Building : QC 2
Attendee :
PMC
ANC
Sr Description of balance work Photograph/Remark
Lift lobby 1
Floor
excess cable terminal at celing cove
finishing arround trap door mirror and ceiling juntion neaten
WallGRC All : Background normal touch up required
GRC and mirror junction to be properly treated and cleaned
Ceiling
Clean ceiling fixtures
Neaten finish around ceiling fixtures
Lift lobby 2
Floor
Wall
GRC All : Background normal touch up required
neaten swiis brown marble to ceiling juntion
GRC and mirror junction to be properly treated and cleaned
mirror to ceiling juntion cleaning
spot at mirror p7
finishing arround trap door
Ceiling
Clean ceiling fixtures
Neaten finish around ceiling fixtures
Sprinkler not flush in ceiling
1.8 Corridor
Tile chip to be properly treated and replayed where ever
camea balance at ceilingcrack tile found at stair case 1. door
Finishing required above skirting
skirting edge damage at many location
skirting not in one line at stir case 1,2
Clean ceiling fixtures
Neaten finish around ceiling fixtures
Wall paint touch to be done
20mm gap found at nos of 1,2,3,4 metal doors
23th FLOOR DE SNAG LIST (Finishing works only)
Dhiren Barot , Anil Vaniya
Arafat,Siji,Chandran
-
8/13/2019 Copy of 23th Floor de Snag Lists
2/5
finishing arround metal door 1,2,3,4
finishing arroungd trap door
marble chip arround glass door 1,
2.4 Corridor
Neaten grout finish at floor tile
colour variation at granite floor marble
Clean ceiling fixturesNeaten finish around ceiling fixtures
chip to be properly treated and cleaned
Ceiling fixturce not in one line
Service lift lobby
grout balance at top of lift architrave to marble juntion
skirting short at woodan door architrave at internal side
granite floor marble colour variation
floor tile offset and colour variation
Clean ceiling
Ceiling to channel junction gap visible
major gap ss architrave to wall marble granite juntion
door varnish touchup
Dustproof strike not installed
Excess gap between timber architrave to wall tile
Excess tile cutting above elc. Room
finish required at band beam
Disabled Toilet
chip tile to be treated and cleaned
Shadow line groove is uneven - needs to be finished properly
Paint incomplete / Blotchy finishRemove paint from ceiling fixtures
sqrew hole found at door frame
Excess gap between timber architrave to wall tile
tile damage at architrave
PVC corner guard proper finish balance
Elecrical room
Remove paint from services
Internal shaft - door not installed
metal door frame grouting balance
Paint touch up blalance
Toilet no 1Vestibule
finishing above skirting
Clean ceiling fixtures
Touch up balance
Neaten finish around ceiling fixtures
door varnish touchup
Excess gap between timber architrave to wall
Janitor
-
8/13/2019 Copy of 23th Floor de Snag Lists
3/5
-
8/13/2019 Copy of 23th Floor de Snag Lists
4/5
Floor balance
Excess gap between timber architrave to wall tile
Toilet no 2
Vestibule
finishing above skirting
Clean ceiling fixtures
Touch up balanceNeaten finish around ceiling fixtures
door varnish touchup
Excess gap between timber architrave to wall
Janitor
chip tile treated and cleaned
door varnish touchup
Incomplete installation of ceiling fixtures
Undulation at Ceiling finish
ceiling Touch up balance
Excess gap between timber architrave to wall tile
Male
2 tlie damage at urinal unit near
PVC garud damage at 3 location
1 tile damge at w/c near wall
Health facoat around grout balance
red paint touchup arround puss plate
Urinal near 1 tile damage
chip tile treated and cleaned
door varnish touchup
wall tile colour variation
Undulation around trap doorCeiling to wall joint junction groove paint balance
Ceiling Cove- finishing work incomplete
Clean ceiling fixtures
pvc corner guard band
bottel trap not in alignment
wall tile colour variation
Excess gap between timber architrave to wall tile
Toilet paper holder , Hand drier , Soap dispenser , Paper dispenser
, Waste paper bin etc are not installed
Female
1 nos tile wall damage
4 nos tile big offset at wall
PVC corner guard damage
mirror damage at bottom
final paint touch up balance
floor tile damage at floor trap
wall tiledamage at w.c
chip to be properly treated and cleaned
door architrave damage
-
8/13/2019 Copy of 23th Floor de Snag Lists
5/5
improper finish above mirror
pvc corner guard band
Ceiling to wall joint junction groove paint balance
Finishing work incomplete at top of mirror
Ceiling Cove- finishing work incomplete
Ceiling undulation
door varnish touchupClean ceiling fixtures
Excess gap between timber architrave to wall tile
Toilet paper holder , Hand drier , Soap dispenser , Paper dispenser
, Waste paper bin etc are not installed
Store room
Plaster balance at back wall of shaft (partly balance)
2 nos shaft 12 m2x 12 m2)
= 24m2 plaster balance.
Floor balance
Wall paint touch up balance
Romove paint from ceiling services
Grouting of metal frame is balance
Extra room
Floor balance
Paint balance
plaster at back wallof shaft(partly balance)
Excess gap between timber architrave to wall tile
Shaft floor balance All shaft
Tenant area
Remove plastic from slab soffit
Sanding/Grinding required at offset at slab soffitStair case 1 & 2