CORPORATE PROFILE WWW.MIE-ENERGY.COM All of the information and presentation material, including text, images and usage of logos , is either the property of, or used with permission by MAJU INTEGRATED ENGINEERS SDN BHD (ENERGY DIV.) - MIE. The information may not be distributed, modified, displayed or reproduced without the prior written permission from MIE. 2020 MAJU INTEGRATED ENGINEERS SDN BHD (MIE) (ENERGY DIVISION) 491172 -T ENERGY DIV. MAJU INTEGRATED ENGINEERS

Upload: others

Post on 28-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

CORPORATE PROFILE

WWW.MIE-ENERGY.COM

All of the information and presentation material, including text, images and usage of

logos , is either the property of, or used with permission by MAJU INTEGRATED

ENGINEERS SDN BHD (ENERGY DIV.) - MIE. The information may not be distributed,

modified, displayed or reproduced without the prior written permission from MIE.

2020

MAJU INTEGRATED ENGINEERS SDN BHD (MIE)

(ENERGY DIVISION) 491172 -T

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 2: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

MAJU INTEGRATED ENGINEERS SDN BHD (MIE) was incorporated in 1999 and started as one

of Malaysia’s premier civil, structural, mechanical and electrical works for buildings and

infrastructures services.

In 2014, MIE set up a new division known as MIE-Energy Div. (MIE-Energy) towards diversifying

the business to penetrate energy sector, such as Oil & Gas (Upstream and Downstream),

Renewable Energy, Subsea, Power Plant and Technology R&D industries, apart from boosting

young local talent in creating a multi-disciplinary engineering services in the said industries.

Serving the sector for more than a decade, MIE-Energy proudly stands as a local unique

MALAYSIAN company that provides project efficiency delivery across project lifecycles, from

concept to final project delivery engineering solutions.

With integrated local expertise, joint-venturing, partnership as well as collaboration with

international partners, it drives us to become one of the comprehensive superiors to deliver

practical performance solutions to our clients for their asset reliability, quality, safety and

economics.

INTRODUCTION

WWW.MIE-ENERGY.COM

ENERGY DIV.MAJU INTEGRATED ENGINEERS

2017

MANHOURS

ACHIEVEMENT

350k manhours within 3

years of establishment

(Energy Division) and

expanded to more than 60

employees

2014

MIE – ENERGY DIV.

New division setup called as

MAJU INTEGRATED

ENGINEERS – ENERGY

DIVISION, with a vision to

boost the oil and gas market

sector

1999

INCEPTION INTO

MARKET

Incorporated in 1999 and

started as Malaysia’s Premier

Civil, Structural, Mechanical

& Electrical for Buildings &

Infrastructure

2015

INTERNATIONAL

Secured international

projects in Thailand and

Singapore

2020

PRESENT

• Securing major contracts

from reputable clients and

has grown up to over 250

employees

• Established footprint in

South East Asia (SEA) i.e.

Thailand, Indonesia,

Singapore and Vietnam

TO-DATE

WITHOUT LOST-TIME INJURIES

750THOUSAND

SAFE

MANHOURS

OUR

VALUES & BELIEF

Empowering the excellentUnleash the true potential of our talent in

delivering exceptional result.

Mutual RespectEnables our people to work across functions and

at all levels in unlocking and maximizing

opportunities.

IntegrityUphold the values of integrity in innovating

creative solutions without compromising people,

environment, assets and reputation.

Page 3: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

ABOUT US – OUR GROUP

WWW.MIE-ENERGY.COM

MAJU INTEGRATED ENGINEERS SDN BHD (MIE)

MIE OFFSHORE SOLUTIONS SDN BHD (MOFS)

• ENGINEERING SERVICES FOR ONSHORE & OFFSHORE

(Concept Select, Feasibility/Basic Engineering, Conceptual Study, FEED &

Detailed Design Engineering)

• BROWNFIELD & GREENFIELD PROJECTS

ENERGY DIV.

• PROJECT MANAGEMENT, PROCUREMENT SERVICES, 3D LASER SCANNING,

MINOR CONSTRUCTION, TRANSPORTATION & INSTALLATION (T&I) , HOOK-

UP & COMMISIONING (HUC), DECOMMISSONING, JACK-UP DRILLING RIG

SERVICES, WELL PLUG & ABANDONMENT, TECHNOLOGY/R&D & MANPOWER

SUPPLY

• ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION & HOOK-UP &

COMMISSIONING, 3D LASER SCANNING, PROVISION OF CHOKE VALVE SUPPLY

& TECHNOLOGY/R&D.

THAILAND OFFICE:

117/12, Moo1, T.TAKIENTA

A.BANGLAMUNG, CHONBURI

20150, THAILANDMIE ENGINEERING SOLUTIONS CO., LTD.

(THAILAND REGISTERED COMPANY)

PARTNERSHIP

UNIVERSITY INDUSTRIAL PARTNERTHAILAND & MYANMAR UNITED STATES OF AMERICA

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 4: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

OUR SERVICES

WWW.MIE-ENERGY.COM

FEASIBILITY STUDY / CONCEPTUAL

FEED / DETAILED DESIGN

PROCUREMENT / FABRICATION

INSTALLATION / HOOK UP & COMMISSIONING

OPERATION / MAINTENANCE SUPPORT / PLANT

SHUTDOWN

DECOMMISSIONING / WELL ABANDONMENT

JACK-UP RIG SUPPLY

LASER SCANNING SERVICES

OUR GROUP OFFERS :

• Innovative Design, Supplied & Project

Solutions

• Creative Solutions

• Quality Deliverables

• Strategic Planning / Thinking

• Cost Effective Solutions

• Highest Safety Requirement

Topside | Substructure | Subsea | Floaters | Petrochemical | Refinery | Power Plant

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 5: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

OFFICE LOCATION

WWW.MIE-ENERGY.COM

Head Quarters & MIE Design Offices

BUSINESS EXPANSIONfrom 4 to 6-wing office (HQ)

BANDAR TASIKSELATAN

T4-2-2, TOWER 4, MAJU LINK, JALAN LINGKARAN TENGAH 2 (MRR2), 57100 BANDAR TASIK SELATAN, KUALA LUMPUR(MIE-ENERGY DIV HQ)

179

KERTEH

LOT 50080, TINGKAT ATAS,JALAN KEMAMAN-DUNGUN, KAMPUNG BARU,24300 KERTEH, KEMAMANTERENGGANU(KERTEH OFFICE)

32LOT 1463&1464, JALAN MACHINDA, LUTONG, 98100, MIRI,SARAWAK(MIRI OFFICE)

MIRI

37KOTA KINABALU

BLOCK NO. F, LOT 1,1ST FLOOR, LINTAS JAYA SHOP LOT,88300 DISTRICT OF PENAMPANGSABAH(KK OFFICE)

10

BINTULU

LOT 7668, 3RD FLOOR, BLOCK 31, KEMENA LAND DISTRICT, 97000, BINTULU, SARAWAK(BINTULU OFFICE)

15

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 6: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

CORPORATE TEAM

WWW.MIE-ENERGY.COM

ENERGY DIV.MAJU INTEGRATED ENGINEERS

HEAD OF PROJECTS & ENGINEERING

Ir. AZAN ZAINUDDIN

FINANCE DEPARTMENT

MOHD HAFIZ MOHD SHUIB

HR/ADMIN DEPARTMENT

SAZREEN MOHAMED HUSSEIN

MIE ENGINEERING SOLUTIONS CO. LTD

(THAILAND)

SUPAPON SAE-BE

ENGINEERING DEPARTMENT

Ir. WAN AZHAR WAN MOHAMAD

CHIEF OPERATING OFFICER

Ir. AHMAD NAZWAN MAT ZIN

MANAGING DIRECTOR

Ir. MAT JUSOH MAMAT

PROJECT MANAGEMENT DEPARTMENT

Ir. MOHAMAD SETH FARABI ISMAIL

PROJECT SERVICES DEPARTMENT

SAIFUL ADLI MOHAMAD

COMMERCIAL, CONTRACT & PROPOSAL DEPARTMENT

RAINANI JAMALODIN

QHSE DEPARTMENT

REZA SYAHRUZZAMAN MOHAMED

CORPORATE & BUSINESS SUPPORT

NABILA FAEQA SALIM

IT DEPARTMENT

SYUKRI HAKIM ABDUL RAHMAN

SATELLITE OFFICE(DOMESTIC – MALAYSIA)

KERTEH

MIRI

BINTULU

KK

MIE OFFSHORE SOLUTIONS SDN BHD

Ir. AHMAD NAZWAN MAT ZIN

PLANNING DEPARTMENT

WAN MOHD IFTITAHWAN KAMAL

QHSSE DEPARTMENT

REZA SYAHRUZZAMAN MOHAMED

Page 7: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

PROJECT EXPERIENCES

CLIENTELE

More than 30

International market penetration

Through partnership, collaboration & joint-venture

CONTRACTSAWARDED

Brownfield & Greenfield

368

Onshore & Offshore

More than

Page 8: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

OUR CLIENTELE

WWW.MIE-ENERGY.COM

HALLIBURTON BAYAN PETROLEUM

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 9: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

OUR LICENSE & CERTIFICATE

WWW.MIE-ENERGY.COM

STANDARDISED WORK AND EQUIPMENT CATEGORIES (SWECs)

ISO 9001:2015

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 10: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

ENERGY DIV.MAJU INTEGRATED ENGINEERSOUR SOFTWARE

WWW.MIE-ENERGY.COM

Discipline Software

Process Engineering

HYSIS ICON Petronas

PIPESIM

FlareNet

Piping Engineering

AVEVA PDMS Naviswork

CAESAR II SmarPlant 3D

AutoCAD

ZWCAD

Mechanical Engineering

TANK SolidWorks

PVelite AnSYS

HTRI

Electrical EngineeringETAP

EDSA

Instrumentation Engineering Instrument Calculation (InstruCalcs)

Intools (Smart Plant Instrumentation)

Structural / Naval

Architecture Engineering /

Civil

SACS Executive Bentley Openroad

BOCAD Tedds

MOSES Orion

STAAD Pro Prota

Tedds S-Frame

MX Road Profesional Bentley Power Civil

Miduss 98

Pipeline EngineeringAutoPIPE Mathcad

Orcaflex Offpipe

Project ManagementMicrosoft Project 2016

Primavera Enterprise P3e

Page 11: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

GREENFIELD EXPERIENCEONSHORE

WWW.MIE-ENERGY.COM

BASIC ENGINEERING DESIGN FOR EFFLUENT MANAGEMENT AT SOURCE (EMAS) PROJECT

• EMBARK ON A DEVELOPMENT OF BASIC ENGINEERING DESIGN FOR EFFLUENT MANAGEMENT AT SOURCE PROJECT TO TREAT OILY

WATER AND MEET REGULATORY LIMIT TO IER 2009 STANDARD “A”.

• SG. UDANG, MELAKA

• YEAR 2019

• 45,000 MANHOURS

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 12: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

GREENFIELD EXPERIENCEONSHORE

WWW.MIE-ENERGY.COM

ENGINEERING DESIGN SERVICES FOR PROPOSED

MODIFICATION TO EXISTING EXPANDABLE POLYSTRYENE

(EPS) AND TAMOL PLANT

• TOTAL CONVERSION FROM EXISTING EPS PLANT INTO

POLYMER DISPERSION PLANT

• PASIR GUDANG, JOHOR, MALAYSIA

• REACTOR, VESSEL, AGITATORS, TANK FARMS AND NEW

DELUGUE SYSTEM

• YEAR 2014

• 35,000 MANHOURS

ENGINEERING OF GASIFIER STEAM BOILER

RENEWABLE ENERGY PLANT

• NEW BUILD DESIGN FOR GASIFIER STEAM

BOILER RENEWABLE ENERGY POLYMER

PLASTIC PARK

• KERTEH, MALAYSIA

• YEAR 2014

• 55,000 MANHOURS

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 13: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

GREENFIELD EXPERIENCEOFFSHORE

WWW.MIE-ENERGY.COM

PROVISION OF CONCEPTUAL & PRE-FEED

STUDY FOR LARAK & BAKONG WHP FOR

SK408 FIELD DEVELOPMENT

• UNMANNED WELLHEAD PLATFORM

• SARAWAK, MALAYSIA

• TOPSIDE : 475 MT

• SUBSTRUCTURE : 1,100 MT

• 80 MTRS WATER DEPTH

• YEAR 2015

PROVISION OF CONCEPTUAL FOR BAKONG

PRODUCTION PLATFORM FOR SK408 FIELD

DEVELOPMENT

• 6-LEGGED CPP

• SARAWAK, MALAYSIA

• TOPSIDE : 3,500 MT

• SUBSTRUCTURE : 1,800 MT

• 85 MTRS WATER DEPTH

• YEAR 2015

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 14: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

BROWNFIELD EXPERIENCEOFFSHORE & ONSHORE

WWW.MIE-ENERGY.COM

UMBRELLA CONTRACT ENGINEERING SERVICES FOR FACILITIES IMPROVEMENT PROPOSAL (FIP) & PLANT CHANGE

• 3 YEARS + 1 YEARS (OPTIONAL) EXTENSION : YEAR 2018 TILL 2022

• COVERAGE LOCATION : KL/MELAKA/KERTEH/KEMAMAN/GEBENG/GURUN/MIRI/BINTULU/ KOTA KINABALU

• ANY OF BROWNFIELD ENGINEERING SERVICES FOR ALL PETRONAS ASSET FOR PROJECT SERVICES, FEASIBILITY STUDY/BASIC, FEED,

DETAILED DESIGN AND OTHER SPECIALIZED ENGINEERING (FOR ONSHORE & OFFSHORE)

• ESTIMATED MORE THAN 2.0M MANHOURS THROUGHOUT CONTRACT DURATION

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 15: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

BROWNFIELD EXPERIENCEONSHORE

WWW.MIE-ENERGY.COM

PROVISION FOR ENGINEERING SERVICES FOR PLANT MODIFICATION AND IMPROVEMENT PROJECT FOR

PETRONAS GAS BERHAD, PETRONAS CHECMICAL ETHLYNE SDN BHD, PETRONAS CHEMICAL POLYETHYLENE SDN BHD &

PETRONAS PENAPISAN (TERENGGANU) SDN BHD.

• 3 YEARS + 2 YEARS (OPTIONAL) EXTENSION : YEAR 2015 TILL 2020

• COVERAGE LOCATION : KERTEH/KEMAMAN/GEBENG (TERENGGANU/PAHANG)

• ANY OF BROWNFIELD ENGINEERING SERVICES FOR ALL PETRONAS ASSET FOR PROJECT SERVICES, FEASIBILITY STUDY/BASIC, FEED,

DETAILED DESIGN AND OTHER SPECIALIZED ENGINEERING (FOR ONSHORE)

• ESTIMATED MORE THAN 1.0M MANHOURS THROUGHOUT CONTRACT DURATION

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 16: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

BROWNFIELD EXPERIENCEONSHORE

WWW.MIE-ENERGY.COM

PROVISION OF ENGINEERING DESIGN

TECHNOLOGY FOR SPENT CAUSTIC TREATMENT

UNIT PROJECT.

• DETAILED DESIGN ENGINEERING AND

TECHNOLOGY LIAISON (MERICHEM, USA)

• RAYONG, THAILAND

• YEAR 2016

• 20,000 MANHOURS

ENGINEERING DESIGN FOR SELECTIVE CATALYST

REDUCTION (SCR) SYSTEM FOR WHRU 3508-F01

PROJECT

• REDUCE NOx EMISSION FROM EXISTING WHRU 3502F01

LOCATED IN PTT RAYONG GAS SEPARATION GAS

SEPARATION. (100PPM@7% O2 (existing value) to

40PPM @7% O2 due to Law Regulation

• RAYONG, THAILAND

• YEAR 2017

• 10,000 MANHOURS

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 17: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

BROWNFIELD EXPERIENCEOFFSHORE

WWW.MIE-ENERGY.COM

ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISIONING FOR BENTARA WELLHEAD PLATFORM

REINSTATEMENT

• PLATFORM RE-INSTATEMENT/RE-ACTIVATION

• MIE HAD CARRIED OUT ALL SERVICES (PMT, Engineering, Laser Scanning, Procurement, Construction Engineering, Offshore

Hook-Up & Commissioning) IN-HOUSE

• SARAWAK, MALAYSIA

• AUG 2017 TO AUG 2018

• 150,000 MANHOURS (W/O LTI FOR ALL SCOPES)

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 18: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

BROWNFIELD EXPERIENCEOFFSHORE

WWW.MIE-ENERGY.COM

PROVISION OF STRUCTURAL ENGINEERING

SERVICES

• STRUCTURAL BROWNFIELD ENGINEERING

WORKS FOR ALL REPSOL PM-3 ASSET

• TERENGGANU, MALAYSIA

• 1-YEAR CONTRACT (2018 – 2019)

• 150,000 MANHOURS

UMBRELLA CONTRACT FOR PROVISION OF DESIGN,

ENGINEERING AND CONSULTANCY SERVICE FOR D35,

D21 AND J4 FIELDS

• BROWNFIELD & GREENFIELD ENGINEERING DESIGN

CONTRACT

• SARAWAK, MALAYSIA

• 2 YEARS + 1 YEARS (OPTIONAL): (2019 TO 2021)

• 500,000 MANHOURS

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 19: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

BROWNFIELD EXPERIENCEOFFSHORE

WWW.MIE-ENERGY.COM

PROVISION OF ENGINEERING & DETAILED

DESIGN FOR J4 & D21 SIMULTANEOUS

PRODUCTION DRILLING (SIPROD)

• D21JT-A:3 SLOT, J4DP-A:11 SLOT INFILL

DRILLING ENGINEERING

• SARAWAK, MALAYSIA

• YEAR 2016

• 40,000 MANHOURS

PROVISION OF ENGINEERING FOR D35DP-A

FACILITIES MODIFICATION AND WELL TIE-IN FOR

CTU DRILLING ACTIVITIES

• WELL WORKOVER ON D35DP-A FOR PHASE 1

PROJECT DEVELOPMENT, SIPROD INFILL

ENGINEERING

• SARAWAK, MALAYSIA

• YEAR 2015

• 25,000 MANHOURS

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 20: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

BROWNFIELD EXPERIENCEOFFSHORE

WWW.MIE-ENERGY.COM

PROVISION OF ENGINEERING SERVICES FOR

EAST BELUMUT INFILL DRILLING PROJECT

• 7 NOS OF INFILL DRILLING WELLS WITH DECK

EXTENSION

• TERENGGANU, MALAYSIA

• YEAR 2015

• 15,000 MANHOURS

PROVISION FOR PIPELINE REHABILITATION WITH IN-

FIELD (IFL) TECHNOLOGY FOR PETRONAS CARIGALI

(PL-234)

• NON-METALLIC PIPELINE REHABILITATION

(RTP/TCP/IFL) IS CHOSEN FOR CAPEX AND TOTAL

LIFE CYCLE COST COMPARED TO CARBON STEEL

REQUIREMENT

• SARAWAK, MALAYSIA

• YEAR 2018

• 8,000 MANHOURS

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 21: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

BROWNFIELD EXPERIENCEOFFSHORE

WWW.MIE-ENERGY.COM

PROVISION OF AS-BUILTING EXERCISE AND

STRUCTURAL GLOBAL ANALYSIS FOR PM323

AND PM329

• AS-BUILT FOR ALL DISCIPLINE AND

STRUCTURAL GLOBAL ANALYSIS

• TERENGGANU, MALAYSIA

• PM323: BEL-A, CHR-A, WB-A, TG-A

• PM329: EPA-CPP, EPA-WHP

• 2 YEAR CONTRACT (2015 – 2017)

• 300,000 MANHOURS

PROVISION FOR CONCEPTUAL OF SAND

REMOVAL AND DISPOSAL SYSTEM AT DUYONG

FOR PETRONAS CARIGALI SDN BHD

• SAND REMOVAL TECHNOLOGIES FOR

COMPARATIVE ASSESSMENT BETWEEN THE

OPTIONS

• TERENGGANU, MALAYSIA

• YEAR 2015

• 5,000 MANHOURS

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 22: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

BROWNFIELD EXPERIENCEOFFSHORE

WWW.MIE-ENERGY.COM

EPCIC OF DEEP DRAWN BOOSTER

COMPRESSION PILOT PROJECT AT ARTHIT

PLATFORM

• BOOSTER COMPRESSOR FOR AWP3 PLATFORM

• THAILAND

• YEAR 2014

• 15,000 MANHOURS

PROVISION OF ENGINEERING MODIFICATION

UPGRADE FOR EARLY PRODUCTION VESSEL

(EPV) AT BALAI CLUSTER

• FACILITIES UPGRADE MODIFICATION DUE TO

RELOCATION OF EPV TO BENTARA CLUSTER

FROM BALAI CLUSTER

• SARAWAK, MALAYSIA

• YEAR 2014

• 15,000 MANHOURS

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 23: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

MARINE & NAVAL ARCHITECH EXPERIENCEOFFSHORE

WWW.MIE-ENERGY.COM

PROVISION OF DEMOBILISATION SERVICES FOR MOPU-SATU AND MOPU-DUA

• DECOMMISSIONING/DEMOBILISATION OF MOPU-SATU & MOPU-DUA TO APPROVED LAYING AREA IN JOHORE DUE TO

PLATFORM ABANDONMENT BY CLIENT

• TERENGGANU, MALAYSIA

• YEAR 2016

• PREPARATION OF DE-INSTALLATION ENGINEERING & PROCEDURE INCLUDING OPERATION SUPPORT

• 7,500 MANHOURS

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 24: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

MARINE & NAVAL ARCHITECH EXPERIENCEOFFSHORE

WWW.MIE-ENERGY.COM

PROVISION OF MOORING ENGINEERING SERVICES

FOR TEMBIKAI OILFIELD

• MOORING ENGINEERING SERVICES FOR

PLATFORM SUPPORT VESSEL (PSV) AT TEMBIKAI

PLATFORM DURING HUC CAMPAIGN

• TERENGGANU, MALAYSIA

• YEAR 2015

• 5,000 MANHOURS

PROVISION OF ENGINEERING FOR BELIDA FPSO

PROJECT

• BELIDA FPSO PROJECT INSTALLATION ENGINEERING

• INDONESIA

• YEAR 2017

• 6,000 MANHOURS

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 25: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

CONSTRUCTION ENGINEERING EXPERIENCE

OFFSHORE

WWW.MIE-ENERGY.COM

PROVISION OF FABRICATION ENGINEERING

AND AS-BUILT FOR HOST TIE-IN AT KNDP-A

• STRUCTURAL FABRICATION / SHOP DRAWING

(IFC), MTO, NDE, GA, ERECTION DRAWING,

NESTING & CUTTING PLAN

• SABAH, MALAYSIA

• 2015

• 12,000 MANHOURS

PROVISION OF FABRICATION SUPPORT (SHOP

DRAWING) FOR CONSTRUCTION OF NEW LAB

AND MATERIALMAN ROOM AT BEKOK-A

PLATFORM

• ALL DISCIPLINES SHOP DRAWING /(IFC) FOR

MATERIALMAN LABS AT BEKOK-A

• TERENGGANU, MALAYSIA

• YEAR 2014

• 4,000 MANHOURS

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 26: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

3D LASER SCANNINGOFFSHORE & ONSHORE

WWW.MIE-ENERGY.COM

3D LASER SCANNING & CONSTRUCTION

DRAWINGS FOR MEP-A AND SAP-A NAG

• 3D LASER SCANNING & CONSTRUCTION

ENGINEERING

• SARAWAK, MALAYSIA

• YEAR 2016

• 15,000 MANHOURS

3D LASER SCANNING & 3D MODEL UPDATE FOR

SHELL BUKOM PLANT

• 3D LASER SCANNING & SP3D MODEL

COMPLETE (INTELLIGENT 3D MODEL)

• SINGAPORE

• YEAR 2017

• 8,000 MANHOURS

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 27: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

SPECIALIZED ENGINEERING

WWW.MIE-ENERGY.COM

FLOW ASSURANCE STUDY FOR TEMBIKAI GAS

DEVELOPMENT

• PIPELINE TRANSIENT ANALYSIS FOR 12” X

58KM FWS PIPELINE FROM TEMBIKAI WHP TO

BERANTAI FPSO

• TERENGGANU, MALAYSIA

• YEAR 2017

PROVISION OF FEA ANALYSIS FOR FLARE STACK

ASSESSMENT STUDY

• DAMAGED FROM SEVERE CORRODED FLARE TOWERS FOR

3 NOS OF FLARE STACK

• TERENGGANU, MALAYSIA

• ANSYS SOFTWARE

• YEAR 2015

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 28: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

SPECIALIZED ENGINEERING

WWW.MIE-ENERGY.COM

ENGINEERING ANALYSIS FOR STEAM TURBINE

INDUCE VORTEX STUDY

• INDUCE VORTEX STUDY FOR FEA & CFD

ANALYSIS

• TERENGGANU, MALAYSIA

• ANSYS & SOLIDWORK SOFTWARE

• YEAR 2017

PROVISION OF CFD ANALYSIS FOR STEAM INLET

DISTRIBUTOR

• CFD & FEA ANALYSIS FOR STEAM INLET DISTRIBUTOR

• TERENGGANU, MALAYSIA

• ANSYS SOFTWARE

• YEAR 2016

ENERGY DIV.MAJU INTEGRATED ENGINEERS

Page 29: CORPORATE PROFILE 2020 - MIE-ENERGY · 2020. 5. 21. · CORPORATE PROFILE All of the information and presentation material, including text, images and usage of logos , is either the

WWW.MIE-ENERGY.COM

ENERGY DIV.MAJU INTEGRATED ENGINEERS

MAJU INTEGRATED ENGINEERS SDN BHD(ENERGY DIVISION)

T4-2-2, Tower 4, Level 2, Maju Link,

Jalan Lingkaran Tengah 2 (MRR2),

57100 Bandar Tasik Selatan, Kuala Lumpur.

MALAYSIA

TEL: +603-9054 5071

FAX: +603-9054 3402

Email: [email protected]

www.mie-energy.com