Page 1: Control System and Software Engineering Process Elder Matias 2006-05-31

Control System and Software Engineering Process

Elder Matias

2006-05-31

Page 2: Control System and Software Engineering Process Elder Matias 2006-05-31

Development Approach

• Based on CLS Beamline Development Guide– Derived from APS approach

• System and Software Engineering Approach– Moving towards use of automated tools and mainstream

software engineering processes (unified process)– Extensive use of P&ID drawings and requirements

documents for requirements capture– P&ID are partially based on the American Instrumentation

Society Standards

• Once a beamline is into the construction stage, the system analyst and scientists iterate and evolve the system

Page 3: Control System and Software Engineering Process Elder Matias 2006-05-31

Development Approach

Inception Elaboration Construction Transition

Requirements Analysis Design Implementation Test

Unified Process

Core Workflows In Each Phase

- Establish Feasibility- Establish Business/Scientific Case- Capture Essential Requirements- Identify Critical Risks- Establish initial budget & schedule

Deliverables (as required):- Project Plan- Risk Assessment- Initial Requirements (10-20%)

Requirements: - Refine System ScopeAnalysis: - Establish what to buildDesign:- Create an ArchitectureImplementation- Build an architecture baseline- Build any prototypesTest- Test the architecture baseline- Test any prototypes

Deliverables (as required):- PID Drawings- Wiring Diagrams- Updated Requirements Document- System breakdown

Requirements: - Uncover missing requirementsAnalysis: - Finish the analyis Design:- Finish detailed designImplementation- Build and install the systemTest:- Test and ring-out the system

Deliverables (as required):- Running System

- Correct any defected- Provide support for commissioning - Prepare final documentation

Deliverables (as required):- Final documentation- Working system

CLSI System (Beamline) Engineering Process

ProposalConceptual

DesignPreliminary

DesignDetailedDesign

Build Commissioning

Page 4: Control System and Software Engineering Process Elder Matias 2006-05-31

Project Phases

Page 5: Control System and Software Engineering Process Elder Matias 2006-05-31

Background

• SAL was established in 1964, the control system has evolved along the way

• With the CLS project In 1999 the design architecture changed to:– EPICS (from Lucid and other custom software)– Linux and RTEMS (from NeXT, SunOS, BSD)– Momentum and S7 PLC (from Micro84 & TSX)– VME Hardware (from CAMAC)

Page 6: Control System and Software Engineering Process Elder Matias 2006-05-31

Background (cont.)

• Standards:– CNSC C-138 – Provides guidance on control

software under CLS operating license– IEC 61508 – For Systems Important to Safety– Canadian Electrical Code – For Control

Hardware and Electrical Installations– Codes of conduct and practice - for ISP (Comp.

Sci/Software Eng.) and P. Eng (Elec. Eng. …) certified/licensed staff

Page 7: Control System and Software Engineering Process Elder Matias 2006-05-31

Major Projects

• Phase I and Accelerator Operational Support• Phase II beamlines• CANARIE Remote Access• Infrastructure

– VME Monitor Program Upgrade (Russ, Neil J. + Intern)– CS-Studio Tree Explorer (Glen W. + Intern)– Data Acquisition Program Upgrade (Glen W, & Ru)– Next Generation Motor Control (Mike M. & Tony W.)

• Upgrades– Diagnostics Kicker, X-ray BPM and time resolve (Johannes)– Linac Gun &RF (Neil J. & Hao)– Linac ACIS System (Robby)– Replace remaining pre-1980 controls (Hao + summer student)

Page 8: Control System and Software Engineering Process Elder Matias 2006-05-31

Moving Forward

• Current CLS Control System– Built on a common design (circa 2000 and 2002)– Homogonous – Common structure and design across the facility– Built on 6 years of EPICS experience – Built on SAL (30 years) of accelerator and nuclear physics science

• Critical Questions– Does it represent best industry practice?– How can we improve quality (scientific capability and the user experience)?– How can we improve efficiency?– Is it safe and ethical?

• How Do We Answer These Questions?– Collectively (cross-disciplinary)– Open to new ideas and methods– Invite people from inside/outside of EPICS to help us….– Invite people from inside/outside synchrotrons to help us…– Built on our in-house experts…– Decisions to change are technically driven with backup (ECR)– Exploit automation to reduce costs and increase reliability

• Shift in approach, from just-in-time make-it-workbuilding well designed, structured reusable applicationssupport highly configurable applications configured just-in-time

Page 9: Control System and Software Engineering Process Elder Matias 2006-05-31

VLANs for: each beamline, machine control, development, office, visitors

VME Crate

(Reflective Memory)

MicroStep

EROCIOC

RTEMS

FieldDev. RS-232

Devices

OPI

Linux

IOCStep Controller

RTEMS

Motors

MicroStep

OPI

Linux

OPI

Linux

Touch PanelOPI Linux

NetworkServer

(bootp, dhcp,auto restore)

Linux

DataArchiveServer

Linux

AlarmServer

MS-Win

MS-SQLServer

MS-Win

PowerEdgeIOC

Linux

PS BoardsIOC

RTEMS

PowerSupplies

EROCIOC

RTEMS

FieldDev.

EthernetDevices

PLC & GPIB

FieldDev.

MagnetsMotors

1GigBridge

IOC

Linux

FieldDev.

ProfibusPLC

System Architecture (3.0)

Page 10: Control System and Software Engineering Process Elder Matias 2006-05-31

Network

Office

Gateway

MS-SQL

50

BAOPI

AlarmPrinter

OPI

IOC

IOC

IOC

PLC

OPI

IOC

IOC

Server Subnet

Office Subnet

Beamline BBeamline A

Main Control Subnet