control4reuse presentation kickoff 20190205 · 3 background water scarcity wastewater reuse today...
TRANSCRIPT
![Page 1: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/1.jpg)
Control4ReuseJPI Water project 2018-2022
![Page 2: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/2.jpg)
2
Content
● Background● Project Vision● Partners●Output●Objectives● Implementation●Work packages●Work plan● Organisation● Activities so far
![Page 3: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/3.jpg)
3
Background
●Water scarcity●Wastewater reuse● Today - wastewater treatment and
use of water two separate systems
![Page 4: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/4.jpg)
4
Project Vision● Integration of wastewater treatment and end-uses● Treated water not a waste but a resource● Quality and quantity of treated water can be adjusted to meet requirements of
specific end-uses
![Page 5: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/5.jpg)
5
Partners
Project partners●Mälardalen University (MDH), Västerås Sweden- project coordinator● Laboratory of Environmental Biotechnology (LBE) INRA- Narbonne France● Federal University of Ceará (UFC) –Brazil
Associated partners● ECOFILAE (private company), France- LBE● GEAU and IEM (academia, experimental site of Murviel Les Montpellier), France-LBE● City community of 'Grand Narbonne' (about 130 000 inhabitants), France- LBE● Water and Wastewater Engineering group of the Aalto University, Finland- UFC● The Finnish Consulting Group (FCG), Finland- UFC● Companhia de Água e Sgoto do Ceará) CAGECE, Brazil-UFC
![Page 6: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/6.jpg)
6
Outputs
● Contribute to the promotion of closed water cycle in society and industry/agriculture● Evaluation of several scenarios for optimizing water management● publications of results in international conferences and in peer-reviewed journals● platform for knowledge exchange among different communities and for stimulating
the generation of new and innovative ideas
![Page 7: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/7.jpg)
7
Objectives
● Objective 1: Characterization of the integrated reuse systems.● Objective 2: Implementation of a framework for simulation.● Objective 3: Optimization of the integrated systems.
![Page 8: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/8.jpg)
8
Implementation - Work packages
●WP1: System simulation platforms●WP2: Optimal estimation and control●WP3: Fault detection methods and evaluation indexes●WP4: Implementation/evaluation of control strategies ●WP5: Project management and dissemination
![Page 9: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/9.jpg)
9
WP1: System simulation platforms
● leader: Laboratory of Environmental Biotechnology (LBE) ● Characterizing the water requirements for reuse● Selection of models of treatment and plant/culture growth● Coupling of the models into one simulation platform
![Page 10: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/10.jpg)
10
WP2: Optimal estimation and control
● leader: Federal University of Ceará (UFC) ●Understanding the dynamics of both treatment and reclamation systems●Definition of framework for analysis and control of integrated WWT and agriculture
reclaiming water systems
+
-
![Page 11: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/11.jpg)
11
WP3: Fault detection methods and evaluation indexes● leader: Mälardalen University (MDH)● Introduction of realistic models of system and disturbance uncertainties●Development of fault detection methods to detect abnormal conditions in the process● Indexes for controller performance evaluation
![Page 12: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/12.jpg)
12
WP4: Implementation/evaluation of control strategies ● leader: LBE● Evaluation of different control strategies● Full-scale implementation of the simulation platform● Validation of plant cultivation on experimental sites
![Page 13: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/13.jpg)
13
WP5: Project management and dissemination
● leader: MDH● Project management, monitoring and communication●Knowledge transfer through conferences, scientific journals and workshops
![Page 14: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/14.jpg)
14
Implementation- work plan
![Page 15: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/15.jpg)
15
Implementation- OrganisationSteering Committee
Management team Dissemination team
Scientific team
MDH: E. ThorinLBE: J. HarmandUFC: F. Corona
MDH: E. ThorinLBE: J. HarmandUFC: F. Corona MDH: E. Thorin
LBE: J. HarmandUFC: F. Corona, M. MulasCAGECE: S. Porto PereiraECOFILAE: N. Condom
MU: N. Ait MouhebGNUC: F. EtchebarneFCG: H. HaimiAALTO: R. Vahala, A. Mikola
MDH: E. ThorinLBE: J. HarmandUFC: F. Corona
![Page 16: Control4Reuse presentation kickoff 20190205 · 3 Background Water scarcity Wastewater reuse Today -wastewater treatment and use of water two separate systems](https://reader034.vdocument.in/reader034/viewer/2022052000/6011d5bde0088579a720b870/html5/thumbnails/16.jpg)
16
Activities so far
● First meeting● Kick-off planned● PhDs and postdocs in position or on the way (LBE and MDH)● the experimental site of Murviel Les Montpellier being instrumented