corporate presentation july
TRANSCRIPT
Corporate Presentation
2010
07-13-10
2
Disclaimer
The material that follows is a presentation of general background information about MPX Energia S.A. and its subsidiaries
(collectively, “MPX” or the “Company”) as of the date of the presentation. It is information in summary form and does not purport
to be complete. No representation or warranty, express or implied, is made concerning, and no reliance should be placed on, the
accuracy, fairness, or completeness of this information.
This presentation may contain certain forward-looking statements and information relating to MPX that reflect the current views
and/or expectations of the Company and its management with respect to its performance, business and future events. Forward
looking statements include, without limitation, any statement that may predict, forecast, indicate or imply future results,
performance or achievements, and may contain words like “may”, “plan”, “believe”, “anticipate”, “expect”, “envisages”, “will likely
result”, or any other words or phrases of similar meaning. Such statements are subject to a number of risks, uncertainties and
assumptions. We caution you that a number of important factors could cause actual results to differ materially from the plans,
objectives, expectations, estimates and intentions expressed in this presentation. In no event, neither the Company, any of its
affiliates, directors, officers, agents or employees nor any of the placement agents shall be liable before any third party (including
investors) for any investment or business decision made or action taken in reliance on the information and statements contained
in this presentation or for any consequential, special or similar damages.
This presentation does not constitute an offer, or invitation, or solicitation of an offer, to subscribe for or purchase any securities.
Neither this presentation nor anything contained herein shall form the basis of any contract or commitment whatsoever.
Recipients of this presentation are not to construe the contents of this summary as legal, tax or investment advice and recipients
should consult their own advisors in this regard.
The market and competitive position data, including market forecasts, used throughout this presentation were obtained from
internal surveys, market research, publicly available information and industry publications. Although we have no reason to believe
that any of this information or these reports are inaccurate in any material respect, we have not independently verified the
competitive position, market share, market size, market growth or other data provided by third parties or by industry or other
publications. MPX, the placement agents and the underwriters do not make any representation as to the accuracy of such
information.
This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or
in part without MPX’s prior written consent.
623 avgMW
from Pecém
and Itaqui
sold in the
A-5 auction
4Q07
IPO:
USD 1.1 billion
3Q08
Construction
works at
Pecém begin
276 avgMW
from Pecém
II sold in the
A-5 auction
Acquisition
of mining
rights in
Colombia
Construction
works at Itaqui
begin
Construction
works at
Pecém II begin
Agreement
with Evonik
signed
MPX
Colombia: 1st
resource
report
Acquisition of
participating
interest in
Parnaiba Basin
LT financing Pecém
and Itaqui : 1st
disbursement
1Q08
1Q09
2Q09
3Q09
4Q09
1Q10
Parnaíba: 1.7 Tcf of
natural gas
contingent
resources certified
MPX Colombia:
Business Plan for
20 Mty integrated
mining system
1.7 billion tons
in potential coal
resources
MPX Energia: Recent History
Power plants under construction
4
MPX ItaquiMPX Itaqui
Installed
Capacity
(MW)
Energy sold
(avgMW)Term of PPA EPC progress1 Start-up date
Energia Pecém * 720 615Jan 2012-
Dec 202769,9%
Jul 2011/Oct
2011
MPX Pecém II 365 276Jan 2013-
Dec 202854,5% Jun 2012
MPX Itaqui 360 315Jan 2012-
Dec 202768,2% Oct 2011
* Energia Pecém is a 50/50 partnership between MPX and EDP.1May/10.
Energia PecémEnergia Pecém MPX Pecém IIMPX Pecém II
Itaqui
5
Itaqui
Pecém I & II
7
Pecém I & II
8
Pecém I & II
9
MPX Parnaíba power generation system
Licensing: Environmental Impact Study for up to 1,863 MW filed andPublic Hearing completed
Engineering project designed to accomodate different technologyconfigurations (combined/open cycle and engines)
Drilling in the Capinzal block started: results expected in Sep/10
MPX Sul
MoU for EPC contract signed
Energy can be sold in free market or 2010 A-5 auction
10,000 MW licensed by end of 2010
MPX Açu: 2,100 (coal) + 3,300 (gas)
MPX Parnaíba: 1,863 MW (gas)
MPX Sul: 600 MW (domestic coal)
MPX Chile: 2,100 MW (coal)
Greenfield power generation projects
11
World-Class Mining Assets + EfficientLogistics
1.7 billion tons in potencial coal resources
3 open-cast and 1 underground mine
2.0 Mty *2.0 Mty *
0.7 Mty *0.7 Mty *
3.5 Mty *3.5 Mty *
5.4 Mty **5.4 Mty **
Mty: MM tons/year
* 65% Dispatch
** 90% Dispatch
Estimated coal
demand from
MPX’s power
plants
MPX Colombia: Integrated Mining System
Production Output Ramp-up in current concessions (Mty)
An additional 5 Mty should come from new areas in La
Guajira and other Departments
MPX Colombia - Uses & Sources
12
Total Capex USD 1.709 M
Debt 1 USD 1.234 M
Cash Generation USD 220 M
Total Equity USD 254 M
Certified and potential resources
Underground mining in San Juan
Railroad capacity: 15 Mty
Port capacity: 15 Mty
0.5
1.7
3.3
4.9
6.4
8.0
10.0
12.0
13.5
15.0
-
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Mty
9 2357 63
4163
32
83
216
273
232
385
172201
116
0
50
100
150
200
250
300
350
400
2010 2011 2012 2013 2014 2015 2016 2017 2018
US
D M
Equity Capex
STAGE 1+2
Equity Needs* and Capex Disbursement Curve
Coal Production Ramp-up Stage 1+ 2
(1) Considers Equity/Debt ratio of 30/70 for mining
and 25/75 for infrastructure investments.
(*) Excluding cash generation reinvested
MPX Port
Presentation of project to local communities underway
Environmental Impact Study underway
ERM-Environmental Resources Management acting as consultant to MPX
Filing foreseen for 2H10
Environmental license foreseen for 1H11
Open-cast mines
Mining plan underway
Environmental Impact Study underway
Filing foreseen for 2H10
Underground mine
6 boreholes to be carried out until year-end
MPX Colombia – next steps