DAILY REPORT FOR SPECAIL SUPPORT & DUCT PROJECT: LAO CAI DAP2 PLANT PROJECT Update 19-Dec-13 ITEM: .................................... Weight - To d TEARM: ................................. Mark/Cut Fitup/Assembl Welding START DAY: 10/Dec/2013 34.00 34.00 34.00 Total weight (ton) Shop DWG Cutting plan Mark/Cut Fitup/Assembl Welding - - 6,470.2 6,470.2 6,470.2 Item Description Unit Total Weight A - Special - Support Ton 789.20 09- Pipe support DWG for compressed station Ton Material Status Ton Engineering Status Ton Shop DWG Ton Cutting plan DWG Ton Mark Cut Ton 432.82 - 432.82 Fit-up/Assembly Ton 432.82 - 432.82 Welding Ton 432.82 - 432.82 Clearing & Painting m2 432.82 - 432.82 Final Inspection report Ton Mark/Parking list Ton Transportation Ton 432.82 - 432.82 10.1- Pipe support DWG for Demineralized water station 5,204.64 Material Status Ton Engineering Status Ton Shop DWG Ton Cutting plan DWG Ton Mark Cut Ton 5,150.94 - 5,150.94 Fit-up/Assembly Ton 5,150.94 - 5,150.94 Welding Ton 5,150.94 - 5,150.94 Clearing & Painting m2 5,150.94 - 5,150.94 Final Inspection report Ton Mark/Parking list Ton Transportation Ton 5,150.94 - 5,150.94 10.2- Pipe support DWG for Demineralized water station Ton 592.00 Material Status Ton Engineering Status Ton Shop DWG Ton Cutting plan DWG Ton Mark Cut Ton 497.00 - 497.00 Fit-up/Assembly Ton 497.00 - 497.00 Welding Ton 497.00 - 497.00 Clearing & Painting m2 497.00 - 497.00 Final Inspection report Ton Mark/Parking list Ton Transportation Ton 497.00 - 497.00 11.1- Pipe support DWG for Process waste water treatment sta ton 839.76 Material Status Ton Engineering Status Ton Shop DWG Ton Cutting plan DWG Ton Mark Cut Ton 293.68 34.00 327.68 Fit-up/Assembly Ton 293.68 34.00 327.68 Welding m2 293.68 34.00 327.68 Clearing & Painting Ton 293.68 34.00 327.68 Final Inspection report Ton Mark/Parking list Ton Transportation Ton 293.68 34.00 327.68 14.1- Pipe support DWG for fresh water cooling station ton 173.09 Material Status Ton Engineering Status Ton Shop DWG Ton Cutting plan DWG Ton Mark Cut Ton 61.71 - 61.71 Fit-up/Assembly Ton 61.71 - 61.71 Welding m2 61.71 - 61.71 Clearing & Painting Ton 61.71 - 61.71 Final Inspection report Ton Up to yesterday To day Up to day

Upload: dinh-van-doan

Post on 28-Nov-2015

18 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Control Log Sheet DAP2

DAILY REPORT FOR SPECAIL SUPPORT & DUCT

PROJECT: LAO CAI DAP2 PLANT PROJECT Update 19-Dec-13

ITEM: .................................... Weight - To day (ton) TEARM: ................................. Mark/Cut Fitup/Assembl Welding Painting (ton) Transportation (ton)

START DAY: 10/Dec/2013 34.00 34.00 34.00 34.00 34.00 Total weight (ton)

Shop DWG Cutting plan Mark/Cut Fitup/Assembl Welding Painting (ton) Transportation (ton)

- - 6,470.2 6,470.2 6,470.2 6,470.2 6,470.2

Item Description Unit Total Weight % complete Remark

A - Special - Support Ton 789.20

09- Pipe support DWG for compressed station Ton

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton 432.82 - 432.82 54.84%

Fit-up/Assembly Ton 432.82 - 432.82 54.84%

Welding Ton 432.82 - 432.82 54.84%

Clearing & Painting m2 432.82 - 432.82 54.84%

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton 432.82 - 432.82 54.84%

10.1- Pipe support DWG for Demineralized water station 5,204.64

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton 5,150.94 - 5,150.94 652.68%

Fit-up/Assembly Ton 5,150.94 - 5,150.94 652.68%

Welding Ton 5,150.94 - 5,150.94 652.68%

Clearing & Painting m2 5,150.94 - 5,150.94 652.68%

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton 5,150.94 - 5,150.94 652.68%

10.2- Pipe support DWG for Demineralized water station Ton 592.00

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton 497.00 - 497.00 62.97%

Fit-up/Assembly Ton 497.00 - 497.00 62.97%

Welding Ton 497.00 - 497.00 62.97%

Clearing & Painting m2 497.00 - 497.00 62.97%

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton 497.00 - 497.00 62.97%

11.1- Pipe support DWG for Process waste water treatment station ton 839.76

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton 293.68 34.00 327.68 41.52%

Fit-up/Assembly Ton 293.68 34.00 327.68 41.52%

Welding m2 293.68 34.00 327.68 41.52%

Clearing & Painting Ton 293.68 34.00 327.68 41.52%

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton 293.68 34.00 327.68 41.52%

14.1- Pipe support DWG for fresh water cooling station ton 173.09

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton 61.71 - 61.71 7.82%

Fit-up/Assembly Ton 61.71 - 61.71 7.82%

Welding m2 61.71 - 61.71 7.82%

Clearing & Painting Ton 61.71 - 61.71 7.82%

Final Inspection report Ton

Up to yesterday

To day

Up to day

Page 2: Control Log Sheet DAP2

Mark/Parking list Ton

Transportation Ton 61.71 - 61.71 7.82%

14.2- Pipe support DWG for fresh water cooling station ton -

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton - - -

Fit-up/Assembly Ton - - -

Welding m2 - - -

Clearing & Painting Ton - - -

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton - - -

19.2- Pipe support DWG for boiler station and slag area ton -

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton - - -

Fit-up/Assembly Ton - - -

Welding m2 - - -

Clearing & Painting Ton - - -

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton - - -

ton -

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton - - -

Fit-up/Assembly Ton - - -

Welding m2 - - -

Clearing & Painting Ton - - -

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton - - -

21.2.1- Pipe support DWG for rection section ton -

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton - - -

Fit-up/Assembly Ton - - -

Welding m2 - - -

Clearing & Painting Ton - - -

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton - - -

21.2.2- Pipe support DWG for rection section ton -

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton - - -

Fit-up/Assembly Ton - - -

Welding m2 - - -

Clearing & Painting Ton - - -

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton - - -

21.3- Pipe support DWG for filtration section ton -

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton - - -

Fit-up/Assembly Ton - - -

Welding m2 - - -

Clearing & Painting Ton - - -

21.1- Pipe support DWG for beneficated phosphate rok storageand slurry stablizing station

Page 3: Control Log Sheet DAP2

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton - - -

21.4- Pipe support DWG for concentration section ton -

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton - - -

Fit-up/Assembly Ton - - -

Welding m2 - - -

Clearing & Painting Ton - - -

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton - - -

23.1- Pipe support DWG for DAP Production section ton -

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton - - -

Fit-up/Assembly Ton - - -

Welding m2 - - -

Clearing & Painting Ton - - -

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton - - -

23.2 & 23.3 - Pipe support DWG for Bulk DAP Storage ton -

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton - - -

Fit-up/Assembly Ton - - -

Welding m2 - - -

Clearing & Painting Ton - - -

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton - - -

Pipe support DWG for interconnecting piperack ton 5,204.64

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton

Fit-up/Assembly Ton

Welding m2

Clearing & Painting Ton

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton

Duct& chute drawing for Boiler station and slag area ton

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton

Fit-up/Assembly Ton

Welding m2

Clearing & Painting Ton

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton

Duct& chute drawing for bulk DAP storage ton

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton

Fit-up/Assembly Ton

Welding m2

Page 4: Control Log Sheet DAP2

Clearing & Painting Ton

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton

Duct& chute drawing for DAP production section 1 lot ton

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton

Fit-up/Assembly Ton

Welding m2

Clearing & Painting Ton

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton

Duct& chute drawing for DAP production section 2 lot ton

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton

Fit-up/Assembly Ton

Welding m2

Clearing & Painting Ton

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton

Duct& chute drawing for DAP production section 3 lot ton

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton

Fit-up/Assembly Ton

Welding m2

Clearing & Painting Ton

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton

Duct& chute drawing for Packing& bags storage ton

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton

Fit-up/Assembly Ton

Welding m2

Clearing & Painting Ton

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton

Duct drawing for DAP Production section 4 lot ton

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton

Fit-up/Assembly Ton

Welding m2

Clearing & Painting Ton

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton

Duct drawing for DAP Production section 5 lot ton

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton

Fit-up/Assembly Ton

Page 5: Control Log Sheet DAP2

Welding m2

Clearing & Painting Ton

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton

Duct drawing for DAP Production section 6 lot ton

Material Status Ton

Engineering Status Ton

Shop DWG Ton

Cutting plan DWG Ton

Mark Cut Ton

Fit-up/Assembly Ton

Welding m2

Clearing & Painting Ton

Final Inspection report Ton

Mark/Parking list Ton

Transportation Ton

NOTE:

Thuộc phạm vi báo cáo của Ban vật tư dự án DAP Lao cai

Thuộc phạm vi báo cáo của Nhóm FE - Trung tâm tư vấn

Thuộc phạm vi báo cáo của Nhà máy KCT - Bắc Ninh ( Mr Hùng )

Page 6: Control Log Sheet DAP2

ItemDrawing No Piece mark Description

PR F032-PRA-001 F032-PRA-001/1 H150X150X7X10 321.00PR F032-PRA-001 F032-PRA-001/2 C150X75X9 21.00PR F032-PRB-002 F032-PRB-002/1 H150X150X7X10 23.00PR F032-PRB-002 F032-PRB-002/2 H150X150X7X10 3.00PR F032-PRB-003 F032-PRB-003/1 H150X150X7X10 4.00PR F032-PRB-003 F032-PRB-003/2 H150X150X7X10 23.00PR F032-PRB-003 F032-PRB-003/3 H150X150X7X10 43.00PR F032-PRB-004 F032-PRB-004/ PL9 2.00PR F032-PRB-004 F032-PRB-004/2 H150X150X7X10 4.00PR F032-PRB-004 F032-PRB-004/3 H150X150X7X10 23.00PR F032-PRB-005 F032-PRB-005/1 H350X350X12X19 412.00PR F032-PRB-005 F032-PRB-005/2 H350X350X12X19 43.00PR F032-PRB-005 F032-PRB-005/3 H300X300 5.00PR F032-PRB-005 F032-PRB-005/4 H250X250 4.00PR F032-PRB-005 F032-PRB-005/5 PL16 20.10PR F032-PRB-005 F032-PRB-005/6 PL12 9.65PR F032-PRB-005 F032-PRB-005/7 PL6 0.14PR F032-PRB-006 F032-PRB-006/1 PL12 9.65PR F032-PRB-006 F032-PRB-006/2 PL6 0.14PR F032-PRB-006 F032-PRB-006/3 L50X50X6 54.00PR F032-PRB-006 F032-PRB-006/4 PL9 2.83PR F032-PRB-007 F032-PRB-007/1 PL16 20.1009 F032-PRB-007 F032-PRB-007/2 PL6 0.1409 F032-PRB-007 F032-PRB-007/3 L50X50X6 345.0009 F032-PRB-007 F032-PRB-007/4 PL9 5.5409 F032-PRF-001 F032-PRF-001/1 C150X75X9 34.0009 F032-PRF-002 F032-PRF-002/1 PL14 30.7709 F032-PRF-002 F032-PRF-002/2 PL14 5.9809 F032-PRF-002 F032-PRF-002/3 PL14 11.39

10.1 F032-PRF-002 F032-PRF-002/4 PL14 17.9010.1 F032-PRF-003 F032-PRF-003/1 H100X100X6X8 343.0010.1 F032-PRF-003 F032-PRF-003/2 H100X100X6X8 434.0010.1 F032-PRF-003 F032-PRF-003/3 PL6 0.2410.1 F032-PRF-003 F032-PRF-003/4 PL9 1.8110.1 F032-PRF-004 F032-PRF-004/1 H100X100X6X8 4354.0010.2 F032-PRF-004 F032-PRF-004/2 H100X100X6X8 34.0010.2 F032-PRF-004 F032-PRF-004/3 H100X100X6X8 343.0010.2 F032-PRF-004 F032-PRF-004/4 PL9 34.0010.2 F032-PRF-005 F032-PRF-005/1 H100X100X6X8 34.0010.2 F032-PRF-005 F032-PRF-005/2 H100X100X6X8 34.0010.2 F032-PRF-005 F032-PRF-005/3 H100X100X6X8 6.0010.2 F032-PRF-005 F032-PRF-005/4 PL9 7.0010.2 F032-PRF-006 F032-PRF-006/1 L75X75X9 5.0011.1 F032-PRF-006 F032-PRF-006/5 PL14 30.7711.1 F032-PRF-006 F032-PRF-006/2 PL14 12.84

Length (mm)

P_AREA(m2)

Weight (kg)

Page 7: Control Log Sheet DAP2

11.1 F032-PRF-006 F032-PRF-006/3 PL14 5.9811.1 F032-PRF-006 F032-PRF-006/4 PL14 6.5311.1 F032-PRF-007 F032-PRF-007/3 H100X100X6X8 76.0011.1 F032-PRF-007 F032-PRF-007/1 H100X100X6X8 75.0011.1 F032-PRF-007 F032-PRF-007/2 H100X100X6X8 34.0011.1 F032-PRF-007 F032-PRF-007/4 PL9 43.0011.1 F032-PRF-008 F032-PRF-008/1 PL14 30.7711.1 F032-PRF-008 F032-PRF-008/2 PL14 12.7914.1 F032-PRF-008 F032-PRF-008/3 PL14 5.9814.1 F032-PRF-008 F032-PRF-008/4 PL14 6.5314.1 F032-PRF-008 F032-PRF-008/1' PL14 26.3814.1 F032-PRF-008 F032-PRF-008/2' PL14 11.4714.1 F032-PRF-008 F032-PRF-008/3' PL14 5.9814.1 F032-PRF-008 F032-PRF-008/4' PL14 5.38PR F032-PRE-001 F032-PRE-001/1 H150X150X7X10 54.00PR F032-PRE-001 F032-PRE-001/2 C150X75X9 34.00PR F032-PRF-002 F032-PRF-002/1 C150X75X9 5.00PR F032-PRF-002 F032-PRF-002/2 C150X75X9 54.00PR F032-PRF-003 F032-PRF-003/1 H100X100X6X8 23.00PR F032-PRF-003 F032-PRF-003/3 H100X100X6X8 435.00PR F032-PRF-003 F032-PRF-003/2 H100X100X6X8 43.00

Page 8: Control Log Sheet DAP2

Q'ty Status Fabrication WorkMark/Cut Fit-up/Drilling Welding

Q'ty Weight Date Q'ty Weight Date Q'ty Weight

1 321.00 1 1-Dec 1 11 21.00 1 21.00 1-Nov 1 21.00 1-Nov 1 21.001 23.00 1 23.00 2-Nov 1 23.00 2-Nov 1 23.001 3.00 1 3.00 3-Nov 1 3.00 3-Nov 1 3.001 4.00 1 4.00 4-Nov 1 4.00 4-Nov 1 4.001 23.00 1 23.00 5-Nov 1 23.00 5-Nov 1 23.001 43.00 1 43.00 6-Nov 1 43.00 6-Nov 1 43.004 8.00 1 2.00 7-Nov 1 2.00 7-Nov 1 2.002 8.00 1 4.00 8-Nov 1 4.00 8-Nov 1 4.001 23.00 1 23.00 9-Nov 1 23.00 9-Nov 1 23.00

1 412.00 1 412.00 10-Nov 1 412.00 10-Nov 1 412.00

1 43.00 1 43.00 11-Nov 1 43.00 11-Nov 1 43.00

1 5.00 1 5.00 12-Nov 1 5.00 12-Nov 1 5.00

1 4.00 1 4.00 13-Nov 1 4.00 13-Nov 1 4.00

3 60.29 1 20.10 14-Nov 1 20.10 14-Nov 1 20.10

1 9.65 1 9.65 15-Nov 1 9.65 15-Nov 1 9.65

16 2.26 1 0.14 16-Nov 1 0.14 16-Nov 1 0.141 9.65 1 9.65 17-Nov 1 9.65 17-Nov 1 9.651 0.14 1 0.14 18-Nov 1 0.14 18-Nov 1 0.142 108.00 1 54.00 19-Nov 1 54.00 19-Nov 1 54.001 2.83 1 2.83 20-Nov 1 2.83 20-Nov 1 2.831 20.10 1 20.10 21-Nov 1 20.10 21-Nov 1 20.101 0.14 1 0.14 22-Nov 1 0.14 22-Nov 1 0.142 690.00 1 345.00 23-Nov 1 345.00 23-Nov 1 345.001 5.54 1 5.54 24-Nov 1 5.54 24-Nov 1 5.541 34.00 1 34.00 25-Nov 1 34.00 25-Nov 1 34.001 30.77 1 30.77 26-Nov 1 30.77 26-Nov 1 30.771 5.98 1 5.98 27-Nov 1 5.98 27-Nov 1 5.982 22.77 1 11.39 28-Nov 1 11.39 28-Nov 1 11.394 71.60 1 17.90 29-Nov 1 17.90 29-Nov 1 17.901 343.00 1 343.00 30-Nov 1 343.00 30-Nov 1 343.001 434.00 1 434.00 1-Dec 1 434.00 1-Dec 1 434.001 0.24 1 0.24 2-Dec 1 0.24 2-Dec 1 0.241 1.81 1 1.81 3-Dec 1 1.81 3-Dec 1 1.811 4354.00 1 4354.00 4-Dec 1 4354.00 4-Dec 1 4354.001 34.00 1 34.00 5-Dec 1 34.00 5-Dec 1 34.001 343.00 1 343.00 6-Dec 1 343.00 6-Dec 1 343.001 34.00 1 34.00 7-Dec 1 34.00 7-Dec 1 34.001 34.00 1 34.00 8-Dec 1 34.00 8-Dec 1 34.001 34.00 1 34.00 9-Dec 1 34.00 9-Dec 1 34.001 6.00 1 6.00 10-Dec 1 6.00 10-Dec 1 6.001 7.00 1 7.00 11-Dec 1 7.00 11-Dec 1 7.00

20 100.00 1 5.00 12-Dec 1 5.00 12-Dec 1 5.005 153.86 1 30.77 13-Dec 1 30.77 13-Dec 1 30.77

10 128.36 1 12.84 14-Dec 1 12.84 14-Dec 1 12.84

Total weight

Page 9: Control Log Sheet DAP2

5 29.89 1 5.98 15-Dec 1 5.98 15-Dec 1 5.9820 130.57 1 6.53 16-Dec 1 6.53 16-Dec 1 6.531 76.00 1 76.00 17-Dec 1 76.00 17-Dec 1 76.001 75.00 1 75.00 18-Dec 1 75.00 18-Dec 1 75.001 34.00 1 34.00 19-Dec 1 34.00 19-Dec 1 34.001 43.00 1 43.00 20-Dec 1 43.00 20-Dec 1 43.003 92.32 1 30.77 21-Dec 1 30.77 21-Dec 1 30.776 76.75 1 12.79 22-Dec 1 12.79 22-Dec 1 12.793 17.94 1 5.98 23-Dec 1 5.98 23-Dec 1 5.98

12 78.34 1 6.53 24-Dec 1 6.53 24-Dec 1 6.531 26.38 1 26.38 25-Dec 1 26.38 25-Dec 1 26.382 22.95 1 11.47 26-Dec 1 11.47 26-Dec 1 11.471 5.98 1 5.98 27-Dec 1 5.98 27-Dec 1 5.984 21.51 1 5.38 28-Dec 1 5.38 28-Dec 1 5.381 54.00 1 54.00 29-Dec 1 54.00 29-Dec 1 54.001 34.00 1 34.00 30-Dec 1 34.00 30-Dec 1 34.002 10.00 1 5.00 31-Dec 1 5.00 31-Dec 1 5.001 54.00 1 54.00 1-Jan 1 54.00 1-Jan 1 54.002 46.00 1 23.00 2-Jan 1 23.00 2-Jan 1 23.001 435.00 1 435.00 3-Jan 1 435.00 3-Jan 1 435.002 86.00 1 43.00 4-Jan 1 43.00 4-Jan 1 43.00

Page 10: Control Log Sheet DAP2

Status Fabrication WorkWelding Painting Transportation to Site

Date Q'ty Weight Date Q'ty Weight Date

1 11-Nov 1 21.00 1-Nov 1 21.00 1-Nov2-Nov 1 23.00 2-Nov 1 23.00 2-Nov3-Nov 1 3.00 3-Nov 1 3.00 3-Nov4-Nov 1 4.00 4-Nov 1 4.00 4-Nov5-Nov 1 23.00 5-Nov 1 23.00 5-Nov6-Nov 1 43.00 6-Nov 1 43.00 6-Nov7-Nov 1 2.00 7-Nov 1 2.00 7-Nov8-Nov 1 4.00 8-Nov 1 4.00 8-Nov9-Nov 1 23.00 9-Nov 1 23.00 9-Nov

10-Nov 1 412.00 10-Nov 1 412.00 10-Nov

11-Nov 1 43.00 11-Nov 1 43.00 11-Nov

12-Nov 1 5.00 12-Nov 1 5.00 12-Nov

13-Nov 1 4.00 13-Nov 1 4.00 13-Nov

14-Nov 1 20.10 14-Nov 1 20.10 14-Nov

15-Nov 1 9.65 15-Nov 1 9.65 15-Nov

16-Nov 1 0.14 16-Nov 1 0.14 16-Nov17-Nov 1 9.65 17-Nov 1 9.65 17-Nov18-Nov 1 0.14 18-Nov 1 0.14 18-Nov19-Nov 1 54.00 19-Nov 1 54.00 19-Nov20-Nov 1 2.83 20-Nov 1 2.83 20-Nov21-Nov 1 20.10 21-Nov 1 20.10 21-Nov22-Nov 1 0.14 22-Nov 1 0.14 22-Nov23-Nov 1 345.00 23-Nov 1 345.00 23-Nov24-Nov 1 5.54 24-Nov 1 5.54 24-Nov25-Nov 1 34.00 25-Nov 1 34.00 25-Nov26-Nov 1 30.77 26-Nov 1 30.77 26-Nov27-Nov 1 5.98 27-Nov 1 5.98 27-Nov28-Nov 1 11.39 28-Nov 1 11.39 28-Nov29-Nov 1 17.90 29-Nov 1 17.90 29-Nov30-Nov 1 343.00 30-Nov 1 343.00 30-Nov

1-Dec 1 434.00 1-Dec 1 434.00 1-Dec2-Dec 1 0.24 2-Dec 1 0.24 2-Dec3-Dec 1 1.81 3-Dec 1 1.81 3-Dec4-Dec 1 4354.00 4-Dec 1 4354.00 4-Dec5-Dec 1 34.00 5-Dec 1 34.00 5-Dec6-Dec 1 343.00 6-Dec 1 343.00 6-Dec7-Dec 1 34.00 7-Dec 1 34.00 7-Dec8-Dec 1 34.00 8-Dec 1 34.00 8-Dec9-Dec 1 34.00 9-Dec 1 34.00 9-Dec

10-Dec 1 6.00 10-Dec 1 6.00 10-Dec11-Dec 1 7.00 11-Dec 1 7.00 11-Dec12-Dec 1 5.00 12-Dec 1 5.00 12-Dec13-Dec 1 30.77 13-Dec 1 30.77 13-Dec14-Dec 1 12.84 14-Dec 1 12.84 14-Dec

Page 11: Control Log Sheet DAP2

15-Dec 1 5.98 15-Dec 1 5.98 15-Dec16-Dec 1 6.53 16-Dec 1 6.53 16-Dec17-Dec 1 76.00 17-Dec 1 76.00 17-Dec18-Dec 1 75.00 18-Dec 1 75.00 18-Dec19-Dec 1 34.00 19-Dec 1 34.00 19-Dec20-Dec 1 43.00 20-Dec 1 43.00 20-Dec21-Dec 1 30.77 21-Dec 1 30.77 21-Dec22-Dec 1 12.79 22-Dec 1 12.79 22-Dec23-Dec 1 5.98 23-Dec 1 5.98 23-Dec24-Dec 1 6.53 24-Dec 1 6.53 24-Dec25-Dec 1 26.38 25-Dec 1 26.38 25-Dec26-Dec 1 11.47 26-Dec 1 11.47 26-Dec27-Dec 1 5.98 27-Dec 1 5.98 27-Dec28-Dec 1 5.38 28-Dec 1 5.38 28-Dec29-Dec 1 54.00 29-Dec 1 54.00 29-Dec30-Dec 1 34.00 30-Dec 1 34.00 30-Dec31-Dec 1 5.00 31-Dec 1 5.00 31-Dec

1-Jan 1 54.00 1-Jan 1 54.00 1-Jan2-Jan 1 23.00 2-Jan 1 23.00 2-Jan3-Jan 1 435.00 3-Jan 1 435.00 3-Jan4-Jan 1 43.00 4-Jan 1 43.00 4-Jan

Page 12: Control Log Sheet DAP2

REPORT NO : DR-001

Daily Manpower Fabrication Shop DATE : B107-Dec-13

LILAMA 69-1 SAW Operator

IINSPECTION ITEM PROJECT : DAP Lao cai Fitter

JOB NO : F-032

DAILY REPORT PLANT : Lao cai Province, Vietnam

SIGNATURE

INSPECTION NOTICE NO : SUBCONT CONTRACTOR CUSTOMER

CUSTOMER'S INSPECTOR : B107-Dec-13 B107-Dec-13 B107-Dec-13

CONTRACTOR'S INSPECTOR :

SUBCONTRACTOR :

Today's weather : Sunny

Temperature Humidity

Morning Afternoon48%

I Manpower Equipment Material & Crane

No Description Quantity Description Quantity Description Quantity

1 Superintendent 10 Forklift Truck 7 ton 0 Bridge Crane 10.T 0

2 Supervisor 0 CNC Gas Cutting Machine 0 Bridge Crane 20.T 0

3 QC 0 Gas Cutting Machine 0 Bridge Crane 5T 0

4 Safety Supervisor 0 Grinder 0

5 Store Keeper 0 Arc Welding Machine (6 T.) 0

6 Welding Foreman 0 CNC Drilling Machine 0

7 Fitter Foreman 10 Sawing Machine 0

8 SAW Operator 0 Drilling Machine 0

9 Fitter 0 AUTO Welding Machine 0

10 Driller 0 Painting Machine 0 ###

11 Welder 0

12 Painter 0

16oC 26oC