSH risk profiles that meet the requirements for level 1 of the Contractor management procedure (HS-PRO-029)).

Tests will only have a validity date of 30 days or less prior to the commencement of the works. Contractors will also be subject to requirements in accordance with City’s Fitness for Work

processes.

Smoking in Designated Areas Only

Smoking is strictly prohibited in all buildings, vehicles and plant. In certain circumstances Contractors can establish designated smoking areas in locations approved by the City Representative.

General Plant and Equipment

The Contractor must ensure that all Plant and Equipment (including powered machinery both stationery and mobile and used in the workplace) brought on onsite is:

operated by appropriately licensed, experienced, trained and qualified persons who have completed competency based training and whose competency has been verified

operated without risk of injury or harm to any persons or property stored, operated and maintained in a safe manner.

Electrical Safety

The Contractor must:

develop and implement SWMS’s in accordance with the OSH Regulations 1996 Part 3, Division 12 section 3.143 and the Electricity (Licensing) Regulations 1991

treat all electrical installations, components, and applications as live and therefore dangerous unless proven dead.

The Electrical Contractor must ensure that only competent licensed electricians perform electrical works. This includes installation, repairs, maintenance and or modifications to plant or equipment wiring.

The Contractor must ensure Electrical Equipment Systems that has been constructed, installed, purchased, hired or materially modified that is brought into service must meet regulatory requirements.

Crane Operation

The Contractor must submit a HRA Crane Operation Request to the City Representative a minimum three business days in advance for approval prior to any works commencing. All crane operations on the City sites are inspected and approved by OSH Team.

Road Closures and Traffic Management Plans

All road or lane closures must meet Main Roads Western Australia - Traffic Management for Works on Roads - Code of Practice.

The Contractor must ensure all accredited Traffic Management Plans are submitted to the City Representative up to 10 business days prior to the works commencing for approval by the City..

NOTE: All Traffic Management Plans / Traffic Guidance Scheme must be prepared by a person holding Main Roads accreditation in Advanced Worksite Traffic Management.

Page 13: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

7 | P a g e

Excavation and Location of Buried Services

The City of Greater Geraldton has many services that have no location records, so the Contractor must be vigilant when undertaking excavation works.

Before commencing any demolition, excavation, construction or other work on the site, the Contractor must verify, and supplement the information provided through Service location investigation, Drawings and “Dial Before You Dig” of the locations where excavation is to take place. Documented evidence of that investigation must be provided to the City Representative. In addition to this the Contractor must mark on the ground the location of any underground services within a minimum of 5m of the excavation, plus any additional areas within the zone of influence of the associated works e.g. machinery movement, stockpiles etc.

The Contractor must ensure any services exposed or installed in an excavation are surveyed/inspected by the CITY’s Representative before backfilling.

Where it has been agreed at the OSH Works Planning meeting that the City is to be the Permit Issuer:

the Contractor must ensure HRA Excavation Requests are submitted to the City Representative a minimum of 5 business days prior to the works commencing for approval by the City

excavation is not to be undertaken without a City HRA Excavation Permit.

Confined Spaces

The Contractor must:

Contractors MUST raise a Permit Request a minimum of three business days for all Confined Space Entry works in spaces owned and controlled by the City.

maintain a system for safe entry and work in, and in the vicinity of, confined spaces as required by the OSH Regulations 1996, Part 3, Division 8 – Work in Confined Spaces and Safe Work Australia’s, Model Code of Practice - Confined Spaces

ensure that appropriate precautions, training, procedures and actions are undertaken so that personnel are protected when entry is required in confined spaces

Identify all confined spaces at the workplace in accordance with Safe Work Australia’s, Model Code of Practice - Confined Spaces.

Handover

Prior to handing back an area or worksite to the City, the Contractor must arrange via the City’s Representative and the City’s OSH Team. This purpose is to identify and record any hazards which may be present. The Contractor must rectify any hazards identified prior to an area becoming operational.

3. SAFETY REQUIREMENTS

Introduction

This section outlines the safety requirements for works carried out in City controlled worksites. These requirements must be implement as a minimum standard.

Page 14: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

8 | P a g e

Emergency Response Planning Arrangements

The Contractor must develop an Emergency Management Plan for approval by the City Representative. This plan must be developed based on an understanding of the requirements for the awareness, notification and response to incidents and emergencies onsite.

Emergency Reporting Requirements

If the Incident is Life Threatening call 000 in the first instance

Contractors must report all Emergency Incidents (Fire, First Aid and Major Fuel/Oil Spills) immediately to the City Representative.

Fire Safety

The Contractor is responsible for the implementation of fire safety measures as detailed below. Queries on fire safety should be directed to the City Representative.

Fire Extinguishers, Hose Reels and other Fire Safety Equipment

The Contractor must ensure that:

the required fire extinguishers and other site based fire safety measures are in place in the construction area and are working as required.

assembly points are maintained all emergency vehicles have access to the works as required. In addition, the Contractor must

provide parking for emergency vehicles where they are in control of the site. combustible debris, rubbish and waste material is removed from site at the end of each work shift. the City Representative is promptly informed of any discharge of a fire extinguisher or use of other

fire safety equipment and the reason for the discharge/use.

Smoking is strictly prohibited in all buildings, vehicles and plant. In certain circumstances Contractors can establish designated smoking areas in areas approved by the City Representative.

Noise

All works that may exceed 85dB(A) must be controlled by Noise Management Plan approved by the City Representative.

The Contractor must:

develop and submit a Noise Management Plan to the City Representative for approval comply with the Code of practice - Managing noise at workplaces comply with relevant environmental legislation and guidelines, specifically the Contractor must

comply with to manage noise, with the aim of minimising any potential community impacts associated with noisy works/activities or noise which could be deemed offensive under the regulations

coordinate and seek approval by the City Representative for any noisy works monitor the noise generated by the works and ensure that the levels and nature of the noise do not

interfere with normal operations.

NOTE: The Contractor must promptly comply with any direction concerning noise control issued by the City Representative.

Page 15: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

9 | P a g e

Hazardous Substances & Fumes

The Contractor must ensure works which generate fumes do not impact workers or the public

Works which can reasonably be expected to create fumes must not be undertaken without prior approval from the City Representative. All hazardous substances that the contractor requires for the scope of works will require a copy of the Safety Data Sheet (SDS) to be forwarded to the City’s OSH team for review and approval.

Dust and Vibration

The Contractor must:

identify any activities which may cause nuisance or damage through vibration provide adequate protection against dust penetration from the work site into adjacent areas. As a

minimum the Contractor must: provide dust suppression measures/containment to meet requirements keep public areas free of dust and debris at all times.

NOTE: These works must be approved by the City Representative.

Hot Work

Where it has been agreed at the OSH Works Planning meeting that the City is to be the Permit Issuer, the Contractor must ensure HRA Hot Works Requests are submitted to the City Representative a minimum of three business days prior to the carrying out any work activity involving grinding, welding, thermal or oxygen cutting, abrasive blasting or heating, and other related heat-producing or spark-producing operations which has the potential to impact workers, services, operations, infrastructure or the public.

A Fire Watch will be implemented whenever Hot Work is being conducted regardless of the protection provided. A person competent in the operation of fire extinguishing equipment and conversant with the local area emergency procedures must observe the Hot Work area. The purpose of the Fire Watch is to detect and prevent the spread of any fire produced by the Hot Works.

The Fire Watch must be maintained for 60 minutes (1 hour) after the completion of hot works.

For all hot works there must be a minimum of two suitable portable fire extinguishers, one fire blanket (and spark shields if working in public areas) at the site of the hot works (minimum of 5 metres away).

Working at Heights

The Contractor must ensure that all work at height that has the potential to impact on workers, services, operations, infrastructure or the public are planned and coordinated with the City Representative. Where it has been agreed at the OSH Works Planning meeting that the City is notified of any Working at Height activity, the Contractor must submit a HRA Working at Height request to the the City Representative a minimum of 48 hours prior to the works commencing for approval.

Scaffolding

The Contractor must provide scaffolding in accordance with the OSH Regulations 1996, Part 3, Division 7 – Scaffolds, the Safe Work Western Australia Code of Practice Prevention of Falls at Workplaces, AS/NZS 4576 Guidelines for Scaffolding and the AS/NZS 1576 Scaffolding series.

Page 16: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

10 | P a g e

Scaffolding which are erected outside the confines of the designated works site must be secured to eliminate the risk of falling objects.

Scaffolds must be designed by a suitable qualified person. Consideration should be given to floor loadings and public/staff interface (i.e. will public need to pass under the scaffolding?).

Scaffolding must only be erected by trained and competent persons. Any scaffolding in the public domain must be covered to prevent falling objects and unauthorised

access. Mobile scaffoldings must be erected by a competent person and only used when all brakes are

applied. Where outriggers are required ensure they are extended correctly. Never mix and match mobile scaffolding components.

Ensure mobile scaffoldings are located on firm level ground with the feet or wheels properly supported. Where adjustable wheels are used, the slope of the surface should not exceed 5 degrees.

Before moving or relocating a mobile scaffold, check that there are no materials on top of the scaffolding deck and use a spotter.

Falling Objects

The Contractor must manage risks to health and safety associated with an object from falling on a person, especially where the falling object is reasonably likely to impact workers, services, operations, infrastructure or the public.

When considering control measures to contain or catch falling objects, the Contractor must identify the types of objects that could fall, as well as the fall gradient and distance, to ensure that any protective structures or equipment are capable of withstanding the impact forces of the falling object.

Ladders

If a ladder is used, the Contractor must ensure the type of ladder is appropriate to the task. Ladders should not be used near a leading edge; a more suitable means of access should be identified.

Extension or single ladders should only be used as a means of access to or egress from a work area, not as a working platform.

‘Domestic’ or ‘home-made’ ladders are not permitted at any City worksite. All ladders must comply with Australian Standard/New Zealand, AS/NZS 1892 series and users should follow the manufacturer’s recommendations on safe use.

Asbestos

Asbestos poses a significant health risk if materials containing Asbestos are not correctly managed. When Asbestos-containing materials are damaged or left to deteriorate, Asbestos fibres can be released and become airborne.

Should materials suspected to contain Asbestos be discovered the Contractor must ensure:

the works are stopped immediately employees and Contractors leave the site the area is secured - demarcation must be put in place to restrict access directly after securing the area, the incident is reported to the City Representative.

Removal of Asbestos must be undertaken by Contractors who are licensed Asbestos removalist if Asbestos-containing materials is classified as:

Page 17: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

11 | P a g e

friable, the Asbestos-containing materials must be removed by a Contractor who possesses an Unrestricted Asbestos removal licence

bonded, the Asbestos-containing materials may be removed by a Contractor who possesses a Restricted Asbestos removal licence.

House Keeping

Site cleanliness is a matter of critical importance and the Contractor must ensure that it keeps its site clean and tidy at all times. In addition, the Contractor must:

maintain security of the worksite and all tools, equipment and materials keep walkways clear of obstructions maintain clear entry and exit routes at all times clean up all areas affected by its ongoing work at least daily and regularly remove rubbish from the

site store all rubbish (including demolished material, sweepings, dust and all other debris) in securely

covered bins immediately clean up any public areas impacted by activities originating from the work site store liquids (waste and supply materials) in water tight containers.

4. High Risk Activities (HRA)

Confined Space Entry Permitting and Safety Rules

Purpose

This Section outlines the management and control of all Confined Space Entry works conducted by Contractors (including third-party Contractors) in confined spaces owned and controlled by the City

Scope

Confined Space Entry Activities in confined spaces owned and controlled by the City.

OSH Works Planning Meeting

An OSH Works Planning Meeting must be undertaken before any works commence. On completion of the OSH Works Planning Meeting the following must be understood:

The location of the Confined Spaces The status of the Confined Space A detailed description of the Confined Space The frequency and duration of entry into the Confined Space City’s Confined Space Register Confined Space Permit Request

Contractors MUST raise a Permit Request for all Confined Space Entry works in spaces owned and controlled by the City.

Contractors must:

Complete the City HRA Confined Space Entry Request along with the required Supporting Documentation online at least three working days before the planned works.

NOT enter a Confined Space until the Permit Request has been approved and signed by all parties.

Page 18: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

12 | P a g e

Supporting Documentation

All Supporting Documentation must be submitted with the Confined Space Entry Request. The type of documents required must be agreed on in the OSH Works Planning Meeting:

Safe Work Method Statement and JHA Confined Space Risk Assessment Emergency Procedures and Rescue Plan (and list of equipment) Appropriate competency certificates of all personnel A copy of the Confined Space Entry Log with the initial information and pre-entry atmospheric test

results completed. Map showing location of the Confined Space

Review of Supporting Documentation

The City Representative and Permit Issuer are responsible for reviewing the Confined Space Entry Request and Supporting Documentation within the allocated three-day period to ensure the request has adequately assessed the hazards and controls associated with work.

Site Inspection

When the Permit Issuer is satisfied the Confined Space Entry Request and Supporting Documentation is adequate, the Permit Issuer must conduct a site inspection to ensure that the agreed controls in the Supporting Documentation have been implemented on site.

Issue Permit

Once the Supporting Documentation has been reviewed and the site inspection completed the Permit Issuer must sign and issue the Confined Space Entry Permit to enable work to commence.

Monitoring

Spot Checks may be conducted to ensure the agreed conditions of the Confined Space Entry Permit are being implemented.

Completion of Work

On completion of the works the Permit Applicant is required to notify the City Representative and Permit Issuer. The City Representative will close the Confined Space Entry Permit

Permit Cancellation

Should a non-compliance occur with the agreed controls in the Confined Space Entry Permit and Supporting Documentation, the Permit Issuer may cancel the Permit. If this happens the Permit Applicant must stop work immediately until further instruction from the City Representative.

Confined Space Entry Safety Rules

General Requirements

A Confined Space Entry Permit is required before entering a Confined Space within a building or structure controlled by the City.

The Contractor must ensure all reasonably practical measures have been taken to eliminate the need to enter the Confined Space.

Page 19: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

13 | P a g e

If it is not reasonably practicable to eliminate the need to enter the Confined Space, a competent person must risk assess the Confined Space, and this risk assessment must be included in the Supporting Documentation submitted with Confined Space Entry Permit Request.

The Contractor must ensure air monitoring is carried out from outside the Confined Space to determine the atmospheric conditions. The Confined Space Entry Log must be completed and submitted as part of the Confined Space Entry Permit Request.

The Contractor must ensure that if ventilation is by forced means, that the fresh air is not contaminated by either exhaust fumes or other pollutants.

Where Confined Space Entry requires respiratory protective equipment, the Contractor must ensure that the type of equipment used is suitable and does not introduce additional hazards.

A standby person must be assigned to continuously monitor the wellbeing of those inside the Confined Space.

Communication method (between the standby person and the personnel in the confined space) must be detailed in the Confined Space Entry Permit Request. The Contractor must ensure communication is always maintained with the personnel in the Confined Space.

A safe means of access/egress must always be maintained whilst personnel are in the Confined Space.

Signs and hard barricades must be erected before any work in relation to a Confined Space commence to prevent entry of persons not involved in the work.

Detailed emergency procedures must be developed for the Confined Space Entry, including a detailed rescue plan.

Rescue equipment must be inspected and set up before any personnel enter a Confined Space.

Crane Operations Process and Safety Rules

Purpose

This Section outlines the management and control of all Crane Operation works conducted by Contractors (including third-party Contractors).

Scope

Crane Operation Activities (includes lifting or boom type equipment such as vehicle loading cranes).

OSH Works Planning Meeting

An OSH Works Planning Meeting must be undertaken before any works commence. On completion of the OSH Works Planning Meeting the following must be understood:

Type of lift (Simple vs Complex) Crane to be used Obstacle lighting (if required) Maximum height the crane can operate Requested maximum height the crane will operate at The crane is within current certification All lifting attachments are within current certification

Supporting Documentation

All Supporting Documentation must be submitted with the HRA Request. The type of documents required must be agreed on in the OSH Works Planning Meeting:

Page 20: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

14 | P a g e

Safe Work Method Statement and Methodology Copy of Part A (refer to Section 4.2.4 below) A Simple Lift Plan/Study or a Critical Lift Plan (see Section 4.3.4 for definition) Crane Load Charts Crane certification Lifting gear certification Map showing location of the proposed Crane Operations Crane Operation details Obstacle lighting Start and end date of the Crane Operations

Review of Supporting Documentation

The City Representative is responsible for reviewing the Crane Operation Request and Supporting Documentation within the allocated three-day period to ensure the Request has adequately assessed the hazards and controls associated with the work.

Lift Plans/Study

A Lift Plan/Study must be completed for all Crane Operations which may impact Infrastructure, Services, Operations or Personnel.

There are two types of Lifts:

Type Description Minimum Controls

Simple All lifting operations that are not classified as complex. (Includes the basic use of chain blocks, winches, come- alongs, etc.)

Risk Assessment or task specific procedure

Lifting Operations Checklist Part A

Complex

Lifting of persons in workbox. Lifting within overhead power line exclusion zones. Lifting large items such as storage tanks or portable

buildings. Lifting items that require additional rigging to balance

the load. Heavy lifts where the load is 10 tonnes or more. Loss of the load would have a serious impact on public

infrastructure (e.g. power, water, gas, sewer, phone, etc.) Tilt-up panel lifting tasks. Multiple crane lift. A lift >80% of the cranes rated capacity (if using a mobile

crane).

Lift Planning, including: Risk Assessment (JHA) Lifting Operations

Checklist Part A and B Lift Plan Pre-lift briefing Applicable Procedures Applicable Safe Work

Method Statement Training VOC

Lift Plans must be completed in full, where something isn’t applicable N/A should be inserted.

Lifting Gear

Lifting gear should be checked before and after use and inspected regularly by a competent person to determine whether it is suitable to keep using. Checks should ensure:

Page 21: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

15 | P a g e

the lifting gear is tagged and relevant information listed e.g. relevant information for a chain includes grade of chain, rated capacity, manufacturer, chain size and the relevant Australian Standard marking.

lifting hooks are provided with operable safety latches unless a safety latch would increase the risk. lifting slings are not damaged e.g. excessive wear, damaged strands, cracks, deformation or severe

corrosion, and the sling is suitable for the load being lifted including capacity and protection from sharp edges.

The manufacturer’s requirements for lifting gear should be followed including using protective sleeves and corner pieces. Although the edges of the load may not appear sharp, a sling may be damaged when it is placed under tension.

Lifting People (Personnel Cages/Work Boxes)

Personnel should only be lifted by plant designed specifically to lift people, for example elevating work platforms. If it is not reasonably practicable to use plant specifically designed to lift people, a Personnel Cage/Work Box may be used to lift workers to perform minor work for a short amount of time in an elevated work area or in the event of an emergency.

Lifting people is deemed a complex lift and a Lift Plan should be completed if a Personnel Cage/Work Box is on site.

The use of Personnel Cages (work boxes) shall comply to regulatory minimum Standards.

Exclusion/Crash Zones and Falling Objects

Exclusion/Crash zones should be established around cranes and adjoining areas to stop people entering the area and risk being injured by the crane or falling objects. The size of the exclusion zone should be based on a risk assessment. Where the SWL capacity of the crane exceeds 80%, as a minimum the length of the extended boom +5m should be established as the Crash Zone.

Where the exclusion zone crosses a public footpath or roadway that needs to be closed, people should be safely directed to an alternative marked route. Lane closures must form part of a Traffic Management Plan.

All, Exclusions zones must be in the form of hard barricading unless agreed otherwise with the City Representative.

Loads to be lifted should be secure and inspected before being lifted for any loose object which could potentially fall off or from the load.

Multiple Crane Lifts

Where a load is being lifted with two or more cranes a detailed Complex Lift Plan must be completed.

Pick and Carry

Pick and carry activities must only be carried out with cranes designed for this purpose and in accordance with the manufacturer’s instructions.

Operational risks such as ground conditions, intended travel pathway, and wind speeds must be considered and detailed in the lift plan.

The load should be carried with the minimum boom length, as close to the ground as possible and moved at a comfortable walking pace.

Cranes should turn with a long radius, to reduce the articulation of the crane.

Page 22: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

16 | P a g e

The load should be kept up-hill of the crane i.e. drive in reverse down a slope to keep the load close to the crane.

Vehicle Loading Cranes

The vehicle loading crane operator must always be able to see the load during the lift. If the load is out of the operator’s view the lifting process must be directed by a licensed dogman or rigger.

The vehicle loading crane should only be used with the load suspended vertically from the hook—the crane should not be used to drag the load over any surface.

The boom should never be positioned directly above the operator control stations or above their head.

Where possible the operator should not position themselves between the vehicle

Crane Operation Safety Rules

General Requirements

The ‘Hierarchy of Control’ must be applied when planning and/or considering control measures for any Crane Operations.

All Crane Operations should be securely barricaded with hard barricading to stop unauthorised access from members of the public and to protect against falling objects.

All equipment (Cranes, EWP’s, Lifting Gear, Harnesses, etc.) should be inspected before use. An anemometer must be fitted at or near the boom tip with an appropriate display inside the cabin

of the crane on all mobile slewing cranes of 100T and above and tower mounted cranes. No crane is permitted to be utilised for any operation unless a current Crane Safe Certificate (i.e.

green sticker) is visible and the crane has been inspected in the previous 12 months. Lifting lugs and lifting points must be inspected by a competent person before being used. Loads must not be lifted or swung over persons or occupied buildings at any time. The operator must not leave the crane controls whilst a load is suspended or the crane is running. Crane hooks must be fitted with a safety latch. Cranes must have the Maximum Rated Capacity (MRC) clearly marked on it. A tag line must be attached to every load lifted. Tag lines should be 16mm natural or synthetic fibre

rope and must not be attached to the rigging of the lift. Handling of raised loads must be avoided except by a tag line to guide into position. In the event of equipment malfunction, all lifting operations must cease and it must be reported to

the City Representative. Outriggers must be fully extended whilst the crane is being operated and must be fully retracted

before any movement of mobile cranes. Trial lifts should be conducted for all Complex Lifts. For cranes with a rated capacity of less than 60T and greater than 10T, the dogman or rigger

requirement must be one person in addition to the crane operator. For cranes with a rated capacity of greater than 60T, the dogman or rigger requirement must be

two persons in addition to the crane operator, i.e. two riggers and one crane operator or one rigger one dogman and one crane operator, as a minimum.

Demolition Process and Safety Rules

Purpose

This section outlines the management and control of Demolition works conducted by Contractors (including third-party Contractors) on the City’s estate.

Page 23: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

17 | P a g e

Scope

The City has separated Demolition works into two categories:

Structural Demolition - The demolition or dismantling of a structure or part of a structure that is load-bearing or otherwise related to the physical integrity of the structure.

Non-Structural Demolition - The demolition or dismantling of a structure or part of a structure that is not deemed load bearing or is hollow in construction.

NOTE: The information provided in this section does not alleviate the Contractor of any responsibilities as detailed in the Occupational Safety and Health Regulation 1996, Part 3, Division 9, Subdivision 7 – Demolition

OSH Works Planning Meeting

An OSH Works Planning Meeting must be undertaken before any works under contract or third- party works commence. On completion of the OSH Works Planning Meeting the following must be understood:

Non-Structural Demolition

Extent of the Demolition works (drawing illustrating what is to be demolished) Services to be affected Review and verification of Asbestos / Asbestos Survey Report (if applicable) Verification of method by which hidden services will be identified Hot Works requirements Life Safety Systems Impairment requirements Risk Assessment for the works Confirmation a review of “As Built” drawings has been or will be undertaken

Structural Demolition

As per Non-Structural Demolition above Confirmation Engineering Investigation / Structural Engineering Report to be undertaken Confirmation Temporary Works will be designed and signed off by an Engineer (if applicable)

NOTE: The Supporting Documentation must be developed in accordance with all legislative requirements and AS 2601 - 2001 demolition of structures.

Supporting Documentation

All Supporting Documentation must be submitted with the Demolition Permit Request. The type of documents required must be agreed in the OSH Works Planning Meeting and will vary depending on the extent of the Demolition works.

Non-Structural Demolition

Safe Work Method Statement for the works Demolition Plan Site Plan Drawing illustrating what is to be demolished Services Management Plan Verification of identification of hidden services Life Safety Systems Impairment Permit (if required)

Page 24: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

18 | P a g e

Hot Works Permit (if applicable) Verification of Asbestos / Asbestos Survey Report (if applicable) Isolation of Energy (Isolation Permit if applicable)

Structural Demolition

All Supporting Documentation as per Non-Structural Demolition above Engineering Investigation /Structural Engineering Report and Sign Off Temporary Works Design and Engineering Sign Off (if applicable)

Review of Supporting Documentation

The City Representative is responsible for reviewing the Demolition Supporting Documentation within the allocated three-day period to ensure the request has adequately assessed the hazards and controls associated with work.

Site Inspection

The City Representative must conduct a site inspection to ensure that the agreed controls in the Supporting Documentation have been implemented on site.

Monitoring

Spot Checks may be conducted to ensure the agreed conditions of the supporting documentation are being implemented.

Engineer’s Reports

For Structural Demolition - All demolition of structural or load bearing members requires an Engineer to sign off that the work will not impact the structural integrity of the member. All works must be undertaken within the specifications made by the Engineer. Any unexpected conditions or changes to the planned Demolition works must be reported to the Engineer, the Contractor as well as the City Representative

Services Within Ceilings, Walls and Floors

Prior to any Demolition works a thorough investigation of the services which may be within the work area must be undertaken by the Contractor, including appropriate sub-surface detection for the surface being penetrated. The sub-surface detect scans must be attached as supporting documentation to the Demolition request.

Services in the works area must be isolated before any Demolition works being undertaken. Where this is not practical, live services must be suitably marked and communicated to the workforce that they are live.

Asbestos

Prior to undertaking any Demolition works, the Contractor must review the Asbestos Register. Should no Asbestos Register not exist and the building was constructed before 31 December 2003 an Asbestos Survey must be undertaken by a competent person. A copy of the report must be sent to the City Representative.

Where the works involve the removal of Asbestos, the Contractor must ensure the sub- Contractor removing the asbestos has the appropriate licences (Restricted or Non- Restricted Licence, depending on the type of Asbestos).

An Asbestos Removal Plan must be submitted to the City Representative for approval by the OSH Team.

Page 25: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

19 | P a g e

Public Safety

Safe public access must always be maintained during the Demolition works. Suitable control measures should be implemented to prevent objects falling on staff and members

of the public who maybe in the vicinity of the works area. An exclusion zone should be erected to prevent unauthorized personnel from entering the work

area.

Demolition Works Safety Rules

General Requirements

The Contractor must notify the Commissioner of Demolition works in accordance with Occupational Safety and Health Regulation 1996, Part 3, Division 9, Subdivision 7 – Demolition.

The Contractor must ensure the Demolition Contractor has the appropriate license to undertake the demolition works (Class 1,2 or 3).

The ‘Hierarchy of Control’ must be applied when planning and/or considering control measures for any Demolition works.

A SWMS must be drafted and be specific to the works. Any Demolition works that requires Working at Heights or Hot Works (or other HRA) will require the

appropriate permit for that works All equipment should be inspected before use. The Contractor must ensure that Plant and Equipment is operated by a competent person and that

it is fit for purpose. The Contractor must ensure debris/waste is removed from the workplace regularly and not allow it

to become a fire hazard.

Excavation Permitting Process and Safety Rules

Purpose

This section outlines the management and control of all Excavation works conducted by Contractors (including third-party Contractors) on City sites.

Scope

Excavation works where the existing ground is to be disturbed to a depth of 100 mm or greater by manual or mechanical means (shovel or machine digging), and includes boring or driving any object into the ground.

The following is not considered to be Excavation:

Vacuum extraction and hand digging using a shovel for service location. Excavation to maximum total depth of a 100mm or less.

OSH Works Planning Meeting

An OSH Works Planning Meeting must be undertaken before any works under contract or third- party works commence. On completion of the OSH Works Planning Meeting the following must be understood:

Location of the Excavation (and proximity to Heritage areas) The extent and dimensions of the Excavation In ground services planning

Page 26: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

20 | P a g e

Location and Identification of all services Isolation of electrical services (if required) Asset owner notifications e.g. Atco Gas / Telstra / Air BP Planning of Excavation e.g. Barricading / Signage

HRA Excavation Permit Request

Contractors MUST raise a Permit Request for all Excavations which may impact infrastructure, services, operations or personnel.

Contractors must:

Complete a the City HRA Excavation Request along with the required Supporting Documentation at least ten working days before the planned works.

NOT commence the Excavation until the Permit Request has been approved and signed by all parties.

Supporting Documentation

All Supporting Documentation must be submitted with the Excavation Request. The type of documents required must be agreed in the OSH Works Planning Meeting.

Excavation Supporting Documentation

A Safe Work Method Statement and Methodology Verification and identification of in ground services including As-Cons Exclusion zone is erected around the proposed works Service Locations Drawings DBYD Temporary works required i.e. trench boxes

Review of Supporting Documentation

The City Representative and Permit Issuer are responsible for reviewing the Excavation Request and Supporting Documentation within the allocated ten working day period to ensure the Request has adequately assessed the hazards and controls associated with the work.

Site Inspection

When the Permit Issuer is satisfied the Excavation Request and Supporting Documentation is adequate, the Permit Issuer must conduct a site inspection to ensure that the agreed controls in the Supporting Documentation have been implemented on site.

Issue Permit

Once the Supporting Documentation has been reviewed and the site inspection completed the Permit Issuer must sign and issue the Excavation Permit to enable work to commence.

Monitoring

Spot Checks may be conducted to ensure the agreed conditions of the Excavation Permit are being implemented.

Page 27: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

21 | P a g e

Completion of Work

After the work is completed the Permit Applicant is required to notify the Permit Issuer and the City Representative that the works are complete.

Permit Cancellation

Should a non-compliance occur with the agreed controls in the Excavation Permit and Supporting Documentation the Permit Issuer may cancel the Permit. If this happens the Applicant must stop work immediately until further instruction from the City Representative.

Excavation Planning

SWMS

A SWMS must be completed and approved before all excavations and ground penetrations. The SWMS should:

describe the methods to be used to undertake an initial examination of the area (e.g. to confirm that the location of utilities and essential services is correct)

describe the excavation methods to be used to undertake the work describe the standard work procedures and controls that apply relating to benching, shoring,

placement of spoil, ground support, trafficability near the edges of open excavations, prevention of falls, access and egress from the excavation, ventilation systems, dewatering systems etc.

detail the steps and control measures required to be undertaken to ensure a safe system of work.

Accurate location of Services on the site

The recommended approach for Service detection is as follows:

Step 1 – Service Data Identification

Discuss the DBYD data with your Service Location Contractors and develop a plan to ensure that the most appropriate detection devices are used to best identify the Services known to be on the site.

Step 2 – Excavation Site Identification

The extent and location of the Excavation is to be accurately marked on the site using the information provided on the Excavation Location Plan required for an Excavation Permit.

Step 3 – Service Location and Marking Requirements

Each Service shown on the DBYD data and additional Services identified is to be marked on the site using a system of identification that can be maintained for the duration of the work. Identification markers, such as PVC pipes, spray or survey pegs, must be consistently colour coded and must include information referencing service type, pipe/conduit configuration and known service depth. Details of the colour coding must be included as part of the Excavation Request.

The Service Location Contractor is to verify that each Service shown on the DBYD data and additional Services has been marked on the site and that the markers for each can be clearly distinguished from one another.

Step 4 – Excavation Perimeter Scan

As the data on Services can contain inaccuracies in content and alignment it is also necessary for the perimeter of the Excavation to be scanned using an appropriate technique to identify if any unknown

Page 28: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

22 | P a g e

Service enters the Excavation zone. A minimum of 5m must be scanned around the perimeter of the excavation.

Step 5 –Marker Currency

It is the responsibility of the Contractor to ensure that the activities on site do not disturb markers. If markers are disturbed the Service Location Contractor must re-confirm the accuracy of markers relevant to the remaining Excavation works before the Excavation works recommencing.

Service Crossing Excavation

Where Excavation crosses a Service, the markers are to extend sufficiently beyond each end of the Excavation to ensure that at least two markers remain on each side of the Excavation so that the alignment across the Excavation can be re-established at any time during Excavation.

Service Parallel to Excavation

Where Services run parallel to the Excavation, markers should be installed at regular intervals along the entire length of the Excavation and extending at least two markers beyond the extent of the Excavation.

Excavation Safety

Where excavations are 1.5 metres deep or greater the Contractor must ensure, that the work area is secured from unauthorised access by providing suitable solid barriers and suitable signage.

The risk of injury to any person arising from the collapse of the excavations must be minimised by ensuring that all sides of the excavation are adequately supported by doing one or more of the following:

o shoring by shielding or other comparable means

o benching

o battering

No unauthorised person must be permitted to enter an excavation while excavation equipment is operating.

To enable safe access and egress to and from excavations, ladders, ramps or other safe means of entry or exit should be provided.

Safe and suitable means of movement must be allowed for persons in and around and excavated area.

No item of plant or excavated material should be placed/stored near the excavated area. Consideration should be given to the need for an area to be established for stockpiling excavated material. If it is not reasonably practicable to establish a stockpile area, excavated material should be placed outside a 45-degree slope line passing through the bottom of the excavation and in no case closer than 1000mm from the edge of the excavation

Excavations should be inspected daily by a competent person before the start of works.

Environmental and Heritage Clearance

The Contractor must ensure that Heritage Monitors are engaged during Excavation works in areas of remnant vegetation or areas formally registered by the State as heritage sites.

Should archaeological material be disturbed during excavations, the Contractor must cease all Excavation works and contact the City Representative

Page 29: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

23 | P a g e

A Clearing/Pruning Permit must be sought for any removal of vegetation, whether native or landscape trees / shrubs in developed areas.

Excavation Safety Rules

General Requirements

A HRA – EXCAVATION Permit is required for all Excavations which may impact on the City’s infrastructure, services, operations or personnel.

The ‘Hierarchy of Control’ must be applied when planning and/or considering control measures. It is the responsibility of the Contractor to ensure that the works are adequately

supervised/inspected to ensure the works are performed as detailed in the Excavation request and as expected.

Prior to commencement of excavations affecting roads or traffic movement, a documented traffic management plan should be prepared that includes, where necessary, traffic controller, barricades and any road closures.

Hot Works Permitting Process and Safety Rules

Purpose

This section outlines the management and control of all Hot Works conducted by Contractors (including third-party Contractors) on City sites.

Scope

Hot Works involving grinding, welding, thermal or oxygen cutting, abrasive blasting or heating, and other related heat-producing or spark-producing operations which has the potential to impact infrastructure, services, operations or personnel, while they are on city sites.

OSH Works Planning Meeting

An OSH Works Planning Meeting must be undertaken before any works under contract or third- party works commence. On completion of the OSH Works Planning Meeting the following must be understood:

The location of the Hot Works Hot Works cannot be conducted within 30 metres of aircraft or aircraft refuelling operations, unless

with specific conditions, approved by the Permit Issuer Hot Works cannot be conducted during a DFES initiated total fire ban, unless a DFES exemption has

been obtained Type and quantity of fire extinguishing equipment required Environmental conditions. i.e.: weather conditions are considered extreme and/or hazardous to any

person/s or property during a hot work procedure The Hot Work area should be secured using approved barriers Are Hot Works to be performed while working at Height or in a Confined Space? Competencies required to perform the tasks and implement the required controls Any further authority required to implement identified controls.

Hot Works Permit Request

Contractors MUST raise a Permit Request for all Hot Works which may impact infrastructure, services, operations or personnel

Contractors must:

Page 30: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

24 | P a g e

Complete the City HRA Hot Work Request along with the required Supporting Documentation online at least three working days before the planned works.

NOT commence the Hot Works until the Permit Request has been approved and signed by all parties.

Supporting Documentation

All Supporting Documentation must be submitted with the Hot Works Request. The type of documents required must be agreed in the OSH Works Planning Meeting and may include:

Risk assessment for hot works undertaken Confined Space Entry Permit (if Hot Works to be conducted within a Confined Space) Rescue Plans (if Hot Works to be conducted within a Confined Space)

Review of Supporting Documentation

The City Representative and Permit Issuer are responsible for reviewing the Hot Works Request and Supporting Documentation within the allocated three-day period to ensure the request has adequately assessed the hazards and controls associated with work.

Site Inspection

When the Permit Issuer is satisfied the Hot Works Request and Supporting Documentation is adequate, the Permit Issuer must conduct a site inspection to ensure that the agreed controls in the Supporting Documentation have been implemented on site.

Issue Permit

Once the Supporting Documentation has been reviewed and the site inspection completed the Permit Issuer must sign and issue the Hot Works Permit to enable work to commence.

Monitoring

Spot Checks may be conducted to ensure the agreed conditions of the Hot Works Permit are being implemented.

Completion of Work

After the work is completed the Permit Applicant is required to notify the Permit Issuer and the City Representative that the works are complete.

Permit Cancellation

Should a non-compliance occur with the agreed controls in the Hot Works Permit and Supporting Documentation the Permit Issuer may cancel the Permit. If this happens the Applicant must stop work immediately until further instruction from the City Representative.

Fire Fighting Equipment and Fire Watch

A minimum of two Fire Extinguishers and one Fire Blanket must be at hand during the Hot Works. Fire Fighting Equipment must conform to Australian Standard 2444-2001 “Portable fire

extinguishers and fire blankets” A Fire Watch must be implemented whenever Hot Work is being conducted regardless of the

protection provided. A person competent in the operation of fire extinguishing equipment, and familiar with the terminal emergency procedures, must observe the Hot Work area. The purpose of

Page 31: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

25 | P a g e

the Fire Watch is to detect and prevent the spread of any fire produced by the Hot Works. The Fire Watch must be maintained for 60 minutes (1 hour) after the completion of hot works.

Hot Work Protection Measures and Designated Hot Work Zones

Workers and members of the public must be protected from the potential risks associated with Hot Works activities e.g. welder’s arc, sparks from cutting, falling objects etc.

All Hot Works in the public domain must be securely barricaded to stop unauthorised access from members of the public.

Arc Safe welding screens that absorb the dangerous ultra violet light that is emitted from the arc welding process should be used, especially in the public domain.

Industrial fire blankets should be used to stop sparks from falling to the ground below, and or getting into cavities.

A designated Hot Works Zone/Tent can be established on site provided it has been approved by the Permit Issuer and suitable control measures have been implemented.

Gas Cutting / Gas Cylinders

Gas cylinders must be secured in an upright position and protected from damage and the uncontrolled release of its contents while being used, moved or stored.

Flashback arresters must be fitted to both the oxygen and fuel gas hoses. For long lengths of hose, arresters should be fitted on both the torch and the regulator.

Equipment and hoses must be checked regularly for damage, faults or leaks and regular maintenance should be conducted to reduce the risk of gas leaks.

Torches and cylinders must be shut off when not in use (ensure hoses are purged). Lighted torches must never be left unattended.

Hoses must be kept away from the work face to ensure they do not come in contact with flames/sparks. Hoses must not be run over sharp objects/abrasive surfaces.

All potential hazards and controls associated with the work e.g. services and isolation Impact to the public e.g. noise, dust, security, work hours etc.

Hot Works Safety Rules

General Requirements

A HRA – Hot Works Permit is required for all Hot Works which may impact infrastructure, services, operations or personnel. It will be agreed in the OSH Works Planning Meeting whether a Hot Works Permit is required.

The ‘Hierarchy of Control’ must be applied when planning and/or considering control measures for any Hot Works. Where possible Hot Works should be eliminated.

Hot Works cannot be conducted within 30 metres of aircraft or aircraft refuelling operations, unless with specific conditions, approved by the Permit Issuer.

Hot Works cannot be conducted during a DFES initiated total fire ban, unless a DFES exemption has been obtained.

A minimum of two fire extinguishers and one fire blanket must be at hand during and one hour immediately after Hot Works are completed.

An inspection of the Hot Works areas must be undertaken before any hot works commence. All flammable liquids/substances within 15 metres of the hot work area must be removed or at the

very least protected.

Page 32: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

26 | P a g e

Working at Heights Process and Safety Rules

Purpose

This section outlines the management and control of all Working at Heights activities conducted by Contractors (including third-party Contractors) on City sites.

Scope

Working at Heights is defined as work in any place where, if precautions were not taken, a person could fall and injure themselves.

If you:

work above 2 metres could fall from an edge, through an opening or fragile surface could fall from ground level into an opening in a floor or hole in the ground work on a roof within 3 metres of an open edge. Examples of Working at Heights include: using working platforms such as scaffolds, tower scaffolds, cherry pickers, scissor lifts and elevated

work platforms work on a roof, piece of plant or equipment using ladders or stepladders. Working at Heights does not include: ascending or descending solely for gaining access.

OSH Works Planning Meeting

An OSH Works Planning Meeting must be undertaken before any works under contract or third- party works commence. On completion of the OSH Works Planning Meeting the following must be understood:

The location of the Working at Heights The design and layout of elevated work areas, including the distance of a potential fall The number and movement of all people at the workplace The proximity of workers to unsafe areas where loads are placed on elevated working areas The adequacy of inspection and maintenance of Plant and Equipment, for example, scaffolding The adequacy of lighting within the work area Weather conditions on the day of the works The adequacy of procedures for all potential emergency situations When harnesses are required, are there appropriate rescue procedures in place to retrieve someone

in a timely manner, to minimise the risk of suspension trauma What communications systems are required.

NOTE: The presence of rain, wind, extreme heat or cold can cause slippery or unstable conditions.

Supporting Documentation

All Supporting Documentation must be submitted when Working at Heights is required. The type of documents required must be agreed in the OSH Works Planning Meeting:

Safe Work Method Statement and Methodology Rescue plans Exclusion zone plans Emergency and rescue equipment to be used

Page 33: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

27 | P a g e

Review of Supporting Documentation

The City Representative is responsible for reviewing the Supporting Documentation within the allocated three-day period to ensure the request has adequately assessed the hazards and controls associated with work.

Monitoring

Spot Checks may be conducted to ensure the agreed conditions of the Working at Heights are being implemented.

Ladders

Assess whether a ladder is the most suitable means of access, consider the length of the task and physical surroundings. Would a EWP or Mobile Scaffolding be more suitable?

Ensure platform ladders are used as intended. A-Frame ladders must only be used for inspections and access/egress.

Only industrial ladders are permitted for use, domestic ladders are prohibited. Do not use a ladder where there is a risk of fall over a leading edge, consider a more suitable means

of access. Ensure the platform ladder is fully open and never over reach from any ladder. Straight ladders must be securely fastened top and bottom and the 1 in 4 rule must be enforced.

Straight ladders must only be used for access/egress and not as a working platform Always be aware of your surroundings and general conditions. Ladders should be maintained in good order and not painted as damage or essential safety

information may be obscured. The SWL of a ladder must be clearly visible. Ladders to be used for electrical installations should be non-conductive.

Elevated Working Platforms

Operatives of Elevated Working Platforms (EWP) must be trained and competent. An exclusion zone must be established around the entirety of the works area. Under no

circumstance should a member of the public be able to walk under a EWP. Inspect the works area before driving a EWP into it. EWP’s should only be used on firm stable

ground Boom Lifts must not be slewed out beyond the work area which has been barricaded. EWP’s must be lowered to an appropriate level before travelling with them. Safety Harnesses must always be worn by all occupants when in a Boom Lift. Only stand on the

platform floor, never stand or sit on the railing. Do NOT exceed the manufacturer’s load capacity limits. Ensure EWPs are maintained and operated in accordance with the manufacturer’s instructions. Consideration should be given to the protection of ground surfaces (paving/tiles) when

manoeuvring

Working at Heights Safety Rules

General Requirements

A SWMS must be drafted and be specific to the Works at Height. The ‘Hierarchy of Control’ must be applied when planning and/or considering control measures for

any working at heights.

Page 34: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

28 | P a g e

All working at heights activities should be securely barricaded to stop unauthorised access from members of the public and to protect against falling objects.

All equipment (EWP’s, Scaffolding, Ladders, Fall Arrest Systems and Harnesses) should be inspected before HRA use.

Ensure the right equipment is used for the task at hand.

Energy Isolation and Control Activity

Purpose

This section outlines clear guidelines when managing Energy Isolation undertaken by Contractors (including third-party Contractors), that has the potential to impact the workers, services, operations and infrastructure, or members of the public.

Scope

Energy Isolation which involves hazardous energy. Hazardous energy includes electrical, hydraulic, pressure, gravitational, mechanical, potential, kinetic and thermal.

OSH Works Planning Meeting

An OSH Works Planning Meeting must be undertaken before any works under contract or third-party works commence. On completion of the OSH Works Planning Meeting the following must be understood:

Identifying the energy source requiring isolation, i.e. Electrical, Water, Gas or Plant & Equipment. Location of the Energy Isolation The extent of the Energy Isolations required The potential impact of the Energy Isolation and effected stakeholders

REQUEST – Energy Isolation

Contractors must:

Complete the City Request – Isolate Energy along with the required Supporting Documentation online at least ten working days before the planned works.

NOT Isolate Energy until the Permit Request has been approved and signed by all parties.

Supporting Documentation

All Supporting Documentation must be submitted with the Energy Isolation Request. The type of documents required must be agreed in the OSH Works Planning Meeting.

Review of Supporting Documentation

The City Representative and Authorised Isolator are responsible for reviewing the Energy Isolation Request and Supporting Documentation within the allocated ten working day period to ensure the Request has adequately assessed the hazards and controls associated with the work.

Site Inspection

When the City Representative and the Authorised Isolator are satisfied the Energy Isolation Request and Supporting Documentation is adequate, the Authorised Isolator must conduct a site inspection to ensure that the agreed controls in the Supporting Documentation have been implemented on site.

Page 35: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

29 | P a g e

The inspection will verify:

whether the authorisation of the Energy Isolation may impact on other HRA’s already authorised within the vicinity of the proposed HRA

whether neighbouring work areas may be impacted by the Energy Isolation all possible sources of stored energy that the Energy Isolation Points can be locked.

Issue Work Authorisation - Lock Out Tag Out (LOTO)

When the Authorised Isolator is satisfied, the Energy Isolation will be carried out in accordance with the City Energy Lock and Tag Out Procedure by the Authorised Isolator.

LOTO Duration

Energy Isolation is undertaken for a specified period. The specified period will vary depending on the Activity being undertaken requiring Energy Isolation.

The Authorised Isolator is responsible for setting an acceptable duration for Energy Isolation, based on the scope of work and an assessment of the risk to the workers, services, operations and infrastructure or members of the public

Consideration should be given to the:

time of day the Activity requiring Energy Isolation is to be performed expected duration of the Activity location of the Activity.

Monitoring and Enforcement

Spot Checks may be conducted to ensure the agreed conditions of the HRA Energy Isolation are being implemented

Re-Energisation on Works Completion

At the completion of works, all Energy re-energisation must be completed in line with requirements stated in the Energy Lock and Tag-out Procedure.

If required, the Authorised Isolator may conduct a post site inspection to confirm works completion in accordance with Energy Isolation Permit conditions.

In some special cases compliance certificates may need to be sighted prior to the re- energisation, for example:

Electrical – Safety Certificate, RCDs test results, basic insulation and continuity testing Gas – Safety Certificates.

Hazardous Substances

Isolation requirements for new and modified Plant and Equipment will be assessed by the Authorised Isolator prior to commencement of work and suitable provisions for Isolation from hazardous materials and purging of equipment will be conducted.

The Isolation and purging requirements of normally enclosed Plant and Equipment to atmosphere will be assessed and specified prior to commencement of work. Where applicable, suitable precautions will be

Page 36: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

30 | P a g e

developed and implemented to protect people from asphyxiation or adverse effects from hazardous materials used to purge equipment.

All valves used as Isolations (including those used while slip plates or blind flanges are fitted) will be locked and tagged as per this procedure.

Tags will be applied at each Point of Isolation to indicate the:

purpose of the Isolation date of Isolation person who performed the Isolation.

Out of Service Tags

An “OUT OF SERVICE TAG” is used to identify Plant and Equipment that has been taken out of service due to a fault or malfunction.

An Out of Service Tag will NOT be relied on to provide personal protection during work where Isolation is achievable.

An Out of Service Tag can be applied by any person where they identify a fault with an item of Plant or Equipment.

The Tag should be filled out correctly and legibly and placed on a prominent location on that item of Plant and Equipment, for example:

mobile Plant and Equipment - the keys should be removed and an Out of Service Tag attached to both the key and the driver’s side door handle or steering wheel. The key should be given to the relevant Supervisor

static Plant and Equipment - the keys (if applicable) should be removed and an Out of Service Tag attached to both the key and the start / operating console.

power tools - the power lead should be coiled up with the Out of Service Tag applied to the coil at the plug end.

NOTE: The key should be given to the relevant Supervisor

Emergency Response Planning

Purpose

This section outlines the requirements for the awareness, notification, and response to incidents and emergencies at an City worksite..

This section outlines key criteria to:

provide direction in the planning for preparedness, response and recovery from emergencies and events that occur on site

enable effective incident management, irrespective of whether the incident occurs in the Contractor work area

This section details the responsibilities placed on Contractors when responding to an emergency, including communication and information sharing, and the interdependencies which exist between the emergency arrangements for:

Contractor

Page 37: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

31 | P a g e

Subcontractor/visitors/public The City Incident Control (Emergency Services)

The information contained in this section is intended to complement the existing emergency and safety management systems adopted by the Contractor to ensure an appropriate awareness and response occurs in a complex high risk public environment.

Underpinning Principles of Emergency Response

The City’s Emergency Management Framework is governed by commonwealth legislation. It provides for a well-considered and immediate response to unplanned events, incidents and emergencies. The emergency response arrangements are guided by the disciplines of notification, assessment and response and an agreed plan to recovery. Once response has been initiated, the State Hazard Management agencies conduct their response as directed in state legislation and associated plans.

The conduct of emergency response is guided by the following principles.

The assurance of the safety, protection and care of employees, and public. The protection of vital assets and critical infrastructure to maintain continuity of operations. The management of any potential impact of the event on property and the environment, and

protect others from further harm. Safeguarding the interest of the greater community and minimising any onward socio-economic

impact to them that may result from the emergency. Maintaining on-going communications with employees, clients, and the broader community. Resuming core business activities and essential services within required timeframes. Preserving the confidence of employees, and the community on the City’s ability to maintain safety

and security, and meet its service obligations at times of vulnerability.

Communicating Incidents

When the Contractor has an unplanned event that may require an emergency response, or additional support or awareness, the following communication protocols are to be adopted.

All life-threatening incidents must be reported first to Emergency Services on 000 Any unplanned incidents or emergencies or any threat to the wellbeing of any person, must be

reported to the City representative. In the event of an emergency or evacuation Contractors are expected to follow the direction of the

Police or Emergency Services Incident Controller. In an emergency response, Contractors are expected to facilitate access and egress for emergency

responders and their vehicles to or through their site as a priority.

Once an awareness of the situation and appropriate response is initiated:

Continue to follow your site emergency response procedures. Be prepared to receive or provide immediate access for police or emergency service vehicles

or first responders either to, through or around your area of works.

Page 38: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

32 | P a g e

5. APPENDIX

Term Acronym Definition

Access The means to approach or enter a place via a staircase, ladder, lift, door or other safe means.

Asbestos

Fibrous form of the mineral silicates belonging to the serpentine and amphibole groups of rock- forming minerals and includes: actinolite, amosite (brown asbestos), anthophyllite,

crocidolite (blue asbestos), chrysotile (white asbestos), tremolite, and

any mixture containing one or more of the above-mentioned minerals

Asbestos Containing Material (ACM)

Any material, object, product or debris containing asbestos.

Australian Standard AS Standards are documents setting out specifications, procedures and guidelines. They are designed to ensure products, services and systems are safe, reliable and consistent. Australian Standards are not legal documents. However, when a government references a standard in legislation, it becomes mandatory. This is a decision made by elected governments, not Standards Australia.

Australia / New Zealand Standard AS/NZS

Authorised Isolator A City employee or Contractor who has successfully completed the City Isolation Training

Building or Structure Any erection, edifice, wall, chimney, fence, bridge, dam, reservoir, wharf, jetty, or ship or other floating structure, and includes any part of any of those things.

Confined Space

An enclosed or partially enclosed space which — is not intended or designed primarily as a workplace; is at atmospheric pressure during occupancy; and has restricted means for entry and exit, and which either –

o has an atmosphere containing or likely to contain potentially harmful levels of contaminant;

o has or is likely to have an unsafe oxygen level; or o is of a nature or is likely to be of a nature that could

contribute to a person in the space being overwhelmed by an unsafe atmosphere or a contaminant.

Construction Work

The construction, erection, installation, alteration, repair, renewal, removal, excavation, dismantling or demolition of, or addition to any building or structure, or any work in connection with any of those things that is done at or adjacent to the place where the building or structure is located; or

Work on which a hoisting appliance or any scaffold or shoring is used or intended to be used; or

Work in driving or extracting piles, sheet piles or trench sheet; or

Work in laying any pipe or work in lining pipe that is done at

Page 39: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

33 | P a g e

Term Acronym Definition

or adjacent to the place where the pipe is laid or to be laid; or Work in sinking, lining, altering, repairing, maintaining,

renewing, removing or dismantling a well or borehole; or Road works, earthworks or reclamation; or Work in laying an underground cable or work related to

laying an underground cable that is done at or adjacent to the place where the cable is laid or to be laid.

Contractor Contractor contracted to undertake works on behalf of a Tenant and/or Lessee.

Contracted Person / Personnel

A person or persons employed or engaged by a Contractor or Sub-Contractor.

Demolition An activity involving the demolition of all or part of a structure.

Energy Isolation Activity or Energy Isolation

An activity on Plant and Equipment involving the isolation of hazardous energy. Hazardous energy includes electrical, hydraulic, pressure, gravitational, mechanical, potential, kinetic and thermal.

Excavation

Any activity that requires the existing ground to be disturbed to a depth of 100 mm or greater by manual or mechanical means (shovel or machine digging), and includes boring or driving any object into the ground.

The following is not considered to be Excavation for the purposes of this Procedure:

vacuum extraction and hand digging using a shovel for service location; and

hand digging using shovels to depth of 100mm or less.

Hazard

Anything (e.g. condition, situation, practice, behaviour) that has the potential to cause harm, including injury, disease, death, environmental or property and equipment damage.

High Risk Activity - Permit Issuer

HRA-PI

A person who has the necessary training, qualification or experience, who has been assessed as competent in a High-Risk Activity discipline, and who has been delegated authority to issue Permits.

High Risk Activity HRA

Activities deemed by the City to be high risk including: Confined Space Entry Crane Operations Demolition Excavation Hot Work Penetrations Working at Heights

High Risk Construction Work

As defined in the Occupational Safety and Health Regulations 1996 - construction work:

involving a risk of a person falling 2 metres or more on telecommunications towers involving demolition

Page 40: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

34 | P a g e

Term Acronym Definition

involving disturbing or removing asbestos involving alteration to a structure that requires the structure

to be temporarily supported to prevent its collapse involving a confined space involving excavation to a depth of more than 1.5 metres involving the construction of tunnels involving the use of explosives on or near pressurised gas pipes (including distribution

mains) on or near chemical, fuel or refrigerant lines on or near energised electrical installations and lines

(whether overhead or underground) in an area that may have a contaminated or flammable

atmosphere involving tilt-up or precast concrete on or adjacent to roads or railways that are in use on a construction site where there is movement of powered

mobile plant in an area where there are artificial extremes of temperature in, over or adjacent to water or other liquids if there is a risk of

drowning involving diving

HRA Permit A document authorising the Contractor/THE CITY Personnel to undertake a High-Risk Activity.

Hot Work Activity or Hot Works

Any work activity involving grinding, welding, thermal or oxygen cutting, abrasive blasting or heating, and other related heat-producing or spark-producing operations which has the potential to impact people, services, operations or infrastructure or the public while they are at City sites.

Incident

An unplanned event which has the potential to cause harm to persons, property/assets, the environment or unintended disruption to power supply. This also includes near misses or non- conformance issues.

Lock out Tag out LOTO

"Lock and tag" requires that a lock is placed on the isolation Point in such a position that no hazardous energy sources can be turned on. The procedure requires that a tag be affixed to the locked device indicating the contact details of the owner of the lock. The locking and tagging of the isolation point lets others know not to de-isolate/re-energise the device.

Line Manager

The Manager, usually reporting to the Chief Officer of the Business Unit, who is responsible for the planning, scheduling and allocation of Activities and issuing instructions and causing supervision/control of Activities undertaken by non-supervisory employees.

Page 41: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

35 | P a g e

Term Acronym Definition

OSH Works Planning Meeting

A meeting, prior to works commencing, facilitated by the Line Manager or THE CITY Representative, attended by the Contractor, and if required an OSH representative, to discuss OSH risks associated with the contracted works and to determine control processes for specific HRA’s.

The City Representative

The most senior Project Manager/Facilitator responsible for a capital works project or Third- Party Contractor works being undertaken for the City. This person may be either a City Employee or contract Project Manager/Project Facilitator.

Project Manager/Project Facilitator

A person engaged by THE CITY as an employee, Contractor or consultant to manage the delivery of Capital Works projects, or to facilitate Third Party Contractor works.

Permit Applicant A Contractor representative or THE CITY Line Manager who submits a HRA Request Form, along with all Specified Supporting Documentation.

Risk

The chance of something happening that will have an impact upon objectives of THE CITY. It is measured in terms of Consequences and Likelihood.

Risk Assessment

A systematic use of available information to determine how often specified events may occur and the magnitude of their consequences.

Safe Work Method Statement

SWMS A Statement submitted by a Contractor and reviewed by THE CITY that describes the methods that will be applied to complete work safely.

Safety Legislation

Legislation applicable to occupational safety and health, dangerous goods and electricity safety

Regulations and subordinate legislation made under that legislation

Any directions on safety or notices issued by any relevant authority or any code of practice or compliance code appropriate or relevant to the Works and

Amendment or replacement of the above.

Supporting Documentation

Supporting documents required when submitting a request for a High-Risk Activity Authorisation.

Spot Check A review of Contractor employee performance and compliance the results of which are reported to relevant THE CITY Representative.

Sub-Contractor An organisation or person engaged by a Contractor to perform work on the Estate.

Page 42: CONTRACTOR SAFETY MANUAL...CONTRACTOR SAFETY MANUAL Health and Safety Procedure HS-MAN-001 Subject: Contractor Safety Manual TRIM #: D-20-049035 Version #: 1.0 Review date: …

CONTRACTOR SAFETY MANUAL

36 | P a g e

Term Acronym Definition

Total Fire Ban

A Total Fire Ban (TFB) is declared because of extreme weather conditions or when widespread fires are seriously stretching firefighting resources. A TFB is declared by DFES following consultation with local governments and is published on the DFES website. A TFB prohibits the lighting of any fires in the open air and any other activities that may start a fire, including all open-air fires, incinerators, welding, grinding, soldering or gas cutting. Contractors are responsible to review DFES website for notifications and requirements.

Work at Height

Includes work being performed in a situation where there is potential for a person or an object, including equipment, material, tools and debris, to fall or be emitted sideways or upwards or otherwise hit persons during work from a scaffold, permanent work platform, through a ceiling or floor and the like. Examples are hosing material from elevated structures, opening drain valves that discharge at height, tools falling off a working platform, rock and soil falling into a trench and falling material deflected off the side of a building.

6. DOCUMENT CONTROL

Approval Date Position Name

Edited By: 01/06/2020 Graduate Occupational Safety and Health Advisor Matthew Young

Document Owner: 01/06/2020 Manager Corporate Compliance and Safety Brodie Pearce

Approved by: 01/06/2020 Senior Occupational Safety and Health Advisor

Mark Gray

Revision # Date Section(s) Changed Brief Description of Change

1.0 01/06/2020 All Draft Document