corot : 27th scientific committee€¦ · 27th scientific committee : 2008/03/14 durations of the...
TRANSCRIPT
1/ 1
COROT : 27th Scientific Committee
2
27th Scientific Committee : 2008/03/14
Mission History and planning
D E1 E2
2007
IRa01 SRc01
LRc01 LRa01 SRa01
J F M A M J J A S O N D J F M A M J J
LRc02
Ear
ly O
per
atio
ns
443 days
Templates E2
DPU1 SET
REVEX
LV LVLV SAA limitsupdated
3
27th Scientific Committee : 2008/03/14
Current Mission Status
■Satellite : Nominal behavior■GPS anomalies:
3 events 01/02/2007, 19/07/2007, 29/01/2008 No impact on the mission
■Instrument : nominal behavior except SET on DPU1 in January 08 Faulty Ecartometry data using Corot ID 2503 during SRa01
operations■Ground segment :
Corot Control Center : Nominal Corot Mission Center : Nominal Ground stations : See further details
4
27th Scientific Committee : 2008/03/14
Single Event Transient (SET) : January the 18th
■What ? Physical reset of DPU1 probably due to Proton impactduring SAA crossing■When ? Friday, the 18th of January at 22:45:57 UT (LRa01)■OBS Services & Processings restarted Tuesday, the 22th of
January at 14:37:41 UT
5
27th Scientific Committee : 2008/03/14
CMC
■Corotsky : OMP data update V2.4 : 2008/02/01 => Exo Stars (AP) added for SRa01 (NGC 2264
cluster) V2.5 : 2008/03/12 => update of fields
6
27th Scientific Committee : 2008/03/14
Ground Stations
■Kiruna / Aussaguel (TTCET) stations Loss of TM packets (HKTMR, PLTM1) 3 main events in 2007 :
• SKRN01 Oct, 10th : 7h of loss due to a physical locking of the antenna : during Pointing andoperations for LRa01 => no impact on the mission
• SAUS01 Oct, 19th and 28th : 2 loss of 3 h each due to faulty electronic TMHD board => missionimpacted only at the 2nd failure
• SKRN01 Nov, 11th: one loss of 14h00 due to a new physical locking of the antenna => missionimpacted. Corrected by new SW version installed beg. Of December at the station.
Beg. Of 2008• Use of the « TTCET kit» at KIRUNA since 08/03/10
■ALC station Main events in 2007:
• power supply,• tracking limits (elevation) increased from 10 to 15° above horizon,
Main events beg. of 2008• New procedure for the initialization (Demodulator error)
Good CNES-INPE I/F has been set up at fall of 2007■VGS Station :
Down linking tested once a week
7
27th Scientific Committee : 2008/03/14
Ground Stations : Passes Loss - Packets Loss
LRa01
LRc01
SRcO1
IRa01
RUN
42856
68640
15500
18821
Total Nb ofpasses
PacketLoss
PassesLoss
KirunaKiruna
21803LRa01
28401LRc01
6600SRc01
11600IRa01
Total Nb ofpasses
PacketLoss
PassesLossRUN
AussaguelAussaguel
26535LRa01
4781211LRc01
10150SRc01
16305IRa01
Total Nbof passes
PacketLoss
PassesLossRUN
AlcantaraAlcantara
8
27th Scientific Committee : 2008/03/14
TM Loss for each RUN
0%
1%
2%
3%
4%
IRa01 SRc01 LRc01 LRa01
Percentage of missing telemetry packets per run
PLTM1
HKTM
PLTM2
1,34%
9
27th Scientific Committee : 2008/03/14
Acquisition of Seismology data : LRa01
LRA01
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
22/10/2007
02/11/2007
13/11/2007
24/11/2007
05/12/2007
16/12/2007
27/12/2007
07/01/2008
18/01/2008
29/01/2008
09/02/2008
20/02/2008
02/03/2008
PLTM1
PLTM2
Spec
10
27th Scientific Committee : 2008/03/14
DURATIONS of the OBSERVATIONSOBS Durations
58
28
157
92
26
55
28
157
137
24
58
26
152
87
24
55
26
142
132
24
0
20
40
60
80
100
120
140
160
180
IRa01 SRc01 LRc01 LRa01 SRa01
days
A1
A2
E1
E2
LR : 150 days
SR : 20 days
10
41
151
142 133
92
128
41
New Exo Templates
SET DPU1
11
27th Scientific Committee : 2008/03/14
Status of Current RUN : SRa01
■Pointing : r.a. 101.04°, dec. 9.02°, roll 2.31°=> End Date (Corotsky block 1607.1) = 08/03/31
■Scientific Services & Processing started A1 : 2008/03/05 at 22:39 UT A2 : 2008/03/07 at 12:56 UT E1, E2 : 2008/03/07 at 22:30 UT Exo Oversampling (the 500 brighest stars) : 2008/03/10 at 12:07 UT Update of Astero Masks : 2008/03/12 at 17:00 UT
■Upload of specific Astero windowing + CCD acquisitionwindow to be done 26th of March => to investigate why ID 2503provided faulty Ecartometry data■End of SRa01 expected 31st of March (almost 24 days of
observation for E1)
12
27th Scientific Committee : 2008/03/14
Orbit Plan Inclination■Goal : to decrease the RA of the ascending node in order to recenter the
Corot eye around future interesting fields■Target : - 4°/year during 2 years : TBC
Evolution de l'ascension droite centrée pour Corot
13,93
14,03
14,13
14,23
14,33
14,43
14,53
14,63
14,73
14,83
14,93
15,03
27/12/2006 05/02/2007 17/03/2007 26/04/2007 05/06/2007 15/07/2007 24/08/2007 03/10/2007 12/11/2007 22/12/2007 31/01/2008
Date
Ascen
sio
n d
roit
e (
deg
)
13
27th Scientific Committee : 2008/03/14
Evolution de l'Ascension Droite du Noeud Ascendant de l'orbite COROT
en fonction de l'amplitude de la manoeuvre d'inclinaison d'avril 2008
0,00
2,00
4,00
6,00
8,00
10,00
12,00
14,00
16,00
18,00
01/04/2008 01/10/2008 01/04/2009 01/10/2009 01/04/2010 01/10/2010 01/04/2011 01/10/2011 01/04/2012
Date
RA
AN
da
ns
J2
00
0 (
de
g)
Di = 0.00 deg
Di = -0.05 deg
Di = -0.10 deg
Di = -0.125 deg
Di = -0.15 deg
Di = -0.175 deg
Di = -0.20 deg
Dérive 4° / anpendant 2 ans
Graphique SB/MS (Philippe Gamet)
14
27th Scientific Committee : 2008/03/14
Operations scheduled in April 08
■SRa01 End of SRa01 : 08/03/31
■Orbit Plan Inclination Maneuvers Inertial Pointing + Transition in VLE_PBS + 1st OCM2 Maneuver : 08/03/31 Calibration by TAS based on 1st Maneuver : 08/04/01 (Orbit restitution) + maneuver programming + thrusts executions : once set
of activities each day from 08/04/02 to 08/04/05 (saturday) Reversal Pointing towards waiting attitude (Sun constraint) : 08/04/05 Inertia Pointing + Last Maneuver : 08/04/07 Orbit restitution : 08/04/08
■Payload SW upload (V500) from 08/03/31 to 08/04/04
■Pointing and Ops for LRc02 from 08/04/09 to 08/04/15 (at the latest)
■Start of LRc02 (EXO) : 08/04/15
15
27th Scientific Committee : 2008/03/14
The Next RunsOBS Durations
0
20
40
60
80
100
120
140
160
SRa01 LRc02 SRc02 SRa02 LRa02
Days
Série1
Série2
Série3
Série4
16
27th Scientific Committee : 2008/03/14
CNES LAM
LESIA
IAS
N1A
larm
N2
N0
N1AlarmN1Alarm
Oversampled list
CoIs & GIs
N1r
eady
forN
2
N1 Alarm Production at CNES :Mid of May