    User Manual SAP R/3 Enterprise Implementation Project

    CONFIGURATION MANUAL

    (SAP R/3 Version ECC6.0)

    CONTROLLING

    Prepared By Approved By

    P.Ravishankar K.Viswanathan

    SAP FICO Consultants. Project Manager

    Info vista Technology Info vista Technology

    Confidential User manual Page 1 of 27

  • 8/7/2019 Contrlloing Settings 1

    2/27

    User Manual SAP R/3 Enterprise Implementation Project

    INDEX

    1. Define Controlling area .......................................................................................................... 3

    Maintain controlling area ....................................................................................................... 3

    1.2 Activate components ........................................................................................................ 5

    1.3 Assignment of company code to controlling area ............................................................ 6

    1.4 Define number ranges for controlling documents ............................................................7

    1.5 Maintain versions ............................................................................................................. 81.6 Defining operating concern ............................................................................................. 8

    2. Cost element group ..............................................................................................................10

    3. Costing sheet configuration ..................................................................................................12

    3.1 Define cost component structure ....................................................................................12

    3.2 Define cost sheet ............................................................................................................21

    4. Costing run ...........................................................................................................................26

    4.1 Define a costing run .......................................................................................................26

    Confidential User manual Page 2 of 27

  • 8/7/2019 Contrlloing Settings 1

    3/27

    User Manual SAP R/3 Enterprise Implementation Project

    1. Define Controlling areaSAP calls managerial accounting as controlling. The module is commonly known as CO.

    The controlling area is the central organization in controlling , structuring the internalaccounting operations. In CHOICE we have defined controlling area as CTC

    Maintain controlling area

    The controlling area is the central organizational structure in Controlling and is used in cost

    accounting. The controlling area just like a company code is a self contained cost accounting

    entity for internal reporting purpose. The controlling area is assigned to one or more

    company codes so as to ensure that the necessary transactions posted to FI , are transferred to

    controlling for cost accounting purpose.

    This is the initial screen for controlling.

    TransactionCodeMenu Accounting > Financial Accounting > Controlling

    In order to maintain controlling area, we have to follow the menu path

    Confidential User manual Page 3 of 27

  • 8/7/2019 Contrlloing Settings 1

    4/27

    User Manual SAP R/3 Enterprise Implementation Project

    TransactionCodeMenu Accounting > Financial Accounting > controlling >

    Organization > Maintain controlling area

    Confidential User manual Page 4 of 27

  • 8/7/2019 Contrlloing Settings 1

    5/27

    User Manual SAP R/3 Enterprise Implementation Project

    1.2 Activate components

    On entering the controlling area, click on the activate components , wherein you will get thefollowing screen.

    It should be configured as per the above.

    Confidential User manual Page 5 of 27

  • 8/7/2019 Contrlloing Settings 1

    6/27

    User Manual SAP R/3 Enterprise Implementation Project

    On clicking the assignment of company code the following screen is displayed. Here you

    assign the company code

    1.3 Assignment of company code to controlling area

    Confidential User manual Page 6 of 27

  • 8/7/2019 Contrlloing Settings 1

    7/27

    User Manual SAP R/3 Enterprise Implementation Project

    1.4 Define number ranges for controlling documents

    TransactionCodeMenu Accounting > Financial Accounting > controlling >

    General controlling > Organization > Maintainnumber ranges for controlling documents

    Then we maintain document number ranges for the controlling documents

    Confidential User manual Page 7 of 27

  • 8/7/2019 Contrlloing Settings 1

    8/27

    User Manual SAP R/3 Enterprise Implementation Project

    1.5 Maintain versions

    Transaction

    CodeMenu Accounting > Financial Accounting > controlling >

    General controlling > Organization > Maintainversions

    We have to maintain plan version for the controlling area.

    1.6 Defining operating concern

    The menu path

    Confidential User manual Page 8 of 27

  • 8/7/2019 Contrlloing Settings 1

    9/27

    User Manual SAP R/3 Enterprise Implementation Project

    TransactionCodeMenu Accounting > Financial Accounting > controlling >

    Profitability analysis > Structure > Define operatingconcern > Maintain operating concern

    The operating concern is the top most reporting level for profitability analysis and sales &

    marketing controlling. We have defined the operating concern as CISS for CHOICE.

    The main screen will be displayed as follows;

    Confidential User manual Page 9 of 27

  • 8/7/2019 Contrlloing Settings 1

    10/27

    User Manual SAP R/3 Enterprise Implementation Project

    2. Cost element groupThe grouping of cost elements of the same type so as to help in reporting or processing more

    than one cost element in a single business transactions.

    We have to define cost element group

    The screen is as follows

    The menu path is

    TransactionCode

    Menu Accounting > Financial Accounting > controlling >Cost element accounting > Master data > Costelements > cost element groups

    This is the groups created forCHOICE.

    This is the cost element group structure

    Confidential User manual Page 10 of 27

  • 8/7/2019 Contrlloing Settings 1

    11/27

    User Manual SAP R/3 Enterprise Implementation Project

    Confidential User manual Page 11 of 27

  • 8/7/2019 Contrlloing Settings 1

    12/27

    User Manual SAP R/3 Enterprise Implementation Project

    3. Costing sheet configuration

    3.1 Define cost component structure

    The cost component structure groups the various cost elements into cost components to show

    the activity price of an activity type, to arrive at the cost of process and to calculate the

    planned cost of a product.

    TransactionCode

    OKTZ

    Menu Accounting > controlling > Product cost planning >Basic settings for material costing > Define cost

    component structure

    We have defined Z8 as SFD cost component & Z9 for PFD cost component for

    CHOICE.

    Confidential User manual Page 12 of 27

  • 8/7/2019 Contrlloing Settings 1

    13/27

    User Manual SAP R/3 Enterprise Implementation Project

    When you select the structure SFD cost component & then clickAssignment cost

    component cost element interval., you will find the list of all GL accounts set up for the

    preparation of cost sheet.

    Confidential User manual Page 13 of 27

  • 8/7/2019 Contrlloing Settings 1

    14/27

    User Manual SAP R/3 Enterprise Implementation Project

    In the screen mentioned below we define cost component structure with attributes. This is

    done by clicking the cost component structure with attributes icon with the name specified .

    We have defined Z8 as SFD cost component & Z9 for PFD cost component.

    The following screen is displayed as below. You will find the structure displaying all the cost

    components for costing.

    Confidential User manual Page 14 of 27

  • 8/7/2019 Contrlloing Settings 1

    15/27

    User Manual SAP R/3 Enterprise Implementation Project

    When you select Z8 ( Raw material & Semi finished goods ) & then clickAssignment cost

    component Cost element interval , you will find the GL accounts related to raw material

    assigned to the cost component structure.

    Confidential User manual Page 15 of 27

  • 8/7/2019 Contrlloing Settings 1

    16/27

    User Manual SAP R/3 Enterprise Implementation Project

    When you select Z8 ( Packing material ) & then clickAssignment cost component Cost

    element interval , you will find the GL accounts related to packing material assigned to the

    cost component structure.

    Confidential User manual Page 16 of 27

  • 8/7/2019 Contrlloing Settings 1

    17/27

    User Manual SAP R/3 Enterprise Implementation Project

    When you select Z8 ( Material overhead ) & then clickAssignment cost component Cost

    element interval , you will find the GL accounts related to material overhead assigned to the

    cost component structure. Here you will be assigning a Secondary cost element as 800001

    to 800013.

    Confidential User manual Page 17 of 27

  • 8/7/2019 Contrlloing Settings 1

    18/27

    User Manual SAP R/3 Enterprise Implementation Project

    When you select Z8 ( Production overhead ) & then clickAssignment cost component

    Cost element interval , you will find the GL accounts related to production overhead

    assigned to the cost component structure. We have defined the production overhead as

    404004.

    Confidential User manual Page 18 of 27

  • 8/7/2019 Contrlloing Settings 1

    19/27

    User Manual SAP R/3 Enterprise Implementation Project

    When you select Z8 ( Other costs ) & then clickAssignment cost component Cost

    element interval , you will find the GL accounts related to other costs assigned to the cost

    component structure. We have defined the production overhead as 498011.

    Confidential User manual Page 19 of 27

  • 8/7/2019 Contrlloing Settings 1

    20/27

    User Manual SAP R/3 Enterprise Implementation Project

    Cost component groups.

    Z8 & Z9 has been defined as cost component groups.

    This can be viewed by clicking Z8 & the cost component groups.

    Confidential User manual Page 20 of 27

  • 8/7/2019 Contrlloing Settings 1

    21/27

    User Manual SAP R/3 Enterprise Implementation Project

    3.2 Define cost sheet

    Here we now define the costing sheet. Menu path

    TransactionCodeMenu Accounting > controlling > Product cost planning >

    Basic settings for material costing > Overhead >Define costing sheets

    This is the initial screen of the costing sheet. We have defined as ZPFD & ZSFD as costing

    sheet for PFD & SFD respectively.

    Confidential User manual Page 21 of 27

  • 8/7/2019 Contrlloing Settings 1

    22/27

    User Manual SAP R/3 Enterprise Implementation Project

    Costing sheet rows

    In order to view the costing sheet rows you have to select the costing sheet & then click

    costing sheet rows. The costing sheet is built on these 3 fields.

    Base Z912 , Z911

    Overhead- Z913 , Z915

    Credit Z01,Z02

    Confidential User manual Page 22 of 27

  • 8/7/2019 Contrlloing Settings 1

    23/27

    User Manual SAP R/3 Enterprise Implementation Project

    Here the base is defined by giving the basic raw materials GL head involved in the relevant

    cost elements column. Here we have defined Z912.

    Confidential User manual Page 23 of 27

  • 8/7/2019 Contrlloing Settings 1

    24/27

    User Manual SAP R/3 Enterprise Implementation Project

    The over head rate is defined as a percentage on the basic cost of raw material @ 6%to

    arrive at the material overhead.

    We have defined the material overhead as Z913.

    Confidential User manual Page 24 of 27

  • 8/7/2019 Contrlloing Settings 1

    25/27

    User Manual SAP R/3 Enterprise Implementation Project

    Credit ; You have defined a percentage of 6% for material overhead of basic raw material &

    wages which has to credited back to production overhead & this is defined in Credit .

    Confidential User manual Page 25 of 27

  • 8/7/2019 Contrlloing Settings 1

    26/27

    User Manual SAP R/3 Enterprise Implementation Project

    4. Costing run

    4.1 Define a costing run

    TransactionCode

    Ck40n

    Menu Accounting > controlling > Product cost planning >Material costing > Costing run > CK40n edit costingrun

    The costing run is mainly done to arrive at the planned cost of a finished product. You have

    to create a costing run with a run date preferably on a month end date to update the planned

    cost in the material master which can be viewed in MM03.(Costing View).

    The following are steps involved in the costing run.

    1. Selection

    2. Structural explosion3. Costing

    4. Analysis

    5. Marking

    6. Release

    Confidential User manual Page 26 of 27

  • 8/7/2019 Contrlloing Settings 1

    27/27

    User Manual SAP R/3 Enterprise Implementation Project

    Details of the steps involved in the costing run.

    1. Selection - You are given the option of selecting the material to be costed & in this

    step you will decide which or all the materials required for a planned cost.

    2. Structural explosion In this step the system checks for all the materials which is in

    Bill of Material (BOM), for the purpose of costing.

    3. Costing The system does the costing based on the sequence of the costing sheet

    configured.

    4. Analysis An analysis is made available to view the planned cost of the finished

    goods selected along with the details of the cost structure.

    5. Marking The system will mark the planned cost of the material required to be costed

    based on your selection.

    6. Release The system will release the planned cost of the material to be costed & getsupdated in the material master costing view.