corning, harrodsburg energy reduction initiatives

12
CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

Upload: gordon

Post on 04-Jan-2016

25 views

Category:

Documents


1 download

DESCRIPTION

CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES. ENERGY SAVINGS HISTORY. 2008 - Established Energy Management Team Year kwh(eq) $ ‘08 159,000 7,300 ‘09 3,750,000 178,000 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

CORNING, HARRODSBURG

ENERGY REDUCTION INITIATIVES

Page 2: CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

2008 - Established Energy

Management Team

Year kwh(eq) $ ‘08 159,000 7,300‘09 3,750,000 178,000 ‘10 8,680,000 442,000‘11 7,620,000 404,606‘12 4,530,000 223,300

ENERGY SAVINGS HISTORY

Page 3: CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

ITEM KWH REDUCTION $-HEATED PULSE AIR 290,000 16,000FOR BAG HOUSE -N2 COMP TURNDOWN 760,000 41,800-FREE COOLING 1,380,000 75,900-LIGHTING RETROFIT 460,000 25,300-ALL TANKS SAME PA 1,820,000 100,100-SHUT DOWN N2 COMP 4,050,000 222,800-ADJUST BOILER SETPTS 760,000 41,800-BATCH DUST FAN 240,000 13,200-HI-EFF CHILLER 610,000 33,600-HI-EFF DRYER 130,000 7,100

FUTURE-ENERGY 1,135,000 KWH(eq) 22,600 @RECOVERY 3,763,000 FT3 NG $6/MCF

SOME ENERGY SAVING

PROJECTS

Page 4: CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

ENERGY RECOVERY

How much energy can we recover, how much will it cost,

and how much will it save?

Using waste energy to produce steam

Page 5: CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

TEST UNIT

Melter

Inlet Isolation gate

Outlet Isolation gate

Fan outlet gate

Heat Exchanger

FanSteam

A

B

C

D

Main duct slide gate

Floor above melter

E

Water

Page 6: CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

OBJECTIVES and KEY LEARNINGS

OBJECTIVES – Prove that we can utilize energy in the melter exhaust without negative impact on melting - Determine the impact of scale - Establish relationship between gas flow rate and performance LEARNINGS-We can do this with no negative impact-Scale formation will be an issue-Performance appears to be related to flow rate-Getting all the energy to the HX is going to be a challenge

Page 7: CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

OBJECTIVES – Prove that we can utilize energy in the melter exhaust without negative impact on melting - Determine the impact of scale - Establish relationship between gas flow rate and performance LEARNINGS-We can do this with no negative impact-Scale formation will be an issue-Performance is related to flow rate-Getting all the energy to the HX is going to be a challenge

OBJECTIVES and KEY LEARNINGS

Page 8: CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

How much steam do we need?

Recently, during the coldest days, the York-Shipley and the 2 Claytons were operating at 50%, 38%, and 52% respectively. That’s 150, 133, and 182 bhp or a total of about 15 million BTU/hr.

We should be able to reclaim be about 5 million BTU/hr.

Replacing the plant’s 18 steam heaters (during cold weather, consume nearly 4,500,000 BTU/hr), would reduce peak demand to 10.5 million BTU/hr. In the winter we would have to augment with the boilers . However, in an average year, we could leave the boilers shut down for about 8 ½ months.

Page 9: CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

HEAT RECOVERY SUMMARY

Total available steam energy up to 132 bhp

At 132 bhp the gas reduction would be 37,600 MCF/yr. At $6.00/MCF, savings would be $225,000/yr

Estimated cost- $85,000/unit or $595,000 for 7 units

Simple Payback – 2.6 yrs.

Current gas price is near the historical low. The 2009 peak was over $15/MCF. At that price, savings = $564,000/yr and simple payback = 1.05 yrs or about 13 months.

Page 10: CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

Motors, Compressors and Fans

NITROGENGenerator capacity of 55,000 scfh was based on nitrogen consumption when it was ordered. Since then, numerous process improvements have led to significant reductions in consumption to less than 35,000 scfh. So we were venting 17,000 scfh to atmosphere.

However, by turning the compressor down to the point where it becomes unstable and then back up to maintain an acceptable safety margin (about 40,000 scfh), the compressor power dropped by 166 kw.

(166kw)(730 hrs/mo)($.o6/kwh)=$7270/monthor about $87,000 per year.

Cost to implement - “zero”

Page 11: CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

Motors, Compressors and Fans

OXYGENA similar compressor turn down on the oxygen generator yielded savings of about $94,000 per year.

Cost to implement – “zero”

POLLUTION ABATEMENT We have two systems, each capable of carrying about ¾ of the total possible plant load. During periods of light load, we can use a x-connect to send all exhaust into either bag house. During extended “light load” conditions this saves over $9,000/month or $110,000/yr.

Cost to install X-connect: $63,000Simple payback: 7 months

Page 12: CORNING, HARRODSBURG ENERGY REDUCTION INITIATIVES

Corning’s Global Energy Management Group

Corning Incorporated recoups ~70% of what it pays to NYSERDA (New York State Energy Reduction Development Agency) via grants for energy reduction projects.

Corning dedicates significant amounts of time and resources to complete grant applications and monitor progress.

Many companies lack the resources required to submit grant applications and execute major energy reduction projects but still must pay NYSERDA fees.