Lead Agent
Office of the AssistantSecretary of the Army
(Installations andEnvironment)
Department of DefenseVoluntary Protection Program
Center of Excellence
Operated by:
Voluntary Protection Programs Participants Association NationalConference Orlando, Florida
Department of Defense VPP Workshop
Effective Processes for Selection and Oversight of Contractors
August 22, 2010
-
8/6/2019 Contractors and VPP
2/21
2
What Does OSHA Say?
OSHA CSP 03-01-003, VPP Policies/Procedures Manual
Mentions contractors in three ways:
Nested contractors (supervised by site personnel)
Applicable contractors (work 1,000 hours or more inany quarter during the last 12 months)
Contractors (type not specified)
-
8/6/2019 Contractors and VPP
3/21
3
What Does OSHA Say?
OSHA CSP 03-01-003, VPP Policies/Procedures ManualRequirements for contractors or all contractors:
Must follow the safety and health rules of the host
Contractor employees must be made aware of:
The hazards of worksite. How to recognize hazardous conditions and signs/symptoms of
workplace-related illnesses and injuries.
Hazard controls and safe work procedures.
Emergency procedures.
Site safety and health goals/objectives and the policies andprocedures that indicate how to accomplish them.
VPP (have the VPP explained to them)
Their rights under the OSH Act
-
8/6/2019 Contractors and VPP
4/21
4
What Does OSHA Say?
OSHA CSP 03-01-003, VPP Policies/Procedures Manual
Requirements specific to Applicable contractors: Maintain TCIR/DART data for worked performed at the site
Documented oversight and management system:
Ensure safety and health considerations are addressed during
contractor selection and performance of work Encourage contractors to have effective safety and health
management systems.
Timely identification, correction, and tracking of hazards
Provision to remove for safety or health violations.
Must be able to demonstrate an understanding of VPP fundamentals
Requirements specific to Nested contractors: Include contractor injuries in hosts injury/illness rates
-
8/6/2019 Contractors and VPP
5/21
5
What Does the VPP CX Say?
CX Gap Analysis / Action Plan (#9, #12, #21, #28) Contract workers are made aware of the sites
S&H mission/policy statements, goals/objectives, and theirresponsibility for helping to achieve site goals
(#46 - #54) Written contractor oversight/management systemincludes:
Consideration of contractor injury/illness rates and safetyperformance during the contractor selection process
Submission of contractor injury/illness data to the site
Oversight to ensure contractor S&H compliance
Disciplinary procedures for noncompliance Provisions for identification/correction/control/tracking of hazards
under the contractors control
Appropriate training of personnel assigned to monitor contractorS&H performance
-
8/6/2019 Contractors and VPP
6/21
6
What Does the VPP CX Say?
CX Gap Analysis / Action Plan (#55, #56, #57) Sound working relationships have been established
with contractors to encourage open communications, hazard reportingand correction, and participation in safety and healthmeetings/activities .
(#241, #242, #243) A process is in place to ensure contractoremployees are aware of:
Rights Under the OSH Act
Site participation in VPP, and VPP requirements that apply to thecontractor
How to recognize hazardous conditions and signs/symptoms ofworkplace related illnesses
Site PPE requirements
Emergency procedures
-
8/6/2019 Contractors and VPP
7/217
OSHA Emphasis Shift
Increased focus on compliance in general
Numerous compliance hits in On-site = No Star/Merit
Extends to contractors working under your roof
Even if they are not your contractors
Clear ability to respond quickly to contractor hazardsand noncompliance is key
Must build into contracts up front
CORs provide reasonable oversight
Safety Office spot checks
Contracting Officers handle problems quickly
-
8/6/2019 Contractors and VPP
8/218
The Dilemma
DODI 6055.1, DoD Safety and Occupational Health ProgramThis instruction does not apply generally to DoD contractor personnel
and contractor operations . . . the contractor is responsible directly toFederal or State OSHA for the safety and health of contractors'employees.
VPP Federal Register Notice of July 24, 2000Managers must provide visible leadership in implementing the
program. This must include ensuring that all workers at the site,including contract workers, are provided equally high quality safety andhealth protection.
W C t D It
-
8/6/2019 Contractors and VPP
9/219
We Cant Do It --But Were Already Doing It!
Air Force VPP Implementation and Contracting Activities (April 09)
Navy NAVFAC Inst 5100.11J NAVFAC Safety and Health Program
Army EM 385-1-1, Safety and Health Requirements Manual
Quick Glance:
Contractor safety plans, approved by the government
Contractor selection factors (injury rates, OSHA citations, etc.)
Training of CORs
Periodic oversight contractor worksites/operations
Reporting/Investigation of contractor mishaps
Contractor hazard abatement system Training of contractor employees
Safety meetings
Work Stoppage
-
8/6/2019 Contractors and VPP
10/2110
Air Force VPP Contracting Guide
The contracting officer shall include in the solicitation arequirement for offerors to submit their 3-yr TCIR and DARTrates as part of their proposal. The TCIR and DART rateswill be considered during the contractor selection process.
The TCIR and DART rates are compared to the mostrecently published Bureau of Labor Statistics (BLS) nationalaverage for the Standard Industrial Classification code (SIC)or North American Industrial Classification Systems(NAICS) code for the applicable industry, as identified in thesolicitation. Where feasible, consider including these ratesas a stand-alone source selection factor or as an element ofthe past performance evaluation assessment.
-
8/6/2019 Contractors and VPP
11/2111
Air Force VPP Contracting Guide
Generally, requirements documents will include:
The VPP URL, http://www.osha.gov/dcsp/vpp/index.html anddirect offerors to the web site to ensure they understand VPP.
A requirement for the applicable contractor to submit a safety andhealth plan. The plan shall be made available to the installation
safety office for acceptance prior to contract performance. A requirement for CORs to assess the contractor for compliance
with their health and safety plan, to include mishap reporting.
A requirement to submit contractor TCIR/DART rates and OSHAForm 300A to the contracting officer by the 15th of January ofeach year.
A requirement for the contractors QC Plan to identify procedures
the contractor will use to track compliance with their Safety andHealth Plan, and to correct violations.
http://www.osha.gov/dcsp/vpp/index.htmlhttp://www.osha.gov/dcsp/vpp/index.html -
8/6/2019 Contractors and VPP
12/2112
Air Force VPP Contracting Guide
The contractor shall:
Comply with the specific health and safety requirements identified inthis PWS, as well as OSHA;
Comply with the health and safety rules of the Governmentinstallation that concern related activities not directly addressed inthis PWS;
Take all reasonable steps and precautions to prevent accidents andpreserve the health and safety of contractor and Governmentpersonnel performing or in any way coming in contact with theperformance of this requirement; and
Take additional immediate precautions identified by the contracting
officer for health and safety purposes.
Violations of these health and safety rules and requirements are to bepromptly corrected as directed by the contracting officer. Failure tocorrect will be grounds for termination of the contract.
-
8/6/2019 Contractors and VPP
13/2113
Army Corps of Engineers EM 385-1-1
Applies to construction contracts under the provisionsof FAR Clause 52.236-13, and to service, supply, andR&D contracts unless technical and S&Hrepresentatives advise that special precautions are
not appropriate due to extremely limited scope ofservices.
1045 pages total - provides for abbreviated accidentprevention plans for smaller contracts.
Often used/referenced by other services.
-
8/6/2019 Contractors and VPP
14/2114
Army Corps of Engineers EM 385-1-1
Provisions include: Accident prevention plans, approved by the government.
Position hazard analyses, reviewed with all affected employees.
Frequent/documented worksite safety inspections.
Hazard/deficiency documentation, tracking, and correction. Trained contractor Site Safety and Health Officer.
Documented S&H training of contractor personnel
Documented monthly safety meetings
Accident reporting and investigation. OSHA recordkeeping and posting of Form 300A.
Emergency planning.
Much much more.
-
8/6/2019 Contractors and VPP
15/21
15
NAVFAC Instruction 5100.11J
Use of EM 385-1-1, FAR Clauses, and NAVFAC GuideSpecification 01525 in contract documents, and hiring of highquality safe contractors minimizes disruption of client operationsdue to mishaps. Lessons learned through investigation ofcontractor mishaps helps prevent future occurrences of similar
mishaps. Periodic project safety oversight should be performedas necessary to ensure compliance with contract requirements,but periodic safety inspections of contractor worksites are theresponsibility of the contractor.
Contractors past safety and health performance should be
included as an element of Past Performance Evaluation. Eachofferor may be requested to provide: OSHA incidence/severityrates for the last 3 years; federal/state OSHA citations for the last3 years; Offerors safety and health quality control program.
-
8/6/2019 Contractors and VPP
16/21
16
NAVFAC Instruction 5100.11J
Each EFD/EFA/OICC requires a safety manager competent in
OSHA and Army Corps of Engineers construction safetydisciplines. A member of each Field Office shall serve as safetycoordinator and complete appropriate competency training. Thesafety coordinator is responsible to work with the cognizantEFD/EFA safety manager to ensure necessary S&Hrequirements/resources provided (e.g., training, PPE, workplaceinspections, medical surveillance, contract review).
Recordable mishaps shall be investigated and a report submittedby the prime contractor to the Contracting Officer.
The FAR clause 52.236-13, Accident Prevention, shall beinserted in construction contracts when the contract amountexceeds the simplified acquisition threshold (normally $100K) . . .and for facilities services contracts when appropriate.
-
8/6/2019 Contractors and VPP
17/21
-
8/6/2019 Contractors and VPP
18/21
18
US Army Garrison Fort Detrick, MD
March 2009 On-site recommended for Merit Contractor Issues
Key changes in contractor management (per OSHA)
Comprehensive contract specification covering:
Key regulatory requirements for the work in question Scaffolding, fall protection, crane use, etc., as
applicable),
Work stoppage and non-payment for noncompliance,
Proof of contractor safety and health training Contractor safety / accident prevention plans
Report accidents in writing within 4 hours
-
8/6/2019 Contractors and VPP
19/21
19
US Army Garrison Fort Detrick, MD
Key changes in contractor management (cont.)
Increased oversight by CORs
Safety training of CORs (10 hour course)
Unannounced spot checks by site Safety Office, and
Allow Safety Office to report problems directly Contracting
Officer rather than strictly through CORs
December 2009 Return Visit Approved for StarThe (new contract spec) has provided previously missing legal
authority to require work stoppage and non-payment for non-
compliance. Also the direct link the Installation Safety Office now hasto the Contracting Officer will remove any sole reliance on COR actionto put the appropriate action in motion. The Commander is totallysupportive of . . . the shutting down of a work site/operation until thehazard is abated.
-
8/6/2019 Contractors and VPP
20/21
20
The Dilemma
The Services can address contractor safety, and already do so inmany ways. Common themes include:
The contractor is responsible for contractor safety/compliance
Require past performance info in solicitations
Contract specs require contractors to work safely and comply
Contractors define up front how they will comply and work safely
The Contracting Officer provides oversight and requirescontractor action when needed
COR oversight confirms conformance to the contract and the
contractors own safety plan they are not regulators The Safety Office is extra eyes, ears, and advisor to the
Contracting Officer, but does not issue orders to the contractorexcept in cases of imminent danger.
-
8/6/2019 Contractors and VPP
21/21
Thank You !!